ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

Similar documents
City of West Hollywood California 1984

Exhibit G. Construction Mitigation Plan

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

City of West Hollywood Construction Period Mitigation Plan

EROSION CONTROL AND GRADING PERMIT APPLICATION

PREVIOUS CC RESOLUTION

20 North Main Alpine, UT (Phone) (Fax) SITE PLAN

BARRY S CORNER. Draft Construction Management Plan

MINIMUM REQUIREMENTS FOR CONSTRUCTION PLANS, GRADING AND/OR DRAINAGE PLANS, LOW IMPACT DEVELOPMENT PLANS, AND WATER EFFICIENT LANDSCAPE PLANS

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

REPORT ON RESIDENTIAL INFILL HOUSING. City of Des Peres, Missouri. By Malcolm Drummond, AICP. Gartenberg Consulting Services. Creve Coeur, Missouri

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES

RESOLUTION NO

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

Home Remodeling Projects

CITY OF MILTON CONSTRUCTION NOTES

Review of Plans and Specs from a Constructability Perspective

ARTICLE 13 SITE PLAN REVIEW

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013

Kings 826 LP Project Manager: Demetri Oarmos Phone:

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

Trash Enclosure Area Guidelines for New Construction and Redevelopment Projects

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.

S P E C I F I C DEVELOPMENT NO. 42 A M E N D M E N T APPLICATION 968 NS-1882 C I T Y C O U N C I L A C T I O N D E C E M B E R 1,

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

El Dorado Avenue

New Administration Building

STAFF REPORT CITY OF SOLANA BEACH

P.C. RESOLUTION NO

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663


PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

Application for a Residential Building Permit

Design Specifications & Requirements Manual

3.0 PROJECT DESCRIPTION

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

COUNTY OF ALBEMARLE. Community Development Department 401 McIntire Road, Room 227 Charlottesville, Virginia (434)

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

CONDITIONS OF APPROVAL. ATWORTH COMMONS PRELIMINARY PLAT and PLANNED UNIT DEVELOPMENT PPU & PPL th Court SW

Delaware Street

ATTACHMENT 3 RECOMMENDED CONDITIONS OF APPROVAL FOR A SITE DEVELOPMENT PERMIT FOR A NEW RESIDENCE AND ATTACHED SECONDARY UNIT

RZ-1 LEGEND FUTURE ACCESS TO ALIGN W/ EXISTING HARRIS COVE DRIVE FUTURE ACCESS TO ALIGN WITH PROPOSED ACCESS OPPOSITE COX ROAD

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES

Building Better Storm Water Quality

PART II - CODE OF ORDINANCES Chapter 16 - CONSTRUCTION, REHABILITATION AND PROPERTY MAINTENANCE REGULATIONS ARTICLE VIII. PROPERTY MAINTENANCE

RESOLUTION NO. PC

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects

CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

Commercial Remodel Permit

Q. CONSTRUCTION IMPACTS

CITY OF FRIENDSWOOD DOCUMENT TPDES REQUIREMENTS

New Stadium Project. Construction Activity Mitigation Program. January 22, 2014

PART 3 STORM WATER TECHNICAL MANUAL

Index. Composition and Order of Plan Set. Utility Plan... 5

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

914. "I-1", LIGHT INDUSTRIAL DISTRICT

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

PLEASE NOTE: The cover sheet must include the occupancy type, construction type, and square footage of the area of work.

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements...

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

MAINE MEDICAL CENTER

Building Guide. Introduction. Construction Design Requirements. Revised 31-Jan-2018 Adopted 01-Mar-2018

Sidewalk Regulations. Table of Contents

Re: Erosion Control Report and Drawings Requirements Accompanying Document

If you have any questions during the review of the enclosed materials, please call me at (207) or me at

Building Permit Submittal Requirements

Items in this checklist identify the base requirements that are to be provided by the design professional.

Demolition Permit Application

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

A. INTRODUCTION AND SUMMARY OF FINDINGS B. CONSTRUCTION SCHEDULE

BMP FACT SHEET DF-1 HOA Annual Self-Certification Report

Attachment 1 Findings and Conditions

City of Reno Public Works

CITY OF FORTUNA, CALIFORNIA

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)

PART II - SURVEYING AND GRADING CRITERIA

City of San Luis Obispo Development Standards for Solid Waste Services

District of North Vancouver Construction Traffic Management Plan Guidelines

PRIVATE ROAD AND DRIVEWAY STANDARDS Development Standard #1 (Rev 7/18)

MEMORANDUM - CITY OF PASADENA DEPARTMENT OF PUBLIC WORKS

Table Related Arlington County Standards, Specification and Policies

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

CITY OF CAMARILLO STORMWATER POLLUTION CONTROL PLAN Demolition or Stockpile Activity Under One Acre

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Transcription:

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM Each applicant needs to thoroughly review the conditions of development issued by the Planning Division in the format of a Resolution approving your project s development. Each project has specific requirements for items which need to be approved by the Engineering Division prior to issuance of the Building Permit. The list below identifies the typical set of items which need to be submitted and/or incorporated into the design of your project. Also, included are the various plan check fees associated with the submittals. 1. Street & Parkway Improvement Plan: Guidelines on what to include in the plan can be found on the City s website, www.weho.org. Click on City Hall, then City Divisions, then to Engineering, and finally Development Services. Download the document titled Street and Parkway Improvement Plan Guidelines. The plan sheet(s) shall be labeled Street and Parkway Improvement Plan and be reflected as such on the sheet index. Submitted plans must be signed and stamped by a Civil Engineer, licensed to practice in the State of California. Submitted plans shall be consistent with the Architectural and Landscaping plan sheets. There is an Engineering Division plan check fee due at the time of submittal. 2. Construction Period Mitigation Plan: This document must be approved by the City prior to issuance of Building PermitsGuidelines on what to include in the Construction Period Mitigation Plan and a sample can be found on the City s website, www.weho.org. Click on City Hall, then City Divisions, then to Engineering, and then Development Services. Download the document titled Construction Mitigation Plan Guidelines. Do not leave any item blank, if item does not apply to your project, state as such in answering the item Also included with the guidelines is an example that shows some of the common things that the City is looking for in this document. There is an Engineering Division plan check fee due at the time of submittal of the construction period mitigation plan. The construction period mitigation plan shall be prepared by the applicant and submitted to the Building Official, City Engineer and the Director of Community Development for approval, prior to issuance of a building permit. Included in this plan: a. Specify the names, addresses, telephone numbers and business license numbers of all contractors, subcontractors, the developer and the architect. 1

b. List a designated on-site construction manager, with 24-hour contact information to be used only in case of emergency. c. Describe how demolition of any existing structures is to be accomplished. d. Designate the permitted waste haulers and recyclers and include the construction period disposal and recycling plan. e. Indicate where any cranes are to be located for erection and construction. f. Describe how much of the public street, alleyway, or sidewalk is proposed to be used in conjunction with construction. g. Set forth the extent and nature of any pile-driving operations. h. Describe the length and number of any tiebacks which must extend under the property of other persons. i. Provide a drainage plan and describe all BMPs (best management practices) that will be used to prevent construction debris from entering the storm drain system. j. Specify the nature and extent of any dewatering and its effect on any adjacent buildings. k. Describe anticipated construction-related truck routes, number of truck trips, hours of hauling and parking locations. l. Specify the nature and extent of any helicopter hauling. m. State whether any construction activity beyond normally permitted hours is proposed. n. Describe any proposed construction noise mitigation measures. o. Describe construction-period security measures including any fencing, lighting, and security personnel. p. Provide a construction-period parking plan which shall minimize use of public streets for parking. 3. Solid Waste & Recycling: The project must be designed to incorporate solid waste and recycling operations in a convenient manner. The following are the general guidelines for the design of the trash and recycling storage area: a. Plans shall clearly show the dimensions (length and width) of the areas designated for trash and recycling bins. Residential developments with more than 4 units are required to have bin service for trash and recyclables. b. Although it is the City s preference to not have trash chutes, if trash chutes are designed into the project, separate chutes shall be provided for the collection of recyclables and solid waste. c. The trash and recyclables storage area must be on a level surface and consider the logistics of the removal and replacement of the bins. 2

d. The safety of trash hauler personnel must be considered when placing the storage area in a subterranean garage with a steep driveway ramp incline. e. If the trash location is put at grade, the trash and recyclables storage area shall be inside a specially designated structure or on the outside of a structure in an approved fence or wall enclosure, an interior courtyard area or in the rear or interior side yards. f. Exterior trash and recyclables storage areas shall not be located in a required front yard, street side yard, parking space, and landscaped or open space areas. g. The storage areas shall be accessible to residents and/or employees (commercial projects) at all times. h. Driveways and aisles shall provide unobstructed access for collection vehicles and personnel with at least the minimum clearance required by the collection methods and vehicles utilized by the designated collector. 4. Demolition and Construction Debris Recycling Plan: Prior to the issuance of any demolition permit, the applicant shall submit to the Environmental Services Specialist a Demolition and Construction Debris Recycling Plan, which indicates where select demolition debris is to be sent for recycling. The plan will be subject to review and approval by the City. The plan shall list the material to be recycled and the name, address, and phone number of the facility or organization that will accept the materials. 5. Designated Waste Haulers: Demolition debris is to be hauled away only by a hauler permitted to operate in West Hollywood. A list of permitted haulers can be found on the City s website, www.weho.org. Type Haulers and Recyclers in the search box. 6. Pollution Control Requirements: For the demolition and construction phases of the work, the project will need to adhere to stormwater pollution regulations that come from National Pollutant Discharge Elimination System (NPDES) permit requirements. Helpful guidelines regarding these requirements can be found on the City s website www.weho.org and type Urban Runoff in the search box. Projects are required to have a Storm Water Pollution Prevention Plan (SWPPP) or Standard Urban Stormwater Mitigation Plan (SUSMP) depending on the size and scope of your project. These plans require installation of things that need to be incorporated into the project design and will require a detailed review and approval by the City prior to the issuance of the building permits. 3

a. For sites involving less than 1 acre of disturbed area, an Owner s Certification must be prepared. For sites on hillsides, or those with at least 1 acre of disturbed area a Local Storm Water Pollution Prevention Plan (LSWPPP) must be prepared. b. For sites with more than 1 acre of disturbed area, a Storm Water Pollution Prevention Plan (SWPPP) must be prepared and the Contractor must provide evidence to the Building and Safety Division that a Notice of Intent (NOI) has been submitted to the appropriate State agency. c. If construction will be carried out on the project between October 1 and April 15, a Wet Weather Erosion Control Plan must be prepared. The preparation, submittal and adherence to all City requirements are the responsibility of the Contractor. d. Some projects require a Standard Urban Stormwater Mitigation Plan (SUSMP) to be incorporated into the project design. This plan must specify the various infrastructure components and Best Management Practices (BMPs) for the project post construction which will control/prevent non-storm water discharges. 7. Driveway Considerations: The location of any new driveway access point shall be reviewed on a case by case basis and approved by the City Engineer as a part of the review of the Street and Parkway Improvement Plan for the project s frontage. a. Any abandoned or unused driveways along a property s frontage shall be removed and replaced with City standard curb, gutter, sidewalk and/or landscaped parkway. b. The design for the driveway should follow the latest edition of APWA Standard Plans 110-2 Driveway Approaches. The construction notes on the Street and Parkway improvement plan shall include the following items: i. Location of the center line of the proposed driveway. ii. Dimensions for the W, X and Y of the driveway apron. iii. Residential driveways shall be four inch (4 ) thick Portland Cement Concrete, commercial driveways shall be six inch (6 ) thick Portland Cement Concrete. c. Driveway slope: The Proposed driveway(s) should be designed to have a functional driveway and prevent vehicles from scraping when entering and exiting the driveway approach. i. In your design you should plot a profile of the vehicular travel path on a sheet of paper at a scale of ½ = 1. Then using the template provided, the plotted profile shall show that the driveway is able to accommodate the vehicular entrance and exit without hitting the points on a vehicle front, tail and 4

undercarriage. Grade breaks and elevations for the driveway approach shall be called out on the plans. ii. Trash and Recycling Impacts: For projects with subterranean garages, often the project proposes a trash and recycling area in the subterranean garage. However, if the driveway slope is greater than 11% it becomes nearly impossible to push a fully loaded trash bin up such a steep slope. Also, in a subterranean garage the ceiling heights are often designed too low for a truck to service the bins. Therefore, if the driveway slope is going to be steep, the designer shall consider locations at grade for the trash and recycling area. Having the trash and recycling areas at grade rather than in a subterranean garage may affect the footprint or layout of a building, therefore the architect or designer shall consider this early on in the design of the project. DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION FY 13-14 BASE FEE SCHEDULE FY 13-14 FEE PLAN CHECKING - INITIAL FEE * Storm Drain, Traffic Signal Plans 1,000.00 Street and Parkway Improvement Plan 500.00 Road Deed 300.00 Construction Period Mitigation Plan (Major Projects) 500.00 Construction Period Mitigation Plan (Minor Projects) 100.00 * Further fee payment may be required if actual costs exceeds the above fees ENVIRONMENTAL SERVICES: PLAN CHECKING - INITIAL FEE * Storm Water Pollution Prevention Plan (Major Projects) SWPPP 1,000.00 Storm Water Pollution Prevention Plan (Minor Projects) SWPPP 500.00 Construction & Demolition Recycling Plan 250.00 Post Construction Recycling Plan (New Developments) 50.00 * Further fee payment may be required if actual costs exceeds the above fees 8. Preconstruction Meeting: A preconstruction meeting shall be scheduled with the City s Public Works Inspector prior to any work being done in the City. Please call (323) 848-6379 to schedule a preconstruction meeting. 5

9. Encroachment Permits: Separate Encroachment Permits must be approved by the City Engineer and Public Works Inspector prior to commencement of any activities affecting the public right-of-way. Prior to issuance of each Encroachment Permit, the applicant shall submit to the satisfaction of the City s engineering division details regarding the scope activities covered by the Encroachment Permit. These activities may include, but not be limited to: a. Excavation staging of haul trucks, haul routes, site clean up b. Bins dumpsters, haul trucks c. Temporary fencing/pedestrian barricade/façade protection d. Office construction office in public right of way e. Material Deliveries f. Material Storage g. Concrete Pours staging of trucks, clean out, clean up h. Worker Parking renewed monthly i. Construction Equipment crane, gunite equipment, scaffolding, etc. j. Traffic and Pedestrian Management Safety Plan at project (traffic control plans, pedestrian access) k. Public Improvements, Sidewalk, Curb, Gutter, Driveways DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION FY 13-14 BASE FEE SCHEDULE FY 13-14 FEE CONSTRUCTION ENCROACHMENT PERMITS Construction Site Parking - Commercial Area Work trucks/contractor/worker parking at jobsite frontage parking Per parking meter, per day, includes signs for posting 20.00 Construction Site Parking - Residential Area Work trucks/contractor/worker parking at jobsite frontage parking Per month, per parking space (24') does not include sign for posting 100.00 Per vehicle per day 20.00 Concrete Construction in the Public Right of Way Removal, Replacement or Construct concrete, including but not limited to, commercial driveway, curb & gutter, parkway drain, curb drain, cross gutter, 350.00 wheelchair ramp, and sidewalks etc. Removal, Replacement or Construct concrete residential driveway, or sidewalk 100.00 only Concrete Trucks, in and out the same day 100.00 6

Construction Equipment in the Public Right of Way Initial Permit Issuance & two days 450.00 Per each additional day 150.00 Lifting Equipment in the Public Right of Way Bucket truck, boom lift, scissor lift, fork lift, small truck mounted crane, per 100.00 vehicle per day. Large oversized cranes shall be charged per Construction Equipment Material Containers (Dumpsters) in the Public Right of Way In & out same day 100.00 Initial Permit Issuance & two days 350.00 Per each additional day 150.00 Oversized Load Permit Issuance, (includes sign posting to prohibit parking along travel route, 350.00 notifications to law enforcement, etc.) Pedestrian Protection Scaffolding, construction safety barrier, temporary construction fencing, 350.00 pedestrian barrier, water barricade, façade protection, etc. per month. Sewer Installation in the Public Right of Way Mainline, lateral, manhole, sewer saddle, etc. repair, rehabilitation or new line. 450.00 Temporary No Parking Sign Per Sign 5.00 Temporary Structures (Construction Office) Permit Issuance, initial month 350.00 Each additional month per square foot 2.00 Utilities (Water, Cable, Electric, Gas, etc.) Service cut, mainline service, repair, or replacement. Initial permit issuance 450.00 Service cut, mainline service, repair, or replacement. Per each additional week 450.00 Blocking Traffic Lanes During Weekday A.M. or P.M. Peak Hours Per minute on Major Highways (7a.m. to 9 a.m.; or 4 p.m. to 7 p.m.) 50.00 Major Highways: Santa Monica Blvd., Sunset Blvd, Melrose Ave, Beverly Blvd., La Brea Ave., Fairfax Ave., Cresent Heights Blvd., Robertson Blvd., La Cienega Blvd., Fountain Ave., San Vicente Blvd. 7