Modeling Parameters. Exit Velocity Exit Temp. Location longitude

Similar documents
Supersedes: 11/15 (Rev. 03) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

The Environment (Protection) Rules, STANDARDS FOR EMISSION OR DISCHARGE OF ENVIRONMENTAL POLLUTANTS 1 SCHEDULE I (See rule 3)

Overlapping Wastewater Air Regulations

An Overview of Proposed Petroleum Refinery Fenceline Monitoring Requirements. A&WMA ACE 2015 Monitoring HAPs in Ambient Air Paper 309 June 23, 2015

APPENDIX XXIII SUBPART FF COMPLIANCE PLAN

The 3 N s of Air. Diane H. Leche Air Permit Coordinator ExxonMobil Baton Rouge

RCRA Subpart AA - Air Emission Standards for Process Vents

Evaluation of Benzene Fenceline Monitoring Program in USEPA s Proposed Refinery Sector Rule

Tennessee Gas Pipeline Company, LLC Compressor Station Whites Creek Pike Page 1

New Source Performance Standards (NSPS) 40 CFR 60 Subpart OOOO for Storage Tanks (Part 1)

NSPS OOOOa Fugitive Emissions Requirements

CHAPTER 6: AIR EMISSIONS

DRAFT Procedures for Quantifying Fugitive VOC Emission Sources at Petroleum Facilities

Data Quality in Estimating Storage Tank Releases to Air in the Oil and Gas Sector

San Joaquin Valley Air Pollution Control District. Procedures for Quantifying Fugitive VOC Emissions At Petroleum and SOCMI Facilities

Frequently Asked Questions Regarding Rule 2260, Registration Requirements for Equipment Subject to California s Oil and Gas Regulation

RULE CRUDE OIL STORAGE TANK DEGASSING OPERATIONS (Adopted 11/8/94) b. Has a storage capacity greater than 2,000 barrels.

Frequently Asked Questions Regarding Rule 2260, Registration Requirements for Equipment Subject to California s Oil and Gas Regulation

State of the Art (SOTA) Manual for Volatile Organic Compound Storage Tanks (greater than or equal to 2,000 gallons)

CAM Applicability Analysis and CAM Plans

Standards of Performance for Crude Oil and Natural Gas Production, Transmission and Distribution (40 CFR 60, Subpart OOOO) Air Quality Compliance

Whiting Business Unit

Waste Generation and Release Estimation from Chemical Processes - Chapter 8.3. David R. Shonnard Department of Chemical Engineering

Methane Emission Standards for Crude Oil and Natural Gas Facilities

APPENDIX F Pennsylvania Upset Rules and Data

APPLICATION FOR AUTHORITY TO CONSTRUCT/OPERATE

SWCAA Emission Inventory Instructions

SACRAMENTO METROPOLITAN AIR QUALITY MANAGEMENT DISTRICT EXPEDITED BARCT IMPLEMENTATION SCHEDULE FOR ASSEMBLY BILL 617.

RULE GASOLINE AND ROC LIQUID STORAGE TANK DEGASSING OPERATIONS (Adopted 11/8/94)

Commonwealth of Kentucky Division for Air Quality PERMIT STATEMENT OF BASIS

Commonwealth of Kentucky Division for Air Quality PERMIT STATEMENT OF BASIS

Additionally, the Application is woefully inadequate, sloppy and indeed, even illegible at parts. Since the Mingo TransGas project would be a

Current EPA Air Regulatory Issues for the Gas Compressor Industry. Ruben Herrera Gas/Electric Partnership Conference February 9, 2012

API s CELE Committee on Evaporative Loss Estimation GEORGE L. MOROVICH

Satisfying the Corrective Action Requirements of the Refinery Sector Rule

Statement of Basis. Daikin America, Inc. Morgan County Decatur, Alabama

New Source Performance Standards (NSPS) 40 CFR 60 Subpart OOOO for Storage Tanks

e-cfr Data is current as of October 16, 2017

JACKSONVILLE ENVIRONMENTAL PROTECTION BOARD RULE 5 CONTROL OF TRS AND VOC EMISSIONS FROM CRUDE SULFATE TURPENTINE PROCESSING FACILITIES

NSPS Subpart OOOO Overview

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

RULE 344. PETROLEUM SUMPS, PITS AND WELL CELLARS. (Adopted 11/10/1994) 1. The provisions of this rule shall not apply to spill containments.

Remote Sensing Studies Demonstrate that Refinery Emissions are Underestimated.

EPA's Proposed Air Pollution Standards for the Oil and Natural Gas Sector Preliminary Analysis September 2011

State Of The Art (SOTA) Manual For Non-Hazardous Onsite Remediation Processes

Oil and Gas 101: An Overview of Emissions from Upstream Oil and Gas Exploration and Production Sources

REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) STATE IMPLEMENTATION PLAN (SIP) REVISION WESTERN NEVADA COUNTY 8-HOUR OZONE NONATTAINMENT AREA

Federal GHG Reporting Rule

Refinery Sector Rule Focused Compliance. Presented by: Becca Bradley Stephen Walls, P.E. Jeremy Sell, P.E.

Odor and Hazardous Air Pollutants Emissions Assessment Plan. The world s leading sustainability consultancy N. Channel Avenue Portland, Oregon

APPLICATION REVIEW CHECKLIST LAND PROTECTION DIVISION HAZARDOUS WASTE PROGRAM OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY TECHNICALLY ADMIN.

APPENDIX A TECHNICAL SUPPLEMENTS

MON RULE BATCH PROCESS VENT REQUIREMENTS PROCESS VENT REQUIREMENTS. Presented by Michael R. Dixon, P.E. Dixon Environmental BATCH PROCESS VENT

Refinery-wide Maintenance Vent Compliance Program Development Strategies. Presented by Phil Fish, Barr Engineering Co.

HEI Exposure Workshop July 2018

San Joaquin Valley Unified Air Pollution Control District

Toxic Substance Reduction Plan Summaries

Major Methane Emission Sources from Offshore Platforms and Floating Production, Storage and Offloading Vessels (FPSOs)

Petroleum Refining. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

White Paper The Greening of the Conventional Oil Industry Meridian Energy Group, Inc. Green Investment Highlights

EPA s Methane Agenda Will the Oil & Gas NSPS OOOOa Regulation Affect Other Sectors? Presented By: Jay Christopher Trihydro Corporation

Ozone State Implementation Plan (SIP) Revision. Reasonably Available Control Technology (RACT) as Applicable to the 8-Hour Ozone Standard

Overall Air Emissions Control Strategy Tim Higgs Intel Corp. 145 S. 79 th St. MS: CH10-22 Chandler, AZ (480)

APPLICABILITY. (1) Except as provided in Section (b), this rule is applicable to all vapor degreasing operations.

Title V. Model General Permit Template SERIES 2 LOADING RACKS. Template # SJV-LR-2-1

RELEASE POINT TYPE Enter or select one of the following stack/emission point release orientation: downward

ADDENDUM TO THE OIL AND GAS PRODUCTION PROTOCOL (Version 1.1)

Title V. Model General Permit Template SERIES 1 LOADING RACKS. Template # SJV-LR-1-1

White Paper. Solutions to Contain VOC Emissions and Comply with Evolving EPA Regulations.

EPA s Proposed GHG Reporting Rule:

San Joaquin Valley Unified Air Pollution Control District

1995 Protocol for Equipment Leak Emission Estimates

GENERAL APCD PERMIT INFORMATION REQUIREMENTS LIST

DEVELOPMENT OF 2010 OIL AND GAS EMISSIONS PROJECTIONS FOR THE DENVER-JULESBURG BASIN

2011 Barnett Shale Air Quality Compliance Update. 30 TAC & 40 CFR 98 Subpart W

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM March 27, 2002

Natural Gas STAR Methane Challenge Program: Supplementary Technical Information for ONE Future Commitment Option

Title V. Model General Permit Template SERIES 1 FLARES. Template # SJV-FL-1-1

Janice T. DeVelasco, P.E.

Storage Tanks and Other Field Facilities

Fugitive Emissions Management in Alberta Presentation to the Meeting of Canadian Flaring and Venting Regulators

What information should be submitted to the District regarding Circulation Tanks for Well Stimulation Treatments?

Air Regulatory Issues Unconventional Gas and Light Tight Oil Developments Infrastructure Consequences

REDUCING FLARING OF BOG S SHIPS BY INSTALLATION OF AN LNG QUENCHING SYSTEM

DRAFT. AIR EMISSION PERMIT NO Total Facility Operating Permit IS ISSUED TO. NuStar Pipeline Operating Partnership LP

TABLE OF CONTENT

Industrial Accessories Company 4800 Lamar Ave Mission, Kansas ETHANOL MARKET. PP007

Directive 017 Heavy Oil GOR Testing Requirements

Methane Emission Reductions in Oil and Gas Processing

Elements of a completeness review

U.S. EPA Greenhouse Gas Reporting Rule, New Source Performance Standards, and Methane Emissions Reduction Opportunities

Final Report DEVELOPMENT OF 2012 OIL AND GAS EMISSIONS PROJECTIONS FOR THE PICEANCE BASIN

Best Practices for Using Flares to Meet Proposed EPA Emissions Regulations for Hydraulically Fractured Natural Gas or Oil Wells

15A NCAC 02Q.0102 is amended with changes as published in 30:07 NCR as follows:

07/08 TABLE OF CONTENTS: 1

Item Hydrogen Gas Plant

Controlling NOx and other Engine Emissions

Notice of Construction (NOC) Worksheet

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

Israeli PRTR Release Estimation Techniques

Transcription:

Introduction In 2001-2002, EPA performed an initial risk assessment, commonly refered to as the Risk Test, for all ~155 U.S. petroleum refineries. EPA looked at the risk associated with emissions of all relevant hazardous air pollutants (HAPs) from refinery point sources including process heaters & boilers, flares and thermal oxidizers, wastewater collection and treatment systems, cooling towers, fugitive equipment leaks, storage tanks, product loading operations, miscellaneous process vents, CRUs, FCCUs, and SRUs. The results of the Risk Test showed that the risk associated with inhalation of benzene emissions from RMACT 1 sources was potentially significant enough to justify additional, more detailed analysis. Consequently, these templates are designed to collect information on benzene from RMACT 1 sources. However, summary information is requested on the last page for benzene emissions from non-rmact 1 sources as well (e.g., HON units). The next phase of this analysis involves EPA performing a more detailed risk assessment of benzene sources from a representative subset of petroleum refineries. Approximately twenty refineries have been selected for this analysis. These refineries are being asked to provide EPA with the necessary data to allow EPA to perform the risk assessments. Detailed information will be required on benzene emissions and on other source characteristics. The attached spreadsheets attempt to provide a relatively straightforward method for collecting these data. The facility is not required to use these spreadsheets; they are only a tool. If the facility already has an existing database that contains the information that is being requested, it is not required to use these spreadsheets but rather can provide the existing database extract to EPA. A facility can also elect to submit any existing Health Risk Assessment (HRA) or other risk assessment that has been performed for the facility, provided this risk assessment is reasonably representative of current operations. In general, the California refineries subject to AB 2588 will have such an HRA. Please be sure to include all of the pertinent data that was used for this assessment, including the inputs to the emissions model, such that EPA can repeat the assessment for sources of benzene, should they so choose. If you elect either of the above alternatives and therefore do not choose to complete the tables on the spreadsheets, please note that you must complete the questions that follow each of the tables. It is important that EPA is able to understand, in sufficient detail, the basis for your benzene emission estimates. At the same time that EPA is performing their Residual Risk analyis, they plan to perform their 8-yr review of the MACT standards required by 112(d)(6) of the Act. To this end, it is important that you answer the questions that require you to identify any additional changes that the facility has made to reduce benzene emissions from each point source category. Included here would be source reduction activities, such as changes to operations, tank water draw procedures, work practices, etc. as well as any changes made to startup, shutdown, maintenance, depressuring, or catalyst transfer procedures. Lastly, these spreadsheets focus on the RMACT 1 benzene emissions sources. On the last page, please identify any additional significant sources of benzene that you are aware of, if any, and provide the same type of information on emission rates, modeling parameters, and control techniques as per the RMACT 1 spreadsheets. Please provide the requested, preferably electronically - by July 31, 2005 - to: Rob Ferry The TGB Partnership 1325 Farmview Road Hillsborough, NC 27278 Rob.Ferry@TGBpartnership.com (919) 644-8250 voice (919) 644-8252 fax

General Notes 1. The emissions data to be provided should be based on the most currently available estimates (e.g. 2004) that are representative of ongoing operations. To the extent that existing Health Risk Assessments and other risk assessments (and their supporting emissions data) are provided as an alternative, these assessments should be based on data that are reasonably representative of current operations. If the facility has an approved project, or anticipated change to a project, that will either increase or decrease emissions but is not yet constructed or on line, the facility may elect to report both current as well as future estimated emissions (i.e. emissions post start-up of the project). 2. A scaled plot plan should be provided. The scaled plot plan needs to have accurate and coordinates (lat-long coords) marked for a least one specific point. of the facility is a critical factor in the health risk model. It is strongly advised that you locate your facility using lat-long coords, and that you confirm that these coordinates are correct. 3. Please provide a process diagram, if available, or a list of all emission sources and control devices labeled with unique ID codes. Where it makes sense, sources can be grouped (e.g. fugitives, tanks, wastewater conveyance, etc). Each listed emission source (or group of sources) and control device shall be located on the plot plan by its ID code. As an alternative to a plot plan, UTM coordinates may be submitted for each emission point or group of emission points. For grouped sources, the UTM coordinates should be to the centroid of the group. 4. Facilities can respond to this questionnaire with either electronic (preferred) or paper versions.

Facility Name/: Cooling Towers (2,3) Controls (4) Cooling Tower Identifier Monitoring Exit Velocity Exit Temp. Recirculation Rate Diameter and Process Units Served (1) (tons/yr) (Yes/No) (decimal degdecimal deg (m/sec) (deg K) (gpm) (m) (m) (1) Indicate each cooling tower and the process units served by that tower (e.g., vacuum distillation, FCCU, etc - if acronyms are used, please provide a key). Please identify each cooling tower by its ID code. (2) Describe in detail how the emissions were calculated. For each emission source, indicate A, B, C, D and/or E below, and provide the necessary information. Also, please describe the emission speciation method and data source(s). A. Source testing Test method used: Number/frequency of tests: B. Emission Factor Factors used: Bases for factors (e.g. AP-42): C. Engineering Calculation Variables included in calculation: Calculation method: D. Modeling Model used: Inputs to model: Describe how emissions were calculated: E. Estimation Method of estimation(published data, similar sources, process knowledge, etc): (3) Are cooling towers subject to a permit limit on total VOC or benzene emissions? If so, please provide the limit. (4) Are these cooling towers monitored for hydrocarbon leaks? If yes, describe below (e.g. type and frequency of monitoring). Is this monitoring required by state/local regulation or permit, or is it performed volunatarily? Please describe below any additional changes that the facility has made to reduce benzene emissions from cooling towers.

Facility Name/: Fugitive Equipment Leaks (2,3,4) Valves Pumps Compressors Connectors Other Process Process Process Length Process Width Process Process Unit Identifier (1) (tons/yr) (tons/yr) (tons/yr) (tons/yr) (tons/yr)decimal degdecimal deg (m) (m) (m) (1) Indicate each process unit that is controlled by an LDAR program. It is acceptable to group by process unit type (e.g. crude units, reformers, etc., or other logical grouping method), but multiple process unit areas are not to be grouped together. If a breakdown of fugitive equipment leaks by process unit is not readily available, then engineering judgment may be used to apportion the total fugitive equipment leaks to the individual process units. (2). Describe in detail below what method(s) was used to estimate the emissions. That is, identify which method you used from "EPA Protocol for Equipment Leak Estimates (EPA-453/R-95-017)". Describe how the benzene wt. % was determined. Put N/A if certain components are not included in your LDAR program, e.g. connectors. Please describe "other", if applicable State below your current leak repair thresholds for each of these components (e.g. 10,000 ppm for valves, etc. Describe monitoring method, including type of monitor, method of recording data, how leak rates are converted to mass emission rates Has this facility ever monitored leaks from heat exchangers? If yes, please describe. (3) Are fugitive equipment leaks subject to a permit limit on total VOC or benzene emissions? If so, please provide the limit (4) If fugitive equipment leaks are not available by type of component, then report the total of all components (for each process unit area) under the column labeled 'Other'. Please describe below any additional changes that the facility has made to reduce benzene emissions from equipment leaks

Facility Name/: Storage Tanks (2,3) Emission Controls Floating-Roof Tanks Fixed Roof Primary Seals, Liquid- or Mech Shoe- Mounted Secondary Seals, Rim- Mounted Slotted Guidepole Controls (4) Vapor Recovery or Balancing Tank or Tank or Tank or Length Tank or Width Tank or Tank Identifier (1) (tons/yr) (Yes/No) (Yes/No) (Yes/No) (Yes/No) (decimal deg(decimal deg (m) (m) (m) (1) Indicate those tanks that store materials with a benzene content > 0.1 wt.%. Identify whether the tank is an internal floating-roof tank (IFRT), external floating-roof tank (EFRT), or fixed-roof tank (FRT - i.e., with no floating roof), and whether it is a Group 1 or Group 2 MACT tank. Please identify each tank by its ID code. It is acceptable to provide this information as blocks or areas of tanks that store the same type of material (e.g. crude oil, gasoline/naphtha, middle distillates,), that is, where the benzene content and the emissions controls are expected to be similar. Please indicate the number of tanks included in the block/area. It is expected that grouping might only be done where there is a battery of small, identical Group 2 tanks for which individual tank data are not available. Where you have tank-by-tank data available, however, please provide it. (2) Describe in detail below how the emissions were calculated (e.g. TANKS ver 4.xx). If some other calculation method (engineering estimate, emission factor, testing, etc) was used, describe the method and how the emissions were derived. Also, please describe the emission speciation method and data source(s). (3) Are storage tanks subject to a permit limit on total VOC or benzene emissions? If so, please provide the limit. (4) Note: This is significant only for EFRTs equipped with slotted guidepoles. For other tanks (e.g. IFRTs, EFRTs without slotted guidepoles, or that are domed), indicate N/A. Please describe below any additional changes that the facility has made to reduce benzene emissions from storage tanks.

Facility Name/: Wastewater Treatment System (2,3) Controls (4) Sealed/ Monitored Conveyance System Flow Rate Length Width Wastewater Collection System (1) (tons/yr) (Yes/No) (gpm) (decimal deg)(decimal deg) (m) (m) (m) (2,3) Controls (4,5) Level of Control Flow Rate Length Width Wastewater Treatment Units (1) (tons/yr) (O/C/CD) (gpm) (decimal deg)(decimal deg) (m) (m) (m) (1) Please provide a wastewater collection and treatment flow diagram indicating which units have controls, the type of control, and the regulation requiring the control. The wastewater collection system includes all process drains and junction boxes, together with their associated sewer lines, down to the wastewater treatment unit. The wastewater treatment unit typically begins with the forebay of the oil-water separator. Please identify each unit by its ID code. Please indicate and describe any wastewater streams that go offsite for treatment. (2) Describe in detail below how the emissions were calculated. For example, WATER 9 or TOXCHEM, etc. If another calculation method (engineering estimate, emission factor, testing, etc) was used, describe method and how emissions were derived. Also, please describe the emission speciation method and data source(s). Include emissions from process drains here and not on the fugitive equipment leaks sheet. (3) Are wastewater treatment facilities subject to a permit limit on total VOC or benzene emissions? If so, please provide the limit. (4) Is your facility subject to the BWON with TAB > 10 Mg/yr (and thus is subject to BWON controls)? If yes, indicate below the compliance option chosen (i.e. 2 Mg, 6 BQ, etc.). Please provide your most recent Total Annual (TAB) and Quantity (BQ) Reports (subpart FF, Part 61). If your conveyance system is sealed and monitored, please describe. (5) O = open (uncovered), C = covered (but not routed to controls), CD = covered and routed to a control device. Please describe below any additional changes that the facility has made to reduce benzene emissions from wastewater conveyance and treatment systems.

Facility Name/: Misc Process Vents (Group 2) (2,3) Controls (4) Vent Identifier and Indicate Vent Vent Diameter Exit Velocity Exit Temp. Process Unit Served (1) (tons/yr) Type decimal degdecimal deg (m) (m) (m/sec) (deg K) (1) List any RMACT1 Group 2 miscellaneous process vents, and their associated process units Please identify each vent by its ID code. Note: Given the high degree of control provided by process heaters and incinerators, VOC/HAP emissions associated with Group 1 MPVs are insignificant. VOC emissions associated with Group 2 MPVs are typically uncontrolled and therefore can be of more significance. (2) Describe in detail how the emissions were calculated. For each emission source, indicate A, B, C, D and/or E below, and provide the necessary information. Also, please describe the emission speciation method and data source(s) A. Source testing Test method used: Number/frequency of tests: B. Emission Factor Factors used: Bases for factors (e.g. AP-42): C. Engineering Calculation Variables included in calculation: Calculation method: D. Modeling Model used: Inputs to model: Describe how emissions were calculated: E. Estimation Method of estimation(published data, similar sources, process knowledge, etc): (3) Are miscellaneous process vents subject to a permit limit on total VOC or benzene emissions? If so, please provide the limit (4) Indicate type of control device used (e.g. process heater/boiler, thermal incinerator, vapor recovery unit, etc.). Please describe below any additional changes that the facility has made to reduce benzene emissions from miscellaneous process vents.

Facility Name/: Marine Vessel Loading Controlled/Recovered (2,3) Annual Volume Loaded Vent Vent Diameter Exit Velocity Exit Temp. Controlled/Recovered Emission Point (1) (tons/yr) (Million Bbls) decimal degdecimal deg (m) (m) (m/sec) (deg K) Uncontrolled (2,3) (5) Annual Volume Loaded Length Width Uncontrolled Vessel Loading Dock ID (4) (tons/yr) (Million Bbls) decimal degdecimal deg (m) (m) (m) (1) Identify individual vapor recovery or abatement sources. Please identify each control device and its associated loading dock(s) or berth(s) by their ID codes. Please include any wastewater streams generated by marine vessel loading, if not already included on wastewater sheet. Please describe the type of control (e.g., flare, thermal combustion, vapor balancing, carbon adsorption, etc.) (2) Describe in detail below how the emissions were calculated. Also, please describe the emission speciation method and data source(s). (3) Are marine loading operations subject to a permit limit on total VOC or benzene emissions? If so, please provide the limit. (4) Identify individual docks or berths where marine vessels may be loaded without a vapor recovery/control system. Please identify each dock or berth by its ID code. Please include any wastewater streams generated by marine vessel loading (e.g., ballast water), if not already included on wastewater sheet. (5) Modeling area should approximate the dimensions of a standard marine vessel. Please describe below any additional changes that the facility has made to reduce benzene emissions from marine vessel loading.

Facility Name/: Gasoline Loading Racks Controlled/Recovered (2,3) Annual Volume Loaded Truck/Car Tightness Vent Vent Diameter Exit Velocity Controlled/Recovered Emission Point (1) (tons/yr) (Million Bbls) (4) decimal degdecimal deg (m) (m) (m/sec) (deg K) Exit Temp. Uncontrolled (2,3) (6) Annual Volume Loaded Length Width Uncontrolled Loading Rack ID (5) (tons/yr) (Million Bbls) (decimal deg)decimal deg (m) (m) (m) (1) Identify individual vapor recovery or abatement sources. Please identify each control device and its associated loading rack(s) by their ID codes. Please include any benzene transfer operations. Please include any wastewater streams generated by gasoline loading, if not already included on wastewater sheet. Please describe the type of control (e.g., flare, thermal combustion, vapor balancing, carbon adsorption, etc.) (2) Describe in detail below how the emissions were calculated. Also, please describe the emission speciation method and data source(s). (3) Are gasoline loading racks subject to a permit limit on total VOC or benzene emissions? If so, please provide the limit. (4) Indicate the standard for tank truck tightness in terms of the 5-minute limit on pressure drop (e.g., NSPS 3", MACT 1"). If not subject to tank truck tightness requirements, enter 'NA'. (5) Identify individual racks that may be operated without a vapor recovery/control system. Please identify each rack by its ID code Please include any benzene transfer operations. Please include any wastewater streams generated by gasoline loading, if not already included on wastewater sheet. (6) Modeling area should approximate the dimensions of a rack loading area. Please describe below any additional changes that the facility has made to reduce benzene emissions from gasoline loading and benzene transfer operations.

Facility Name/: Data Year: Other Significant Sources of (2,3) Controls (4) (Yes/No) Other Other Other Other Description (1) MACT Source Category (tons/yr) (decimal deg(decimal deg) (1) Describe each operation. Please identify each emission point by its ID code. Examples could include units subject to the HON (and not Refinery MACT), flares not otherwise specified, benzene transfer operations, and ethylene units. If benzene emissions from an other-than RMACT 1 source would be more readily reported in the format of one of the pages for a specific type of emission point, a copy of that page may be made for reporting such 'other' emissions. The page should have a note added at the top identifying that page as being from 'other' sources, and identifying the MACT Source Category. (2) Describe in detail how the emissions were calculated. For each emission source, indicate A, B, C, D and/or E below, and provide the necessary information. Also, please describe the emission speciation method and data source(s). A. Source testing Test method used: Number/frequency of tests: B. Emission Factor Factors used: Bases for factors (e.g. AP-42): C. Engineering Calculation Variables included in calculation: Calculation method: D. Modeling Model used: Inputs to model: Describe how emissions were calculated: E. Estimation Method of estimation(published data, similar sources, process knowledge, etc): (3) Are these other sources subject to a permit limit on total VOC or benzene emissions? If so, please provide the limit. (4) Describe how benzene emissions are controlled.