An Assessment of Material Management on Building Construction Sites

Similar documents
Assessment of Craftsmen Turnover in the Construction Industry

Application of Dynamic Programming Model to Production Planning, in an Animal Feedmills.

Industrial Engineering Letters ISSN (print) ISSN (online) Vol 2, No.2, 2012

The Relationship between Information Technology and the Tourism Sector Performance: An Analytical Study on Jordan)

Importance of Marketing Education Courses as Perceived by Students and Lecturers in Tertiary Institutions in Enugu State, Nigeria

Impact of Training and Development on Employee Performance

Testing strategies for stakeholders in Component Based Software Development

Business Process: Design, Development and Implementation of an E-Procurement and Supply Management System at Kampala International University

BUILT DYE-SENSITIZED SOLAR CELLS- A CONFIRMATORY TEST OF A MATHEMATICAL MODEL

Cloud Based Dedicated Application for Multiple Organizations: Cloud Computing for All Organizations

The relationship between empowerment and job satisfaction: Applied study on Jordanian Textile Companies

A Tool for Measuring Organization Performance using Ratio Analysis

Impact of Training and Development on Organizational Performance: Empirical Study on Telecommunication Sector of Pakistan

Sustainability of Scientific Maize Cultivation Practices in Uttar Pradesh, India

Study of The Aspects Used By Commercial Airlines In Facilitating Domestic Tourism In Kenya

The Effect of Management Information System on Organizational Performance: Applied Study on Jordanian Telecommunication Companies

Perception of Women Executives Towards Balancing Their Work Life And Personal Life

Determinants of Agricultural Output: Implication on Government Funding of Agricultural Sector in Abia State, Nigeria

A Second Order Confirmatory Factor Analysis of Composite. Indicators of Sufficiency Economy Integration of Knowledge

SWOT Analysis of Agriculture Sector of Pakistan

Determinants of Inventory Managements as a Component of Working Capital in Ensuring Corporate Profitability-A Conceptual Approach

Technology Innovations in the Smelting of Chromite Ore

Employee Engagement: Its Effectiveness to the Employees in the. Health Sector

The Cost of Oil Spillage and Gas Flaring on The Socio-Economic Development of The Niger Delta Region of Nigeria

Effect of Recruitment and Selection of Employees on the Performance of Small and Medium Enterprises in Kisumu Municipality, Kenya

Job Satisfaction of Employees in Banking Sector: A Case Study on Janata Bank Limited

Improving Power Distribution Efficiency On Power Lines

European Journal of Business and Management ISSN (Paper) ISSN (Online) Vol.6, No.21, 2014

Construction Resources Management System for Gaza Strip Building Contractors

E-Commerce and E-Governance: Technology for Tomorrow on India Reforms- 2020

Journal of Education and Practice ISSN (Paper) ISSN X (Online) Vol.5, No.31, 2014

An Inventory Control Model for Fixed Deterioration and Logarithmic Demand Rates

Performance Improvement Plan for Developing Countries

Performance Evaluation of Labour Output of Indigenous Construction Firms in North- Central Nigeria.

Evaluation of Factors Affecting Residential Building Maintenance in Nigeria: Users Perspective

The Head Loss Ratio in Water Distribution: Case Study of a 448- Bed Student Hostel

Sustainable Resource Productivity in Small Scale Farming in. Kwara State, Nigeria

Job Satisfaction of Teachers according to their Academic Degrees: A case study of the secondary school teachers in the Iranian province of Mazandaran

Optimal Growth and Characterization of Cobalt Sulphide Thin Films Fabricated Using the Chemical Bath Deposition Technique

A Comparative Analysis of Methods of Procuring Plant and Equipment in execution of Construction Projects

Waste Energy Management and Recovery: A Novel Solution to Energy Conservation and Sustainable Development

Mathematical Theory and Modeling ISSN (Paper) ISSN (Online) Vol.5, No.4, 2015

Constraints of the Development of Accounting Information Systems in Financial Companies Listed on the Amman Stock Exchange

Performance Analysis of Community Development Activities Of Two. Multi-National Oil Companies In Rivers State, Southern Nigeria

Automatic Vehicle Checking Agent (VCA)

Assessing the Potential Hazards of Demolishing Operation

Role of Tranormational Leadership In Effective Knowledge Management

One ERP system for twenty five universities An empirical investigation for development ERP private cloud: Kingdom of Saudi Arabia universities case

Fatigue Behaviour of Medium Carbon Steel of Different Grain Structures

Participatory Performance Measurement or Self-Assessment: Amelioration Employee Job Satisfaction

Impact of Behavioural Biases on Working Capital Management of Manaufactring Sector of Pakistan: A Non Parametric Investigation Approach

Effectiveness of Complaint Management in CRM System

Deteriorating Inventory Model For Two Parameter Weibull Demand With Shortages

Reducing the Cost of Pumping High Viscosity Fluids for Jordanian Industry

Direct Marketing with the Application of Data Mining

New Public Management as Way of Achieving Sustainable Development in Nigeria

Impact of the Analysis of the Microenvironment: an example of distillery in the Czech Republic

Energy Efficient Lighting: Luminance Assessments of CFLs and Incandescent Bulbs

Measuring the Role of Auditor Governance and its Impact on the Gap Credibility of Accounting Information

Customer Satisfaction of Super Stores in Bangladesh- An Explorative Study

Optimization of Product Mix in Cold Rolling Steel Industry Using Product Portfolio Matrix and Multi Objective Goal Programming Model

Liquidity of Short-term Assets Related to Debt Paying Ability: An Empirical Study on Pharmaceuticals Sector of Karachi Stock Exchange

Optimization by Heuristic procedure of Scheduling. Constraints in Manufacturing System

The Effects of Emotional Intelligence on Job Satisfaction

Incorporating Rain Water Harvesting into the Green house Farming

Experimental Investigation on Effect of Head and Bucket Splitter Angle on the Power Output of A Pelton Turbine

Employee Training and Empowerment: A Conceptual Model for Achieving High Job Performance

The Influence of Applying Lime and NPK Fertilizers on Yield of Maize and Soil Properties on Acid Soil of Areka, Southern Region of Ethiopia

Corporate Image and Organizational Performance of State Owned Enterprises Monitored by Privatization Unit (PU) Uganda

Studying Effect of Feed Vapor Fraction on Consumption Energy in Distillation Process

Parallel and Context Based Search in Cloud using Multi Agent System

Effect of Planned Preventive Maintenance Application on the Performance of Egbin Thermal Power Station

Production Planning of LCDs: Optimal Linear Programming and

SWOT Analysis of Nigerian Business Environment

Role of Organizational Structures in Supply Chain and Operational Management

An Assessment of the Impact of the Public Procurement Act 663 (2003) of The Republic Of Ghana, Approaching A Decade Of Its Enactment

Implementation of Management Performance Assessment Based HR Scorecard

Factors Affecting Manpower Capacity Development among. Agribusiness-Based Entrepreneurial Organizations in Abia State, Nigeria

Problems and Prospects of Small- Scale Palm oil Processing in Delta- State, Nigeria

The Extent of Contribution of Coso Report in Improving the Internal Control at the Industrial Companies at Amman Stock Exchange

Row Spacing and Fertilizer Rate on Yield and Yield Components of Tef Eragrostis Teff (Zucc.) Trotter) under Transplanting Planting Method

Sensitization and Monitoring of Water Use in Irrigation Schemes Based on Efficient Water-Use Technologies

Effectiveness of Biogas Production from Slaughter Waste using Two Mixing Ratios (Waste: Water Ratio of 1:1 and 1:2)

The impact of the internal audit function to improve the financial performance of commercial banks in Jordan

Customers Preference Attributes in the Usage of Core Banking Services: An Empirical Investigation

Geographical Information Systems Approach for Transportation Planning Management

Profitability Analysis of Fish Farms in Mymensingh

The Association between Internal Auditing Function Quality and External Audit Costs- Evidence from Egypt

Variation of water quality across Cooum river in Chennai city

E-Recruitment as a Strategy for Informal Networking: A Case Study of Mobilink

Effect of Occupational Stress on Executives Leadership Styles

Micro and Small Restaurants in Nairobi's Strategic Response to. their Competitive Environment

Employee Obsolescence and Counterproductive Work Behaviour among Employees of Government Organizations and Departments

The Impact of Information Technology in Enhancing Supply Chain Performance: An Applied Study on the Textile Companies in Jordan

Journal of Biology, Agriculture and Healthcare ISSN (Paper) ISSN X (Online) Vol.4, No.23, 2014

Genotype Effect on Body Weight of Different Rabbit Breeds and Their Crosses

The Effect of Marketing Strategies as a Strategic Response on the Attainment of Competitive Advantage: A Study of Commercial Banks in Kenya

Factors Determining Establishment of Participatory Forest Management (PFM): The Case of Konso Woreda Gocha Kebele, Ethiopia

Human Resource Development Research as a Route to Sustainable Development in Nigeria

Environmental Cost Accounting and Cost Allocation (a Study of Selected Manufacturing Companies in Nigeria)

Transcription:

An Assessment of Material Management on Building Construction Sites Calistus Ayegba Department of Building, School of Environmental Technology Federal university of Technology Minna calistus.ayegba@futminna.edu.ng Abstract The paper considers the management of materials on building construction sites. In the study, method of material procurement practice on construction site, factors affecting material management on building construction site as well as causes wastages on construction sites were determined. The study further Suggest measures for effective material management in construction site. Data for the study was obtained through a structured questionnaire administered to respondents in ten different construction sites and head offices of the construction companies in charge of the sites in Minna metropolis Niger State. Findings reveal that, 31% of respondents organization procure materials for sites by head office provisions without site requisition, 64% of respondents organization procure materials for sites by head office provisions with site requisition and 5% of respondents organization procure materials for sites by through direct purchase by site manager or engineer. The respondent identified the following as the main causes of material wastage on building construction sites: Damage by mishandling, inadequate storage facilities on site, delay in material supply, inadequate supervision, poor site security, Weather and other natural occurrence, Rework, alteration of designs, over ordering of construction materials, theft and Vandalism. Based on the findings in the work, appropriate recommendations were being made for effective material management on building construction sites. Key words: Building materials, Wastes, Managements, Construction Sites. 1. Introduction Cost wise all constriction works depend on two factors, namely, cost of materials and cost of labour and According to Khyomesh (2011), 30 to 70 percent of project cost is consumed by material with about 30 to 40 percent of labor. But labour cost is nearly the same for good construction work as well as bad construction; therefore attention should mainly be directed to the cost of materials and management of materials. Waste of construction materials on site refers to the difference between materials delivered to construction site and those that are actually used for the construction work (Onabule, 1991) hence from Onabule s specification it can be affirmed that construction waste are those materials supplied to site for construction and are not being used in the actual construction constituents. This supports Seeley (1997) views that not all materials delivered to construction sites are used for the purpose for which they are ordered. Furthermore, Formoso, Isatto, and Hirota (1999), defined waste as any losses produced by activities that generate direct or indirect cost but do not add any value to the product. Rational management of material to avoid waste is an important consideration for reducing construction cost and construction duration. Therefore, there is a need for efficient materials management in order to control productivity and cost in construction projects. Hence the overall objectives of any on-site management activity should be directed to provide full-guard on construction materials and to perform efficient usage of such materials (Mohammed and Anumba 2006). Material management is the process that coordinates planning assessing the requirement sourcing, purchasing, transporting, storing and controlling of materials, minimizing the wastage and optimizing the profitability by reducing cost of material. The goal of material management is to ensure that materials are available at their point of use when needed, the material management system attempts to ensure that the right quality and quantity of materials are appropriately selected, purchased, delivered, and handled on site in a timely manner and at a reasonable cost. Most often contractors carry out project with little or no profit which is so due to procurement systems in which the lowest bidder is often awarded the contract. In trying to cope with lowest bid contract and at the same time avoid construction cost overruns contractors involves in the use of substandard elements, shoddy jobs through use of cheap inexperience labour which most often results in building collapse, abandoned projects, and liquidation of contractors. But researchers have continuously identified that efficient management of materials can result in substantial savings in project costs, (khyomesh, 2011; AbdulRahman and Alidrisyi, 1994). So with good construction material management construction cost overrun can be avoided profits can be made even with the lowest bid and the various bad practices by contractors can be avoided. It is against this background that this study is initiated for effective material management on construction sites. 18

2.Objectives of the Study 1. determine method of material procurement practices on construction site 2. determine the causes of material wastage on building construction sites 3. identify the factors affecting effective material management on building construction site 4. suggest measures for effective material management on building construction site. 3. Research Methodology Data for the study was collected via a structured questionnaire designed to assess the views of respondents on material management on building construction sites. Respondents were asked to rate their perceptions regarding the level of importance of these strategies on a four point Likert ordinal scale where 4 = Strongly Agree, 3 = Agree, 2 = Disagree and 1 = Strongly Disagree. The study was carried out in Minna the Niger state capital. The questionnaires were administered to contractors in their head offices and their representatives on construction sites. A total of 10 different contractors with their respective construction sites were visited and 2 questionnaires each were administered at the head offices as well as at the construction sites making a total of 40 questionnaires being distributed. Hinkel et al (1998) however believes that the minimum sample size that allows normal distribution assumptions to be used rather than using a t-distribution is 30. Hence the sample size of 40 is justifiable. Data obtained from the survey were analysed using simple percentages and Relative importance Index (RII) method. The Relative importance index (RII) was calculated using the formula: RII = W A N_ ( Where W= the weight assigned to each strategy by the respondents, A = Highest weight (which is 4 in this case), N = the total number of respondents. The limits of definition of RII were: 0< 0.25 = Strongly Disagree, 0 0.50 = Disagree, 0 0.75 = Agree 0 = Strongly Agree. A rank ordering of these variables were then assigned based on the calculated RII. 4. Results and Interpretation Table 1. Manner of Material Procurement Practice on Construction Site. Response Frequency Percentage % Head office provisions without site requisition 31% 10 27% head office provisions with site requisition 64% 25 68% direct purchase by site manager or engineer 5% 2 5% Total 37 100% Figure 1. Manner of Material Procurement Practices on Construction Site. Table 1 shows the method of material procurement practices on construction sites. Results shows that 31% of respondent s organization procures materials for construction sites by head office provisions without site 19

requisition, 64% of respondent s organization procure materials for construction sites by head office provisions with site requisition and 5% of respondent s organization procures materials for construction sites through direct purchase by site manager or engineer. The low percentage of 5% of methods of procurement of materials for construction sites by direct purchase by site manager or engineer is not surprising since such method is prone to challenges of accountability and corruption. This results also endorses procurement of materials for construction sites by head office provisions with site requisition as a better option than procurement without site requisition which might amount to over supplying or under supplying materials leading to wastage or delay as the case may be. Table 2. Causes of Material Wastage on Building Construction Sites S/NO Causes of material wastage on building construction sites 4 3 2 1 RII Rank Order A Damage by mishandling and re-work due to poor 23 8 5 1 0.86 1 workmanship B Inadequate storage facilities on site, 12 15 10-0.76 4 C Delay in material supply, 15 9 11 2 0.75 5 D Inadequate supervision, 18 15 4-0.85 2 E Poor site security, 14 17 6-0.80 3 F Weather and other natural occurrence, 5 9 12 11 0.55 9 G Alteration of designs, 7 11 18 1 0.66 7 H Over ordering of construction materials, 12 7 10 8 0.66 7 I Theft and Vandalism. 3 24 5 5 0.67 6 Table 2 gives the responses to the list of causes of material wastage on building construction sites. From the results the relative index for all the list of causes of material wastage on building construction sites were all greater than 0.5 which is an indication that respondents agree and strongly agree with the list of causes of material wastage on building construction sites, with damage by handling and rework due to poor workmanship, inadequate supervision and poor site security having higher relative index of 0.86, 0.85 and 0.8 and ranked 1 st, 2 nd and 3 rd respectively. This implies that damage by handling and rework due to poor workmanship; inadequate supervision and poor site security are the main causes of material wastage on building construction sites Table 3. Factors Affecting Effective Material Management on Building Construction Sites, S/No Factors Affecting effective Material Management On Sites 3 2 1 RII Rank order A Design changes 19 8 10-0.81 2 B Lack of proper work planning and scheduling 20 7 8 2 0.80 3 C Inefficient workforce 22 8 6 1 0.85 1 D Fraudulent practices / negligence and corrupt 15 9 13-0.76 4 practices E Lack of security personnel 11 7 16 3 0.68 6 F Waste on construction site 6 15 13 3 0.66 7 G Storage facility 12 9 16-0.72 5 Table 3 shows the responses to the factors affecting effective material management on construction sites. From the results, inefficient workforce, design changes and lack of proper planning and scheduling are the factors ranked 1 st, 2 nd, and 3 rd with relative index of 0.85, 0.81 and 0.80 respectively. Fraudulent practices/negligence and corrupt practices is ranked 4 th with relative index of 0.76, while storage facility, lack of security personnel and waste on construction sites are ranked 5 th, 6 th, and 7 th with relative index of 0.72, 0.68 and 0.66 respectively. 20

Table 4. Measures for Effective Material Management on Building Construction Site S/No Measures for effective material management on Building Construction Site 4 3 2 1 RII Rank Order 1 Employment of skilled craftsmen and operators 24 11 2-0.86 1 2 Training of both management and other staff. 16 15 4 2 0.80 2 3 Employment of store keeper and security 17 12 8-0.75 5 personnel 4 Procurement requisition to specify quality, 12 13 10-0.76 4 quantity and delivery time 5 Ensuring proper planning and scheduling of 21 9 7-0.79 3 building works 6 Introducing material management at the design 16 6 13 2 0.68 6 stage 7 Attention to weather conditions 6 12 15 4 0.55 7 Table 4 gives the responses to the measures for effective material management on building construction site with employment of skilled craftsmen and operators and training of both management and other staff being the measures ranked 1 st and 2 nd with relative index of 0.86 and 0.8 respectively. Ensuring proper planning and scheduling of building works is ranked 3 rd with relative index of 0.79 while Procurement requisition to specify quality, quantity and delivery time is ranked 4 th with relative index of 0.76. Employment of store keeper and security personnel, introducing material management at the design stage and attention to weather conditions are ranked 5 th, 6 th, and 7 th with relative index of 0.75, 0.68 and 0.55 respectively. The higher relative index values for employment of skilled craftsmen and operators and training of both management and other staff as measures for effective material management on building construction site supports earlier responds from table 3 where inefficient workforce was being identified as the main factor affecting material management on building construction sites. 5. Conclusion and Recommendations The research has examined materials management on building construction sites. Findings shows that procurement of materials with requisition from site is more common with the contractors and its best practice of materials procurements for construction sites for effective materials management. The study also establish that the following: damage by mishandling and re-work due to poor workmanship, inadequate storage facilities on site, delay in material supply, inadequate supervision, poor site security, weather and other natural occurrence, alteration of designs, over ordering of construction materials, theft and vandalism are the causes of material wastage on building construction sites and the factors affecting effective material management on construction sites are as follows: design changes, lack of proper work planning and scheduling, inefficient workforce, fraudulent practices /negligence and corrupt practices, lack of security personnel, waste on construction site and lack of or inadequate storage facility. Furthermore, the research identifies the following as measures for effective material management on building construction site: employment of skilled craftsmen and operators, training of both management and other staff, employment of store keeper and security personnel; procurement requisition to specify quality, quantity and delivery time; ensuring proper planning and scheduling of building works, introducing material management at the design stage and consideration of weather conditions. The study recommends that Contractor should make provisions for training and retraining of management and site personnel in order to improve their efficiency for effective material management and contractors should ensure the use of skilled craftsmen for their works and provide efficient supervision with professionals to ensure effective material management on building construction sites. REFERENCES Abdul-Rahman,.H. and Alidrisyi, M. N. (1994) A Perspective of Material ManagementPractices in a Fast Developing Economy; the case of Malaysia.Construction Management and Economics. Formoso,L.T., Isatto, E.L. and Hirota, E.H. (1999). Methods for Waste Control in the Building Industry.Conference Proceedings organized by International Group for Lean Construction (IGLC) 26-28 July, California. Hinkel E; Wiersma, W and Jurs, S.G (1988): Applied Statistics for the Behavioural Sciences. Houghton, Mifflin, Boston 21

Khyomesh V. Patel (2011) Construction material management on project sites. Mohamed, S.F. &Anumba, C.J. (2006). Potential for improving site managementpractices through knowledge management, Construction Innovation: Information,Process, Management. Onabule, G.A. (1991). Options for Efficient Management of Construction Resources on ite. In Oluteju, B. (ed). Effective Contract Management in the Construction Industry. Seeley, I.H. (1997). Quantity Surveying Practice. London: Macmillan Press Ltd. 22

This academic article was published by The International Institute for Science, Technology and Education (IISTE). The IISTE is a pioneer in the Open Access Publishing service based in the U.S. and Europe. The aim of the institute is Accelerating Global Knowledge Sharing. More information about the publisher can be found in the IISTE s homepage: http:// CALL FOR PAPERS The IISTE is currently hosting more than 30 peer-reviewed academic journals and collaborating with academic institutions around the world. There s no deadline for submission. Prospective authors of IISTE journals can find the submission instruction on the following page: http:///journals/ The IISTE editorial team promises to the review and publish all the qualified submissions in a fast manner. All the journals articles are available online to the readers all over the world without financial, legal, or technical barriers other than those inseparable from gaining access to the internet itself. Printed version of the journals is also available upon request of readers and authors. IISTE Knowledge Sharing Partners EBSCO, Index Copernicus, Ulrich's Periodicals Directory, JournalTOCS, PKP Open Archives Harvester, Bielefeld Academic Search Engine, Elektronische Zeitschriftenbibliothek EZB, Open J-Gate, OCLC WorldCat, Universe Digtial Library, NewJour, Google Scholar