PROJECT DESIGN GUIDE A02 DESIGN RESPONSIBILITY MATRIX

Similar documents
PROJECT DESIGN GUIDE D08 QUALITY CONFORMANCE

PROJECT DESIGN GUIDE A00.1 COMPETENCE STATEMENT AND ASSESSMENT

PROJECT DESIGN GUIDE D02 COMMUNICATION PLAN

BSRIA Guide BG6 Why, What, How?

Structural Engineering & Civils Scope of Services

Legal Aspects of BIM. Jeremy Glover

A DESIGN MANAGEMENT DOCUMENT A05 DRAFT. GUIDE A05 DESIGN EXECUTION PLAN (Preconstruction / construction) Project No.

A DESIGN MANAGEMENT DOCUMENT A05.b projectdesignguides.com DRAFT. GUIDE A05.1 DESIGN EXECUTION PLAN (Preconstruction / construction) Project No.

Project monitor services

BIM Management Training Course One Day Course on the fundamentals of BIM Management. ciobacademy.org

21/01/2019 RIAI Advice Note - Types of Information 1

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008

Please read the Notes below before using the BIM Particular Conditions.

BUILDING INFORMATION MODEL (BIM) PROTOCOL

HKIS QSD PQSL Series 2014

Managing Contractors (Scotland)

Band Systems Ltd. Construction Phase Plan CDM POLICY STATEMENT

Apex Housing Association Appointment of consultants procedure

Managing CDM in Network Rail Telecom

RIBA Small Project Plan of Work

METHODOLOGY APPLICATION

FORM OF APPOINTMENT AS CONSULTANT (CDM CO-ORDINATOR) (FOAC

CDM Note 002: Principal Designer Appointment

Prequalification Questionnaire. for. Property Related Professional Services. PROC/2013/80/CT/Professional Services EU RESTRICTED PROCEDURE

BIDDING FOR BIM. CIF Bidding for BIM. September

COSBEDMO19 - SQA Unit Code FM75 04 Manage project completion and handover in built environment design management

CIVIL and STRUCTURAL ENGINEERING PROFESSIONAL SERVICES NWCE- 8VTDJX. with the option to extend for up to a further 24 months. USER GUIDE Version 2

CONSTRUCTION MANAGER

Quick Guide: Meeting ISO Requirements for Asset Management

WE ARE UNDERWAY! CDM 2015 CDM 2015 HAS NOW KICKED OFF. ARE YOU AWARE OF THE CHANGES? WALKER MANAGEMENT

Notes for completion of Pre-Qualification Questionnaire (P.Q.Q)

Environmental Planning & Coordination Organization

Energy Efficiency System:2014 (EES + )

DIRECTORATE OF ESTATES AND FACILITIES

CDM 2015 Regulations Frequently Asked Questions (FAQ s) (Last updated January 2016)

DIRECTORATE OF ESTATES AND FACILITIES

STRUCTURAL ENGINEER S SERVICES SCOPE

SAFETY, HEALTH & WELFARE AT WORK (CONSTRUCTION) REGULATIONS Briefing Note 1 for Clients, Designers and Project Supervisor Design Process

Design Build: CCDC

Survey Services Rev. 0 Bid # Scope of Work

APPENDIX T.2 SACPCMP The South African Council for the Project and Construction Management Professions

Here are the questions that were not answered during the webinar session.

MCS 025. Installer Certification Scheme Competency Criteria Guidance. Issue 1.1

Forms of Procurement. Traditional Form of Procurement

Cost Management and BIM Holly Davis. Presentation to BIM Regions East

CLAW/CEW BIM Toolkit for Clients Client Training and Supplier Awareness Sessions Wednesday 24 th September Cardiff

CLAW/CEW BIM Toolkit for Clients Client Training and Supplier Awareness Sessions Monday 22nd September 2014 Swansea

EXPRESSION OF INTEREST (EOI) LONG FORM. Planning / Engineering Services Assignment

Engineering Management Manual

To act as the nominated competent Health and Safety Manager and provide leadership for the Energy Services Directorate.

Employer s Information Requirements

MECHANICAL & ELECTRICAL ENGINEER S SERVICES SCOPE

J&P OMAN COMPANY ORGANISATION P.110 PROCEDURE. Page: 1 of 16. Document Title: Issue Date: 13/04/2014. Revision Date: 06/06/2016 Revision No.

11 AC Procurement and Management of Consultants


BIM: Risks & Responsibilities: Can a BIM Protocol provide the solutions?

PTM PLANT ISO 9001 Quality Manual Certification No

Guidance for. Employers Information Requirements

BRIEF - PROJECT PLAN

REQUEST FOR PROPOSALS (RFP)

Digital plan of work and Classification. Rob Manning BIM Task Group

When the template is complete, the whole Work Package document can be printed and approved. Saving the Work Package document under its own name

Owner has determined that this project is a Major Capital Renovation project as that term is defined herein.

SUPPLIER APPROVAL & REGISTRATION PROCEDURE

Smart Meters Programme Schedule 5.2. (Software) (CSP South version)

BIM Building Information Modelling

Employer s information requirements (EIR) An overview of facilities management requirements

Request for Information for e-procurement solutions

National Standard of Competency for Architects

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

ICES Core Cost Engineering Competencies

The Audit and Risk Committee is established under Part 3 Section 19(1) of the Charles Darwin University Act 2003.

CIC Response to HSC Consultative Document 200 on the revision of the Construction (Design and Management) regulations 1994

MSP 50 CONTROL OF CONTRACTORS

Design Team Procedures Practice Note 1, February DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2)

Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015)

Annex G to Loughborough University Facilities Management Health and Safety Procedure

ARCHITECTURAL SERVICES TENDER

GDPR Compliance Checklist

Bangalore International Airport Limited INFORMATION DOCUMENT REQUEST FOR PROPOSAL (RFP) For

Contract Awareness with the Adoption of BIM: What workplaces need to know

CONSULTANCY POLICY Approved by Council 30 June 2011 (minor revisions 19 June 2012)

CDM COMPETENT QUESTIONNAIRE FOR PRINCIPAL DESIGNERS Companies with less than 5 employees

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Principles of the Railway Industry Supplier Qualification Scheme

IMAS First Edition 01 October 2001 Amendment 5, June 2013

Assembling a Collaborative Project Team

Royal Decree of 29 April 1999 on the authorisation of external services for technical inspections at the workplace (Belgian Official Gazette 2.9.

Incident Response Planning & Management

The Corporate Governance Statement is accurate and up to date as at 30 June 2018 and has been approved by the board.

Centerwide System Level Procedure

PENGUINS PLUS FESABILTIY

CHANGES TO THE CDM REGULATIONS

IMAS First Edition 01 October 2001 Incorporating amendment number(s) 1

SUPPLIER APPROVAL & REGISTRATION

Maintenance for Building Services

Document B105. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project

Design Management Plan

CIF BIM Guide Standards & Policies August 2017

RELATIONSHIP CONTRACTING FOR CIVIL CONSTRUCTION BY STANDING OFFER PANEL ARRANGEMENTS

Transcription:

PDG PROJECT DESIGN GUIDES A02 PROJECT DESIGN GUIDE A02 DESIGN RESPONSIBILITY MATRIX Project Name: Name Project No.: Number Date Document No.: PDG-PDG-PRO-A02.0 Date Created: 30 th Mar 2012 Date Revised: Last edited on: 1 Nov 2012 Philip D G Yorke 2012 1 of 7

Revision: Revision description: Revision date: 01 02 03 Edited to be project specific / Revised by: Name: Position: Signature: Checked by: Name: Position: Signature: Authorised by: Name: Position: Signature: Last edited on: 1 Nov 2012 Philip D G Yorke 2012 2 of 7

Document Distribution: Name Company Status Date A 00/00/2012 Status key: A Action I - Information Last edited on: 1 Nov 2012 Philip D G Yorke 2012 3 of 7

CONTRACT DEVELOPMENT & DELIVERY LEAD A DESIGN MANAGEMENT DOCUMENT A02 Project Design Guides Ltd The series of Design Management Guides currently includes: PROJECT DESIGN GUIDE A00 CONSULTANT APPOINTMENT STRATEGY AND CAM PROJECT DESIGN GUIDE A00.1 COMPETENCE STATEMENT AND ASSESSMENT PROJECT DESIGN GUIDE A01 PROJECT DESIGN GUIDE A02 PROJECT DESIGN GUIDE A03 PROJECT DESIGN GUIDE A04 PROJECT DESIGN GUIDE A05 PROJECT DESIGN GUIDE A06 PROJECT DESIGN GUIDE D01 PROJECT DESIGN GUIDE D02 PROJECT DESIGN GUIDE D03 PROJECT DESIGN GUIDE D04 PROJECT DESIGN GUIDE D05 PROJECT DESIGN GUIDE D06 PROJECT DESIGN GUIDE D07 PROJECT DESIGN GUIDE D08 PROJECT DESIGN GUIDE D09 PROJECT DESIGN GUIDE D10 PROJECT DESIGN GUIDE L01 PROJECT DESIGN GUIDE L02 SCHEDULE OF SERVICES (SOS) DESIGN RESPONSIBILITY MATRIX (DRM) DESIGN PROGRAMME & DELIVERABLES DESIGN REVIEW & AUTHORITY PLAN PROJECT QUALITY PLAN (PQP) CONTRACT SCHEDULES & DESIGN PROCESSES DESIGN DASHBOARD COMMUNICATIONS PLAN DESIGN INFORMATION FLOW MAPPING DOCUMENT PROTOCOLS spare / BIM RFI PROCEDURES CHANGE CONTROL PROCEDURE QUALITY CONFORMANCE spare spare DESIGN MANAGEMENT AUDIT CONSULTANT PERFORMANCE REVIEW & TREND Last edited on: 1 Nov 2012 Philip D G Yorke 2012 4 of 7

1.0 Introduction The DRM is one of the fundamental, and mandatory core documents to be appended to consultants appointments. The purpose of this document is to provide an overall schedule of design responsibilities. Preferably all consultants are to be named with individual columns. At very least the main consultants are to be named, i.e. Architects, Structural / Civil Engineer, Building Services, Landscape, Fire and Acoustic; Minor adhoc consultants scope MUST be included and can be captured under other, if not appointed at the time of the creation and agreement of the DRM. The DRM in appendix A has been created at the task element break down level. The purpose of these documents is to provide clarity of design responsibility. This can be defined distinctly from the provision of services, to be found in Guide A01. A thorough DRM will knit together the Contractors stage definitions, the RIBA stage definitions, the BSRIA stage & scope definition, and others as appropriate. Gaps in scope must be carefully checked for and eliminated. They have the potential for additional costs to contractor and/or client, prolongation and contractual discussions. To this end the following list, is guidance of items to look out for: Briefing documents; Surveys; Site boundaries / interfaces; Statutory services / interfaces; Discipline interfaces; Package interfaces. The appendix B matrix indicates the various responsibilities of the designers for key design activities for the project. It is not a definitive list and shall not limit the designer's obligations to provide the Services as defined by the designer's conditions of contract. Nor shall it limit any services that might reasonably be expected of the designer as necessary or appropriate, to secure the proper and timely design, procurement, construction and completion of the Works as defined by The Building Contract between Client and Contractor. 2.0 Definitions used in the DRM All reference to the Employer in this scope should be read as being the Main Contractor. The Original Client employing the Main Contractor is referred to in this document as Client. All references to the Project Manager have been deleted and replaced with Employer, again referring to the Main Contractor. This may need to be changed depending on the project specific procurement route. The following definitions apply for the purposes of this document: Client's Requirements - any documents prepared by or on behalf of the Client by a party other than the Employer and provided to the Employer setting out his design requirements for the Project; Contractor - Specialist Trade Contractor or other Sub-Contractor to the Main Contractor normally with design responsibility; CDM - Construction Design and Management Regulations 2007; BIM - Building Information Management; PIMS - Project Information Management System; SOS - Schedule of Services; CDP Contractor Design Portion Last edited on: 1 Nov 2012 Philip D G Yorke 2012 5 of 7

3.0 Additional Notes It MUST be agreed as a single version by all consultants where a multi appointment strategy is being rolled out. It MUST be reviewed and edited to be back to back with the main contract, to cover all client requirements. Client responsibilities can be included provided they have been set out in the Main Contract documents. The responsibilities described in the DRM relate to any stage of work, i.e. RIBA A-L or other similar, and it is intended that projects will select the necessary services for each or any stage of works under consideration. The wording "if necessary" means as deemed necessary by the Employer unless expressly stated to the contrary. Where the term Consultant is used this is to include other Consultants and any Sub-Consultants. It is a document to be edited (columns) in line with the number of consultants. If say one multi-discipline practice was appointed, only one column would be required. Each Consultant is responsible for the co-ordination and integration of their own work into the design. Inclusion of line items and wording of, to be agreed with the authorised person (refer to PDG 05). Inclusion of line items and wording of, to be agreed with the consultants P.I. insurers. In Framework agreements the SoS may only need to be agreed once. The Contractor is to seek agreement from relevant authorised persons and P.I. insurers. "L / A / P" to be inserted in the matrix in accordance with definitions named on the DRM. Scopes of service/duties for CDM Coordinator are not included on this schedule. Refer to appendix A & B of PDG A02 for the Master documents. 4.0 Managing this document Once the DRM has been completed and agreed by all parties, it is to become an appointment contract schedule. There should be no need for it to be amended or updated. Last edited on: 1 Nov 2012 Philip D G Yorke 2012 6 of 7

Appendix A - DRM Last edited on: 1 Nov 2012 Philip D G Yorke 2012 7 of 7