QUALITY ASSURANCE / QUALITY CONTROL POLICY

Similar documents
Quality Assurance Policy and Procedures

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

QUALITY MANAGEMENT SYSTEM QUALITY MANAGEMENT SYSTEM

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EVANS CAPACITOR COMPANY

BELDEN QUALITY SYSTEM OVERVIEW

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

QUALITY ASSURANCE REQUIREMENTS

Vendor Qualification Survey

Quality System Manual - Section 00

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

Project Management Techniques

DEC STD ISO Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

UNCONTROLLED DOCUMENT

CMI Guidance Document

UPGRADE ASSESSMENT CHECKLIST

INS QA Programme Requirements

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

DeFoe Corp. 800 South Columbus Ave. Mount Vernon, NY QUALITY ASSURANCE MEASUREMENT ANALYSIS AND IMPROVEMENT

NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION AQAP-110

TITLE: SQR-001 Supplier Quality Requirements

CORPORATE QUALITY MANUAL

D.P.E.LTD QUALITY CONTROL PROCEDURE NO 9 QUALITY CONTROL REQUIREMENTS FOR SUPPLIERS MASTER COPY

DECISION TO ACCREDIT

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

SUPPLIER QUALITY MANUAL

Project Procedures 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 13 BASIS OF OPERATION

INTERNATIONAL STANDARD

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Supplier Quality Requirements

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual

INTRODUCTION TO QUALITY ASSURANCE

Quality Management System Plan

Quality Manual ISO 9001:2008 ISO 9001:2015

25 D.L. Martin Drive Mercersburg, PA (717)

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24

Supplier Quality Clauses

Everest Engineering Works ISO REVISION DATE ISSUE

IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL

QUALITY ASSURANCE AND QUALITY CONTROL MANUAL

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

ISO 9001:2000 Revision G

Awareness to ISO 9001:2000

Humantech Environmental Management System Manual

Eagle Machining, Inc.

ISO 9001:2015. Quality Management System. Manual

WOODS CONTRACTING QUALITY ASSURANCE QUALITY CONTROL QA/QC MANUAL VERSION: REV.2

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig

Quality Management in Construction Projects 6. Dr. Nabil El Sawalhi

BS EN ISO 9001 QUALITY ASSURANCE MANUAL

Quality System Manual - Section 00

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008

Document 2007 Rev 0 December 2005 Page 1 of 8

QUALITY SYSTEM REQUIREMENTS FOR Manufacturer YFTFC001

0. 0 TABLE OF CONTENTS

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

QUALITY REQUIREMENTS FOR SUPPLIERS

Replaces: Not applicable.

KLINGE COATINGS. 3.1 Deviation A deviation addresses material, which has not been produced or has a known material substitution.

Quality Management System Manual

HUGHS LIMITADA- SHEQ HSE RESPONSIBILITIES

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

Quality Manual Revision: C Effective: 03/01/10

IN-PILE CREEP RELAXATION AND POST-IRRADIATION THERMAL CREEP TESTING

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION

Price Electronics,LLC Quality Assurance Manual

QUALITY POLICY MANUAL

Quality Manual ISO 9001:2000

Quality Manual. AARD Spring & Stamping Quality Manual

Quality Honeycomb Supplier Quality Requirements

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

QUALITY MANUAL DATE: 03/07/13 REVISION 05 UNCONTROLLED COPY

QUALITY MANUAL. Revision K. JADE PRECISION MEDICAL COMPONENTS, LLC 3063 B Philmont Avenue Huntingdon Valley, PA 19006

Integrated Manual. Quality, Occupational Health & Safety and Environment. Code of Document: Issue No: Date of the next review: Eng. A.F. Kahale.

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality

QUALITY SYSTEM MANUAL

QUALITY ASSURANCE MANUAL

Quality Management System Manual

NATO STANDARD AQAP-2310 NATO QUALITY ASSURANCE REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS

Machined Integrations, LLC

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company.

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

Environmental Management System Manual (EM-01) Revision No. : 2 Date : 1/6/2017. Revision History Sections Affected

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Continental Steel & Tube Co. Quality Manual

NATO STANDARD AQAP-2131 NATO QUALITY ASSURANCE REQUIREMENTS FOR FINAL INSPECTION AND TEST

Quality Assurance Audit Checklist

HFI Fluid Power Products Quality Manual Revision # 5 dated 02/07/10. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc.

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008

INSPECTION SYSTEM REQUIREMENTS

ISO 9001:2008 Quality Management System QMS Manual

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA

Supplier Quality Agreement

CHAPTER 10 FACILITIES EVALUATIONS (PRE-AWARD) SURVEYS PART 1 INTRODUCTION

Transcription:

QUALITY ASSURANCE / QUALITY CONTROL POLICY TABLE OF CONTENTS SI. NO. DETAILS 1. Introduction 2. Quality Policy and Objectives 3. Organization 4. Contract Review 5. Document and Data Control 6. Purchasing 7. Product Identification and Tractability 8. Process Control 9. Inspection and Testing 10. Control of Inspection, Measuring and Test Equipment 11. Inspection and Test Status 12. Nonconformance and Corrective / Preventive Action 13. Handling, Storage, Packaging, preservation and Delivery 14. Control of Quality Records 15. Internal Quality Audit 16. Training 17. Safety 18. List of Annexure Doc. No. AC/ PQP/003, Rev. A, Date: 2.04.2017 Page 1 of 7

1. INTRODUCTION 1.1 PURPOSE: This Project Quality Plan (PQP) has been prepared and formulated as a document of Quality related activities. It is required to meet the terms of the contract. 1.2 SCOPE: The contents of this document shall be applicable to all works to be carried out by Atlantic Construction LLC related to: a) Civil b) MEP c) Structural Works. 1.3 REFERENCE AND APPLICABLE DOCUMENTS: The following documents have been used as source of reference for the preparation of this Project Quality Plan. a) Quality Assurance Manual b) Safety Manual c) Tender Document d) Client Scope of Work. 1.4 DEFINITIONS: In the context of this document the following abbreviations, words or phrases shall be taken to have meaning assigned to the term: Client / Customer : Lead Consultant : Structural and MEP Consultant : Slope Stability and Road Consultant : Contractor : Supplier: Any person / agency providing products to ATLANTIC. Quality: The totality of features and characteristics of a product or service that relies on its ability to satisfy stated or implied needs. Quality Assurance (QA): All those planned and systematic actions necessary to provide adequate confidence that a product or service will satisfy the given requirement for quality. Quality Control (QC): Operational techniques or activities (e.g. inspection or test) used to verify the technical and quality requirements for the services and / or products. Quality Audit: A systematic and independent examination to determine whether quality activities and related results comply with planned arrangements and whether these arrangements are implemented effectively and are suitable to achieve objectives. Quality Plan: A document setting out the specific practices, resources and sequence of activities relevant to a particular product, service, contract or project. Procedures: A documented description of the method to be adopted in the performance of a given task and where applicable accept / reject criteria for that task. Doc. No. AC/ PQP/003, Rev. A, Date: 2.04.2017 Page 2 of 7

Inspection: Activities such as measuring, examining, testing and gauging one or more characteristics of a product or service and comparing this with specified requirements. Nonconformity: Non-fulfillment of a specified requirement. Corrective Action: Action taken to eliminate cause of nonconformity to avoid its recurrence. Preventive Action: Action taken to eliminate the cause of potential nonconformity to avoid its occurrence. Concession: A formal approval by the appropriate agency to authorize a deviation from the specification or design, which does not affect the final function of the proposed specification or design. Repair: A process of restoring a nonconforming characteristic to a condition such that the item conforms to the original specified requirements, where such a repair of restoration is acceptable. Rework: The process by which a nonconforming item is made to conform to a prior specified requirement by suitable corrective means. 1.5 DISTRIBUTION: The CONTROLLED COPIES of this document shall be issued to various users by the QA/QC Engineer and he will maintain the distribution list for the same. All such copies shall be stamped as CONTROLLED COPY. 2. QUALITY POLICY To provide our services to our customers in time with the aim of maintaining the highest quality and performance standards by optimizing cost, utilizing all available resources effectively and adopting safe work practices. To fulfill our quality policy, we have defined the following objectives: Establishing and maintaining system as per ISO 9001: 2000. Recruitment of qualified staff and provide on job training. Efficient and committed management of staff and projects. Meeting customer and regulatory requirements regarding quality and safety. Providing necessary tools and equipments to carryout the jobs in an efficient manner. Improving system on continual basis by using quality improvement tools to the effectiveness of the Quality Management System. Doc. No. AC/ PQP/003, Rev. A, Date: 2.04.2017 Page 3 of 7

3. ORGANISATION Organization structure is attached in the document. 3.1. RESPONSIBILITIES AND AUTHORITIES The responsibilities and commensurate authorities of various personnel as shown in the organization chart shall be as follows: 3.1.1. Project Manager (PM): He will be a representative of ATLANTIC and shall be reported to the Director. The main work functions shall include, but may not be limited to the following: a) Effective operation of Quality System at the project site. b) Identifying and providing resources. Maintaining records in respect of the same. c) Harmonious interface between various departments in the project organization. d) Final approval for Purchase Requisitions, negotiations with subcontractors and suppliers. e) Administration of the project including industrial relations, personnel relations and welfare. f) Liaison with local authorities along with Accounts and Administration department. g) Responsible for achievement of target set before hand for the project. h) Effective handling of Client complaints. i) Liaison with Client and Consultants. j) Review of nonconformity s noticed during various stages and suggesting/implementing corrective and preventive actions. k) Reviewing and approving Quality System documentation related to site. l) Defining the scope of work and preparing budgets. m) Dealing with all contractual matters. 3.1.2. Project Engineer (Civil): He shall be responsible for a) Study drawings, specifications and prepare work program to execute the work. b) Planning and organizing day-to-day work in his allotted area and giving work status. c) Providing information to Site Engineers for preparation of weekly activities. d) Estimating manpower, material, plant & machinery requirement and informing to Project Manger. Ensuring availability of equipment, material and manpower in consultation with Project Manger. e) Monitoring and controlling subcontractors. f) Defining the scope of work and preparing budgets. g) Preparing Work Orders and certifying the subcontractor s bills. h) Communication with Client / Consultants, where required. i) Dealing with Contractual matters. j) Maintaining quality records related to his area of operation. k) Estimation of quantities. l) Preparation of Client bill, as per the contractual requirements. m) Maintaining records for all extra work. Doc. No. AC/ PQP/003, Rev. A, Date: 2.04.2017 Page 4 of 7

n) Settlement of billing and Preparation of final bill. 3.1.3. QA/QC Engineer: He shall be responsible for: a) Safe working and adopting proper work procedures and methodologies and implementation of QA / QC and safety procedures. b) Implementation of Inspection and Test Plans and maintaining related records. c) Creating general awareness of QA / QC activities amongst workers. d) Identify and document non-conformity s. e) Communicate the nonconformance to concerned personnel. f) Implement corrective / preventive actions in consultation with Project Manager, wherever required. g) Maintaining records related to nonconformance and corrective action / preventive action. h) Preparing Inspection and Test Plans, Method statements (where necessary) and formats. i) Periodic calibration of inspection, measuring and test equipment / instruments and maintaining related records. j) Maintaining and Updating drawing receipt and issue register. k) Receiving and distributing drawings and maintaining/updating Drawing Register. 3.1.6 Site Supervisor/Foreman: He will be responsible to Project Engineer. He shall be overall responsible for day-to-day site activities and also the following. a) Responsible for all activities of your particular site under your purview. b) The work should be carried out as per the Project Procedure / Quality Control Plan given by the PM/PE c) Follow the Company s HSE policy and instruct the technicians to carry out the job with proper PPE. d) Maintaining daily records at site including time sheet, check list, allocation of labour etc. e) Responsible for preparing MRV as per the requirement of materials for your site. f) Responsible for completing the job within given time. g) To discuss the Project Engineer for the progress of the project from time to time. h) Review the time schedule allocated for the project, the manpower, equipments and material delivery schedule and shall approach your PE/PM for changes in the schedule. i) To give instruction to the personnel to keep your site should be clean and tidy at all times. j) Responsible for quality related matters at your site and follow the inspection methods & record the same in inspection formats and get it approve with client. 4. CONTRACT REVIEW 4.1 Review of contract documents: Prior to commencing of project and during execution, the contract documents shall be reviewed by Project Manager to ensure that all references, codes and standards are clearly identified. Doc. No. AC/ PQP/003, Rev. A, Date: 2.04.2017 Page 5 of 7

4.1.1 Any omissions, errors, clarification, etc., shall be communicated to the Client / Consultant/Main Contractor through Project Manager. 4.1.2 Records of all the above communications shall be maintained by Project Engineer. 4.2 Variation to contract: Any variation to the contract raised either by Client / Consultant or Contractor shall be in accordance with the agreed procedures in contract document. 5. DOCUMENT AND DATA CONTROL The document and data control at site shall be controlled as per the flow charts. For the detailed scope of documents to be controlled and the responsibilities for their preparation, review and approval refer Document Management Schedule at Site. Where required, method statements shall be prepared and issued to the users, Client, Consultant, Main contractor and subcontractors. Planning Engineer shall maintain one copy of the same in the Technical Office. 6. PURCHASING Refer flow charts for procedures related to: a) Selection of Subcontractor / Supplier b) Procurement of Material Initial approval of the material / product proposed to be used in the project site, as per the contractual requirement / specifications, shall be obtained from the Client / Consultant and recorded by Material Approval Request. For detailed procedures related to evaluation and selection of subcontractors, issue of Work Orders and control of subcontractor s service / products. For detailed procedures related to material planning and scheduling. 7. PRODUCT IDENTIFICATION AND TRACEABILITY Receipt stage: The procedure followed shall be as detailed in Store keeping procedure. 8. PROCESS CONTROL 8.01. Various activities of the project shall be planned, executed and controlled as per the approved flow chart 8.02. Method Statements, wherever required, would be submitted to Client as and when the jobs are being taken. Doc. No. AC/ PQP/003, Rev. A, Date: 2.04.2017 Page 6 of 7

8.03. Jobs shall be monitored on continuous basis by the Project Manager and Planning Engineer. Good Engineering Practices shall be followed for executing various jobs. 8.04. During the execution and progress of work any variations in the scope of work from the approved construction drawings shall be recorded and approved by the Client / Consultant by Request for Information (RFI) format. 8.05. Non-available / ambiguous information and clarifications pertaining to the works being executed in the project site, shall be obtained from the Client / Consultant. 8.06. Safe working environment shall be ensured while working. 8.07. Plant and Machinery shall be maintained as per the procedures. 8.08. Wherever necessary, processes, personnel shall be qualified and related records shall be maintained. 9. INSPECTION AND TESTING Inspection and testing activities at various stages shall be carried out as per the Inspection and Test Plan, which shall be developed as, in the Quality Control Plan QA/QC Engineer maintains the records as per the Project Quality Plan. In case of subcontracted jobs, Quality records shall be get it approve with client and distributed through document Control procedure. 10. CONTROL OF INSPECTION, MEASURING & TEST EQUPMENT The Inspection, measuring and test equipment / instruments shall be controlled by QA/QC Engineer 11. INSPECTION AND TEST STATUS During in-process and finished product stage, the inspection and test status shall be identified through Project Quality Plan. 12. HANDLING, STORAGE, PACKAGING, PRESERVATION AND DELIVERY Delivery: The project shall be handed over in a phased manner and substantial completion certificates shall be obtained from the Client. The detailed item wise QA & QC plan would be submitted within 10days from the date of receipt of Engineering Instruction received. Doc. No. AC/ PQP/003, Rev. A, Date: 2.04.2017 Page 7 of 7