SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

Similar documents
SECTION STORM DRAIN

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

SECTION EARTHWORK

SECTION TRENCHING

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

DIVISION 4100 SITEWORK

BID NO VOLUME II. Date Due: May 7, 2018 at 10:30am

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION FILL AND BACKFILL

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

SECTION 14 EMBANKMENT

SECTION EMBANKMENT

Appendix D General Earthwork and Grading Specifications for Rough Grading

SECTION UNCLASSIFIED EXCAVATION AND GRADING

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

C. Foundation stabilization for pipe and utility structures.

Union County Vocational - Technical Schools Scotch Plains, New Jersey

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION STRUCTURE EXCAVATION AND EARTHWORK

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION TRENCHING & BACKFILLING

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION ASPHALT CONCRETE

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION EXCAVATION AND FILL

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

Stanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma

A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

BASE CONSTRUCTION MATERIALS A Aggregate

SECTION SOILS REPORT

SECTION TRENCI-JING PART 1 GENERAL

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SHOP DRAWINGS SHALL INCLUDE A COMPLETE BILL OF MATERIALS FOR ALL REINFORCING STEEL, WHICH IS REFERENCED TO THE

Section 14 EARTHWORK, EXCAVATION, EMBANKMENT AND SUB-GRADE

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

SECTION BITUMINOUS CONCRETE PAVING

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SECTION GENERAL EXCAVATION

Construction Specification for General Excavation

EARTHWORK. C. Handling, storage, transportation, and disposal of excavated material

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

SECTION MAINTENANCE OF EXISTING CONDITIONS

Application for Right of Way Permit

Design and Construction Standards SECTION EARTHWORK

SECTION ASPHALT PAVING AND SURFACING

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION ASPHALT PAVING

Stabilizer Solutions, Inc. All Rights Reserved. Page 1 of 5

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

A. Work of this Section is affected by unit prices for earth moving specified in Section "Unit Prices."

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

DIVISION 2100 SITEWORK

APPENDIX "B" ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

A. Excavation consists of the removal of material encountered to subgrade elevations and the reuse or disposal of materials removed.

CITY OF ELIZABETHTON Building Department Excavations and Cuts Permit Application

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

SECTION TRENCH EXCAVATION AND BACKFILL

SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

DIVISION 2 - EARTHWORKS

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL

SECTION Section Excavation and Backfill For Structures Section Embedment and Base Course Aggregate

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

Base Course Design and Construction

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings.

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

B. Subsurface data is available from the *Owner. Contractor is urged to carefully analyze the site conditions.

SECTION EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Chapter 3: Permit Procedures and Requirements

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

SECTION 10 - TRENCHING AND BACKFILLING

SECTION EARTHWORK

CHAPTER 3 EXCAVATIONS

Transcription:

SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction of existing ground and fill. E. Preparation of subgrade for other improvements. F. Grading of soil. 1.2 RELATED SECTIONS A. Contract General Conditions and Division 1. B. Section 01 5000 Temporary Facilities. C. Section 31 11 00 Clearing And Demolition. D. Section 31 14 00 - Soil Materials. E. Section 31 23 00 - Trench Excavation and Backfilling. 1.3 WORK NOT INCLUDED IN THIS SECTION A. Trench Excavation and Backfilling: See 31 23 00. 1.4 REFERENCES A. ANSI/ASTM D1557 - Test Methods for Moisture-Density Relations of Soils and Soil Aggregate Mixtures Using 10 lb (4.54 Kg) Rammer and 18 inch (457 mm) Drop. 1.5 DEFINITIONS A. Utility: Any buried or above ground pipe, conduit, cable, associate device or appurtenances, or substructure pertaining thereto. 1.6 COORDINATION A. Coordinate work with Owner s personnel. CHILDREN S WATER PLAY AREA 31 20 00 PAGE 1

B. Verify that the location of existing utilities have been indicated at work site by utility authorities. 1.7 EXISTING UTILITIES A. Refer to Contract General Conditions. B. Where subsurface work involves more than the normal depth of excavation required for the removal and/or construction of surface improvements (surface improvements such as concrete work, paving, landscaping, signs, etc.), the Engineer will have made a diligent attempt to indicate on the plans the location of all main and trunkline utility facilities which may affect the Work. In many cases, however, the only available information relative to the existing location of said facilities may have been small scale undimensioned plats. The locations of said facilities shall, therefore, be considered approximate only, until exposed by the Contractor. C. Under circumstance similar to 31 20 00/1.7B., service laterals and appurtenances will have also been shown where information was available as to their location. In many cases, however, the only available information relative to the existing location of said facilities may have been small scale undimensioned plats. The locations of said facilities shall, therefore, be considered approximate only, until exposed by the Contractor. D. Determine exact location of existing buried utilities by: 1. Marking on ground or pavement surface the alignment and extent of the proposed facilities and the probable location of existing utilities using construction plans and existing surface features. 2. Requesting Underground Service Alert (USA) to indicate location of existing buried facilities (phone 1-800-642-2444). Provide USA a minimum of two (2) working days notice of request for locations, and notify Owner of said request concurrently. 3. Locate exact location of existing utilities by hand methods of excavation, or by use of vacuum equipment. E. At proposed work location, expose by hand methods (or vacuum equipment) all existing utilities along the route of the proposed work prior to using any mechanical equipment. If mechanical equipment is allowed at a particular location, it may only be used after the completion by the Contractor of a successful exhaustive search by hand (or vacuum equipment) methods to locate all existing facilities as indicated on the plans, and/or as indicated on the ground by USA or Owner s personnel. F. Record the location of all utilities encountered. Where locational conflicts exist between existing utilities and the planned location of facilities to be constructed under the Contract, submit detailed information to the Owner s Inspector for review and direction. G. Maintain all existing utility mains and service lines in constant service during construction of the Work. CHILDREN S WATER PLAY AREA 31 20 00 PAGE 2

H. Where service disruptions are allowed, minimize the length of such disruptions by proper scheduling and diligent pursuit of the work. 1.8 PROJECT RECORD DOCUMENTS A. Submit under provisions of Section 01 70 00. B. Accurately record actual locations of utilities encountered. PART 2 - PRODUCTS 2.1 MATERIALS A. Fill in Turf or Other Planting Areas: Type S2 or S3 per Section 31 14 00. B. Fill in Non-planting Areas: Type S1, S2 or S4 per Section 31 14 00. PART 3 - EXECUTION 3.1 EXAMINATION A. Verify site conditions. 3.2 PREPARATION A. Identify required lines, levels, contours and datum. B. Locate, identify, and protect existing above and below grade utilities from damage. C. Protect plant life, lawns, trees, shrubs, and other features not authorized for removal. D. Protect existing structures, fences, curbs, sidewalks, paving and other improvements to remain from damage from excavation equipment and vehicular traffic. E. Employ equipment and methods appropriate to the work site. F. Protect excavated areas from drainage inflow, and provide for drainage of all excavated areas. G. Comply with all provisions of the Construction Safety Orders and General Safety Orders of the California Division of Industrial Safety, as well as all other applicable regulations as they pertain to the protection of workers from the hazard of caving ground in excavations. 3.3 EXCAVATION B. Excavate soil to finish subgrade of improvements (or layer thereof) to be placed thereon, or to finish surface grade where no improvements are to be placed thereon. C. Conform excavation to the lines, grades and cross-sections shown on the plans. CHILDREN S WATER PLAY AREA 31 20 00 PAGE 3

D. When excavating through tree roots, perform work by hand and cut roots, where authorized, with a saw. E. Remove excess soil not to be used as fill in the Work from the site. Unless requested by Owner to be deposited at a site designated by Owner on campus property, obtain a disposal site and legally dispose of said excess material, all at no additional cost to the Owner. 3.4 FILLING B. Clear all debris, vegetable matter and other deleterious material from areas to receive fill, per Section 31 11 00. C. Compact existing ground to required relative compaction prior to placement of fill. D. On existing slope areas steeper than 8 horizontal to 1 vertical, plow or scarify existing surface prior to filling to produce a bond with the material to be placed. E. Place and compact soil fill to finish subgrade of improvements (or layer thereof) to be placed thereon, or to finish surface grade where no improvements are to be placed thereon. F. Conform fill to the lines, grades and cross-sections shown on the plans. G. Place fill materials in layers not exceeding 0.67 foot in uncompacted thickness, and compact in accordance with 31 20 00/3.5. H. Maintain optimum moisture content of fill materials to attain required compaction density. I. Fill materials to conform to 31 14 00/2.1. J. Provide, at no additional cost to Owner, imported soil material conforming to Soil Type S3 per 31 14 00, as needed to attain finished grades of Work outside the limits of non-vegetative surface improvements. K. Provide, at no additional cost to Owner, imported soil material conforming to Soil Type S4 per 31 14 00, as needed to attain finished subgrade of Work within the limits of non-vegetative surface improvements. 3.5 COMPACTING B. Utilize equipment which will not disturb or damage existing utilities and other improvements. C. Maintain optimum moisture content of materials to attain required compaction density CHILDREN S WATER PLAY AREA 31 20 00 PAGE 4

D. Compact in layers not exceeding 0.67 foot in uncompacted thickness. E. Obtain minimum 95% relative compaction of soil in the upper most 24 inches of trench backfill for areas to receive concrete, asphalt-concrete, aggregate base, or other non-vegetative surface improvements. Compaction in other areas shall obtain 90% relative compaction. F. Provide compaction testing for all Earthwork per specification section 01 45 23. Do not proceed with additional work in area of compaction until testing has been completed and approved by the testing laboratory and the owner. 3.6 PREPARATION OF SUBGRADE FOR SURFACE IMPROVEMENTS B. Where concrete, asphalt-concrete, aggregate base, or other non-vegetative surface improvements, or a layer of said surface improvements, are to be constructed on the soil surface, prepare the subgrade for said improvements in accordance with this section. C. Blade or disk the soil to a depth of 6 inches, and remove and dispose of (off the project site) all rocks, hardpan chunks or otherwise unsuitable material over 2.5 inches in size. D. Thoroughly mix, water, roll and compact to a relative compaction of no less than 95%. E. Coordinate work with Owner s personnel to ensure that campus irrigation practice and watering schedule does not result in the saturation of soils in the work area. F. Prior to commencing construction of surface improvements, pass a test roller of size and weight as approved by the Owner over the subgrade to establish the extent of soft or spongy areas requiring repairs. G. Repair completely, at no additional cost to the Owner, any soft, spongy, or otherwise unstable areas encountered in the subgrade, by either of the following methods: 1. Remove the material (to the extent and depth necessary to eliminate the condition) and replace it with acceptable materials in conformance with this section. 2. Utilize an alternate method, such as subgrade reinforcement utilizing a geotextile fabric, as may be recommended by a properly licensed civil or geotechnical engineer, whose services are engaged and paid for by the Contractor. Prior to the repair, obtain the approval of the owner for such alternate method. H. Inasmuch as unstable areas are regularly encountered within the campus area, include in the amount bid for this project full compensation for the repairs described in 31 20 00/3.6F., assuming extensive areas of unstable conditions within the work area. I. Conform finished subgrade surface to the lines, grades and cross-sections shown on the plans. CHILDREN S WATER PLAY AREA 31 20 00 PAGE 5

3.7 FINE GRADING A. Fine grade all finished surfaces to the lines, grades and cross-sections shown on the plans, and to blend to hard surface improvements. B. Make gradual grade changes. Blend slopes into level areas. C. Rake and smooth all finished surfaces not to receive hard surface improvements. 3.8 TOLERANCES A. Top surface of Subgrade for Non-Vegetative Surface Improvements or Layers Thereof: Plus or minus 0.02 foot from planned elevation. B. Top surface of Subgrade for Vegetative Surface Improvements or for Bare Ground - Plus or minus 0.05 foot of planned elevation, or as required for finish surface to match adjacent improvements or ground. 3.9 FIELD QUALITY CONTROL A. Field testing will be performed per owner s requirements. B. Compaction testing will be performed in accordance with ANSI/ASTM D1557. C. If tests indicate work does not meet specified requirements, recompact, or remove and replace, and retest. END OF SECTION CHILDREN S WATER PLAY AREA 31 20 00 PAGE 6