Pacific Northwest Demand Response Project Lee Hall, BPA Smart Grid Program Manager. February 14, 2013

Similar documents
Utility Scale Integration of Wind and Solar Power

Roadmaps for Demand Response & Storage

Energy Imbalance Market Overview

Pacific Northwest National Laboratory-

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION

Welcome to the California Independent System Operator. August 7, 2015

Using More Energy Can Be a Good Thing: C&I Loads as a Balancing Resource for Intermittent Renewable Energy

Dispatch-able CHP, District Energy, and a Duck

Regional Conservation Update: News From the Front

Hydroelectric Pumped Storage Potential and Renewable Energy Integration in the Northwest

Pacific Northwest Low Carbon Scenario Analysis

2017 IRP Update. Proposed Long Term Resource Strategy Proposed Conservation

Demand Response Association of Energy Engineers. Presenter: David Wylie, P.E. ASWB Engineering

Ron Melton Battelle, Pacific Northwest Division

SPP at a Glance. Located in Little Rock. Approximately 600 employees

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Chapter 2. Direct Testimony of Joseph P. Hoerner and Shayleah J.

Integration of Demand Response with Renewable Energy for Efficient Power System Operation

Open Access Technology International, Inc. (OATI)

Energy Policy 2015 Annual Update

Transactive Control in the Pacific

Eugene Water & Electric Board. The Future of Utilities in the Pacific Northwest

Resource planning and operational requirements for the advanced grid: Demand Response Potential Studies

Market Design and Renewables in the U.S.

PG&E s General Comments on Demand Response Vision Update. January 11, 2008

Status of the western energy imbalance market and regional initiatives

2005 Integrated Electricity Plan. Resource Options Workshop #2 Planning Criteria March 09, 2005

For Bandon Utilities Commission

Energy Storage Integration in Alberta s Energy Only Market. Kevin Dawson Director, Market Design Alberta Electric System Operator

Appendix 1 PRELIMINARY DELIVERABILITY BASELINE ANALYSIS STUDY REPORT

Energy Storage and the Built Environment. Steve Saunders Associate Director Arup t +44 (0)

Exploring the Impacts of California s Renewable Portfolio Standard

BPA s Non-Wires Solutions Overview

Idaho Power s Transmission System. Greg Travis Nov. 8, 2018

NORTHWESTERN ENERGY 2018 ELECTRICITY RESOURCE PROCUREMENT PLAN STRAWMAN 1

The Future From One RTO s Window The Institute for Regulatory Policy Studies. Dave Hadley VP, State Regulatory Relations Midwest ISO

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL (NERC)

National Council on Electricity Policy Annual Meeting & Workshop Denver, CO. May 8, Jeff Bladen Executive Director Market Development

PUBLIC UTILITY COMMISSION OF OREGON STAFF REPORT PUBLIC MEETING DATE: February 11, 2015 REGULAR X CONSENT EFFECTIVE DATE N/A

Building the Business Case for Renewables, Energy Storage, and Demand-Side Resources

California ISO Energy Imbalance Market Operations Overview. June 10, 2014 Webinar

Delivering Innovation: Demand Side Management. Bob Hammond, Energy Services Director City of Richland

Northern Tier Transmission Group Stakeholder Meeting Boise, Idaho July 22, 2009

CLECA Comments on ISO DR/EE Roadmap

Mid-C Seminar July 16 th, 2014

2010 RTO Metrics Report: NESCOE Data Summary

ACTIVE DEMAND MANAGEMENT IN THE PLAN EEAC WORKSHOP. EEAC Consultant Team January 30, 2018

Loads and Resources Methods and Assumptions

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development

Smart Buildings in a Smart Grid

SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard

MISO Energy Storage Study DRAFT Scope

Integrating Renewable Energy Into the Western U.S. Grid: Challenges and Opportunities

Introduction to the Energy Imbalance Market (EIM Module 1)

2012 Grid of the Future Symposium. Evolution of the US Power Grid and Market Operations through the next Decade

Redefining Smart: Evaluating Clean Energy Opportunities from Products with Grid Connected Functionalities

Distributed Energy Resources (DERs) and electricity sector evolution: an Ontario perspective on challenges and opportunities

Smart Grid & Demand Management World Future Energy Forum January 19, Scott Henneberry Schneider Strategy & Innovation VP, Smart Grid Strategy

Regional Impact of Renewables

A managed approach to the successful deployment of a cost effective residential and small commercial AMI, Demand Response, and Automatic Load Control

Joint Initiative Update Joint Initiative = 3 regional transmission planning groups Columbia Grid Northern Tier Transmission Group WestConnect Constitu

2017 IRP Advisory Group. July 21, 2017 IRPAG

Eversource Demand Demonstration Projects and Budget Update

Renewable Integration The California Experience

Columbia River Drainage

ELECTRIC RELIABILITY: How Much, By What Means, At What Cost?

CONTENTS LIST OF TABLES LIST OF FIGURES

CAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes)

LONG ISLAND LONG ISLAND

Background The most recent Integrated Electric Resource Plan (2011 IERP) was adopted by the EWEB Board in February 2012.

EXHIBIT GG. DATE FILED: February 9, :29 PM FILING ID: 9B5E9BDEA737B CASE NUMBER: 2016CV144

Modernizing the Electricity Grid MILESTONES

Grid-interactive Electric Thermal Storage (GETS) provides economic and environmental benefit

Western Energy Imbalance Market and Regional Initiatives

Dynamic Price, Product and Messaging Specification

NW Hydro and California

2005 Integrated Electricity Plan. Provincial IEP Committee Meeting #2 Planning Criteria February 22/23, 2005

Electrification and its Implications for the California Electricity System

Grid-Interactive Electric Thermal Storage (GETS) Space and Water Heating

Great Basin Transmission ITP Submission to California ISO. May 2018

NWPP Market Assessment and Coordination Initiative

Virtual Power Plant Simulation

Electric System Impacts of Utility Large-Scale Investment in Building Energy Efficiency

BUILDING TRANSFORMATION THROUGH TRANSPARENCY

INITIAL ASSESSMENT OF POTENTIAL FOR ACTIVE DEMAND MANAGEMENT (ADM) EEAC Consultants

Watt About Energy in the Northwest

BILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. [Docket No. RM ]

Roundtable I: Energy Markets: The Rise of Community and Institutional Scale Resources

Northwest Power and Conservation Council Symposium: Pacific Northwest Power Markets

Distributed Energy Management: The New Era of Demand Response RESEARCH BY:

Energy Storage at PGE. Regional Dynamics

April 28, SUBJECT: Northwest Regional Forecast Presentation by Pacific Northwest Utilities Conference Committee

Community Energy Advisory Council. June 21, 2007

American Public Power Association: Public Power Forward Initiative

2009 Integrated Resource Plan. PNUCC Board of Directors Meeting. January 7, Copyright 2010 Portland General Electric. All Rights Reserved.

AEMO and ARENA demand response trial to provide 200 megawatts of emergency reserves for extreme peaks

Table 10.1 DRAFT IRP Action Plan

New England States Committee on Electricity

CAISO s Plan for Integration of Renewable Resources

Designing Energy Solutions

UNM ME 217 Energy, Environment & Society. Renewable Energy and the Need for Energy Storage. November 8, 2011 Steve Willard, P.E

Transcription:

Pacific Northwest Demand Response Project Lee Hall, BPA Smart Grid Program Manager February 14, 2013

Installed wind capacity is approaching 50 percent of our load Not much geographic diversity; most in BPA s balancing authority Nearing limits of hydro system to provide balancing reserves 2 2

Wind increasing -- more than 4,000 MW hydro interchange load wind thermal 3

Regional situational analysis issues to address 1) Operational reserve and capacity constraints Wind integration: BPA faces significant balancing reserve demands River management: BPA is at the limits of balancing reserves but must ensure sufficient margin to meet multiple use requirements, including managing overgeneration events Ease supply constraints and operational demands during summer and winter peaks and large unit outages 2) Transmission expansion challenges 3) Economic impacts on utilities Rate design with demand charge creates incentives for our customer utilities to invest in DR 4

Nationally Demand Response is used extensively. Programs across US total at least 58,000MW 1 Examples from NERC 2010 Summer Reliability Assessment Available DR is an average of about 5 10% of peak in other regions Estimated total dispatchable DR in WECC region 4,300 MW Peak DR 25,000 MW 1,898 MW Much of the DR in the nation is for capacity (peak management) WECC Peak DR 137,950 MW 4,460 MW In the PNW, Pacificorp and Idaho Power have had 300MW+ programs Peak DR 50,000 MW 2,400 MW Peak DR TVA Peak DR (target) 32,000 MW 1,400 MW Cost is $4 - $7 kw/month for mature programs 65,000 MW 1,062 MW 1 Source: FERC Demand Response & Advanced Metering Report, February 2011 Peak DR 53,000 MW 627 MW 3 rd Party aggregators have played a major role. 5

Over the past four years in the Northwest, BPA and Utilities have partnered in a series of pilots and demonstrations Invested in research Together, BPA Technology Innovation, BPA Demand Response, and our utility and consultant partners have spent ~$4.5 million on DR research from FY 2009 through FY 2012 Finishing four years of field testing, pilots, modeling, and analysis Sixteen utilities and BPA have partnered on DR pilots Additionally, at least 44 utilities have, or plan to, implement AMI a potential enabler for DR 6

Current DR Pilots Residential Commercial Irrigation Industrial Building management Storage-battery HVAC thermostat In-home display Process adjustment Refrigeration/ cold storage Thermal storage space heating Thermal storage water hearting Water heater controller Water pumping PNW DR pilots sponsored by BPA: technologies tested for residential, C & I, and irrigation applications Utility Sector/Expected MW Technology/Planned Installs Central Electric 0.2 403 City of Forest Grove 0.1 1 City of Port Angeles 0.4 90 90 30 20 500 1.8 1 1 2 4 4 2 18.0-40.0 2 City of Richland 0.1 0.2 1 30 Clark Public Utilities 0.1 1 Columbia REA 3.0-5.0 1 2 Consumers Power 0.3 2 Cowlitz County PUD 0.1-0.2 70 Emerald PUD 0.3 200 10 10 200 EWEB 0.1 100 0.1- Kootenai Electric 0.2 78 95 0.1-0.2 6 0.1- Lower Valley 0.2 3 0.1- Mason County PUD #3 0.2 2 100 Orcas Power & Light 0.4 410 United Electric Co-op 1.8 4 7

OpenADR DR platform tested: We have a means to dispatch and measure Events Now how do we develop a resource for use by both utilities and BPA? We ve tested the Grid OpenADR compliant platform to trigger events in several pilots: Used OpenADR, a standard protocol for DR Dispatch platform that can be used to coordinate multiple needs by the utility for peak management (day ahead) and by BPA for balancing (10 minute notification) 8

We have piloted a DR Business Case Tool for Utilities to evaluate DR investments (in thermal storage) Unique cost/benefit for each utility based on potential revenue streams: peak reduction load shaping balancing service Leave behind Excel Tool. Review sessions with PNGC, Flathead Electric, and others Figure: Example results of the business case model 9

Moving forward with a two-pronged approach TI program and DR commercial demonstration projects TI Program: TI Program Proof of concept research and development projects as part of BPA s Technology Innovation program Evaluate DR potential of new technologies and loads of significant interest to the region Eight new DR-related projects selected for FY2013 TI portfolio, focused on: data centers the only test of its kind in the nation heat pump water heaters municipal wastewater treatment energy storage Developing focus for next year s TI portfolio Commercial Demos 10

Moving forward with a two-pronged approach TI program and DR business plan TI Program (continued): Developing focus for next year s TI portfolio to test these technologies: Lighting specifically LEDs Battery storage Next generation of thermal storage (e.g., new types of water heater controls and space heating devices) Whole home energy automation, including the use of home area networks including the use of smart thermostats, smart appliances, et cetera. Heat pump water heaters and DR/EE Small renewables and utility scale integration Distributed generation resources Communication systems and protocols, such as OpenADR Aquifer recharge and other new load opportunities Understanding DR potential of commercial building, irrigation and industrial energy control systems. 11

Moving forward with a two-pronged approach TI program and DR business plan DR Commercial Demonstration Projects: Identify potential larger-scale commercial demonstration projects designed to prove the availability and reliability of DR to help address multiple regional needs Work with utilities, DR aggregators, and other groups throughout the region to identify, design, implement, and test new DR projects Moving far beyond peak load management to address multiple purposes and objectives Use proven technologies from DR pilots, including end-use technologies and DR management system Leverage strong working relationships with utilities and other stakeholders 12

Moving forward with a two-pronged approach TI program and DR business plan DR Commercial Demonstration Projects (continued): Focus on areas with most likely near-term needs Transmission congestion, power system peaks, balancing reserves and oversupply Objectives: Determine best commercial arrangements, acquisition method, and equitable cost allocation Evaluate dispatch by BPA and/or utilities Achieve an operationally meaningful scale 13

Moving forward: A commercial demonstration phase, and continuation of collaboration Joint Approach. Work with utilities and regional groups to identify, design, and implement projects Mix of Partners. Select a mix of partners, including utilities (load following and slice, within and outside of BA) and at least one DR aggregator, utilities as aggregators other ideas? Cost Allocation. The cost allocation for each project will be determined by an analysis of expected benefits, with each participating utility contributing based on the expected benefit they would receive Scale. Portfolio should be as simple as possible while still being commercially viable and operationally meaningful Collaboration throughout agency to operationalize DR with a meaningful scale Ideally 4-6 projects (excluding Technology Innovation and non-wires projects) To test multiple DR products/uses, acquisition methods, geographies and load types with manageable cost and operations impact $3.2 Million allocated in FY14 and FY15 Contract length: up to three years Continue with the Twopronged approach: TI Program and Commercial Demonstrations Proof-of-Concept Pilots (Technical Feasibility) Continued TI (R & D) Pilots of New Technology Commercial Demonstrations 2008 2012 2015 14

We have identified four potential DR products DR Product BPA Benefits Utility Benefits Capacity Lower cost power capacity Economic opportunities Balancing Reserves Increased and lower cost INC and DEC reserve capacity Increased VERBS revenue Generation Oversupply Decreased costs Less need to curtail wind Non-wires Peak Load Reduction Capital cost savings from deferring or reducing Transmission construction LF: Lower wholesale power costs Slice: Power capacity and economic opportunities Slice: Increased INC and DEC reserve capacity Reduced BPA costs over time Productive use for oversupply energy Reduced BPA costs over time Capital cost savings from deferring or reducing distribution investments INC = within-hour load increase DEC = within-hour load decrease LF = Load Following VERBS = Variable Energy Resource Balancing Service 15

Several approaches envisioned for participation -- Bring BPA your ideas! Single Utility Model Utility designs and implements a DR commercial demonstration project in its own service area Could be implemented by utility itself or a third-party Group Group of Utilities Group of of Utilities Model Utilities Model Model Utilities with DR Aggregator Group of utilities work together to design and implement a DR commercial demonstration project across their service areas Could be implemented by utility itself or a third-party Join a BPA-coordinated team of utilities to evaluate and select a DR aggregator to implement a DR commercial demonstration project across service areas of participating utilities 16

Outreach and engagement approach 3/31/2013 7/31/2013 9/30/2013 Through 9/2015 Group Meetings Interested Utility Meetings Proposed DR Project Portfolio All-utility meeting on 2/7 Utility group follow-up meetings (ICUA, NWPPA, PPC) Continue discussions with PNGC, NRU, etc. Meet individually with interested utilities to design DR projects Assess benefits and cost allocation Joint utility/bpa aggregator evaluation # MWs available Utility partners Aggregator role Expected benefit Implementation of Identify utilities interested in partnering to evaluate joint-use DR projects Assess interest in using DR aggregators Identify mutuallybeneficial, costeffective DR projects Cost/benefit analysis Cost allocation approach Acquisition method Budget Funding plan Operations plan DR Commercial Demonstration Project Portfolio Dispatch strategy Systems approach Additional education for interested utilities and utility groups Partner utilities for next step identified Proposed DR project portfolio Budget and funding plan Acquisition method Governance plan Evaluation plan Implementation roadmap 17

Contact Information BPA Smart Grid Program Manager: Lee Hall 503-230-5189 ljhall@bpa.gov Smart Grid Outreach Coordinator: Katie Pruder-Scruggs 503-230-3111 kpruder@bpa.gov 18