1. 1 river stream Vol. 26 No JOURNAL OF NATURAL RESOURCES Mar TV

OPTIMAL WATER MANAGEMENT MODELING FOR HYDROPOWER SYSTEM ON RIVER NIGER IN NIGERIA

Empirical Analysis of Gray Relational Analysis of Employment Structure and Industrial Structure in Guangdong Province

Maintaining healthy rivers and lakes through water diversion from Yangtze River to Taihu Lake in Taihu Basin

2.32 XESET 2 HYDROPOWER PROJECT

Session: For more information:

Multi-objective optimization for irrigation deficit through cascade reservoirs

Application of MIKE 11 in managing reservoir operation

Simulation of a reservoir with standard operating rule

Hydropower in Sichuan province: investigative report by Liu Zhi Transition Institute Beijing March Translated and edited by Probe International

multiconsult.no Hydropower modelling Vientiane January

An Improved Contract Net Protocol with Multi-Agent for Reservoir Flood Control Dispatch

Current Water Management Practices for Kerr Reservoir

APPENDIX 9.2 Description of SPLASH Model

Impacts of human activities on the flow regime of the Yangtze River

Integrated hydrological modeling to support basin-scale water resources management

THE SUMMARY OF SAFETY MONITORING AND OPERATION ABOUT RCC GRAVITY DAM IN CHINA

OPTIMISATION OF HYDROPOWER IN A MULTI-OBJECTIVE CONTEXT

Research And Application On The Coupled Method Of Remote-Sensing And Ground- Monitoring Of Reservoir Storage Capacity

Application of Enemble Streamflow Forecasts for Decisionmaking

Evaluation on Urban Land Comprehensive Carrying Capacity in Xi an City Under the Process of Urbanization

Water Utilization and Land Use in the Process of Urbanization & Industrialization: the Case of Guangzhou

Guangzhou Low Carbon Society 2030

Research of Load Leveling Strategy for Electric Arc Furnace in Iron and Steel Enterprises Yuanchao Wang1, a*, Zongxi Xie2, b and Zhihan Yang1, c

Yangtze River Economic Zone and Adaptation to Climate Change

Climate Change Impact & Adaptive Water Management for Major Basins in China

Research of Trading Mechanism on New Energy to Replace the Captive Power Plant

Xayaburi Hydroelectric Power Project

Action Plan toward Effective Flood Hazard Mapping in China

Effects of irrigation on groundwater recharge under deep buried depth condition

AN INVESTIGATION OF THE USE OF OPTIMIZATION TECHNIQUES IN THE OVERALL EFFICIENCY ANALYSIS OF HYDROPOWER PLANTS

CH2356 Energy Engineering Hydro Power. Dr. M. Subramanian

Hydropower retrofitted onto existing water infrastructure assets

Study on feasible technical potential of coal to electricity in china

NAP-GSP REGIONAL TRAINING WORKSHOP FOR ASIA Mainstreaming Climate Change Adaptation into Water Resources Seoul, September 2017

Water Resources in Korea

The Niger: a lifeline. Effective Water Management in the Upper Niger River

Time-Series Characteristics of Wind Power and Its Impact on Jilin Power Grid

The Volga River Basin - history of development and modern hydrological regime under the changing climate

Flood control and safety evaluation of Banqiao reservoir

Centralized versus distributed reservoirs: an investigation of their implications on environmental flows and sustainable water resources management

Plant Operation Optimization- A Case Study of Middle Marsyangdi Hydropower Station

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA

Optimal Economic Life Interval Evaluation Method of Transformers

Discussion on water resources value accounting and its application

International Conference on Water Resource and Environment 26 (WRE26) IOP Conf. Series: Earth and Environmental Science 39 (26) 227 doi:.88/755-35/39/

Yangtze River. Geomorphology, Hydrology, and the Three Gorges Dam. Chris Pavlovich, Lauren Ceckowski Brian Singer, Aveline Cruickshank

Simulation of soil moisture for typical plain region using the Variable Infiltration Capacity model

Comparing the Generating Strategies of Hydropower of Cascade Reservoirs to Mitigate the Shortage of Water Supply

Simulation on the Time Progress of the Non-Point Source Pollution Load in Initial Stage Runoff for Small Watershed

Decline of groundwater table in Beijing and recognition of seismic precursory information

Experimental Study of Triangular Sharp-Crest Weir in Open Channels

Water-Energy Nexus: Economics of Hydropower

Optimal reservoir operation strategy for balancing ecosystem and human needs

EXHIBIT B PROJECT OPERATIONS

Impacts of Climate Change on Nitrogen Load and its Control in the Upper Huai River Basin, China

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

Towards the optimization of water resource use in the Upper Blue Nile river basin

HYDROLOGY - BASIC CONCEPTS

Optimization of long-term Han River basin hydropower scheduling using linear programming

Evaluation of the HYMOD model for rainfall runoff simulation using the GLUE method

Study on the Dynamic Control of Dam Operating Water Levels of Yayangshan Dam in Flood Season

A Case Study on the Selection of Purification Project of Lake

Effect of Urbanization on Climate Change in Nanjing

Coal and Coal Power s Role in China s Energy System

A new method for indirectly estimating infiltration of paddy fields in situ

10 Project Cost Estimation

Analysis on the Influence Factors of Wind Power Accommodation

Optimization of Water Allocation in Canal Systems of Chengai Irrigation Area

IRRIGATION CHALLENGES IN NORTH WEST GREECE: PERSPECTIVES AND SOLUTIONS FOR FLOOD PRONE REGIONS

Flood Management of. Han River Flood Control Office. Dr. Sung, Ji Youn. Water Resources Information Center

Investigation of sustainable development potential for Ulubey Aquifer System, Turkey


Simulated Calculation of Temperature Control and Anti-crack during Construction of Inverted Siphon

EXECUTIVE SUMMARY. Consultative Committee Report Jordan River Water Use Plan

Analysis and forecasts of investment scale and structure in upstream sector for oil companies based on system dynamics

Climate change adaptation from small and medium scale hydropower plants: A case study for Lao Cai province

SUMMARY WATER BALANCE ASSESSMENT

IRRIGATION CHALLENGES IN NORTH WEST GREECE: PERSPECTIVES AND SOLUTIONS FOR FLOOD PRONE REGIONS

Water Resources CHOIR in China

Presentation -- Three Gorges Dam (TGD) on the Yangtze River

EFFECTS OF UPSTREAM HYDROPOWER DAMS AND WATER DIVERSION PROJECTS TO THE DROUGHT AND SALINE INTRUSION OF THE MEKONG RIVER DELTA IN VIETNAM

Analysis of China s Energy Intensity and Its Forecast

Empirical Research on the Performance of Circulation Industry Based on Input-Output Analysis Evidence from Zhejiang Province, China

Trends in Streamflow and Water Level in Xiang River Basin in China

Three Gorges Project. A Project with Tremendous Benefits and in Favour of Environmental Improvement. By Cao Guangjing May 22, 2004

Decoupling Economic Growth from Energy Consumption: an Analysis of Beijing, China

Flood forecasting model based on geographical information system

Factors Analysis and Policy Suggestions for China s Objective by Non-fossil Energy Accounts for 15% of Total Energy Consumption

Study on optimal operating rule curves including hydropower purpose in parallel multireservoir systems

Annual runoff prediction using a nearest-neighbour method based on cosine angle distance for similarity estimation

ANALYSIS OF HYDRAULIC FLOOD CONTROL STRUCTURE AT PUTAT BORO RIVER

Flood forecasting model based on geographical information system

VUNG TAU GO CONG DAM MATHEMATICAL MODELLING: ONE SIZE FITS ALL?

Annual runoff prediction using a nearest-neighbour method based on cosine angle distance for similarity estimation

HPP CEBREN. Prepared by: Development and Investments Department

Transcription:

Proc. IAHS, 379, 125 129, 2018 https://doi.org/10.5194/piahs-379-125-2018 Author(s) 2018. This work is distributed under the Creative Commons Attribution 4.0 License. Reservoirs operation and water resources utilization coordination in Hongshuihe basin Chonghao Li 1, Kaige Chi 2, Bo Pang 2, and Hongbin Tang 1 1 China Southern Power Grid Dispatching and Control Center, Guangzhou, 510520, China 2 College of Water Sciences, Beijing Normal University, Beijing, 100875, China Correspondence: Chonghao Li (lich@csg.cn) Received: 28 December 2017 Accepted: 14 January 2018 Published: 5 June 2018 Open Access Abstract. In the recent decade, the demand for water resources has been increasing with the economic development. The reservoirs of cascade hydropower stations in Hongshuihe basin, which are constructed with a main purpose of power generation, are facing more integrated water resources utilization problem. The conflict between power generation of cascade reservoirs and flood control, shipping, environmental protection and water supply has become increasingly prominent. This paper introduces the general situation and integrated water demand of cascade reservoirs in Hongshuihe basin, and it analyses the impact of various types of integrated water demand on power generation and supply. It establishes mathematic models, constrained by various types of integrated water demand, to guide the operation and water resources utilization management of cascade reservoirs in Hongshuihe basin. Integrated water coordination mechanism of Hongshuihe basin is also introduced. It provides a technical and management guide and demonstration for cascade reservoirs operation and integrated water management at home and abroad. 1 Overview Hongshuihe basin is located in the upper reach of Xijiang River, the mainstream of the Pearl River system. The basin, with an area of 190 000 km 2, locates in the subtropical area. The climate is mild and the rainfall is abundant. The annual rainfall is 1200 mm in its upstream and reached 1500 to 1600 mm in reaches in Guangxi province. From Tianshengqiao of Nanpanjiang in the upper reach to Datengxia of Qianjiang, the total length is 1050 km and the gap reaches 760 m. The average annual water volume reaches 133 billion m 3 at Datengxia dam site. Hongshuihe Cascade Hydropower Base is one of the 13 major hydropower bases in China and also an important energy base in South China. It plays an important role in power supply in Guangdong and Guangxi. At present, the constructed cascade hydropower stations in Hongshuihe basin include Lubuge, Tianshengqiao I, Tianshengqiao II, Pingban, Longtan, Yantan, Dahua, Bailongtan, Letan, Qiaogong and Changzhou. Together with Datengxia Hydropower Station which is under construction, the total cascade generating capacity is 13 645 MW, and the average annual electricity generation is about 53.3 billion kwh. The sketch map of cascade hydropower stations in Hongshuihe basin is shown in Fig. 1. In the recent decade, with the economic development the demand for water resources has been increasing rapidly. The reservoirs of cascade hydropower stations in Hongshuihe basin, which are constructed with a main purpose of power generation, are facing more and more serious integrated water use problems. The conflict between power generation of cascade reservoirs and flood control, shipping, environmental protection and water supply has become increasingly prominent. Power dispatching agencies and water resources management departments are facing new challenges on reservoirs operation. Usually multi-purposes operation method is studied and applied in the practical reservoir operations under the conflicting circumstances (Feng et al., 2014; Yang et al., 2010). Published by Copernicus Publications on behalf of the International Association of Hydrological Sciences. Innovative water resources management understanding and balancing interactions between humankind and nature

126 C. Li et al.: Reservoirs operation and water resources utilization coordination Figure 1. Sketch map of cascade hydropower stations in Hongshuihe basin. 2 Water utilization demands and their impacts on power dispatching Water use for power generation and other purposes are all utilized through hydraulic engineering facilities such as reservoirs, tunnels and locks. Due to different purposes, conflicts often arise in the way of water use (Zhang, 1983; Feng, 1990). Take flood control for example, the flood control departments require the main reservoirs to reduce water storage and reserve enough flood control capacity to ensure flood control safety in flood season. However, the power dispatching departments need the main reservoirs to increase water storage to ensure the power supply in dry season. There are often contradictions in the way and time of water storing or releasing. The cascade hydropower stations in Hongshuihe basin, which are constructed with a main purpose of power generation, are an important energy base of south China. Its total installed capacity accounts for about 65 % of the maximum load in Guangxi in 2017, playing an important role in the operation of the Southern Power Grid such as peak load regulation, frequency regulation, voltage control and accident backup in the power supply of Guangdong and Guangxi provinces. The impacts of various types of integrated water demands on power dispatching of cascade hydropower stations is analysed from the perspective of hydropower generation and power supply as below. 2.1 Flood control The specific requirement of flood control is that water level of reservoir shall not exceed the flood limit water level, or outflow shall not be greater than the specified value. The impact on hydropower generation and power supply include: 1. The reservoir will lose water regulation ability if the flood limit water level is reached or exceeded, and the peak regulation and frequency modulation capacity of the power station will decrease. Water should be discharged to regulate the peak. 2. If water storage is not enough in flood season, the water capacity and power supply will be limited in dry season. 2.2 Shipping The specific requirement of shipping is that reservoir shall discharge water in the determined flow at a specified time period to ensure the water level of the downstream channel is stable. In case of emergency, it may be necessary to increase or decrease the discharge flow significantly to meet the rescue requirements of ship accidents. The impacts on hydropower generation and power supply include: 1. There is water head loss or even water volume loss in the power station. 2. Power station can only generate power according to the determined output power, losing the capacity of peak regulation, frequency modulation and accident backup. 3. Power stations in upstream and downstream shall cooperate with each other. The cascade power stations will be limited as a whole. The operation mode of thermal power plants and other power plants need to be adjusted and the power supply reliability declined. 4. In case of emergency, a large number of power plants may need to be involved in adjustment, and the grid operation mode will be changed. Proc. IAHS, 379, 125 129, 2018 proc-iahs.net/379/125/2018/

C. Li et al.: Reservoirs operation and water resources utilization coordination 127 2.3 Water supply The specific requirement of water supply is that reservoir shall discharge water in the determined flow at a specified time period, as required by shipping; or the reservoir water level and the downstream water level should not be less than the specified value in order to meet the water demand of relevant facilities. The impacts on hydropower generation and power supply include: 1. There is water head efficiency loss in the power station. The adjustable output of power stations units will be limited by the extra water supply in dry season. 2. Hydropower station may be forced to drain water during equipment maintenance period in dry season. 3. Power stations in upstream and downstream shall cooperate with each other. The cascade power stations will be limited as a whole. The operation mode of thermal power plants and other power plants needs to be adjusted. 4. Power supply reliability will be declined. 2.4 Environmental or ecological water The specific requirement of environmental or ecological water is that reservoir shall control the outflow of reservoirs by not less than the specified lower limit so as to maintain the environmental and ecological water in the downstream. In case of emergency, it may be necessary to increase or decrease the discharge flow significantly. The impact on hydropower generation and power supply include: 1. Load peak regulation capacity of power stations and grid will be influenced in dry season. 2. In case of emergency, a large number of power plants may need to be involved in adjustment, the grid operation mode will be changed, and the power supply reliability will be declined. What s more, power market reform is implementing in the power industry in China at present. The operation of hydropower stations depends not only on water supply, water use and power system operation requirements, but also on the results of the transactions in power market. Unplanned water use, especially water needs in emergency like water pollution accident or shipwreck rescue, may result in market breaches and economic penalties for hydropower owner as a market member. Market trading agencies may have to deal with other power plants temporarily. This may trigger a short-term sharp price increase in the power market. 3 Mathematical models The contradiction between the integrated utilization of reservoirs and the power generation operation of cascade hydropower stations has become increasingly prominent. In order to guide the operation of cascade reservoirs in Hongshuihe basin and to provide decision support for the daily operation of hydropower stations, this paper presents mathematical models for the integrated utilization of cascade reservoirs. The models use various types of integrated water demand as constraints, including a long-term model and a short-term model according to the different operation periods. The long-term dispatch model is mainly used for monthly and annual operation plan making of cascade reservoirs in the Hongshuihe basin. The model maximizes the total power generation of cascade, taking the operation requirements of reservoirs, various types of integrated water demand (like outflow and water level control) and power demands of each period of the power system as constraints. The objective function: E = Max N i=1 j=1 T K i Q i,j H i,j t (1) Constraints: Water Level : Z i,min Z i,j Z i,max Generating Flow : Q i,min Q i,j Q i,max (2) Power Capacity : P i,min P i,j P i,max In addition, it should obey the water balance equation: V i,j+1 = V i,j + (I i,j Q i,j q i,j ) t (3) Where E is the total power generation of the cascade reservoirs in the basin; K i is the output coefficient of the hydropower station i; and Q i,j, H i,j, Z i,j, P i,j, I i,j, q i,j and V i,j respectively represent for the generating water flow, water head, reservoir water level, power output, inflow, discharge and reservoir water storage of the hydropower station i during time period j. The short-term dispatch model is mainly used for daily operation schedule of cascade reservoirs in the basin. It aims to minimize the total generating water consumption of the cascade hydropower stations, considering the determined intraday hourly power demand. It takes the operation requirements of reservoirs, various types of integrated water demand (like outflow and water level control) and hourly power grid demand as constraints. The objective function: W = Min N i=1 j=1 T Q i,j t (4) The constraints are basically the same with those in the longterm model. While the time period is different. In addition, the water flow equation among cascade reservoirs, which used to calculate the inflow of reservoir from proc-iahs.net/379/125/2018/ Proc. IAHS, 379, 125 129, 2018

128 C. Li et al.: Reservoirs operation and water resources utilization coordination Figure 2. 2017 Monthly operation plan of Longtan reservoir. its upstream reservoir outflow considering the flow lag time, should be obeyed: Ii,j = Qi 1,j dt + Ri,j (5) Where W is the total generating water consumption of the cascade hydropower stations in the basin; Ii,j, Qi,j and Ri,j are the average inflow, quantity of generating water flow and cascade flows between hydropower stations of the hydropower station i during period j respectively; and dt is the water flow lag time from the hydropower station i 1 to the hydropower station i. Reservoirs operation is a typical multi-objective dynamic programming. Usually large system decomposition and coordination methods or dynamic programming algorithms are used in the optimizing solutions (Wang and Zhao, 2003; Shao et al., 1998; Mei et al., 2007; Huang et al., 2014). Based on the mathematical models above, software of cascade hydropower dispatching system in Hongshuihe basin has been developed using Java and Oracle database. It provides good technical support for reservoirs operation decision-making and daily, monthly or annual plan making of hydropower operation. Figure 2 shows the 2017 long-term optimizing calculation results of Longtan reservoir from the dispatching system. 4 Water utilization coordination management The dispatch management of basin cascade reservoirs involves many industries and departments like water, power, shipping and environmental protection. In fact, it requires not only reservoir dispatch optimization techniques, but also needs a sound and comprehensive water coordination mechanism to strengthen the dispatch and management of reservoirs in Hongshuihe basin. In order to further improve the integrated utilization of water resources and the overall benefits of the whole basin, a water integrated utilization working Proc. IAHS, 379, 125 129, 2018 group, involving many industries and departments like power dispatching agency, flood control agency, waterway management bureau, environmental protection departments, industrial and agricultural water use organizations and hydropower stations, was established. A constant communication and coordination mechanism has formed to share the basin water information timely and resolve the contradictions in water use promptly, which effectively promote the security and efficiency of integrated water utilization. In addition, measures like the tracing and monitoring of integrated water use in the basin, water utilization benefit assessment afterwards furtherly improve the scientific management of water resources utilization in the basin. Since 2010, the power supply and water demand of all parties have been well coordinated in a series of major integrated water using events through active coordination and scientific operation, such as basin flood control, water transfer in winter and spring, shipping solution of Changzhou navigation lock in dry season and dispose of water pollution accidents. Good results and significant social benefits have been achieved. 5 Summary This paper introduces the integrated water demand of the cascade reservoirs in Hongshuihe basin, analysing their impact on power generation and supply, and sets up mathematic models, which are constrained by integrated water demand, for cascade reservoirs integrated operation in Hongshuihe basin. It also introduces the basin integrated water coordination mechanism in use and its active role in improving the water resources utilization efficiency in the basin, providing a technical and management demonstration for cascade reservoirs operation and integrated water management at home and abroad. proc-iahs.net/379/125/2018/

C. Li et al.: Reservoirs operation and water resources utilization coordination 129 Data availability. The data are not publicly accessible as the reservoir operation case in this paper is production and operating relevant activity, and the data is under commercial privacy protection. Competing interests. The authors declare that they have no conflict of interest. Special issue statement. This article is part of the special issue Innovative water resources management understanding and balancing interactions between humankind and nature. It is a result of the 8th International Water Resources Management Conference of ICWRS, Beijing, China, 13 15 June 2018. Acknowledgements. This research is supported by National Key Research and Development Program (during the 13th Five-year Plan) under Grant No.2016YFC0401309, Ministry of Science and Technology, PRC. Edited by: Dingzhi Peng Reviewed by: two anonymous referees References Feng, S.: Multi-objective Decision Theory and Its Application, Human: Huazhong University of Science and Technology Press, 1990. Feng, Y., Tian, Y., Han, J., and Cui, Y.: Reservoir Ecological Power Optimal Operation and Its Applied Research, China Rural Water and Hydropower, 0, 137 141, 2014. Huang, C., Wang, Z., Li, S., and Chen, S.: A Multi-reservoir Operation Optimization Model and Application in the Upper Yangtze River Basin I. Principle and Solution of the Model, J. Hydraul. Eng., 45, 1009 1018, 2014. Mei, Y., Xiong, Y., and Chen, L.: A dynamic programming method for the multi-purpose operation of cascade reservoirs, Journal of Hydroelectric Engineering, 26, 1 4, 2007. Shao, D., Xia, J., and Sun, Z.: Study on Real Optimal Operation Model for the Reservoir of Water Resources Multi-Objective Integrated Utilization, International Journal Hydroelectric Energy, 16, 7 11, 1998. Wang, X. and Zhao, R.: Theory of Optimal Reservoir Dispatching with Multi-objective and Its Application, J. Hydraul. Eng., 104 109, 2003. Yang, F., Zhang, X., and Tan, G.: Elementary Study of Multiobjective Operation Model Considering Ecological Operation, Engineering Journal of Wuhan University, 43, 433 437, 2010. Zhang, Y.: Hydropower Station Optimal Operation, China Water & Power Press, Beijing, 1983. proc-iahs.net/379/125/2018/ Proc. IAHS, 379, 125 129, 2018