Wood Canyon Emergent Wetland Project. City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656

Similar documents
Little Cypress Bayou Special Study - Subwatershed 1.10

Appendix D - Evaluation of Interim Solutions

Presentation to the District of Central Saanich Hagan-Graham and Tetayut Water Quality Monitoring Programs

DEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA

COASTAL CONSERVANCY. Staff Recommendation December 11, 2003 LAGUNA DE SANTA ROSA: RESTORATION MANAGEMENT PLAN AND PHASE II SEDIMENTATION STUDY

Surface Water Improvement and Management (SWIM) Plan Development

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 NCCP PROGRAM IMPLEMENTATION: SAN DIEGO RIVER CALMAT PROPERTY PHASE 2

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

Middle Santa Ana River Bacterial Indicator TMDL Implementation Report

LOXAHATCHEE RIVER WATER QUALITY EVENT SAMPLING TASK 2: FINAL REPORT ASSESSMENT OF LOXAHATCHEE RIVER WATER QUALITY

ALISO CREEK WATERSHED RUNOFF MANAGEMENT PLAN WATER QUALITY DATA ASSESSMENT 2013 ANNUAL REPORT ORANGE COUNTY STORMWATER PROGRAM

4. Present Activities and Roles

Appendix B: Inventory of Data Sources

Middle Santa Ana River Bacterial Indicator TMDL 2009 Dry Season Report

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

PINEY RUN WATERSHED 2005 PROFILE

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

Rainbow Creek TMDL Monitoring Program Report for October 2016 through September 2017

AGENDA CHANNEL ISLANDS HARBOR TASK FORCE SPECIAL MEETING

Multipurpose Wetland Creation and Restoration to Improve Water Quality and Wildlife Habitat in Coastal Urban Bayous

Mamaroneck & Sheldrake Rivers Basin Village of Mamaroneck Flood Risk Management Study

Responses to Comments from State Agencies

Restoring Wreck Pond Inlet Jenna Krug, Habitat Restoration Coordinator

Pima County Receives A+ for ROMP Upgrades

Pennsylvania Pequea and Mill Creek Watershed Section 319 National Monitoring Program Project

Section 6: Stormwater Improvements

Storm Water Resource Plan Criteria and Metrics Checklist

The F.O.R.C.E. The Future Of Redwood Creek Environment

LAKE CHEMUNG GENOA TOWNSHIP LIVINGSTON COUNTY, MICHIGAN STORM DRAIN AND TRIBUTARY STUDY. Prepared for:

Meacham Creek Restoration Project

2002 Water Quality Monitoring Report

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

5.1 SUMMARY OF PROJECT FACILITIES AND SERVICES

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY

ADDENDUM #1 RFP WOLFTRAP CREEK STREAM RESTORATION

MARK TWAIN LAKE WATER QUALITY REPORT. for

5. RESOURCE MANAGEMENT STRATEGIES

Stormwater design considerations

Temporary Stream Crossing

COTTONWOOD CREEK RECLAMATION PHASE I & II

Pacheco Reservoir Expansion

Temporary Stream Crossing

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

Exploring the Possibilities At Prado Dam

STREAM RESTORATION PURPOSE, PRACTICE, AND METHODS. By Marcus Rubenstein, CPESC

NORTH GRIFFIN REGIONAL DETENTION POND - WETLANDS FILTRATION FOR NON-POINT SOURCE POLLUTION CONTROL AND ABATEMENT

PROJECT HIGHLIGHTS,

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot

Chapter 3 Previous Studies

CARLYLE LAKE WATER QUALITY REPORT. for

OCSD Urban Runoff Program SCAP Collection Systems in Motion

Hydrologic Study Report for Single Lot Detention Basin Analysis

VII - WATER CONTROL PLAN

Lake Lou Yaeger Section 206 Study Aquatic Ecosystem Restoration

Chapter VII. Falls Lake Project -- Water Control Plan

TABLE OF CONTENTS. TOC-i

RIPARIAN CORRIDOR STUDY FINAL CITY CREEK MANAGEMENT PLAN TABLE OF CONTENTS

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

Cokato Lake (86-263) Wright County. Hydrologic Investigation

Water Quality Conditions & Management on Rangelands

3F. Hydrology and Water Quality

Chapter 13: Wildlife and Vegetation

Drainage Criteria Manual Review

Appendix Q Conceptual Mitigation Plan for Impacts to Wetlands and Other Waters of the United States

Primer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

GUIDE TO OAKLAND S CREEK PROTECTION ORDINANCE

Lee County Artesian Well Abandonment Project

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

Background. Oso Watershed Land Uses

Voluntary Water Quality Conservation Plan

Errata sheet for the Connecticut General Permits May 2, 2017

VENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID #

WASA Quiz Review. Chapter 2

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Appendix X: Non-Point Source Pollution

9. Evaluation Mechanisms

I. Welcome & Introductions WPAC History (Paul Racette, PEC)

by Keith Kennedy Manager of Environmental Programs North Central Texas Council of Governments

Spring Forecast Based Operations, Folsom Dam, California

Potato Lake 2010 Project Results and APM Plan. Saturday May 28, 2011 Dave Blumer, Jake Macholl SEH Lake Scientists

EVALUATING LOW IMPACT DEVELOPMENT BEST MANAGEMENT PRACTICES AS AN ALTERNATIVE TO TRADITIONAL URBAN STORMWATER MANAGEMENT

Long-Term Volunteer Lake Monitoring in the Upper Woonasquatucket Watershed

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID

Nutrient distributions and the interaction between coastal wetlands and the nearshore of Lake Ontario

OXFORD RETENTION BASIN MULTIUSE ENHANCEMENT PROJECT FISH RELOCATION PLAN

EXECUTIVE SUMMARY DES PLAINES RIVER WATERSHED-BASED PLAN WHY A WATERSHED-BASED PLAN? WHAT IS A WATERSHED?

Stream Buffers Sharpest Tool in the SWM Toolbox Tom Hegemier, PE, D.WRE, CFM

Working in Arid and Semi-Arid Climates with Hydromodification Concerns

Biofilter Wetland at Harrow Run Water Quality Evaluation of Pollutant Removal Efficiency from a Tailwater Recovery System

RIPARIAN CORRIDOR STUDY FINAL PARLEYS CREEK MANAGEMENT PLAN TABLE OF CONTENTS

United Water Conservation District November 2016 Hydrologic Conditions Report 2017 Water Year. December 6, 2016

REND LAKE WATER QUALITY

Constructed Wetland Pond T-8

Surface Water Improvement and Management (SWIM) Plan Development

Wapato Access Feasibility Study

Transcription:

Wood Canyon Emergent Wetland Project City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656

Introduction Wood Canyon is located within Aliso and Wood Canyon Regional Park in southwest Orange County, California (Figure 1, 2). The canyon is drained throughout its approximated 3.5-mile length by Wood Canyon Creek, a major tributary to Aliso Creek, which flows into the Pacific Ocean near Aliso Creek Beach. The Wood Canyon portion of the Regional Park is a protected wilderness area, however; development along the canyon ridges has created conditions that threaten riparian vegetation and habitat along Wood Canyon Creek (Creek). The Creek is experiencing marked channel incision and degradation, which is attributable to the accelerated delivery storm-water runoff at the headwaters for Wood Canyon Creek. As a result, a number of major resource-related concerns including loss of riparian habitat, erosion, poor water quality, flooding, and declines in populations of native fauna and flora have occurred. 1 The U.S. Army Corps of Engineer s Aliso Creek Water Management Study 2 concluded that 20.5 of the 59 acres (35%) of the riverine habitat in Wood Canyon are highly degraded and of this total, 20 acres (34%) have been impacted to the point that they provide negligible or no measurable function. The Creek begins at the north end of Wood Canyon. The City of Aliso Viejo (City) maintains a detention basin at the headwaters of the Creek, which receives runoff via the J02P08 storm drain system from primarily residential areas (298 acres). The detention basin has a storage capacity of 20 acre-feet. The detention basin is dominated by low-growing ruderal species that provide minimal floral and faunal habitat functions and values. Flow from the basin is discharged onto a concrete apron and directed into the Creek. The Creek is a natural channel with mature riparian vegetation, but showed sign of active degradation and bank erosion. The purpose of this project is to create a wetland habitat using native riparian/wetland plant species within the detention basin, which would enhance water quality, flood control and channel protection at the beginning of the Creek (Figure 3). Since this Project is situated at the headwaters of the Wood Canyon Creek and has a long-lasting effect on the Creek as a whole, the Project will also increase and enhance the overall Wood Canyon Creek riparian corridor and its associated wildlife habitat. Objectives The objectives of the Wood Canyon Emergent Wetland Project were Create a wetland habitat using native riparian/wetland plant species that will effectively restore the pristine nature of the upper portion of Wood Canyon Creek to a pristine state. Augment the existing ruderal plan community with a mosaic of native species and multiple vegetation strata that would enhance the habitat-support functions and values within the detention basin. 1 United States Army Corps of Engineers. 2002. Los Angeles District. Preliminary Plan Formulation Report for the Wood Canyon Ecosystem Restoration Study. 2 United States Army Corps of Engineers. 2001a. Los Angeles District. Aliso Creek Watershed Management Study, Feasibility Report. 2

Improve the hydrologic function of the riparian corridor by attenuating flood flows and dissipating energy by modifying the outlet structure to mitigate flooding and erosion downstream of the Creek. Permit Compliances In compliance with the varying regulatory bodies, the City has met the following permitting requirements: Resolution No. 2004-053: A resolution of the City Council of Aliso Viejo, California, Declaring a Categorical Exemption in Accordance with the California Environmental Quality Ac and Filing of a Notice of Exemption for the Wood Canyon Emergent Wetland Project (November 3, 2004). Notice of Exemption for the Wood Canyon Emergent Wetland Project filed with the County of Orange Clerk on December 8, 2004. Clean Water Act Section 401, Water Quality Certification and Waiver of Waste Discharge Requirements for Discharge of Degraded and/or Fill Materials (RWQCB, San Diego Region, 401, Project No. 04C-151, January 25, 2005). Certification of Compliance with the Department of Army Nationwide Permit (Permit No. 200300588-SJH, February 2, 2005). Lake or Streambed Notification # 1600-2005-0045-R5 (California Department of Fish and Game, June 17, 2005) Grant Funding The following grants were awarded to the City to implement the Project: Habitat Conservation Program - $83,000 through the California Department of Parks and Recreation. Partner for Fish and Wildlife Program - $18,600 through the U.S. Fish and Wildlife Service. Clean Beach Initiative - $43,000 through the State Water Resources Control Board 3

Conceptual Design and Construction The emergent wetland site was constructed within the existing J02P08 detention basin. The construction process included the following activities: To ensure an adequate capacity is maintained in the detention basin for flood control, about 18 inches of sedimentation has been removed and transported offsite. Six cascading ponds have been constructed below the flow line of the basin to ensure that the flood control function of the basin is not reduced. The flow is guided to meander and provide the wetland ponds sufficient retention time. Erosion control fabric and cobbles has been used on pond overflows (Figures 3a and 3b). Several large rocks have been transported on the Project site and placed several feet downstream to act as energy dissipaters. A variety of native species were planted along the east, north, and west sides of the upstream detention basin to create viable, self-sustaining, wetland habitat. Two plant communities were created along the side (east and west) and back (north) slopes, including southern willow scrub closer to the toe and oak woodland farther up the slope to its crest or to the beginning of the access road. Southern willow scrub has been established from the toe to 6.5 feet to 8 feet above, and the oak woodland would be established from 6.5 to 8 meters from the toe up the face of slopes. The design included a short-term irrigation system to augment the existing hydrologic conditions and to aid in the establishment of self-sustaining plant communities. All roads affected by construction activities have been repaired to its pre-project conditions. The construction of this wetland site was initiated in September 2005 and completed on December 2005. Figures 3, 4 provide views of the wetland site on pre-construction and current conditions. An educational and public awareness describing the importance of a wetlands ecosystem and habitat restoration are now available at the project site (KIOSK) and on the City of Aliso Viejo official website (http://www.cityofalisoviejo.com). Mitigation Monitoring Plan In order to evaluate performance standards and the success of this project, the City has developed and implemented a mitigation monitoring and management plan. The time period involved for monitoring will be between three to five years, starting at the end of the construction period. The range in the monitoring time period is dependent on the results of the following measured parameters. Hydrology - frequency of inflows, duration of inundation, depth of inundation, outflows, duration of dry periods. 4

Fauna - macro invertebrates, water birds, frogs, species diversity, species abundance, species distribution, important species, breeding events. Vegetation - species diversity, species abundance, species distribution, growth, health and important species. Water quality Temperature, ph, turbidity, nutrients and indicator bacteria. Aquatic habitat - habitat diversity and bank stability The monitoring plan is shown in Appendix A. Monitoring Results The Mitigation Monitoring Plan was developed and implemented immediately after the completion of the construction phase in December 2005. The plan included water quality sampling, and field measurements to assure the progress in the restoration of site hydrological status and the growth of the fauna and vegetations. Field Observations The City of Aliso Viejo continued the implementation of the Mitigation Monitoring Plan during FY 2006-07. City staff inspected the sites on a monthly basis and documented all field observations. The following is a summary of the field observations during FY 2006-07: No erosion was observed at the site during and after the rainy season. Water was flowing through the wetland ponds at projected rates. All natural and planted vegetations were growing at normal rate (reproduction and density) compared to other natural habitats. Frogs, squirrels, birds, butterflies. mosquito fish and other wild species were present at the site. Educational brochures describing the importance of a wetlands ecosystem and habitat restoration were posted on a KIOSK at the wetland site. The KIOSK was designed and installed by Aliso Viejo s Boy Scout Troop 700. 5

Water Quality Analyses Water quality samples were collected from the inlet and outlet of the wetland site during dry weather seasons in 2006 and 2007. Samples were collected and analyzed according to the Standard Methods for the Examination of Water and Wastewater (21 st Edition, American Public Heath Association and American Water Works Association). Analytical data are listed in Table 1. For comparison purpose, the table includes Tolerance Interval values cited from the County of Orange Dry Weather Monitoring Report. These values were calculated as the 90 percentile of the data collected during 2006-07 dry weather from South Orange County storm drain outfalls and creeks. As illustrated in Table 1, concentration of indicator bacteria in water samples collected form the inlet to the wetland ponds ranged from 11,000 to 120,000 CFU/100mL for total coliform, 1,700 to 18,000 for fecal coliform, and 8,600 to 72,000 for Enterococcus bacteria. These levels are lower than the dry weather Tolerance Intervals reported by the County of Orange in 2006-07 Dry Weather Monitoring Reports. As the water passed through the wetland ponds, the concentration of indicator bacteria reduced significantly; 1 to 2-logs reduction. The average concentration of the indicator bacteria in the water samples taken from the wetland outlet averaged at 2,583 for total coliform, and 419 for Enterococcus bacteria. The level of fecal coliform bacteria dropped to an average of 154, which is lower than REC-1 water quality objective of 200 cfu/100ml. No significant changes in the level of other constituents were observed as the water passes through the wetland. In general, 2006 and 2007 dry weather monitoring data indicate that the quality of J02P08 runoff improved as it passed through the wetland. No significant changes were observed in other measured water quality parameters (Table 2, ammonia, nitrate and orthophosphate). 6

Figure 1: Location Map 7

8

Figure 3a: Riparian Restoration and Enhancement Diagram 1 Figure 3b: Riparian Restoration and Enhancement Diagram 2 9

Figure 4: The Wood Canyon Creek at J02P08 Pre-construction View Figure 5: The Wood Canyon Creek at J02P08 Post-construction View of the Ponds 10

Figure 6: The Wood Canyon Creek at J02P08 Wetland Inlet Figure 7: Kiosk at the Wood Canyon Emergent Wetland Project site Summer 2007 11

Figure 8: The Wood Canyon Creek at J02P08 Wetland Site View Summer 2006 Figure 9: The Wood Canyon Creek at J02P08 Wetland Site View Summer 2007 12

Table 1: Analytical Parameters Sample Location Wetland Inlet Wetland Outlet Parameter Total Coliform Fecal Coliform Enterococcus Ammonia Nitrate Orthophosphate Total chlorine Dissolved Oxygen TSS TOC Specific Conductivity Total Coliform Fecal Coliform Enterococcus Ammonia Nitrate Orthophosphate Total chlorine Dissolved Oxygen TSS TOC Specific Conductivity 5/31/2006 6/14/2006 7/12/2006 8/23/2006 3/19/2007 5/21/2007 6/13/2007 7/11/2007 8/13/2007 Dry Weather Tolerance Intervals Value 120,000 27,000 53,000 19,000 75,000 17,000 11,000 78,000 58,000 330,000 14,000 4,800 5,100 9,200 18,000 1,700 8,000 3,000 2,300 95,000 72,000 8,600 19,000 24,000 64,000 12,000 20,000 12,000 14,000 53,000 0.5 0.39 0.19 NA NA NA NA NA NA 1.45 2.8 3.7 2.6 4 4.3 4.5 3.1 5 3.2 5.6 0.38 0.28 0.36 0.85 0.46 0.62 0.44 0.72 0.41 2.95 ND mg/l NA 0.1 ND ND ND ND ND 0.12 6.52 mg/l NA 6.1 NA 7.28 6.95 5.2 6.15 4.68 36 mg/l NA 78 NA 17 13 74 6 47.55 7.5 mg/l NA NA NA 8 7.1 11 11 NA NA NA NA NA 606 871 1,010 1160 834 6000 1,600 1,300 9,000 9,000 4,000 700 200 6,000 450 330,000 120 120 10 10 1,000 10 10 100 <10 95,000 650 920 300 300 140 450 800 200 <10 53,000 1.32 0.42 1.2 NA NA NA NA NA NA 1.45 3.5 3.9 1.9 2.1 4.4 4.7 3.5 2.7 1.6 5.6 0.36 0.35 0.74 0.35 0.91 0.59 0.73 0.78 0.59 2.95 ND mg/l NA 0.1 ND ND ND ND ND 0.12 6.78 mg/l NA 6.1 NA 7.48 6.5 4.86 6.32 4.68 22 mg/l NA 78 NA 14 27 12 12 47.55 8.4 mg/l NA NA NA 9.9 7.9 39 7.7 NA NA NA NA NA 680 1,060 906 1,300 881 6,000 13

Figure 10: Concentration of Total Coliform Total Coliform 1,000,000 Inlet 100,000 Outlet 10,000 1,000 100 Tolerance Level 10 Mar-06 May-06 Jul-06 Aug-06 Oct-06 Nov-06 Jan-07 Mar-07 Apr-07 Jun-07 Aug-07 Sep-07 Figure 11: Concentration of Fecal Coliform Fecal Coliform 1,000,000 100,000 10,000 1,000 100 Inlet Outlet Tolerance Level 10 1 Mar-06 May-06 Jul-06 Aug-06 Oct-06 Nov-06 Jan-07 Mar-07 Apr-07 Jun-07 Aug-07 Sep-07 Figure 12. Concentration of Enterococcus Bacteria Enterococcus 1,000,000 100,000 10,000 1,000 100 Inlet Outlet Tolerance Level 10 1 Mar-06 May-06 Jul-06 Aug-06 Oct-06 Nov-06 Jan-07 Mar-07 Apr-07 Jun-07 Aug-07 Sep-07 14