Market Shifts: New Infrastructure in the Northeast

Similar documents
Natural Gas Pipeline Expansion Activity

Northeast Drives US Basis Trends

NORTHEAST GAS MIDSTREAM

U.S. Natural Gas Markets Where Is It All Going to Go?

The Appalachian Basin

Increasing Industrial Demand As Easy (or not) as 1, 2, 3

Wyoming Pipeline Authority Public Meeting. Anne Swedberg, Manager, North American Power and Gas Content

NEXUS Gas Transmission

Spectra Energy: Moving Ahead, Gaining Momentum

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

Business Development Outlook. Paul Smith Director, Business Development

We ve Seen This Movie Before

Natural Gas Issues and Emerging Trends for the Upcoming Winter and Beyond

CBIA Energy Conference Natural Gas- Coming to Your Neighborhood Soon October 10, 2013 Cromwell, Connecticut Michael Dirrane Director, Northeast

East Tennessee Natural Gas. Shipper Meeting. Fox Den Country Club Knoxville, TN April 20, 2017

Panel: Re-plumbing the North American Gas Transmission Grid 2.0

Western US Natural Gas Supply & Demand Outlook

Winter U.S. Natural Gas Production and Supply Outlook

Platts NGLs Conference. September 24, 2013

Impact of Shale Gas on Transmission

Regional Gas Market Update

2017 Annual Seaview Customer Meeting. SEAVIEW RESORT, Galloway, NJ May 4, 2017

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

Winter U.S. Natural Gas Production and Supply Outlook

The Energy Consortium Recent Developments and the Outlook for Natural Gas in the Northeast. John R. Bitler October 20, 2010

Natural Gas Outlook and Drivers

Natural Gas Market Update

North American Midstream Infrastructure Through 2035 A Secure Energy Future. Press Briefing June 28, 2011

Oil. Gas. Market Notes. North American Natural Gas Market Outlook Year-End 2014: A View to Contents

STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION

CenterPoint Energy Services. Current Market Fundamentals June 27, 2013

Tennessee Gas Pipeline Co, L.L.C. Northeast Energy and Commerce Association September 27, 2012

Energy and commodity price benchmarking and market insights

Western Oklahoma Residue Takeaway Impact of Growing SCOOP/STACK Supply

I Saw Miles and Miles of Texas

CERI Commodity Report Natural Gas

Energy Market Fundamentals Update

2018 Industry Outlook. Pipeliners Association of Houston

Greg Hathaway Energy Source Holdings, LLC

Gas s Pipeline to Sustainability:

C9-19. Slide 1. markets later in the presentation.

East Coast Projects Overview

OIL AND GAS OUTLOOK: HOW ARE THE ENERGY MARKET AFFECTING METALS? Nicole Leonard, Project Manager, Oil & Gas Consulting Services November 2015

Joyce Turkaly, Director Natural Gas Market Development

North America Midstream Infrastructure through 2035: Capitalizing on Our Energy Abundance

EIA Short-Term Energy and Winter Fuels Outlook

STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

IAF Advisors Energy Market Outlook Kyle Cooper, (713) , March 6, 2015

Outlook for Natural Gas Supply and Demand for Winter

Ohio Energy. Workshop J Big Changes Continue to Transform Natural Gas Market Midwest Hydrocarbon Infrastructure Developments

East Tennessee Natural Gas Customer Meeting. Hilton Head, South Carolina September 24, 2015

ENERGY WATCH Authors: Paul Flemming, Julia Criscuolo, Oliver Kleinbub, José Rotger and Scott Niemann

AEE New England New England Energy Update 1/6/2016. Tim Bigler Senior Market Strategist

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

Canton Ohio Regional Chamber 2018 Utica Midstream Seminar

Background Reports & Initiatives

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

Oil & Gas Production Monitor

North American Crude Oil and Natural Gas Too Much Too Soon!

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas

EXPORT DEPENDENCE: THE U.S. NATURAL GAS STORY

ENERGY OUTLOOK 2017 FALL/WINTER

CERI Commodity Report Natural Gas

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas

Natural Gas Market Update

Albany, NY December 1, Natural Gas Outlook. Presentation to: Northeast Power Coordinating Council (NPCC) General Meeting

Energy Market Outlook

Energy Market Outlook

GOVERNOR S ENERGY SUMMIT

TransCanada Natural Gas Pipelines As at December 31, 2017

Natural Gas Market Conditions; & Gas & Power In New England

IAF Advisors Energy Market Outlook Kyle Cooper, (713) , October 31, 2014

Energy Market Outlook Webinar. December, 2017

Vector Pipeline TM. Vector Pipeline. Customer Meeting Nashville, Tennessee September 21, 2017

Energy Market Outlook

Light Crudes and Condensates in Turmoil: Production, Exports, Splitters and Blending

Energy Market Outlook

Southeastern Ohio Oil and Gas Association Gas Committee Report July, 2013

ONTARIO ENERGY REPORT Q1 2015

Wachovia LNG Conference

The Impact of Recent Hurricanes on U.S. Gas Markets for the Upcoming Winter

Energy Market Outlook

Southeastern Ohio Oil and Gas Association Gas Committee Report June, 2013

AIChE: Natural Gas Utilization Workshop Overcoming Hurdles of Technology Implementation

October 23, 2018 Harrisburg, PA

Energy Market Outlook

Energy Market Outlook

Gas Infrastructure Trends and Impacts Downstream

TransCanada U.S. Pipelines Central ANR Pipeline, ANR Storage, and Great Lakes Gas

U.S. Shale Gas in Context

Outlook for Natural Gas Supply and Demand for Winter

UNDERSTANDING NATURAL GAS MARKETS. Mohammad Naserifard MSc student of Oil & Gas Economics at PUT Fall 2015

Natural Gas Market Update

Energy Market Outlook

CERI Commodity Report Natural Gas

Energy Market Outlook

Southeastern Ohio Oil and Gas Association Gas Committee Report April, 2015

WEST to EAST PIPELINE PROJECT

ROVER PIPELINE LLC. Rover Pipeline Project. RESOURCE REPORT 10 Alternatives. FERC Docket No. CP

Transcription:

Market Shifts: New Infrastructure in the Northeast Colette Breshears, Natural Gas & Infrastructure Intelligence April 5, 2017 info@genscape.com US: +1 502 583 3435 EU: +31 20 524 4089

Agenda Genscape who are we & who am I Where we ve been Swelling production in new areas of the country Dramatic price crash in 2014 Where we are and where we re going Production now on the rebound Demand growth Pipeline reversals and build-out shifting supply/demand balances What does this mean for Ohio? Rover, Leach XPress, NEXUS 2

Genscape: Data and Intelligence for Global Commodity and Energy Markets Spring Rock Produc/on Genscape is the originator of independently measured oil storage volumes, pipeline flows, refinery opera@ons, and power plant electricity output. Provides fundamentals-driven market intelligence Subscribers have access to cri@cal market data - Cushing Volumes 48 hours before EIA data - 30-min flow updates and real-@me alerts on key pipelines Founded in 2011, acquired by Genscape in April 2012 Detailed 5-year Natural Gas, Oil and NGL Produc@on forecasts for the U.S. and Canada Genscape s analy@cal forecas@ng arm Team that is rapidly growing, with various industry backgrounds ranging from petroleum engineers to traders 3

Supply Shift ð Infrastructure Shift info@genscape.com US: +1 502 583 3435 EU: +31 20 524 4089

Infrastructure Shifts: Supply Basins, Historically where we were Winter 2008/2009 Production (Bcf/d) ~60 Bcf/d 11 2.6 1 3.8 8.6 8.8 4.7 6.4 7.9 4.8 Oil +10 39 Source: Spring Rock 5

Infrastructure Shifts: Supply Basins, Historically where we were Winter 2008/2009 Production (Bcf/d) ~60 Bcf/d 11 2.6 1 3.8 8.6 8.8 4.7 6.4 7.9 4.8 Oil +10 39 Source: Spring Rock 6

Infrastructure Shifts: Supply Basins, Historically where we were EIA, 2008 7

Infrastructure Shifts: Demand Growth what changed Residential and Commercial Use Heating, Cooling, Cooking etc. Electric Generation Natural Gas fired power plants Supplanting coal and fuel oil plants Industrial and Chemical Use Metals, Plastics, Pharmaceutical Methanol generation Natural Gas Vehicles Very low demand source Mexican Exports Growth in all the same areas as the US Liquefied Natural Gas (LNG) Global export opportunities Population Growth Industrial Growth Export Growth 8

Infrastructure Shifts: Demand Growth what changed EIA, 2008 9

Infrastructure Shifts: Supply Basins, Now what changed Winter 2016/2017 Production (Bcf/d) ~79 Bcf/d 11.2 23.4.6 2.6 10.2 7.2 7.3 7.4 3.2 5.6 Oil +10 39 Source: Spring Rock 10

Infrastructure Shifts: Supply Basins, Now what changed Winter 2016/2017 Production (Bcf/d) ~79 Bcf/d 11.2 23.4.6 2.6 10.2 7.2 7.3 7.4 3.2 5.6 Oil +10 39 Source: Spring Rock 11

Infrastructure Shifts: Supply Basins, Now where we are Winter 2016/2017 Production (Bcf/d) ~79 Bcf/d 11.2 23.4.6 2.6 10.2 7.2 7.3 7.4 3.2 5.6 Oil +10 39 Source: Spring Rock 12

2014 price crash ð lingering effects 13 info@genscape.com Market Shifts: New Infrastructure US: in +1 the 502 Northeast 583 3435 EU: +31 20 524 2017, 4089 Genscape Incorporated. All rights reserved. 2016, Genscape Incorporated. All rights reserved.

With Price, Rigs Dropped Oil And Horizontal Rigs were at an all time high in Oct 2014; total rigs now recovering at levels last seen in Mar 2010 2000 Lower 48 Rigs 600 Total Rigs by Play 1600 1200 800 400 500 400 300 200 100 0 - Gas Oil Horizontal Permian Haynesville Marcellus/Utica Eagle Ford Bakken Source: Spring Rock, Rig Data 14

With Price, Rigs Dropped: Rigs (still) lost since October 2014-35 -4-226 -37-203 -48-36 -64 Out of 1,252 rigs dropped since October 2014, 724 rigs were horizontal (~58%) -28-23 -34 Oil -1,026-228 -15 +5-208 -25-16 Gas -226-19 Rig Count Change Since 10/24/14 Source: RigData, Spring Rock 15

With Price, Rigs Drop: Forecast for the lower 48 2000 1800 1600 1400 1200 1000 800 600 400 200 0 1674 Rigs 323 Rigs Forecast Peaking this summer after adding 386 rigs in a year At current forward prices Gas Rigs Oil Rigs Source: RigData, Spring Rock 16

With Rig Recovery, Production Recovers: Production forecast for 2017 2016 Yr/Yr Decline Vs. Expected 2017 Decline (MMcf/d) -25-19 -251 +121-527 +1,647-12 +3,340-358 2016 2017 +610 +786 +28-530 -22 +338-314 +300 +669 Oil +10 39 Lower 48 +735 +4,887 Associated Gas +914 +1,395 At current forward prices Data from 3/27/17 Source: Spring Rock 17

What does this mean for Ohio and the Utica? 18 info@genscape.com Market Shifts: New Infrastructure US: in +1 the 502 Northeast 583 3435 EU: +31 20 524 2017, 4089 Genscape Incorporated. All rights reserved. 2016, Genscape Incorporated. All rights reserved.

Infrastructure Shifts: Supply Basins, Now and Future Infrastructure is the balancing force between supply and demand Reversals: low-hanging fruit - almost all complete New Projects: greenfield pipelines and laterals Supplement reversals Development of new markets EPP, 2016 19

Infrastructure Shifts: What does this mean for Ohio? +14 Bcf! Project Name Owner Company Start Date State Status Capacity Northern Supply Access Project Boardwalk Pipeline Partners Apr-17 OH/IN/KY/TN/MS/LA Opera@ng 284 Rockies Express Pipeline (REX) Zone 3 Addi/onal Capacity Tallgrass Energy Partners May-17 OH/IN/IL Announced 150 ET Rover Pipeline Phase I - Supply Laterals and Mainline Energy Transfer Partners Jul-17 OH Under Early Construc/on 3,250 Access South Spectra Energy Nov-17 OH/MS Under Early Construc/on 320 Adair Southwest Project Spectra Energy Nov-17 OH/KY Under Early Construc/on 200 Appalachian Lease Project (TEAL) Phase 1 Spectra Energy Nov-17 OH EA/EIS Issued 638 ET Rover Pipeline Phase II - Michigan Market Segment Energy Transfer Partners Nov-17 OH/MI Cer/ficate Issued 1,300 Leach XPress Columbia Pipeline Group Nov-17 PA/OH/WV Under Early Construc/on 1,500 Lebanon Extension Project Spectra Energy Nov-17 OH/PA Under Early Construc/on 102 NEXUS Gas Transmission Spectra Energy Nov-17 OH/MI EA/EIS Issued 1,500 Abandonment and Capacity Restora@on Project Kinder Morgan Dec-17 OH/KY EA/EIS Issued - B-System Project Columbia Pipeline Group Sep-18 OH Pre-Filed TBD Central Corridor Pipeline Extension Duke Energy Sep-18 OH Announced 168 ANR East Project TransCanada Corpora/on Nov-18 OH/IN/MI Announced 2,000 Appalachian Lease Project (TEAL) Phase 2 Spectra Energy Nov-18 OH EA/EIS Issued 312 Gulf Coast and Midwest Market Access - SEML Modifica@on TransCanada Corpora@on Nov-18 OH/LA Open Season Completed 190 Gulf Coast and Midwest Market Access - Tie-Line Expansion TransCanada Corpora@on Nov-18 OH/MI/IN Open Season Completed 558 Gulf Coast and Midwest Market Access - Willow Run Horsepower Expansion TransCanada Corpora@on Nov-18 OH/MI Open Season Completed 140 Mountaineer Xpress Columbia Pipeline Group Nov-18 OH/PA/WV Filed 2,700 Sweden Valley Dominion Transmission Dec-19 OH/PA Announced 120 Buckeye XPress Columbia Pipeline Group Nov-20 OH Open Season Completed 700 Midwest Market Access Project (MMAP) TransCanada Corpora/on Nov-20 OH/IN Open Season 225 20

Infrastructure Shifts: Integration with Production Northeast production is extremely dependent on infrastructure export capacity - So much supply it can t escape However, production is still independent of capacity 28,000 More closely linked to local hub prices and 24,000 E&P Behavior 20,000 at 3/27/17 forward prices Incremental MMcf/d since mid 2014 16,000 12,000 8,000 Rock Springs Leidy Southeast Full Leidy Southeast Par@al OPEN Phase I 4,000 TEAM 2014 0 Jul-14 Sep-14 Nov-14 Jan-15 Produc/on Forecast vs.pipeline Expansions callouts represent significant projects, includes Genscape s es@mated start dates Mar-15 May-15 Jul-15 Lebanon West II AIM Sep-15 Nov-15 REX Z3 Expansion Jan-16 Mar-16 May-16 Jul-16 Sep-16 Nov-16 Jan-17 Northern Access 2016, Rover Phase 2 Leach XPress, Rover Phase 1 Gibraltar NEXUS Ohio Valley Connector Mar-17 May-17 Jul-17 Sep-17 Mountaineer, Empire North TEAL Nov-17 Atlan@c Sunrise MARC II Jan-18 Diamond East Mar-18 May-18 Cons@tu@on PennEast, Appalachia to Market Export, no demand Export + Demand Regional Produc@on Growth Jul-18 Sep-18 Nov-18 21

Infrastructure Shifts: What does this mean for Ohio? Rover Has Certificate Under Construction Stated In Service: July/November 2017 (our EISD currently November 17/March 18) Risk to stated date: High construction Capacity: 3,250 MMcf/d (Phase 1: 1.95 Bcf/d; Phase 2: 1.3 Bcf/d) Shippers: Ascent (1100), Antero (800), Range (400), Southwestern (200), Gulfport (150), EQT (150), Rice (100), Eclipse (100), unknown (100) Nexus Does not have Certificate Stated In Service: November 2017 (our EISD currently January 2018, moving out) Risk to stated date: High lack of FERC Quorum HUGE factor Capacity: 1,500 MMcf/d Shippers: Union Gas (150), Enbridge (150), Columbia Gas of Ohio (50), DTE Gas, DTE Electric, CNX, Noble, Chesapeake 22 Leach XPress Has Certificate Under Construction Stated In Service: November 2017 Risk to stated date: Medium-High Capacity: 1,500 MMcf/d Shippers: Kaiser Francis (400), Ascent (400), Range (300), Noble (200), Gulfport (100), Uncontracted (100) REX Zone 3 (online)

Infrastructure Shifts: Rover 23

Infrastructure Shifts: Challenges for Pipelines Permitting Federal: FERC, USACE State: DEQ, DEP, etc. County: Township City Landowner Protest and Legal Action Public Opinion Construction Eminent Domain Weather Supplies Protest and Legal Action $ $$ $$$$ 24 Source: FERC filings, Genscape flight

Fin Q&A Incremental MMcf/d since mid 2014 28,000 24,000 20,000 16,000 12,000 8,000 4,000 Leidy Southeast Par@al TEAM 2014 0 Jul-14 Sep-14 Leidy Southeast Full OPEN Phase I Nov-14 Rock Springs Jan-15 Produc/on Forecast vs. Pipeline Expansions callouts represent significant projects, includes Genscape s es@mated start dates Mar-15 May-15 Jul-15 Lebanon West II AIM Sep-15 Nov-15 REX Z3 Expansion Jan-16 Mar-16 May-16 Jul-16 Sep-16 Nov-16 Jan-17 Northern Access 2016, Rover Phase 2 Leach XPress, Rover Phase 1 Gibraltar NEXUS Ohio Valley Connector Mar-17 May-17 Jul-17 Sep-17 Mountaineer, Empire North TEAL Nov-17 Atlan@c Sunrise MARC II Jan-18 Diamond East Mar-18 May-18 Cons@tu@on PennEast, Appalachia to Market Jul-18 Sep-18 Nov-18 Export, no demand Export + Demand Regional Produc@on Growth 25

Closing Slide To follow up, request a free trial or learn more, visit: genscape.com/natural-gas-infrastructure-intelligence Contact Me: Colette Breshears Natural Gas & Infrastructure Intelligence cbreshears@genscape.com (best) 281-243-8322 Skype: cbreshears_1 AIM: colettebreshears@gmail.com USA Louisville Genscape, Inc. 1140 Garvin Place Louisville, KY 40203 Europe Amsterdam Genscape International, Inc. Damrak 20A 1012 LH Amsterdam The Netherlands info@genscape.com US: +1 502 583 3435 EU: +31 20 524 4089