Washington Suburban Sanitary Commission

Similar documents
227 West Trade Street Phone Suite 1400 Fax Charlotte, NC 28202

March 11, Mr. Dan Brown Chief Executive Officer Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, NC Dear Mr.

227 West Trade Street Phone Suite 1400 Fax Charlotte, NC 28202

April 19, Dear Ms. Haskins

WATER AND WASTEWATER CAPACITY FEES REPORT PROPOSED

What are WSSC s conservation objectives? How is conservation linked to WSSC s environmental protection, resource management, sustainability goals?

Update to Facility Capacity Charges Methodology and Schedule. A study for El Dorado Irrigation District. prepared by. Bartle Wells Associates

Chesapeake Bay WIP Phase II Status in the COG Region

FINAL REPORT. Lake Arrowhead Community Services District Water and Sewer Capacity Fees January \

GUIDANCE DOCUMENT WATER SUPPLY CAPACITY MANAGEMENT PLANS MARYLAND DEPARTMENT OF THE ENVIRONMENT

ADOPTED CIP. Capital Improvements Program FYs

Washington Suburban Sanitary Commission. PROPOSED CAPITAL IMPROVEMENTS PROGRAM Fiscal Years STAFF DRAFT PUBLIC HEARING DOCUMENT

2.0 ASSESSMENT OF WSSC

WATER AND SEWER CAPACITY FEE STUDY

Water and Wastewater Facilities Land Use Assumptions Plan, Capital Improvements Plan, and Maximum Impact Fees Study. San Antonio Water System

Las Gallinas Valley Sanitary District Sewer Capital Facilities Charge March 2015

FY CIP. Commissioners Worksession July 19, 2017

FEE SCHEDULE 7 Water Development and Connection Fees Aurora Water (Platted Before January 1, 2017)

CITY OF PITTSBURG DEVELOPMENT OF WATER AND SEWER FACILITY RESERVE CHARGES

Revising Water and Wastewater Impact Fees in a Time of Rapid Change in the West

COG Region s Potomac Water Quality & Wastewater Treatment Fact Sheet (current draft, as of 7/28/09)

City of Stockton California

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law

WATER AND SEWER CAPACITY FEE STUDY

APPENDIX B. WSSC Design Criteria for Water Distribution Systems

Water, Wastewater and Irrigation Impact Fee Study

CENTRAL DAVIS SEWER DISTRICT

TABLE OF CONTENTS DRAFT

Contents 8/31/2017 DRAFT REGIONAL IMPACT FEE FACILITIES PLAN & ANALYSIS

Land Use Assumptions Technical Memorandum

TABLE OF CONTENTS 1.0 INTRODUCTION

Approved Design Capacity for Grant Funding Under the Bay Restoration Fund

Capital Improvements Plan (CIP) Water Delivery / System Development. Capital Improvements Advisory Committee September 5, 2018

Technical Memorandum No. 1

Tap Fees and System Development Charges for Residential Water and Wastewater Connections in North Carolina as of January 2009.

Federal Storm Water Requirements

Altoona Water Authority

BUENA SANITATION DISTRICT

FINANCING CONSIDERATIONS FOR P3 PROJECTS

SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES. Comprehensive Water, Sewer, and Stormwater Rate Study

Anacostia River Tunnel Briefing For: ANC 6B

GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS

Final Report Rate, Charge, and Cost of Service Study. For: Parker Water and Sanitation District. December 2014

System Development Fee Analysis. Prepared for. Brunswick Regional Water and Sewer H2GO

A GUIDE TO DESIGNING CONSERVATION-ORIENTED WATER SYSTEM DEVELOPMENT CHARGES

3. Water Conservation Program

Evaluation of Nonresidential Wastewater Discharge presentation of Findings and Recommendations

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview

How Much Does it Cost to Connect to a Water and Wastewater Utility in North Carolina? Residential Water and Wastewater Connection Fees as of January

COMMISSION ADOPTED POLICY Revenue Policy

Western Municipal Water District 2015 DRAFT Connection Fee Study No Water Demand Offset Fee + Schedule Rate Increases

Water Supply Outlook. Interstate Commission on the Potomac River Basin (ICPRB) 30 W. Gude Drive, Suite 450 Rockville, MD Tel: (301)

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

WATER AND WASTEWATER RATE STUDY

ASSUMPTION STUDY. City of Bellevue Water & Sewer Area in the City of Issaquah City Limits August Prepared for: City of Issaquah

City of Anacortes Utility Rates & Information January 2016

OAKLAND COUNTY HEALTH DIVISION SANITARY CODE ARTICLE II - GROUNDWATER PROTECTION

ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977

Successful Stormwater Utility Programs

CALGARY EDMONTON FORT ST. JOHN KAMLOOPS KELOWNA NELSON QUESNEL RICHMOND

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Water Supply Outlook. Interstate Commission on the Potomac River Basin (ICPRB) 30 W. Gude Drive, Suite 450 Rockville, MD Tel: (301)

MEMORANDUM TO THE INDUSTRY

NOTICE OF INTENT TO ADOPT REGULATIONS

health for the purpose of providing adequate sewer and drainage facilities in the City of Louisville and

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

TASK IV: ANALYSIS OF MILLBROOK SEWER AND WATER SYSTEM CONSUMPTION CHARGES AND SEWER CAPITAL ASSESSMENTS

MontgomeryPlanning.org

Frequently Asked Questions About Water and Wastewater Rates (FY )

2010 UPDATE OF WATER AND WASTEWATER IMPACT FEES FOR THE CITY OF GEORGETOWN

San Francisco PUC Clean Water Enterprise Wastewater Rate Study

2010 Washington Metropolitan Area Water Supply Reliability Study

Wastewater Treatment Capacity Analysis of the Ballenger-McKinney Wastewater Service Area of Frederick County, Maryland Updated

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

SEWERAGE AND SEWAGE DISPOSAL SERVICE

UPDATE. Funding Decentralized Wastewater Systems Using the Clean Water State Revolving Fund ACTIVITY

Cooperative Multi Community Water Systems

Water and Wastewater Cost of Services Analysis June 2016

General Manager s Report

CHAPTER 4 SYSTEM DESIGN CRITERIA

SI ENERGY MANAGEMENT PROGRAM & WATER SUPPLY EMERGENCY PLAN

Water Pollution Control Utility Financial Planning Study

Arlington County, Virginia. Presentation to the County Board

water resources FUNCTIONAL PLAN

WASHINGTON SUBURBAN SANITARY COMMISSION MINUTES OF THE COMMISSION MEETING. Chair Thomasina V. Rogers called the meeting to order at 10:11

Comprehensive Cost of Service and Rate Design Study

Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011

Public Utilities Director. Public Utilities Assistant Director. Administrative Analyst. Laboratory. Laboratory Manager. Sr. Utilities.

COBB COUNTY WATER SYSTEM RATES, CHARGES AND FEES MONTHLY SERVICE CHARGES

RATE SETTING OVERVIEW. City of Richmond, VA Department of Public Utilities

DC Water s Green Bond Report DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY FISCAL YEAR 2017

SURFACE WATER UTILITY FEE

DRAFT FINAL REPORT. City of Kalispell. Stormwater Impact Fee Study

Impact Fees: Existing Capacity Valuation

WATER & SEWER SERVICES

Water Conservation Plan

PRELIMINARY REGIONAL WATER IMPACT FEE FACILITIES PLAN & ANALYSIS CALCULATIONS WASHINGTON COUNTY, UTAH

GUIDELINE FOR PROVIDING WATER AND SEWER SERVICE TO DEVELOPER PROJECTS AND PUBLIC OR PRIVATE PROPERTIES

APPENDIX B THE MUNICIPAL AUTHORITY OF THE TOWNSHIP OF ROBINSON DESCRIPTION OF THE AUTHORITY ' S WATER AND SEWER SYSTEM AND FINANCIAL INFORMATION

SEWER USER RATE CHARGE STUDY

Transcription:

Washington Suburban Sanitary Commission Water and Sewer System Development Charge Study Final Report February 2018 MFSG 911-A Commerce Road Annapolis, MD 21401 410.266.9101 mfsgllc.com

Municipal & Financial Services Group February 13, 2018 Letitia Carolina-Powell Budget Division Manager Washington Suburban Sanitary Commission 14501 Sweitzer Lane Laurel, MD 20707 Dear Ms. Carolina-Powell, Reference: Water and Sewer System Development Charge Study The Municipal & Financial Service Group is pleased to submit to the Washington Suburban Sanitary Commission this report summarizing the water and sewer system development charge study. This document represents the results of our analysis which provides an evaluation of WSSC s system development charges, including detailed calculation of the charges and benchmarking of the charges with those of other utilities in Maryland and Virginia. It has been our distinct pleasure to work with the Commission on another endeavor. The assistance provided by management and staff was essential to the completion of the study. The dedication of everyone who assisted in the study process should be acknowledged and was vital to the success of the study. Thank you for the opportunity to work with the WSSC on this important project. Very truly yours, Michael Maker Senior Manager Municipal & Financial Services Group 911-A Commerce Road Annapolis, Maryland 21401 410.266.9101 Office 410.266.5545 Fax www.mfsgllc.com

TABLE OF CONTENTS 1. Background...1 2. Current System Development Charges...1 Exhibit 2.1.1 Current System Development Charges... 1 3. Calculation Methodology...1 4. Net Replacement Cost of Assets...2 Exhibit 4.1.1 Net Replacement Cost of Assets Calculation... 2 5. Units of Capacity...3 Exhibit 5.1.1 Capacity Fixture Units... 3 6. SDC Calculation...4 Exhibit 6.1.1 SDC Calculation... 4 7. Proposed SDCs...4 Exhibit 7.1.1 Proposed System Development Charges... 4 8. System Development Charge Comparison...5 Exhibit 8.1.1 System Development Charge Comparison - Single Family... 6 Exhibit 8.1.2 Combined System Development Charge Comparison - Single Family... 7 MFSG TOC WSSC

1. Background WSSC collects system development charges from new customers joining the water and sewer systems. System development charges (SDCs) are charges levied on new development to pay for the construction of major water and sewerage facilities needed to accommodate growth. Water and sewer system development charges are discussed below with any suggested changes/modifications. 2. Current System Development Charges WSSC s current SDCs are charged based on the number of fixture units (i.e., plumbing fixtures such as toilets, sinks, baths, etc.) within a property, with the charge per fixture unit being $88.00 for water and $115.00 for sewer. There is a specific charge identified for apartments and three charges for residential properties based on the number of toilets. The current system development charges are shown in Exhibit 2.1.1. Exhibit 2.1.1 Current System Development Charges Property Type Water Sewer Combined Apartment $896.00 $1,140.00 $2,036.00 1-2 toilets / residential $1,344.00 $1,710.00 $3,054.00 3-4 toilets / residential $2,240.00 $2,850.00 $5,090.00 5 toilets / residential $3,135.00 $3,991.00 $7,126.00 6+ toilets / residential (per fixture unit) $88.00 $115.00 $203.00 Non-residential (per fixture unit) $88.00 $115.00 $203.00 3. Calculation Methodology System development charges were evaluated using the system buy-in method (also referred to as the equity method) which reflects the cost of buying into the current system, or the average equity of existing customers. This calculation is often used in a utility which has sufficient capacity to serve both current and new customers. The methodology used follows the methodologies referenced in American Water Works Association s Principles of Water Rates, Fees, and Charges (AWWA Manual M1) and Water Environment Federation s Financing Charges for Wastewater Systems (WEF Manual of Practice No. 27). The calculation is essentially the replacement cost of assets (net depreciation and outstanding principal on debt) divided by units of capacity. MFSG 1 WSSC

4. Net Replacement Cost of Assets The following steps were taken to calculate the replacement cost of assets to be included in the SDC calculation: 1. The original cost of each of WSSC s fixed assets was escalated to replacement cost in today s dollars, using the Construction Cost Index published by Engineering News Record. Then, the percent to which each asset was already depreciated was used to calculate the replacement cost less depreciation, referred to as replacement cost new less depreciation or RCNLD. Using RCNLD reflects the replacement value of WSSC s assets while taking into consideration the remaining depreciable life of the assets and equitably compensates existing customers for the excess capacity that is available for development. Next, the eligibility for the SDC calculation of each asset was determined. Since an SDC recovers the capital costs of backbone capacity in the water and sewer systems and WSSC already recovers the capital costs of constructing distribution and collection mains through front foot benefit charges, water and sewer mains with diameters 14 inches or less (used as a proxy for distribution and collection mains) were excluded from the SDC calculation. Multiplying the RCNLD asset values by their percent eligible for the SDC calculation results in the valuation for the SDC calculation. 2. Projects within WSSC s approved FY 2018 FY 2023 capital improvement plan that invest in the backbone system (storage, treatment, transmission and conveyance projects) were added to the SDC calculation as they contribute to WSSC s asset base as they are constructed. 3. The present value of outstanding principal on debt was subtracted from the SDC calculation to avoid charging customers twice (through SDCs and user rates) since debt issued for projects is typically recovered through user rates (which SDC customers end up paying once they join the system). 4. Adding the replacement cost (less depreciation) of assets to the eligible capital project costs and subtracting the present value of outstanding principal on debt results in the net replacement cost. The components of the SDC net replacement cost calculation are shown for water and sewer in Exhibit 4.1.1: Exhibit 4.1.1 Net Replacement Cost of Assets Calculation Step SDC Cost Component ($, millions) Water Sewer 1 Replacement Cost New Less Depreciation (RCNLD) $2,083.7 $3,281.2 2 Capital Projects $1,260.7 $1,609.5 3 Less Present Value of Outstanding Principal on Existing Debt ($702.0) ($1,089.2) 4 Net Replacement Cost $2,642.4 $3,801.5 MFSG 2 WSSC

5. Units of Capacity The following steps were taken to calculate the service units to be included in the SDC calculation: 1. The design capacity of the treatment facilities was calculated. WSSC owns two water treatment facilities (Potomac and Patuxent) which have a combined water treatment capacity of 345.0 million gallons per day (mgd). WSSC owns six wastewater treatment facilities (Piscataway Creek, Seneca, Damascus, Western Branch, Parkway and Hyattstown) and has purchased 169.6 mgd of treatment capacity at the Blue Plains Regional Wastewater Treatment Plant in Washington, DC, 3.0 mgd of capacity at the Mattawoman wastewater treatment in northern Charles County and 0.02 mgd (20,000 gallons per day) of capacity in the Town of Poolesville s wastewater treatment plant. This equals a combined sewer treatment capacity of 271.64 mgd. 2. Based on WSSC s previously calculated average water residential usage and peaking factor, a water equivalent dwelling unit planned required capacity of 339.57 gpd was calculated. Based on WSSC s previously calculated average sewer residential usage and I&I factor, a sewer equivalent dwelling unit planned required capacity of 329.70 gpd was calculated. 3. Using the current 3-4 toilets / residential SDC as the typical household size, the combined SDC of $5,090.00 was divided by the per fixture unit SDC of $203.00 resulting in approximately 25 fixture units per 3-4 toilets / residential property type. The calculated water equivalent dwelling unit of 339.57 gpd was divided by 25 fixture units resulting in 13.58 gpd per fixture unit for water. The calculated sewer equivalent dwelling unit of 329.70 gpd was divided by 25 fixture units resulting in 13.19 gpd per fixture unit for sewer. 4. The water design capacity of 345.00 mgd was divided by the 13.58 gpd per fixture unit resulting in 25.4 million capacity fixture units, while the sewer design capacity of 271.64 mgd was divided by the 13.19 gpd per fixture unit resulting in 20.6 million capacity fixture units. The components of the SDC capacity fixture units calculation for water and sewer are shown in Exhibit 5.1.1: Exhibit 5.1.1 Capacity Fixture Units Step Units of Capacity Component Water Sewer 1 Current Capacity (mgd) 345.00 271.64 2 Equivalent Dwelling Unit (EDU, in gpd) 339.57 329.70 3 GPD/Fixture Units 13.58 13.19 4 Capacity Fixture Units (millions) 25.4 20.6 MFSG 3 WSSC

6. SDC Calculation To calculate the SDC per capacity fixture unit, the net replacement cost was divided by the capacity fixture units, resulting in an SDC per fixture unit for water of $104.03 (or $104.00 rounded to the nearest dollar) and an SDC per fixture unit for sewer of $184.56 (or $185.00 rounded to the nearest dollar), as shown in Exhibit 6.1.1. 7. Proposed SDCs Exhibit 6.1.1 SDC Calculation SDC Calculation Component Water Sewer Net Replacement Cost ($, millions) $2,642.4 $3,801.5 Current Capacity Fixture Units (millions) 25.4 20.6 SDC per Fixture Unit $104.03 $184.56 SDC per Fixture Unit (rounded to the nearest dollar) $104.00 $185.00 FY 2019 proposed system development charges using WSSC s charge basis and the calculation methodology described above are presented (along with WSSC s current SDCs) in Exhibit 7.1.1. Exhibit 7.1.1 Proposed System Development Charges Current FY 2019 Proposed Property Type Water Sewer Combined Water Sewer Combined Apartment $896.00 $1,140.00 $2,036.00 $1,040.00 $1,850.00 $2,890.00 1-2 toilets / residential $1,344.00 $1,710.00 $3,054.00 $1,560.00 $2,775.00 $4,335.00 3-4 toilets / residential $2,240.00 $2,850.00 $5,090.00 $2,600.00 $4,625.00 $7,225.00 5 toilets / residential $3,135.00 $3,991.00 $7,126.00 $3,640.00 $6,475.00 $10,115.00 6+ toilets / residential (per fixture unit) $88.00 $115.00 $203.00 $104.00 $185.00 $289.00 Non-residential (per fixture unit) $88.00 $115.00 $203.00 $104.00 $185.00 $289.00 MFSG 4 WSSC

8. System Development Charge Comparison As part of the system development charge analysis, a comparison of WSCS s SDC methodology and charges was developed. Exhibit 8.1.1 provides a comparison of system development charges for surrounding utilities in Maryland and Virginia (sorted alphabetically within each state). The SDC calculations in the last three columns represent the cost for a single family residence to connect to the respective utility s system; the comparison is for the smallest meter size allowable by the utility for a single family residence (WSSC s standard for new developments is 1 inch), 3 toilets and 25 fixture units in order to provide an apples to apples comparison of utilities with different charge methodologies. As shown in Exhibit 8.1.1, the charge or fee imposed by other utilities equivalent to an SDC at WSSC can be referenced as several different names, such as a connection fee, impact fee, capacity fee, availability fee (which is common in Virginia) or some other name. The methodology for calculating SDCs also varies by utility. Like WSSC, some of the comparison utilities (such as Frederick County, Arlington County and Fairfax County) base the charge on the number of fixture units in the property, some (such as Baltimore County, Howard County Fairfax Water and Loudoun Water) base it on meter size and others (Anne Arundel County, Harford County and Prince William County Service Authority) base it on equivalent dwelling unit (EDU) or equivalent residential unit (ERU). While the meter size basis is the most common methodology in the industry and the easiest to administer, the fixture unit basis (which WSSC uses) provides for a greater level of accuracy when calculating water and sewer demands. MFSG 5 WSSC

Exhibit 8.1.1 System Development Charge Comparison - Single Family State Utility Name Methodology Water SDC Sewer SDC Combined SDC Maryland WSSC (Current) System Development Charge toilets/fixture units $2,240 $2,850 $5,090 Anne Arundel County Capital Facility Connection Charge equivalent dwelling units (EDUs) $6,855 $6,855 $13,710 Baltimore County Systems Connection Charge meter size $575 $875 $1,450 Frederick County Capacity Fee dwelling units/fixture units $5,160 $7,202 $12,362 Harford County System Development Fee equivalent dwelling units (EDUs) $3,735 $7,714 $11,449 Howard County House Connection Charge meter size $2,400 $4,500 $6,900 Virginia Arlington County Infrastructure Availability Fee drainage fixture units (DFUs) $2,125 $2,875 $5,000 Fairfax Water/Fairfax County Availability Charge meter size/fixture units $4,100 $8,100 $12,200 Loudon Water Availability Charge meter size $6,766 $8,209 $14,975 PWCSA Availability Fee meter size/equivalent residential units (ERUs) $4,600 $10,800 $15,400 MFSG 6 WSSC

Exhibit 8.1.2 provides a comparison of the combined (water and sewer) system development charges for WSSC with surrounding utilities. The utilities and numbers shown are the same as those in Exhibit 8.1.1, sorted in descending order by combined charge total. The single family residence is assumed to have the smallest meter size allowable by the utility for a single family residence (WSSC s standard for new developments is 1 inch), 3 toilets and 25 fixture units in order to provide an apples to apples comparison of utilities with different charge methodologies. While the most current charges available were used in the comparison, the amounts may not reflect unknown increases within the comparison utilities. Exhibit 8.1.2 Combined System Development Charge Comparison - Single Family Average, $9,615 PWCSA $4,600 $10,800 Loudon Water Anne Arundel County $6,766 $6,855 $6,855 $8,209 Frederick County Fairfax Water/Fairfax County Harford County $4,100 $3,735 $5,160 $7,714 $7,202 $8,100 WSSC (Proposed) Howard County $2,600 $2,400 $4,625 $4,500 WSSC (Current) $2,240 $2,850 Arlington County Baltimore County $2,125 $575 $875 $2,875 Water Sewer $- $2,000 $4,000 $6,000 $8,000 $10,000 $12,000 $14,000 $16,000 $18,000 Exhibit 8.1.2 shows that for a typical single family connection, the combined proposed system development charge for WSSC remains lower than the average for the comparison utilities. MFSG 7 WSSC