RECONS PROJECT: MINIMIZING CONSTRUCTION ENVIRONMENTAL IMPACT

Similar documents
Marco de la Feld Smart Ground Prog ject Leader

After-LIFE Communication Plan EcoQuarry

URBAN EMPATHY Working Package 3. RESULT INFORMATION FILE Phase 1. Description of the result to be capitalized in URBAN EMPATHY

Deliverable 3.3 Analysis of actual and potential opportunities to include measures supporting EMAS adoption at national and regional level

PEIT 2005-Cap-03 7/3/06 17:35 Página 35 DEFINING THE PEIT S OBJECTIVES

Waste Management Planning

ENVIRONMENTAL LEGISLATION ANNUAL REPORT SPAIN. (March 2013) Prof. Blanca LOZANO and Diana COGILNICEANU

CASE STUDY Electronic Waste Management (e-waste) developing a system for the collection, re-use and recycling of old PCs

Demographic: by reduction of the birth rate, aging of the population, one-parent families, immigration, etc.

ECOPORT - An environmentally friendly Port Community LIFE98 ENV/E/000426

EMAS KEY BENEFITS FOR ORGANISATIONS AND AUTHORITIES

Management of Infrastructures of Waste Treatment

BILBAO DECLARATION BUILDING IN SAFETY

6515/18 AM/am 1 DG E 1A

Deliverable 3.2 Overview of existing experiences: case studies on simplification measures adopted

EUROPASS DIPLOMA SUPPLEMENT TO HIGHER TECHNICAL VOCATIONAL TRAINING

Global Partnership on Waste Management

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

Final architecture diploma projects in the analysis of the UPC buildings energy performance

ASSET MANAGEMENT SUSTAINABILITY POLICY 2016

Development and Spatial Planning

Environmental Policy and Guide December 2010

4. WHAT ARE THE EXISTING BARRIERS AND HOW CAN THEY BE OVERCOME? 1. INTRODUCTION

DEFRA Consultation on Site Waste Management Plans for the Construction Industry (April 2007)

QUALITY LABEL AND CERTIFICATION FOR SPANISH LEMON EXPORTERS IN COLABORATION WITH:

1.0 Summary of Recommendations for Spain

POSITION PAPER. on the European Commission s Circular Economy Package. Brussels, February / 8

Instruments of environmental policy

13 Resource and Waste Management

13 Resource and Waste Management

LAYMAN S REPORT POLYMIX. Polymer waste in asphalt mixes: a way to increase sustainability of road infrastructures

Greening the food sector in Henan, Qinghai and Sichuan provinces, China

Submission to the Inquiry into the Product Stewardship Bill 2011

PBL Environmental Management System. Staff Awareness Training. This package has been developed by the Parsons Brinckerhoff Ltd, Environment Group

FSC SOCIAL STRATEGY: BUILDING AND IMPLEMENTING A SOCIAL AGENDA VERSION 2.1. Section C: FSC Social Strategy

Business Continuity Policy

URBAN EMPATHY Working Package 3. RESULT INFORMATION FILE Phase 1. Description of the result to be capitalized in URBAN EMPATHY

A WASTE RESEARCH, DEVELOPMENT AND INNOVATION ROADMAP FOR SOUTH AFRICA ( )

COVENANT OF MAYORS WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS WHEREAS WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS WHEREAS,

Yeow Yoon Foo. Sustainability, Social

Assessing the costs and benefits of reducing waste in construction

A New Recycling Policy

EUROPASS DIPLOMA SUPPLEMENT

Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome

Position Paper. This is in contradiction with the principles of an open a broad consultation.

Regional study about the identification of regulatory relief/promotional incentives best practices to promoteemas

Certifying Construction and Waste Collection Companies for Waste Minimisation. Kevin Crutchley - Christchurch City Council

ARLEM report on local water management in the Mediterranean

A8-0031/ AMENDMENTS by the Committee on the Environment, Public Health and Food Safety

STRATEGIC PLAN OF THE IDIBGI

QUALITY ASSESSMENT OF STATISTICS IN EUSTAT

Construction Waste Measurement Guide

Official Journal of the European Union L 310/11

Procurement Services Packaging Policy.

Waste Management Planning

Committee on Petitions NOTICE TO MEMBERS

Committee on the Environment, Public Health and Food Safety. of the Committee on the Environment, Public Health and Food Safety

RECYCLING IN GREATER DEMOLITION PROJECTS AND EXPLOITATION OF THE IRMA CITY CONCEPT

INTEGRATED WASTE MANAGEMENT. APPROACH AND IMPLEMENTATION IN ROMANIA. Silvian IONESCU 1

BUILDING A MUNICIPAL PRIVATE SECTOR DEVELOPMENT COOPERATION STRATEGY

A FEASIBILITY STUDY CARRIED OUT FOR THE ISLAND OF HYDRA GREECE

Towards EMAS Action Plan

Separate Collection and Biological Treatment of Food and Biowaste in a Circular Economy

REPORT UPDATE OF THE MID TERM EVALUATION OF THE LOCAL OPERATIONAL PROGRAMME

What to expect from MDR Authorised representatives? Sandra Ferretti Chief Compliance Officer & Public Affairs Director

EXECUTIVE DEVELOPMENT & GROWTH FOR EXCELLENCE (EDGE)

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

Welsh Assembly Government Written Response to the Sustainability Committee Report on its Inquiry into Access to Inland Water.

Joint Customs 2020 & Fiscalis The Dublin Initiative

Council conclusions on eco-innovation:enabling the transition towards a circular economy

Waste Management Planning

The construction and demolition waste consist of inert material, most of which are recyclable. These constituents can be classified as:

Emergency Government Ordinance No. 195/2005 on environmental protection, as further amended and supplemented ( GO No. 195/2005 );

Principles of Integrated Energy Design in the muncipal practice. Jose Santos, 19 th September 2013

EU Legislation on Export/Storage/Disposal of Mercury

Performance audit report. Waste management planning by territorial authorities

MODULE 2 TOURISM AND DEGRADATION OF COASTAL RESOURCES

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT

Closed - Closed Loop System with EcoIndustrial District - CLOSED LIFE99 ENV/IT/000048

CENTRAL EUROPE PROGRAMME

UFTEC - Substitution of conventional treatment of raw river water by ultrafiltration membrane technology LIFE09 ENV/ES/000467

Agents that participate in its carrying-out. Methodology of the working group. First meeting. Presentation of the methodology to companies

WASTE-C-CONTROL - Waste management options for greenhouse gases emissions control LIFE09 ENV/GR/000294

INDICATORS FOR EVALUATION OF TRANSPARENCY

EUROCHAMBRES and UEAPME s amendment proposals on the revision of the Waste Framework Directive

ROMAIR - Implementation of an air quality modelling and forecast system in Romania LIFE08 ENV/F/000485

The Nestlé Policy on the Environment

Circular Economy: an opportunity for micro SMEs. Peter Czaga, DG Environment, European Commission

CASE STUDY EMAS IN THE WASTE SECTOR

POSITION June Circular Economy Proposal for a Directive amending Directive 2008/98/EC on Waste. Parliamentary Draft Report of Simona Bonafè, MEP

2015 SOLID WASTE ANNUAL REPORT

Waste Strategy for Herefordshire and Worcestershire: A Review

DGE 1 EUROPEAN UNION. Brussels, 27 April 2018 (OR. en) 2015/0274 (COD) PE-CONS 10/18 ENV 127 CODEC 251

Safety, Environmental and Social Responsibility Policy

GUIDANCE NOTE ON THE CONCEPT OF RELIANCE ON THE WORK OF

Quality Assessments of Statistical Production Processes in Eurostat Pierre Ecochard and Małgorzata Szczęsna, Eurostat

Recycling of Waste Materials in the Production of Stone Wool for Insulation LIFE98 ENV/DK/000629

Assessing the costs and benefits of reducing waste in construction

The official procedure for mandatory inspection of sprayers in use in Spain. How to deal with regional autonomous authorities.

Transcription:

RECONS PROJECT: MINIMIZING CONSTRUCTION ENVIRONMENTAL IMPACT J.L. Caña (1), A. Garcia (2) and B. Tenas (3) (1) Gremi de Constructors d Obres de Barcelona i Comarques (Builders Guild), Spain (2) Gremi de Constructors d Obres de Barcelona i Comarques (Builders Guild), Spain (3) Socintec, Spain Abstract The aim of the RECONS project is to minimise the environmental impact of the construction sector activity and to define sustainable waste management strategies. The innovative nature of the project RECONS lies in the cooperative approach to an Environmental Management System according to the 761/2001/CE Regulation that states that organisations can voluntarily adhere to a Community Environmental Audit Management System (EMAS). The project considers the promotion of the EMAS in small and medium-sized firms and micro-firms of the construction industry. The project RECONS, in the construction framework, seeks to make the application of a Cooperative Environmental Management System viable through the Builder Professional Union of Catalonia (Guild) and to extend it not only to the activity of the Union but to the smallest firm related to it. Defining this objective means taking into account the following aims: Facilitating the implementation of environmental policies in small, medium-sized and micro firms Sensitising and involving employers and employees in an efficient and effective way by means of the organisational structure and the existing channels between the small and medium-sized firms and the micro-firms as well as the Guild that associates them Attaining that the environmental intervention at the defined geographical territory connects all the present actors and optimises the work relations among them. Fulfil the environmental legislation related to the construction sector at the local, autonomic, national and european levels. 288

The specific objectives are: - To present the Project to the members of the Builders' Guild as well as the various agents involved in the construction sector and relevant administrations. - To explain to the members of the Guild of Constructors and those responsible who are directly involved the approach to be taken to the project and its planning. Keywords: Recons: Reducing construction environmental impact SME: Environmental Management System 1. PROJECT PARTICIPANTS The technical ability of the participants in the project can be seen in the following graph: COLLABORATOR CO-FINANCERS LOCAL ADMINISTRATION (Municipalities) Government of Catalonia Department of the Environment Directorate of Territorial Policy and Public Works Master Plans (Location of Infraestructures) Introduction of Municipal Bye-laws of Waste Management Directorate General of Environmental Planning Sectorial Programming Directorate General of Environmental Quality Certification The Waste Agency Waste management Centre for the Enterprise and the Environment - CEMA - Good housekeeping practices Secretariat Territorial Planning - Planning and management of soil use - Urban planning - Master plans MEMBER Programme to Foster Planning and sustainable construction Co-operative EMS Standardisation of recycled materials PROGROC Infrastructures INSTITUTE OF THE TECHNOLOGY OF CONSTRUCTION ( ITeC) Transfer plant Rubble tips Areas: Constructive process, Quality, Maintenance and Rehabilitation, R+D+I Programme BENEFICIARY POLYTECHNIC UNIVERSITY OF CATALONIA (UPC) Environmental Planning Chemical Engineering Civil Engineering MEMBER COLLABORATOR Micro Small Medium-sized Large companies enterprises enterprises enterprises 92 % 7% 1% CONSTRUCTION ACTIVITIES (Excavations, new buildings, rehabilitation and demolition) : Quality Environment and occupational risk prevention Support for the companies activity: Information, Dissemination, Assessment, Training Communication Action Framework Activity Figure 1: Project participants 289

2. TASK FLOW Below, follows a description of the task flow to be developed to carry out the RECONS project Figure 2: Task flow 3. TASK DESCRIPTION Elaborating a qualitative diagnosis to obtain data from the industry (T1) There is dispersed information about the real environmental impact of building activity in the metropolitan area of Barcelona (323,000 ha, 4.5 million inhabitants), taking into account the different territorial realities (from urban to rural). In order to know the reality of the building sector in this territorial unit and the environmental problems derived from carrying it out, it is vital to localise, order, analyse and synthesise the data that exists about it, with the aim of obtaining updated and reliable information about the sector that will enable decision-making strategies to be defined and, in the end, to model the alternatives for management efficiently. When analysing this data, the 290

different variables that define Environmental Management of the sector will be taken into consideration, which are the following: Size of the company Its situation in the territory Stage / Unit of Work Environmental Management Equipment Extraction activities Volume of waste/treatment Management itineraries Designing a Cooperative Environmental Management Model (related to the 721/2001/CE EMAS regulation) (t2) The Principles of the Design of the Co-operative Environmental Management System Model are established in accordance with the following: Both the organisation, functions and responsibilities, as well as the activities and actions that are established in the Co-operative Environmental Management System, will reflect, as far as possible, the current function of the Guild, including, however, the modifications and new activities that are considered necessary to adapt it to the requirements of the System, taking as a reference the EMAS model. The modifications and new activities proposed will be proposed in such a way that they will optimise the efficiency of the processes: adapting existing operative documents and defining the mechanisms of communication and protocols of operation between the Guild and the member companies. The systematisation, rationalisation and standardisation of the activities that generate or that could generate environmental aspects of a greater or lesser significance, will have as its aim the prevention and minimisation of the environmental impact derived for the different activities that the building sector develops. As a result, the introduction of the system should initiate the Guild and the companies involved in a process of continual improvement of its environmental behaviour. In the Co-operative Environmental Management System both the information that is to be collected systematically to recognise the possible incidents as well as the mechanisms for action for their correction, prevention and improvement will be included. Accomplishing an environmental assessment (T3) The activities of the central headquarters of the Guild in Barcelona and the respective headquarters of the building companies participating of this phase of the project are 291

considered to be the object of the Environmental Assessment. In the same way, centres of temporary work will be defined to assess, depending on the unit or phase of the work that is being carried out at the time the assessment is made. As a minimum, temporary work centres in which the following construction activities are developed will be the object of assessment: - A new building with excavation of the metropolitan setting, - Demolition in an urban centre, - Rehabilitation in an urban centre, - A new building in a rural setting, - Civil engineering in a metropolitan setting. In this way, the set of work selected and the central headquarters previously mentioned, will cover a representative spectrum of the activity of the sector, which will offer a good appreciation of the environmental points that its activity generates.. However, it must be taken into account that viability in the consideration of the environmental aspects, will come largely from the specific setting in which each site is located and the transport obliged by the management of particular aspects. Elaborating the Cooperative Environmental Management System Documentation (T3.1) Based on the Environmental Assessment carried out, the documents required for the Cooperative Environmental Management System to comply with the requirements derived from the concept of co-operation between the Guild and the member SMEs and micro companies will be drawn up. The reference point for the development of this phase of the project will be the structure and requirements of Regulation (EC) 761/2001 (EMAS). The documents will be divided into three levels: Co-operative Environmental Management Manual Strategic Documents Operational Documents Policy, Objectives, Goals, Environmental Statement Procedures and Technical Instructions Figure 3: Different levels of the document The documents of the Co-operative Environmental Management System must be as complete, clear and precise as possible, to facilitate and ease its consultation and understanding by the building companies involved in the project and, in the future, those that adhere to the system. Therefore, one must try to write up all the documents of the System simply, using the greatest number of graphics possible. 292

+ International RILEM Conference on the Use of Recycled Materials in Buildings and Structures POLITICA MEDIOAMB. PROGRAMAS MEDIOAMBIENTALES MANUAL DE GESTIÓN MEDIOAMBIENTAL PROCEDIMIENTOS OPERATIVOS INSTRUCCIONES DE TRABAJO OTROS DOCUMENTOS (Planes de formación, planes informes deauditoría, etc.) REGISTROS DEL SISTEMA (Incidentes, quejas, denuncias, etc.) DECLARACIÓN MEDIOAMBIENTAL Figure 4: Pyramidal structure of the document Implementing the Cooperative Environmental Management System (T3.2) To ensure that the introduction process develops in an optimum way and guarantees the smooth running of the system, two kinds of instruments will be used: 1. Training staff. 2. Technical service in setting up and developing the system. During the process of introducing the Co-operative Environmental Management System, the members of staff of the Guild and of the participating building companies must become integrated into the system, as they have to participate in the process of continuous improvement of environmental behaviour. This involvement can be considered from two points of view: on the one hand, they will be participants; and on the other they should be informed and trained to achieve their participation. Of the mechanisms of participation the EMAS system proposes, which is the reference for this project, the following are noteworthy: Reciprocal information between the different levels of the organisation. Education and training on the basis of the EMAS (in accordance with the responsibility). Participation at all levels and at all stages. Establishing the tools that will enable the channelling of suggestions from the employees and of reward systems. 293

System Implantation. Pilot experiences - Defining indicators (T3.3 / T3.3.1) To achieve the desired results, 10 pilot schemes will be carried out in 5 scenarios of action, depending on the different alternatives of waste management. The scenarios chosen are the following: a) Activities of building new constructions with excavating activity in a metropolitan setting. b) Activities of building new constructions in which the Project Phase has included criteria for minimising, re-using and classifying the site waste. c) Demolition activities in an urban centre. d) Activities of rehabilitation in an urban centre. e) Activities of building a new construction in a rural setting. For each of these 5 scenarios, one or more of the building companies will be involved. The building projects associated with these five scenarios should have an Environmental Site Management Plan, a document that reflects the application of the requirements of the Cooperative Environmental Management System in the project. The scheme, therefore, will allow the introduction and validation of the efficiency of the system in different realities and sizes of companies. In these five scenarios, therefore, the respective Environmental Site Management Plans will be introduced, which will define, amongst other elements, the alternatives for building waste management at several levels, depending on the location of the site. These levels will be the following: 1. Re-use "in situ": reduction and separation at source. For each site, there will be an analysis of the possibility of "in situ " installation of technology for recycling the waste. 2. Waste recovery outside the site: Segregation of site waste clean waste Final waste fraction with various residual materials (stone and mineral materials, metallic fractions, others...) dirty waste This contemplates the introduction and validation of good housekeeping practices in site waste management and the introduction of procedures for segregating materials likely to be recycled in external installations: Transfer plants Fixed recycling plants 3. Disposal of final waste in landfills. For correct waste management, in the scenarios where, for certain reasons the waste cannot be introduced again into the productive cycle, procedures will be defined to validate and control the destination of the waste fractions that are taken to landfill. The disposal of final waste is always considered as the final option in waste management, with the intention of minimising the quantity of waste sent to landfill. The location of landfills will be assessed with regard to the building sites. 294

Testing and validating the system (T3.4) To articulate the mechanisms required to complete the process of introducing the Cooperative Environmental Management System successfully. To put into practice the processes of continuous improvement of environmental management. To facilitate the use of self-control by the building companies in environmental matters. To guarantee that the Model adapts to the technical and economic conditions of the SMEs and micro companies, so that its immediate application is feasible. Model diffusion planning (T4) To raise awareness of the project in general, and the Methodology in particular, fostering its application both on companies in the Territorial Unit and in other Spanish and European companies that operate under similar conditions to those of the area which is the object of the project. To distribute the materials that result from the associations, organisations and bodies linked to the building sector and particularly those that make up SMEs and micro companies at a regional and state level, as well as local, regional, state and community Administration with competence in the matter. The development of these stages is rounded off with the starting-up of a Training and Awareness Plan. In this process a particularly relevant question for the project is guaranteed - developing and implementing Building Environmental Management Plans that will allow controlling and assessing the management of those environmental aspects generated by the building activity. When defining the Building Environmental Management Plan, the necessary criteria to guarantee its effective and efficient implementation in the small and medium-sized firms as well as in the micro- firms should be taken into consideration. The Plan seeks to integrate the environmental management criteria of the Cooperative Environmental Management System into all stages related to a building project - from the project Designing stage to its Planning and Execution. The plan should reflect the implementation of the System to a particular building project. Therefore, this document should gather the different ways to actuate, the resources and the list of activities linked to the environmental management related to a particular work. 4. EXPECTED RESULTS A cooperative environmental management system applicable to the whole construction industry in Catalonia and other regions in the EU A significant reduction of the environmental impact derived from the activity of the different firms participating in the project 295

A procedure to develop Building Environmental Management Plans applicable to small and medium-sized firms as well as to micro-firms in the construction industry A definition of waste management strategies derived from building activities - defining and listing environmental management and operational behaviour indicators for decision- making in strategy selection To start the proper recycling and reuse process of the reject materials of the construction, to formalize the endorsement process that guarantee their application in the construction industry. A practical guide for cooperative environmental management that guarantees a constant improvement of the environmental results in the industry. The Model diffusion is planned to be carried out both within the aimed region and in the whole Catalan territory, as well as in other Autonomous Communities in Spain and other Europeans regions. 296