SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE

Similar documents
QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE

KANMANTOO BROWNFIELDS EXPORATION DRILLING RESULTS

KANMANTOO COPPER MINE: STRATEGY AND OPPORTUNITY SA GOVERNMENT COPPER SUMMIT GREG HALL IIIII CEO & MANAGING DIRECTOR 6 MAY 2015

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016

For personal use only KANMANTOO MINE: MINING WITHIN OUR COMMUNITY GREG HALL IIIII CEO & MANAGING DIRECTOR 13 APRIL 2015

HILLGROVE ACQUIRES OPTIONS ON INDONESIAN BAUXITE PROJECTS

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

6 June 2017 Georgian Mining Corporation Further Drill Results from Kvemo Bolnisi East s Gold Zone 2 Target

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

For personal use only

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 DECEMBER 2017

ASX : BLK. Australian gold producer with exceptional growth opportunity

Maiden Ore Reserve for Camel Creek JV

Excellent Results from Conceptual Mine Study Ondjou Prospect, Namibia

DALGARANGA PRE-FEASIBILITY UPDATE

For personal use only

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030

HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE

For personal use only

Aurora Tank Gold Drilling Completed on Schedule

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 30 SEPTEMBER 2018

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 30 JUNE 2016

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 30 JUNE 2018

For personal use only

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

FIRST GOLD ORE DISPATCHED FROM ULYSSES

For personal use only

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES

Second drill rig to accelerate major drilling program at Productora

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2018

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

DALGARANGA GOLD PROJECT CONSTRUCTION & OPERATIONAL UPDATE 2 MONTHS TO FIRST GOLD

2018 Resources and Reserves

Great Western Scoping Study Update & Onsite Gold Processing

For personal use only

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 30 SEPTEMBER 2017

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months

KANMANTOO COPPER MINE PRIMARY TO OXIDE HAYDEN ARBON IIIII MINE GEOLOGIST BEN ALEXANDER IIIII METALLURGICAL SUPERINTENDENT 5 DECEMBER 2014

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

For personal use only

ASX ANNOUNCEMENT. MacPhersons Nimbus Silver Target up to 6 Million Ounces. Highlights. ASX Code: MRP. Contact Details

2014 MINERAL RESOURCES AND ORE RESERVES

For personal use only

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

Thalanga Operations Ore Reserve and Mineral Resource Statement

Nueva Esperanza Project Teterita Mineral Resource Upgrade

Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010

Australia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project

For personal use only

For personal use only

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD

5 th Asian Bauxite & Alumina Conference

Australia's Newest Gold Producer

ASX ANNOUNCEMENT 15 August 2011

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai

ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

Hot Chili Commences Scoping Study on Productora Copper Project, Chile

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

AVALON SIGNS HOA WITH HANNANS TO ACQUIRE DISCOVERY ZONE COPPER-IRON DEPOSIT FOR A$4M

West African Resources commences deep diamond drilling targeting high-grade primary zone with +400m holes

DALGARANGA GOLD PROJECT DEVELOPMENT UPDATE

For personal use only

For personal use only

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME

ASX Release ASX Code: YTC

For personal use only

Saracen Mineral Holdings Limited ACN

For personal use only

Molybdenum- The New Battery Metal 2018

For personal use only

SARACEN MINERAL HOLDINGS LTD

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO

TEMBANG PROJECT OPTIMISATION

ASX/MEDIA RELEASE FRIDAY, 5 MARCH 2010

For personal use only

PILOT TEST WORK TRIGGERS FINAL TRANCHE OF TREMONT FINANCING

Nullagine Gold Project Life of Mine Update

CORPORATE PRESENTATION. February 2016

For personal use only

Ore Reserves and Mineral Resources Statements 30 June 2013

Update on operating and development activities

Quarterly Report for Shareholders Period Ending 30 September 2010

Kingsgate 2012 Mineral Resources & Ore Reserves

For personal use only

Highlights. Wa Project. Akoko Project. Scoping studies on the Julie West gold vein were completed with the following outcomes;

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

For personal use only

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2018

For personal use only

CAPITAL DOWN AT TALA HAMZA

Azure Minerals Ltd ASX Code:

JORC RESOURCE AT KONONGO INCREASED TO 1.47 MILLION OUNCES OF CONTAINED GOLD

SECOND QUARTER REPORT 15 JULY 2014

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Transcription:

Wednesday, 20 February 2013 SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE The Kanmantoo Copper Mine s Indicative Life of Mine (LOM) anticipated to extend to 2023. Life of Mine Production Target of 30-32Mt @ 0.7-0.8% Cu containing approximately 190k tonnes of recoverable copper (based on Ore Reserves, Mineral Resources & Exploration Targets). Ore processing throughput targeted to increase from 2.4Mtpa to 2.8Mtpa during Q2 2013. Hillgrove has current stated Mineral Resources and Ore Reserves of: Mineral Resources (March 2012) JORC Tonnage Cu Au Ag Bi Cu Metal Classification (Mt) (%) (g/t) (g/t) (g/t) (kt) In Situ Resources Long Term Stockpiles Measured 4.2 0.85 0.13 2.26 173 35.3 Indicated 20.5 0.87 0.16 2.34 129 178.3 Inferred 6.5 0.66 0.15 1.73 114 43.0 Measured 1.1 0.46 N/A N/A N/A 5.0 Indicated 0.5 0.18 N/A N/A N/A 0.9 Total 32.8 0.80 0.15 2.20 132 262.6 Note: Estimation of Bi is based on limited sampling data. Bi is recognised as a potential penalty element at Kanmantoo. 2012 In Situ Resources > 0.25% Cu. Long Term Stockpiles > 0.15% Cu. Au, Ag and Bi assays are not available. Ore Reserves (April 2010) Category Tonnage Cu Au Ag Mt (%) (g/t) (g/t) Proved 2.3 0.87 0.13 3.2 Probable 12.5 0.84 0.18 3.1 Ore Reserves 14.8 0.85 0.17 3.1 Hillgrove Resources Limited (ASX:HGO) is pleased to advise that an updated Life of Mine Plan (LOM) for the Kanmantoo Copper Mine has been completed, as part of recent submissions to the financing banks for the project. Since this submission, further work has been undertaken which is based on both the current Mineral Resources released in May 2012 and on near mine Exploration Targets which are outlined below. These were combined together to form a planning inventory, which was used as the basis for generating a series of planning scenarios. IIII HILLGROVE RESOURCES LIMITED ACN 004 297 116 www.hillgroveresources.com Suite 1709, Level 17 Australia Square Tower, 264 George Street, Sydney NSW 2000, Australia T +61 2 8247 9300 F +61 2 8247 9399

Two Exploration Targets have been incorporated into the planning inventory. The first Exploration Target of 2.0-3.0Mt at 0.6-0.8% Cu, is based on exploration drilling conducted during 2012 in the North Kavanagh and Paringa areas, which is being modelled and assessed and the results of this drilling are anticipated to be reported in Q2 2013. 7,019m of drilling in 49 drillholes have been completed using Reverse Circulation and 901m of drilling in 6 drillholes have been completed using diamond drilling. This drilling has extended mineralisation beyond defined resources along strike and down dip of North Kavanagh and Paringa, as well as identifying new lenses in Paringa. It must be recognised that the potential tonnage and grade estimated is, as yet, conceptual in nature as resource modelling of this area has not been completed. It is however, based on similar levels of drilling information as defined Mineral Resources. A second Exploration Target of 5.0-7.0Mt at 0.7-0.8% Cu is estimated from areas of near mine exploration in close proximity to existing resources. Areas identified for exploration development include down dip extensions of Matthew, O Neil and further North Kavanagh zones. Extensions and further delineation based on recent encouraging intercepts include Emily Star South, north east of the Main Pit area and Coopers Find. This second Exploration Target is based on the assumption of a 50% conversion rate of the 2012 exploration drilling program on known near mine targets but is subject to future drilling success. It must be recognised that the potential tonnage and grade estimated is conceptual in nature as the target has not been drilled. It is uncertain whether further information will result in the estimation of Mineral Resources. As part of this new LOM scenario planning, a long-term pit optimisation was carried out which Hillgrove considers provides a reasonable basis for indicative future planning, and which has resulted in a likely extension of mine life to 2023. Note whilst economic analysis has been done, this program requires further work and testing to progress to Ore Reserves status. The new LOM plan contains a total life of mine Production Target of 30-32Mt @ 0.7-0.8% Cu for approximately 190k tonnes of recoverable copper. This is comprised of estimates of tonnage and grade from the following sources: 12.0Mt at 0.85% Cu of Proved and Probable Ore Reserves (after depletion of 2.8Mt @ 0.85% Cu since publication of the Ore Reserves); 5.0Mt at 0.7% Cu of primary, transition and oxide ore in the Measured and Indicated Mineral Resources categories; 4.0Mt at 0.6% Cu of primary, transition and oxide material in the Inferred Mineral Resources category; 1.6Mt at 0.4% Cu of stockpiled ore; The first Exploration Target of 2.0-3.0Mt at 0.6-0.8% Cu of primary, transition and oxide material identified in 2012 drilling (detailed Mineral Resource modelling currently underway); and The second Exploration Target of 5.0-7.0Mt at 0.7-0.8% Cu in near mine exploration targets of unclassified copper ore resources adjacent to the Kanmantoo mine areas Matthew and North Kavanagh, as well as additional exploration areas. Hillgrove is reporting a Production Target that is based on a portion of Inferred Mineral Resources and/or an Exploration Target in addition to Ore Reserves and/or Measured and Indicated Mineral Resources. Hillgrove considers that the respective proportions of Inferred Mineral Resources and the Exploration Target are not the determining factors in project viability. In addition, the Inferred Mineral Resources and Exploration Target do not feature as a significant proportion early in the mine plan. Over the first half of the year Hillgrove will be finalising an update to its Mineral Resources and Ore Reserves based on the near mine exploration drilling completed during 2012. An updated JORC compliant Mineral Resources estimate is anticipated to be released in Q2 2013 and an updated JORC Note: HGO has a 31 January Year End, therefore quarter references are Q1 Feb-Apr, Q2 May-Jul, Q3 Aug-Oct and Q4 Nov-Jan. Page 2

compliant Q3 2013. Ore Reserves estimate includingg these areas is anticipated to be released in during Hillgrove Resources Chief Financial Officer, Russell Middleton said, The extension of the LOM is a significant development for Hillgrove, with thee update extending thee estimated period of operation up from 6.5 to 10 years. Not only do we have an extended life of mine potential through too 2023, but we also now have an improved understanding of the Resources and have increased confidence about the mine production profile in terms of total mining movements over this period. In addition, the outlook for f regional exploration around Kanmantoo continues to be stronger than ever, Mr M Middletonn said. Mr Middleton also advised the ore processingg throughput is forecastt to increasee to 2.8Mtpa during Q2 2013, as a result of the installationn of a new primary jaw crusher scheduled to bee commissioned during April. Consequently, the increased throughput and extended life of mine is set to have a positive impact on Kanmantoo s cash generation and overall value. Over the past quarters, the Company has focused intensely on o growingg cash-flow,, managing expenses and consolidating operational gainss at Kanmantoo to achieve the targeted annual production levels projected for the mine and resulting revenue. To be able to deliver d an extended life of mine for Kanmantooo in this context is particularly rewarding for the board andd management, and good news for all shareholders, Mr Middleton said. The new LOM includes a total Production Target of 30-32Mt at 0.7-0.8% Cu, producing approximately 190k tonnes of recoverable copper. In 2013, approximately 2.0 to 3.0Mt off unclassified resource material is expected to be converted into Ore Reserves. Figure 1 illustrates the ore presentation schedule in the planning inventory by confidence level (Mineral Resources category Measured, Indicated, Inferred and Unclassified). FIGURE 1. KANMANTOO LOM ORE PRESENTATION SCHEDULE BYY RESOURCES CATEGORY (MEASURED, INDICATED, INFERRED AND UNCLASSIFIED AS AT THE END OF NOVEMBER 2012) The new LOM pit design includes the new satellite areas of Paringa and Critchley plus extensions into Nugent and North Kavanagh thatt will providee significant increases to t planned ore to be mined, when combined with the original Main and Emily Star pits. This has enabled the LOMM strip ratio of waste to ore to be reduced from 5.0 to 4.5, whilst maintaining an average diluted d Cu head grade of between 0.7-0.8%. Note: HGO has a 31 January Year End, therefore t quarter references are Q1 Feb-Apr, Q2 Q May-Jul, Q33 Aug-Oct and Q4 Nov-Jan. Page 3

All optimisation work undertaken to developp the LOM plan and designs is aligned with the current inputs and assumptions for the developmentt of Ore Reserves and the long term plan at Kanmantoo. Primary ore is processed using sulphide flotation methods and oxide and transition ore are to be processed using sulphidisation (oxide flotationn methods). Figure 2 illustrates the Kanmantooo LOM pit designs. Areas identified for development include down dip extensions of Matthew, North Kavanagh and O Neil zones. Extensions and further delineation based on recent encouraging intercepts include Emily Star South, Northh East of the Main Pit area and Coopers Find. FIGURE 2. KANMANTOO INTERIM PLANNINGG INVENTORY DESIGNSS Note: HGO has a 31 January Year End, therefore t quarter references are Q1 Feb-Apr, Q2 Q May-Jul, Q33 Aug-Oct and Q4 Nov-Jan. Page 4

For more information contact: Mr Greg Hall Mr Russell Middleton Managing Director Chief Financial Officer Tel: 02 8247 9300 Tel: 02 8247 9300 ABOUT HILLGROVE Hillgrove is an Australian mining company listed on the Australian Securities Exchange (ASX: HGO) focused on the operation of the Kanmantoo Copper Mine in South Australia, and exploration on its Indonesian tenements, where the Company is targeting the discovery of world class epithermal gold and porphyry copper/gold. The Kanmantoo Copper Mine is located less than 55km from Adelaide in South Australia. With construction now completed, Kanmantoo is an open-cut mine, which has ramped up to an initial throughput of 2.4Mtpa, and is now targeting throughput of 2.8Mtpa, to produce approximately 80,000 dry metric tonnes of concentrate per annum. Competent Person's Statements The information in this release that relates to Exploration Targets is based upon information compiled by Mr Steven McClare, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr McClare is a full-time employee of Hillgrove Resources Limited and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). The Competent Person has consented to the inclusion in the release of the matters based on their information in the form and context in which it appears. The information in this release that relates to Mineral Resources and Ore Reserves is based on previously released reports: 1. 2012 Resource Statement by AMC Consultants Pty Ltd compiled by Mr Aaron Meakin as released to the ASX on 31 May 2012; 2. 2010 Ore Reserve estimates by Mining and Cost Engineering Pty Ltd compiled by Mr Geoff Davidson as released to the ASX on 4 May 2010. Hillgrove Resources Limited confirms in this announcement that it is not aware of any new information or data that materially affects the information included in the previously released reports. In the case of estimates of Mineral Resources or Ore Reserves, the company confirms that all material assumptions and technical parameters underpinning the estimates in the previously released reports continue to apply and have not materially changed. Note: HGO has a 31 January Year End, therefore quarter references are Q1 Feb-Apr, Q2 May-Jul, Q3 Aug-Oct and Q4 Nov-Jan. Page 5