Srikanth Kommu. Dholera & Auric. BIM for Infrastructure Projects. Industrial Cities. General Manager DMICDC

Similar documents
Delhi Mumbai Industrial Corridor (DMIC) Project

Status Note: DMIC Project. 1. Activation Area (22.5 sq.km) in Dholera Special Investment Region (DSIR), Gujarat:

Smart Communities of the 21 st century

ENERGY CONSERVATION IN BUILT ENVIRONMENT IN SMART CITIES

Navin Kumar

INDUSTRIAL CITY DEVELOPMENT LIMITED

ISAS Brief No. 76 Date: 16 July 2008

An Exploratory Study of DMIC Water Uses

DMICDC DMIC STATUS & OPPORTUNITIES. Tokyo February 18, 2008 DELHI-MUMBAI INDUSTRIAL CORRIDOR DEVELOPMENT CORPORATION LIMITED. Dadri. Haryana.

BIM for infrastructure, Paul King Bentley Systems 2016 Bentley Systems, Incorporated

Efficacy of different nodes in Delhi Mumbai Industrial Corridor

Joint Statement Summit Meeting 11th November, 2016

Transformation. Agenda. February Office of Minister of Commerce & Industry, Government of India

CIVIL ENGINEERING BENEFITS OF BIM. Helping Civil Engineers do more with BIM

CHAPTER 7 Building Information Modeling

BIM Consultants. Our Phone. . Website +1 (312)

Construction coordination

Saurabh Gangwar 2018 Project Management Symposium

Draft - Smart City Proposal. Kalyan Dombivli Municipal Corporation

Website Sola, Ahmedabad

Presentation Outline. 1. Introduction / Overview 2. BIM in the RFP Process. a. Aesthetic concepts

ACEC CAD AND BIM FOR SENIOR FIRM LEADERS

Lake Constance 5D-Conference Holistic Model-based Collaboration in Designing and Constructing a Power Plant Project

technology BIM Services 1

BUILDING INFORMATION MODELING (BIM) THE WHOLE TRUTH 10:30am 12:00pm. Presenter: Rod Yeoh, Principal, Omicron Architecture Engineering Construction

EBOOK BIM ASSESSMENT GUIDE TAKE THE FIRST STEP TOWARDS CRAFTING A BIM IMPLEMENTATION PLAN

Building Tomorrow Today: Spotlight on Autodesk Navisworks & BIM 360 Glue

AT THE FOREFRONT OF THE CONSTRUCTION INDUSTRY WITH BUILDING INFORMATION MODELING (BIM): THE CHALLENGES

BUILDING BLOCKS IN YOUR BXP

23/01/1438. Management of BIMProject: BIM Management Plan. Mohamed Mohsen Kamel. Prof. Dr. Emad Elbeltagi

Seb Cox MEng MSc MCIOB PMP

Benefits of Employing BIM on Unique Designs: Art Gallery of Alberta. Bob Walker Ledcor Construction Limited Edmonton, Alberta May 2011

Regional Plan-2021 and Other Transport Proposals under Implementation

STUDY ON WATER SUPPLY SYSTEMS OF MAHARASHTRA GOLDEN QUADRILATERAL CITIES IN DELHI-MUMBAI INDUSTRIAL CORRIDOR OF THE REPUBLIC OF INDIA

August 1, 2013 Japan Center for a Sustainable Environment and Society (JACSES)

6/10/2018. Building Information Modeling Overview. Pirtle s History with Building Information Modeling (BIM)

BIM Checklist. Introduction

INTEGRATED LIFECYCLE MANAGEMENT BIM/VDC REQUIREMENTS IMPLEMENTATION PLAN

Emanuel Marreel Siemens Chairman Smart Building Committee

BIM-MEP AUS 2013 FORUM. Efficiencies Gained through BIM; from Design to Construction. Martin Howland

BIM guide for members of the Institution of Mechanical Engineers

On Application of BIM Technology in Building Design Stage

Building Information Modeling to Facilities Information Management and Beyond

HS2 s approach to BIM and Beyond

GeoBIM Geospatial World Forum Crossrail: A case Study in Project Information Management. Malcolm Taylor 28 th May 2015

innovation..collaboration..supply chain..stakeholder engagement.. interoperability..international standards

2010 Bentley Systems Incorporated. FM Handover (COBie2) Aquarium

A BIM STORY. Andreas Wecker BIM Management / Losinger Marazzi. Thibaut Lecoutere BIM Site Coordinator / Losinger Marazzi

INTEGRATED PROJECT DELIVERY AIA / AGC JOINT COMMITTEE

10 TH UMI Conference cum Exhibition and CODATU XVII Conference

BIM PROJECT EXECUTION PLAN FOR [PROJECT TITLE]

AGENDA. BIM Opportunities for CMMS

VIRTUAL DESIGN & CONSTRUCTION, THE NEXT LEVEL OF COLLABORATION AND INTEGRATION 2016 Airport Construction Strategy Summit. Special Thanks To:

DESIGNING OF MODULAR RAINWATER HARVESTING SYSTEM & STORM WATER DRAIN INSTALLATION OF LATEST DESIGN & TECHNOLOGY AT BAHRAMPUR GOVT.

Measuring the Impact of BIM in Design-Bid-Build

Xavier University s Facility Management BIM Integration A Case Study

International Research Journal of Engineering and Technology (IRJET) e-issn: Volume: 03 Issue: 01 Jan p-issn:

20/02/2016. The BIM Hub. A trusted environment for BIM professionals. Why BIM? Why BIM? We need a more Sustainable Model of Building Procurement

Future perspectives: Improving environmental, social and economic performance through Integrated Project Development

4D Modeling: Applications and Benefits

groupbc.com GroupBC Giving you powerful, simple and secure collaboration

1.1 IT Requirement of Employer - MMRCL Digital Project management platform to be used for PMRCL

for Owner Operators Leveraging the engineering Design SmartPlant Leveraging the Engineering Design Basis Across the Plant Life Cycle

Bronx Mental Health Redevelopment Project

Engineering and Design

Addendum-1. Ref. Original clause Amended Clause

The BIM implementation in Hong Kong s construction industry by CIC is taking both:

Crossrail Constructing Excellence

BUILDING INFORMATION MODELLING Enabling Construction: Victoria Station Upgrade ICE 15 January 2013

Projects & Pipelines Department

Life Cycle of BIM at the Port Authority

Deliver higher value and maximize lifecycle building performance to support VA s mission to deliver excellent medical service.

BIM Uncovered. Collaborate Effectively and Deliver Better Design, Construction and Operational Models

Building information modeling (BIM) The holistic view by Siemens

FROM THE CEO. Sameh Masry

Application of Building Information Modelling (BIM) in the Hong Kong Housing Authority s Public Housing Developments

Sectors of operation. Capacity building & skill set development. Area development. Agri and food infrastructure. Industrial infrastructure

PROJECT NAME. Duke University. Architect (Specify Design Vs. AOR If Multiple) Construction Manager. Civil Engineer. Structural Engineer

Supplementary Work and Construction Interferences. Elective Project (BBPM, KPTA, MKTB or PIPL)

BIM & TRA The holistic view by Siemens

EUROPE S BEST KEPT SECRET! Jonathan Croft - Technical Consultant

BUILDING INFORMATION MODELLING BOUYGUES UK THE USE OF BIM TO IMPROVE PROJECT PERFORMANCE

Introduction. Definition Benefits Applications Costs/ROI Getting Started Examples Resources

CLAW/CEW BIM Toolkit for Clients Client Training and Supplier Awareness Sessions Wednesday 24 th September Cardiff

CLAW/CEW BIM Toolkit for Clients Client Training and Supplier Awareness Sessions Monday 22nd September 2014 Swansea

Evaluation of the Cost Impact of 2015 IBC Prescriptive Code Changes

Pre-Feasibility Report

Confederation of Indian Industry. Invest North A CII-KPMG study. Rajasthan State Profile. August 2013

ATTACHMENT 4. New Eastside Regional Park Phase 1. BIM (Building Information Modeling) 3D Design & Modeling Program Requirements

Certificate change of SPV Name. DMIC IITGNL Site Layout Plan Report. Khasra Details and Lease Plan. Principal Water Allocation Letter

1. PROJECT BIM BRIEF BIM 1.1 GENERAL. Cross references. 1.2 Application of this Project BIM Brief. 1.3 BIM Project Team

Anaheim Regional Transportation Intermodal Center (ARTIC) 2014 AIA TAP / BIM Awards

FIVE WAYS YOUR MOVE TO A BIM WORKFLOW PAYS OFF

Advancing Management of Urban Water Infrastructure

IT AS AN INTEGRATED PART OF THE BUSINESS LEAN & DIGITALIZATION PETRA ÅLUND SANDVIK IT GLOBAL SHARED SERVICES

5D BIM Implementations in Hong Kong and Mainland China

A Presentation on. BIM Implementation for Construction Projects and Developer

By D. S. Rana Chief Project Manager / DFCCIL

Transcription:

Dholera & Auric Industrial Cities BIM for Infrastructure Projects Srikanth Kommu General Manager DMICDC DELHI MUMBAI INDUSTRIAL CORRIDOR DEVELOPMENT CORPORATION 13/02/2018 DMICDC 1

Agenda: 1. DMICDC NODES. 2. BIM MANDATE 3. IMPLEMENTATION CASE STUDIES. - DSIR REGION - AURIC REGION 4. ACHIEVEMENTS 13/02/2018 DMICDC 2

8 Nodes being developed in DMIC Phase I 1. Dadri Noida Ghaziabad IR, UP... 200 sqkm 2. Manesar Bawal IR, Haryana 402 sqkm 3. Neemrana Kushkhera Bhiwari IR, Rajasthan. 165 sqkm 5 2 3 1 4. Pitampura Dhar Mhow IR, MP. 372 sqkm 5. Jodhpur Pali Marwar IR, Rajasthan 72 sqkm 6. Ahmedabad Dholera IR, Gujarat 920 sqkm 7. Shendra Bidkin Industrial Park, Maharashtra 84sqkm 8. Dighi Port IA, Maharashtra.. 253 sqkm 6 8 4 7 13/02/2018 DMICDC 3

3D Model Driven Approach Mandate for DMIC Nodes DMIC mandates the use of advanced computer based dynamic 3D-model driven approach for: Detailed planning Design, engineering Construction, and operation of the DMIC nodes. To allow: Simulation Visualization and engineering analysis of all transportation, utility, building, civil works and geospatial infrastructures. The 3D Infrastructure Information Models are to be used throughout the design, construction and operational life-cycle of the asset, including:- System collision detections Materials quantification Construction sequencing Project reviews Decision support Design analysis, and Quality assurance. all phases of this program. 13/02/2018 DMICDC 4

What is BIM? BIM (Building Information Modeling) is an intelligent 3D Model-based process that gives Architecture, Engineering & Construction (AEC) professionals, the insight and tools to more efficiently Plan, Design, Construct, and Manage Buildings and Infrastructure. 13/02/2018 DMICDC 5

Input Design & Construction Scope / Program Finance / Budget Concept Development Design Development Detailed Design Development Construction Management Commissioning Handover/ Closeout Operations & Management What is stage-wise BIM Input Output - To initiate the BIM process into the project We require Inputs at the different levels. - Even before construction the object is virtually created, models get updated progressively & go into O & M. 13/02/2018 DMICDC 6

2D Input to 3D Output Transformation Geospatial World 2018 What is BIM Input & Output Collaboration 13/02/2018 DMICDC 7

13/02/2018 DMICDC 8

Building Information Modelling Case Studies. 2010 13/02/2018 DMICDC 9

DHOLERA SPECIAL INVESTMENT REGION DHOLERA INDUSTRIAL CITY DEVELOPMENT LIMITED A Platinum Rated Green City 13/02/2018 DMICDC 10

Dholera Industrial City The pivot of Resurgence of the Country & investment potential 2010 13/02/2018 DMICDC 11

Objective Infrastructure Stages Timeline Geospatial World 2018 Information Considerations 2010 Activation Area Phase-1 Phase-2 2010 2019 2025 2035 Project Start Project Development Preliminary Design Tendering and Award Detail Design and Construction Handover Phase-3 2042 Project Completion Operation & Maintenance Roads Rail/Transit Airport Bridges Portable Water Recycle Water Industrial Water Waste Water Storm Solid Waste Treatment Facilities WTP/CETP/STP Flood Management Power Transmission & Distribution Gas ICT Network Administration Buildings Analysis Simulatio n Clash Detection Estimatio n Construct ion Sequenci ng Design Review Quality Assuranc e 13/02/2018 DMICDC 12

13/02/2018 DMICDC 13

Why? 2010 Nationwide BIM Mandate Project BIM Mandate A differentiator to competition Demonstrate Leadership Standardize Project Delivery Process Improve profitability 13/02/2018 DMICDC 14

What? 2010 Concept & Schematic Design Design Development Tender Construction Operation & Maintenance Project Level O & M Level 13/02/2018 DMICDC 15

How? 2010 3D Visualization SPV Building BEC Building 13/02/2018 DMICDC 16

How? Schedule 2010 Simulation/4D/Construction Planning Clash Detection & Coordination Program sequencing Improved quality 13/02/2018 DMICDC 17

ABCD-1 SPV & BEC Buildings-Virtual Construction Sequencing using 4D Simulation Technique 13/02/2018 DMICDC 18

ABCD-1 SPV & BEC Buildings-Virtual Construction Sequencing using 4D Simulation Technique 13/02/2018 DMICDC 19

2010 ABCD-1 SPV & BEC Buildings-Virtual Construction Sequencing using 4D Simulation Technique Virtual Construction Sequencing using 4D Simulation Technique www.dmicdc.com 13/02/2018 DMICDC 20

2010 ABCD-1 SPV & BEC Buildings-Virtual Construction Sequencing using 4D Simulation Technique Virtual Construction Sequencing using 4D Simulation Technique www.dmicdc.com 13/02/2018 DMICDC 21

ABCD-1 SPV & BEC Buildings-Virtual Construction Sequencing using 4D Simulation Technique 13/02/2018 DMICDC 22

ABCD-1 SPV & BEC Buildings-Virtual Construction Sequencing using 4D Simulation Technique 13/02/2018 DMICDC 23

ABCD-1 SPV & BEC Buildings-Virtual Construction Sequencing using 4D Simulation Technique www.dmicdc.com 13/02/2018 DMICDC 24

How? 5D 2010 Estimation Quantity Cost 13/02/2018 DMICDC 25

BIM Record Model up to 5D Level can be used for Operations & Maintenance 2010 after handing over the project and used for 6D & 7D Level BIM Process O & M Level 13/02/2018 DMICDC 26

How? 2010 LEED Tracking - Sustainability/Energy consumption control during operations 13/02/2018 DMICDC 27

How? BIM for Facilities and Asset Management 13/02/2018 DMICDC 28

Achievements - dholera BIM Stages Projects Design & Construction * 5D and 6D are being attempted to implement as EPC Contractor s capabilities are limited O & M 13/02/2018 DMICDC 29

A. Roads & Infrastructure Achievements - dholera Geospatial World 2018 Contractor- L & T Activation Area LOD 200 Models have been done ( graphical generic ) LOD 300 Level expected in the next Revision ( graphical specific) BIM Models of ESR BIM Models of Roads 13/02/2018 DMICDC 30

Achievements - dholera Miscellaneous Geospatial World 2018 BIM Model of Chlorination Unit BIM Model of Disc Filter Unit 13/02/2018 DMICDC 31

B. ABCD-1 (SPV & BEC) Achievements - dholera Geospatial World 2018 Contractor- CCEL All types of Models are completed Quality check is going on with the Asset Information Tagging for the Facility Management Use. BIM Model of ABCD-1 Building 13/02/2018 DMICDC 32

C. ABCD-2 (City Integrated Operations Centre) Achievements - dholera Geospatial World 2018 Developed the whole Designs in Revit BIM Platform on LOD 200 for Services and 300 for Architecture & Civil. 13/02/2018 DMICDC 33

13/02/2018 Case Study 34

8 Nodes being developed in DMIC Phase I 1. Dadri Noida Ghaziabad IR, UP... 200 sqkm 2. Manesar Bawal IR, Haryana 402 sqkm 3. Neemrana Kushkhera Bhiwari IR, Rajasthan. 165 sqkm 5 2 3 1 4. Pitampura Dhar Mhow IR, MP. 372 sqkm 5. Jodhpur Pali Marwar IR, Rajasthan 72 sqkm 6. Ahmedabad Dholera IR, Gujarat 920 sqkm 7. Shendra Bidkin Industrial Park, Maharashtra 84sqkm 8. Dighi Port IA, Maharashtra.. 253 sqkm 6 8 7 4 13/02/2018 DMICDC 35

BIM SIMULATION CORRIDOR MODEL FOR SHENDRA (Auric City ) Achievements - auric Geospatial World 2018 Various factors impacting design and construction accounted for. 13/02/2018 DMICDC 36

CABLE TRENCH GRAVITY MAIN STORM WATER DRAIN STORM WATER PIPE POTABLE WATER RESIDENTIAL SEWAGE FIRE FIGHTING 13/02/2018 DMICDC Aggregation/ intensity of interferences detected aided in determination of priority zones and element types such as residential sewerage line, cable trench etc. Later in the design process, and particularly for pre-construction planning stage, interference severity criteria was defined and interference rules configured that helped in supporting element level coordination.

CORRIDOR MODEL SHENDRA INDUSTRIAL AREA Aided in better multi party communication and understanding through 3D model. Benefitted integration of project data and achieve minimum RFIs Virtual model will aid in operations and maintenance of the city infrastructure through SCADA and AURIC Control Command Center. An aggregate dynamic 3D Building Information Model (BIM) created for AURIC SBIA city infrastructure systems with model for civil infrastructure system, roads and underground and above ground utilities systems. 13/02/2018 DMICDC 38

FIRE FIGHTING Clash Detection carried out to come up with coordinated model Coordinated model augmenting site execution process STORM WATER PIPE Cost of rework minimized through clash detection 13/02/2018 DMICDC

Achievements - auric Geospatial World 2018 13/02/2018 DMICDC 40

AURIC CITY HALL 3D Model prepared through BIM Interface Achievements - auric Geospatial World 2018 In progress BIM Model At ground floor level 4D simulation on NavisWorks visualization and tracking of project activities; effective use of schedule and time saving Build sequencing of construction activities 13/02/2018 DMICDC Completed BIM Model for AURIC City Hall 41

AURIC CITY HALL 3D Model prepared through BIM Interface Achievements - auric Completed BIM Model for AURIC City Hall Geospatial World 2018 13/02/2018 DMICDC 42

AURIC CITY HALL 3D Model prepared through BIM Interface Achievements dmic region Geospatial World 2018 Digital Imagery Geospatial System Eco Vision Land Use and Built Environment Information & Communications technology (ICT) Digital BIM PLATFORM DHOLERA Engineering Analysis, Modeling and Management Information & Communications technology (ICT) Smart Industrial City Health and Well Being Project Management Information System Collaboration System Water, energy & infrastructure management Sustainability Mobility 13/02/2018 DMICDC 43

THANK YOU www.dmicdc.com 13/02/2018 DMICDC