CFWI 2013 CALENDAR - Rev. August 11, 2013

Similar documents
CFWI 2013 CALENDAR - Rev. Jan 19, 2013

Regional Water Supply Plan

CI User Engagement Activities and Schedule Nov Apr 2013

WRAT Meeting Draft Minimum Flows and Levels and Reservations (MFLRT) Scope of Work June 7, 2018 Doug Leeper

FWCA Workshop The Central Florida Water Initiative. John Shearer, P.E., BCEE Shearer Consulting Inc. March 30, 2016 Orlando Utilities Commission

Water Planning and Stewardship Committee Item 6a February 8, 2016

CENTRAL FLORIDA WATER INITIATIVE

Sep Oct Nov Dec Jan Feb Mar Apr May. Engage in appropriate Professional Development and seek additional support as needed

CENTRAL FLORIDA WATER INITIATIVE

TABLE B 59. Manufacturers new and unfilled orders, [Amounts in millions of dollars; monthly data seasonally adjusted]

Electric Forward Market Report

VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDA NEW AND REVISED IIM

CENTRAL FLORIDA WATER INITIATIVE

Irrigation modeling in Prairie Ronde Township, Kalamazoo County. SW Michigan Water Resources Council meeting May 15, 2012

Dec Board of Education: Approve Educational Specifications. Dec Jan. 2016

Overview of the New Zealand Natural Capital Assessment May 2014

Continuous Simulation Example Problem

The Impacts of Climate Change on Portland s Water Supply

Pomme de Terre One Watershed, One Plan Request for Proposal Responses DUE: May 19 th, 2017

2020 Campus Master Plan

City of San Clemente Water Usage Report

2015 IRP/RUWMP Kickoff Workshop April 8, 2015

Recalculation of Seasonal Adjustment Factors

CO2, SO2 and NOX Emission Rates. March 15, 2018

Future Emission Scenarios

Draft Refined Incremental Proposal GAC WS 2

The monthly variation of the Business Turnover 1 stands at 1.6%, after seasonal and calendar adjustment

Woking. q business confidence report

Central Florida Water Initiative NOTES: TOHO Water Authority 951 Martin Luther King Blvd. Kissimmee, Florida 34741

Contents. ECFT Model Documentation in Support of the 2014 Draft CFWI RWSP

University of Michigan Eco-Driving Index (EDI) Latest data: August 2017

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Hetch Hetchy Water and Power

Project Overview- Feasibility Report

Columbia River Project Water Use Plan Kinbasket Fish and Wildlife Information Plan

TL 9000 Quality Management System. Measurements Handbook. BRR Examples

Special Meeting of the Imported Water Committee November 14, 2013

Salinity TMDL Development and Modeling in the Otter Creek Watershed. Erik Makus DEQ Hydrologist June 6, 2013

Proposed Work Plan for Seventh Plan Development. October 2, 2014 GRAC Tom Eckman

Traffic Department Anchorage: Performance. Value. Results.

RISK AND VULNERABILITY ASSESSMENT WITH CLIMATE CHANGE: MANCHESTER-BY-THE-SEA HAZARD MITIGATION PLAN ENHANCEMENT

The Statutes of Upper Canada and the Province of Canada, 1792 to 1866

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero

2017 KEY INSIGHTS ON. Employee Attendance and Tardiness

Central Florida Water Initiative Area Minimum Flows and Levels Water Body Status Assessment

Overview Water Sensitive SA Program & Opportunities for collaboration

CFWI Hydrologic Analysis Team Status

CFWI Hydrologic Analysis. September 30, 2011

Surveys Show Insuladd Saves Energy!

Annual State of Drinking Water Quality Report

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT. Resolution Plan for GI-AP1000-PSA-01. Success Criteria for the Probabilistic Risk Assessment (PSA)

Role of high frequency water quality analysis in confirming catchment hydrology interpretation

NON-TREATY STORAGE AGREEMENT JIM GASPARD

Clean Energy Extension

Compliance Training and the Board

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

2002 FIRE INVENTORY VISTAS States

The Efficient and Productive Administrator. Contents are subject to change. For the latest updates visit

T2-T2S Consolidation T2-T2S Consolidation

Barrie Bonsal, Elaine Wheaton, Virginia Wittrock, Evan Siemens, Nick Nicolichuk DRI Workshop, Winnipeg, May 11 th, 2010

GSP Coordinating Committee

OLAP Technologies and Applications

Modeling the production of multiple ecosystems services from agricultural and forest landscape in Rhode Island

San Francisco Housing Authority (SFHA) Leased Housing Programs as of January 31, 2016

Regional Habitat Indicators Project. Workshop #1. Nov 9, 2016

Arlington East WRF Influent Channel Rehabilitation - Final

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT Resolution Plan for GI-AP1000-RC-01 Accident Source Terms. Protection, PSA and Fault Studies

Utilization of the SWAT Model and Remote Sensing to Demonstrate the Effects of Shrub Encroachment on a Small Watershed

5/21/2012. Welcome and Introductions Introduction to the IRWM Program Statewide Program Merced Region IRWM Plan. Regional Advisory Committee

Assessing the impact of climate change on the hydroperiod of two Natura 2000 sites in Northern Greece

Modeling the Middle and Lower Cape Fear River using the Soil and Water Assessment Tool Sam Sarkar Civil Engineer

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT. Resolution Plan for GI-AP1000-SI-05

5 Star London Hotels - Example Report

Assessment of nitrogen retention in the Seine river basin by different approaches

Air quality sensing in europe

a) Seek clarification from the Department for Transport in respect of future core funding for the work of the Strategic Transport Forum.

Municipal Natural Asset Initiative: Pilot for the Region of Peel

The Confluence Model. Presentation to Modeling and Forecasting Working Group January 21, 2015

Root River One Watershed, One Plan Request for Proposals Proposals DUE: Wednesday, December 3, 2014, 4:00 PM

Enhanced Pavement Management Program. Pavement Management Program

REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017

Consolidated Monthly Status Reports Transforming NMSU into a 21 st Century University Team 3 IT Service Delivery: Lead Norma Grijalva

Climate Change Impacts for the Central Coast and Hunter Regions

Draft 2011 Long-term Transmission Plan. Stakeholder Session June 20, 2011

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING December 5, 2018 ROUTINE STATUS REPORTS ITEM 1

WaterNSW Water Operations Report. Murray-Lower Darling November 2017

CRT Operations in Low Water Conditions

Reliability Coordinator Transition Coordination Group Update

Wyoming Water Development Commission Michael K. Purcell, Director 6920 Yellowtail Rd, Cheyenne, WY All Results DRAFT Subject to Change

Racial Equity Work Plan. Equity Advisory Committee June 20, 2017

HYACINTS. Jens Christian Refsgaard Geological Survey of Denmark and Greenland (GEUS)

Safety Document (SD) COMPLIANCE MONITORING. Executive Management Team (EMT), Board of Directors.

..Title Receive Report on Salinas Valley Water Conditions for the Third Quarter of Water Year

GSP Development Update

Reservoir Drought Operations

REGIONAL EXPERT ADVISORY WORKSHOP REPORT 01 MAR 2011 VIENTIANE, LAO PDR OVERVIEW OF PROJECT

A Framework for Assessing the Environmental Water Requirements of Groundwater Dependent Ecosystems

Cotton Update. Hosted by United States Fashion Industry Association (USFIA) and Cotton Incorporated

Gail Melgren, Executive Director, Tri-State Water Resources Coalition. Southwest Missouri Water Resource Study: Summary of Phases

Instream Flows in the San Antonio River Basin From Science to Environmental flow Standards. Steven J. Raabe, P.E

Transcription:

CFWI 2013 CALENDAR - Rev. August 11, 2013 CFWI Critical Path Management December 6 2012 December 20 2012 January 3 January 17 & 18 GAT 1. EMT Measuring Sticks 2. Other lines of evidence example 3. SJRWMD Water Supply Assessment 4. GAT schedule of activities 2. EMT Measuring Sticks a. Follow up items from Dec 6 meeting 3. Other lines of evidence 4. GAT--SC a. Model Calibration 2. Water Use/Demands in CFWI 3. Other lines of evidence a. Review Confoundedness 4. Review GAT flowcharts and process 5. Review GAT items on Jan 7 meeting 6. GAT--SC Management Oversight Meeting *** at CH2M Hill - Orlando*** a. Model Calibration b. Review of water use demands in model 2. EMT Measuring Sticks a. Hydrology (groundwater/surface water linkage) 3. MFLRT Dec 10 Telcon Dec 24 CANCEL Jan 7 In Person Page 1 of 7

January 31 GAT a. current status of MFLs (includes red & green based on current status?) b. Springs measuring sticks 4. Other lines of evidence a. Current status of Water Resources Presentation for Feb 1 SC meeting b. additional items to include other lines of evidence 5. Review and update GIS layers 6. GAT flowcharts 7. Review items that need to be raised to 8. GAT--SC Management Oversight Meeting Jan 22 a. Model Calibration b. Water use demands distribution c. recreational water use 2. EMT Measuring sticks a. Test examples b. introduce options for "acceptable/unacceptable change" 3. Wetlands alternative plan/other line of evidence a. Discuss concepts 4. Review updated GAT flowcharts and process 5. GAT groundwater assessment "decision process" a. discuss conceptual approach 6. Review "Current status of Water Resources" presentation for Feb 1 SC meeting 7. GIS layers status update 8. GAT--SC Preliminary HAT Model Output Jan 31 Meeting Feb 1 Management Oversight Meeting Feb 4 February 1. Review GAT Page 2 of 7

14 2. HAT Update a. Model calibration b. Model scenarios status c. Water use demands distribution d. Other items? 3. EMT Update a. Measuring stick status 4. MFL&RT Update a. Measuring stick status 5. Review Flowcharts 6. Review GIS layers 7. Review Decision Process for groundwater availability assessment 8. Identify other items/tasks needed 9. Summarize changes to GAT Management Oversight Meeting Feb 18 February 28 & March 1 HAT EOP and 2035 Model Runs Feb 22 February 28 meeting a. Model calibration and use of results b. Review model scenarios 2. EMT Update a. Preliminary results of EMT wetland assessment for EOP (2 areas as examples) b. Frame acceptable/unacceptable wetland change item to be discussed with at March 4 meeting 3. MFL&RT Update a. Measuring stick status b. Review completed sticks and compare with previous assessments 4. Review GIS layers to be used for practice run and March 11, 14 & 15 groundwater assessment 5. Finalize flowcharts to be used for practice run and March 11, 14, & 15 groundwater Page 3 of 7

assessment 6. Re-Evaluate March 11, 14, & 15 meeting dates March 1 meeting 1. Practice run and March 11, 14 & 15 groundwater assessment a. Goal to use GAT decision process to practice run through a preliminary/rough current conditions assessment of groundwater availability including areas of potential availability and areas of potential concern EMT and MFL Evaluation Measures Feb 28 will get extended into April Updated model output for RC, EOP, and 2035 Mar 1 will need to revise date Management Oversight Meeting Discuss options for EMT acceptable/unacceptable wetland change for groundwater availability assessment 1. Preliminary groundwater availability assessment a. Confirm groundwater availability process March 11, b. Objective: preliminary findings of groundwater availability based on current 14, & 15 conditions 2. Identify issues that need to be raised to /SC Mar 4 Management Oversight Meeting Mar 18 2. Identify issues that need to be raised to /SC March 27 & 28 4. Finalized presentation to committee on recent conditions assessment 5. Assessed schedule impacts and proposed revised schedule Meeting GAT Objective: Report on status of groundwater availability assessment, and report on recent conditions GAT Preliminary Groundwater Availability Assessment March 31 Management Oversight Meeting Apr 1 Mar 29 Page 4 of 7

April 11 April 24 & 25 GAT Discussed revised schedule 2. Identify issues that need to be raised to /SC Management Oversight Meeting Apr 15 2. Identify issues that need to be raised to /SC Management Oversight Meeting Apr 29 RWSP - Water resource development component options April 30 May 9 & 10 2. Identify issues that need to be raised to /SC Management Oversight Meeting May 13 2. Identify issues that need to be raised to /SC Management Oversight Meeting May 29 Target date for model runs and measuring sticks for GAT Preliminary Groundwater Assessment of Future conditions May 29 May 23 May 29 & 30 1. Preliminary Groundwater availability assessment of future conditions 2. Prepare presentation for joint meeting with on June 17 GAT Preliminary Groundwater Availability May 31 Page 5 of 7

1. Review and refine preliminary groundwater availability assessment for future conditions 2. Groundwater availability assessment June 6 & 7 3. Identify issues that need to be raised to /SC 4. Identify tasks (additional model runs, analyses, etc.) Proposed GAT meeting to review presentation and information for June 17 meeting with June 14 meeting Management Oversight Meeting with Groundwater Availability Team GAT Objective: Report preliminary findings of groundwater availability to including current and June 17 future conditions; review draft presentation for June 28 SC meeting June 21 2. Identify issues that need to be raised /SC 3. Review presentation for June 28 meeting Meeting GAT Objective: Report preliminary findings of groundwater availability, recent and future conditions July 11 & 12 July 18 & 19 Preliminary GAT Groundwater Availability Results Presented June 28 GAT meetings to continue Groundwater availability assessment 1. Follow up items/cleanup 2. Review write ups for RWSP 3. Identify remaining tasks to finalize information and deliverables for RWSP 4. Review presentation for proposed Aug 16 Meeting June 28 Aug 1 & 2 GAT meetings to continue Groundwater availability assessment Management Oversight meeting to review GAT groundwater availability presentation Aug 5 Aug 8 & 9 GAT meetings to finalize Groundwater availability assessment and SC presentation Management Oversight meeting to review GAT groundwater availability presentation Aug 12 Meeting GAT Objective: Report findings of groundwater availability, recent and future conditions Aug 16 GAT Groundwater Availability Results August 16 Aug 23 GAT conference call to review and finalize draft GAT write-up for RWSP Page 6 of 7

Proposed Meeting Sep 27 RWSP Water supply development component options Sep 30 RWSP - Final Draft of Regional Water Supply Plan Nov 30 Page 7 of 7