TOWN OF HOLLIS, NEW HAMPSHIRE

Similar documents
SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

RESTORATION SPECIFICATION

Recommended Technical Standards for Existing Roads UNH Technology Transfer Center

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

Town of Sun Prairie Driveway Permits Standard Operating Procedure

VILLAGE OF BUFFALO GROVE

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

CHANCEFORD TOWNSHIP, YORK COUNTY, PENNSYLVANIA ORDINANCE NO

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

York County Engineering Department Roadway Inspection Requirements

York County Engineering Department Roadway Inspection Requirements

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

MONTEZUMA COUNTY COLORADO ROAD AND BRIDGE STANDARD SPECIFICATIONS

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT]

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

ARCHITECTURAL CONTROL COMMITTEE NEW CONSTRUCTION AND EXISTING HOMES RULES AND REGULATIONS

SECTION A1 EXCAVATION AND BACKFILL GENERAL

Fees: An application fee of one hundred dollars ($100) shall be included with the application submission.

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

Appendix C SPECIFICATIONS FOR DESIGN AND CONSTRUCTION (AMENDED 04/03/90)

Ordinance No Lot Surface Drainage

Appendix J: Storm Conveyance Design Parameters

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

DIVISION 4100 SITEWORK

CHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS

DRIVEWAYS & CURB CUTS (INCLUDING DRIVEWAY EXTENSIONS) BUILDING PERMIT APPLICATION

TOWN OF WINDSOR HIGHWAYCONSTRUCTION STANDARDS (Revised March 2007)

Mills County Entrance and Driveway Ordinance Chapter 4 Mills County Code of Ordinances

WARREN COUNTY, IOWA CHAPTER 19 CHAPTER 19 DRIVEWAY ENTRANCES

Section 403. DRAINAGE STRUCTURES

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

The following information is required when submitting a building permit application:

LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050

PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT

(B). Plan. The plan shall be defined as colllectively all of. storm sewers, drains and drainage ways shall be determined by using

DRIVEWAYS & APRONS & CURB CUTS (INCLUDING DRIVEWAY EXTENSIONS)

SECTION 14 EMBANKMENT

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

STORM DRAINAGE DESIGN MANUAL

GUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS

CHAPTER 3 EXCAVATIONS

SECTION 6. ROAD CONSTRUCTION STANDARDS

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: --

SITE SPECIFIC GRADING PLAN FOR CONTIGUOUS SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION WITH PREVIOUSLY APPROVED PRELIMINARY PLAT (FORM 2)

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION ASPHALT CONCRETE

If you need any additional information concerning this requirement, please contact Superintendent of Public Works John Batchelder.

TOWN OF CHELSEA. Culvert Ordinance: Section 1.

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

Construction Specification for General Excavation

BELMONT PLANNING BOARD

MONROE COUNTY ZONING OFFICE

CITY OF ELIZABETHTON Building Department Excavations and Cuts Permit Application

Chapter 3: Permit Procedures and Requirements

New Market Township. Driveway/Approach Permit

Sidewalk Regulations. Table of Contents

COUNTY OF SUTTER ENCROACHMENT PERMIT

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

STREET STANDARDS FOR PRIVATE ROAD/STREET. Number of Travel Lanes Width of Travel Lanes Width of Right-of-Way. Subbase - Bank Run Gravel (6" minus)

(ITEMS APPLICABLE TO THIS PROJECT MARKED WITH "X")

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION GENERAL EXCAVATION

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

Zoning Permits 11-1 ZONING PERMITS

HONEY BROOK TOWNSHIP

CUYAHOGA COUNTY ENGINEER

Driveways and Other Concrete Slabs

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

RESOLUTIONS Page SECTION I SCOPE OF DOCUMENT 1 SECTION II DEFINITIONS 2

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Construction Specification for Utility Adjustments

DIVISION OF PLAN REVIEW & PERMITTING UTILITY PERMIT SPECIFICATIONS AND PERMIT APPLICATION

Title 15 BUILDINGS AND CONSTRUCTION

$ Plan Review Fee when Permit Application is submitted (*applies to residential permits only*) FENCES

CHAPTER 2 CONDITIONS AND REQUIREMENTS FOR DEVELOPMENT PROJECTS

DATE: $ FEE: DUE AT TIME OF APPLICATION

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

PATIOS, STOOPS and PRIVATE WALKWAYS. This hand out is for REFERENCE ONLY. For more details see specific code sections.

Mason County Road Commission

PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

SECTION FLEXIBLE PAVING

ZONING CLEARANCE PERMIT APPLICATION

Municipality of Waterville Public Sidewalk Repair Policy

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one)

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Transcription:

TOWN OF HOLLIS, NEW HAMPSHIRE ROAD and DRIVEWAY SPECIFICATIONS APPENDIX (Adopted 10/7/08)

APPENDIX A A. Road Design Standards 1. Pavement and drainage facilities, curbs and sidewalks, when required, shall be installed and constructed in accordance with the standard specifications of the Town of Hollis, and in all cases must be constructed under the supervision of the Public Works Director or designee. 2. The distance between two (2) essentially paralleling streets defining a block shall not be less than four hundred (400) feet. 3. As-built drawings and or plans may be required to be submitted, at the discretion of the Public Works Director or designee. 4. All mailboxes will be placed on the left upon entering the property to facilitate municipal snow removal. All mailboxes, wherever the location including off site structures, shall have an apron to be constructed as shown in the Regulations. The mailbox will be set so the front of the box is no closer than the back of the mailbox apron. 5. See Appendix B. B. Drainage Design Standards The purpose of these design standards is to provide adequate road drainage in order to protect public health, safety and welfare. All roads shall be provided with adequate drainage facilities to provide for the removal of water to prevent flooding and erosion of all areas within the right-of-way. 1. Drainage a. Open drainage is preferred in all subdivisions. In certain cases engineering data and standards may warrant a partially or fully enclosed drainage system. b. All cross culverts shall be sufficiently sized and have permanent masonry type headers at both ends. Cross culverts will be a minimum of forty (40) feet in length and fifteen (15) inch diameter minimum. c. Culverts and drainage systems, if required, shall be designed by a licensed professional engineer and shown on all plats. Drainage plans shall be prepared in detail and stormwater shall be carried to existing water courses, or connected to existing water courses or existing storm drains. Slope and drainage easements are to be provided as required prior to final approval. 2. Catch Basins Catch basins shall be installed where required by the Public Works Director or designee using a twenty-four (24) inch square frame and grate such as the Neenah Foundry R-3405 or approved equal (see Figure 1). A minimum sump depth of three (3) feet is required for all catch basins. Each structure shall be cleaned of silt debris, or other matter of any kind, prior to acceptance of the project. Page 1

Figure 1: Ideal Catch Basin Detail C. Guardrails 1. Guardrails must be wood clad and meet the State specification 606 as applicable. See Figure 2 for a typical drawing. End sections shall be turned away and anchored to the ground. Figure 2: Typical Ironwood Guardrail Specifications Page 2

D. Pavement Design 1. Fill, Gravel and Paving. Solid fill, laid in compressed layers shall be no greater than twelve (12) inches in depth, be free from organic matter and be used within twenty-six (26) inches of finish grade. The next sixteen (16) inches must be compacted gravel of proper gradation to meet State of New Hampshire specifications as indicated in Figure 3. The final six (6) inches shall be crushed gravel (NH 304.3), fine graded to receive a uniform pavement surface. The pavement surface shall be four (4) inches of compressed asphalt or bituminous concrete laid in two (2) courses. Binder course shall be two and a half (2 ½) inches thick and a wearing course one and a half (1 ½) inches thick after compression. Figure 3: Typical Roadway Cross Section 2. Common Driveway Construction Specifications See Figure 4 Figure 4: Typical Common Driveway Cross Section Page 3

E. Construction Standards 1. Clearing and Grubbing. All trees and stumps shall be removed from within the right-of-way from any excavated or filled area. All debris, stumps and foreign material shall be removed from the road bed area prior to the placement of fill or gravel. All construction debris and leftover materials shall be removed completely from the project site. Stumps may be buried onsite as shown on the subdivision plan. 2. Compaction. The Town of Hollis may, at the option of the Public Works Director or designee, require compaction tests. The standards must conform to the Standard Specifications for Road and Bridge Construction, New Hampshire Department of Transportation. F. Inspections During the construction stage of any new road for Town acceptance, the owner or his agent, must notify the Public Works Director or designee, at least forty-eight (48) hours in advance before starting the following phases of construction: Inspection #1 After Planning Board approval, placement of Letter(s) of Credit, flagging of Road right-of-way, location of authorized stump disposal, submission of Solid Waste Permit Number, and prior to initial start of project. Inspection #2 After clearing, stumping, grubbing, slopework and prior to placing of any fill materials or base gravel. Inspection #3 After placing approved base gravel and prior to placing finish course of crushed bank run gravel. Inspection #4 After placing culverts, headers and base gravel [base gravel shall have no more than twelve (12) inches lift at any one time in areas of deep fill and no rocks larger than six (6) inches in diameter in the top sixteen (16) inches of bank run gravel] and after compaction of base gravel and prior to placing of crushed gravel. Inspection #5 After fine grading of crushed bank run gravel and prior to applying bituminous asphalt pavement. Inspection #6 Day of application of hot bituminous base. Inspection #6a Prior to application of finish coat of asphalt. Inspection #7 After completion and prior to written request for Town acceptance. The owner or his agent will establish an escrow account with the Town of Hollis to cover the costs of inspections. Note: Additional unscheduled inspections may be conducted at any time at the discretion of the Town. Page 4

APPENDIX B GUIDELINES FOR DRIVEWAY CONSTRUCTION NOTE: These conditions DO NOT replace the Residential Driveway Permit requirements in the Subdivision Regulations, but are meant to instruct the Applicant on what is expected to receive a Driveway Permit. 1. All driveways shall be constructed to conform to typical driveway sections and details for the Town of Hollis, NH. 2. All mailboxes will be placed on the left upon entering the property to facilitate municipal snow removal. All mailboxes, wherever the location including off site structures, shall have an apron to be constructed as shown in the Regulations. The mailbox will be set so the front of the box is no closer than the back of the mailbox apron. 3. Driveways shall be a minimum of ten (10) feet in width. Entrances shall flare as it approaches the pavement to a maximum width of fifty (50) feet measured at the existing edge of roadway excluding the mailbox apron. 4. If wetlands are crossed or infringed upon, a dredge and fill permit shall be required from the NH Department of Environmental Services. 5. Where required, culverts shall be a minimum of fifteen (15) inches in diameter and shall be constructed of reinforced concrete, high density polyethylene pipe or approved equal. The driveway will have a minimum three (3) foot shoulder on each side where it meets the culvert. 6. Headwalls shall be constructed of stone rubble and mortar, pre-cast concrete or approved equal and installed at both ends of the culvert. All headwalls shall be constructed to the same elevation as the driveway. The depth of the culvert shall determine the width of the headwall. 7. The driveway shall slope away from the edge of the roadway at a slope of 3% for a distance of twenty (20) feet. Driveways with an asphalt berm shall require a consultation with the Public Works Director or designee. 8. All driveway bases shall be constructed of twelve (12) inches of bank run gravel and four (4) inches of crushed finish gravel. 9. On all paved roads, new driveways require an asphalt apron from the road to the property line, and shall be constructed of a minimum of two (2) inches of basecoat and one (1) inch finish coat with emulsion applied at the joint with the road. 10. The slope of all new driveways shall not exceed eight (8) percent. This standard shall not apply to driveways of non-occupancy structures. 11. Driveway side slopes (4:1 to 6:1) are required to minimize hazards to vehicles that leave the driveway for any reason. 12. All driveways shall intersect the town s roadway at a perpendicular angle to the centerline of each. 13. Driveways not completed at the time of the Issuance of the Certificate of Occupancy shall require the Owner/Agent to file a cash bond or check to cover satisfactory completion of the following items: Pavement Completion, including Aprons Culvert Completion Headwall Completion Excavation & Filling Loam, Seed and Establish Growth Finish Asphalt These fees shall not be combined with any other payments to the Town of Hollis. 14. The Public Works Director or designee may make changes prior to issuance. Any adjustment after issuance must be in writing, prior to any action taking place. 15. Driveway Permits are valid for two (2) years. A permit will be considered void if no activity has begun within six (6) months. Page 5

Department of Public Works P.O. Box 682, 10 Muzzey Road Hollis, New Hampshire 03049 Tel. 465-2246 e-mail dpw@hollis.nh.us Jeffrey Babel, Director Proposed Driveway Location: Street Tax Map # Lot # Applicant: Date: Mailing Address: Daytime Phone: Land owner, if different from above: Mailing Address: Daytime Phone: Driveway Location: Driveway to be used as: (circle one) Residential Commercial Industrial Alteration Repair Relocation As the landowner, or agent, I hereby agree to the following conditions: 1. To construct entrance only for the bona fide purpose of securing access to the property. 2. To construct the entrance at proposed location indicated on the approved Septic Plan, in accordance with all town statues and all provisions of the Driveway Permit conditions and standard drawings for entrances as issued by the Hollis Public Works. 3. To hold the Town of Hollis and its duly appointed agents and employees not liable against any action for personal injury and/or property damage sustained by reason of the exercise of the Town Driveway Permit. 4. To furnish and install drainage structures that are necessary to maintain existing highway drainage and adequately handle increased run off and to maintain said structures, regardless of the location. 5. On a daily basis, to leave the highway right-of-way of the Town of Hollis free from all debris such as stones, earth and brush resulting from construction of such driveway. 6. To post permanent street numbers, prior to start of construction, three (3 ) inches high, visible from either direction, as per the attached numbering ordinance to assist emergency personnel. Pursuant to RSA 236:13 and regulations adopted hereunder, I apply for permission to construct a driveway entrance as described in this permit. I have read and understand the conditions of this application as described above and on Page 2. Signature of Owner or Agent Printed Name Submit this application with a $25.00 check, made payable to the Town of Hollis to begin the process. The completed Permit will be Mailed to you at the above mailing address showing the conditions of the Permit. If you have any questions, please call the DPW at 465-2246. Page 6

For additional information on determining site distance please refer to Sec.IV.7.H.3.k Page 7

#3063-238 Page 8