PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

Similar documents
Mine Number: Notice of Work: Viktor Bugaychuk Robson Valley Construction Box 474 McBride BC V0J 2E0. Dear Viktor Bugaychuk:

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

CCSD#1 Stormwater Standards

Appendix 4. Soil Management Plan

I hope that this explanation suffices, Thx, Robert

Environmental Assessment Approval

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV

Alberta Transportation The City of Edmonton The City of Calgary

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Conservation and Reclamation INFORMATION LETTER. Environmental Protection Guidelines for Oil Production Sites - Revised January 2002

All nonmetallic mining sites subject to this chapter shall be reclaimed in conformance with the standards contained below.

Code of Practice for Exploration Operations

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm

CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION

Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities

New Administration Building

ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

General Permit No.: OHR Page 53 of 146

Site C Clean Energy Project Agricultural Mitigation and Compensation Plan

PROVINCE OF SASKATCHEWAN MINISTRY OF ENVIRONMENT MINISTERIAL CHANGE APPROVAL PURSUANT TO SECTION 16(2)(a) THE ENVIRONMENTAL ASSESSMENT ACT

Conditions Annexed to and Forming Part of Land Use Permit # MV2013C0021

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

SCHEDULE. 1 Part 10 of the Health, Safety and Reclamation Code for Mines in British Columbia is repealed and the following is substituted:

Chapter MINERAL EXTRACTION AND MINING OPERATIONS


Renewal of Conservation Permit CP Pipeline Road

PRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

ENVIRONMENTAL SCREENING REPORT

TOWARDS RESULTS-BASED STANDARDS FOR MINE RECLAMATION IN BRITISH COLUMBIA. John C. Errington, Ph.D., P.Ag.

ROADS: OPERATION AND MAINTENANCE

Environmental Assessment Approval

Storm Water Pollution Prevention Plan for CES Gravel #3800

Introduction Category 15

Water Pollution Control for Work in Sensitive Areas

Environmental Impact Assessment (EIA)

Facilities Environmental Protection Plan: Burnaby Terminal

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV

SITE DESIGN ENGINEER'S STATEMENT:

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

SANKO GEOTHERMAL POWER PROJECT TRAFFIC MANAGEMENT PLAN

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003

Nottawasaga Valley Conservation Authority

3.0 Natural Resource Management Policies. 3.4 Resource Extraction Policies

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

Environmental Assessment Registration Destination RV Resort

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0

Introduction- Category 9

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

Page 1 of 6 Permit No: MN R J. Mineral Mining and Dressing

Appendix H. Construction Environmental Management Plan (CEMP)

Appendix 8. Petroleum Hydrocarbon Products, Ammonium Nitrate and Explosives Management Plan

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

Performance Standards Compliance Checklist

Assessment of Environmental Liabilities of Historically Reclaimed Sites

Borrow Pit and Quarry Management Procedure Environmental

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

D EROSION AND SEDIMENT CONTROL. Table of Contents

Cox's Construction Ltd. P.O.Box 157 Lawn A0E-2E0 Tel: (709) Fax: (709)

Regulation of Mines In South Florida

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT

LAND DISTURBANCE PERMIT

Technical Summary. January 2014

Alberta Transportation. Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects

Construction Environmental Management Plan (CEMP) for Potash Overland Conveyor

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

Ordinance No NOW THEREFORE, be it hereby ordained by the Glasgow City Council as follows:

Appendix G. Mitigation, Management and Monitoring Plans. Site C Clean Energy Project

Application to the ALC for a Non-Farm Use in the ALR for gravel extraction

Regulatory and Permitting. for Metallic Mining in Minnesota

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

Generic Spill Contingency Plan

DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT

GUIDELINES FOR PREPARATION OF MINE CLOSURE PLAN

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Box Elder County Land Use Management & Development Code Article 3: Zoning Districts

Reclamation Plan Modification for the Patrie Pit

Forest Recreation Management

GRADING, EROSION AND SEDIMENTATION CONTROL

BC MINES ACT PERMITTING: UPDATE ON GOVERNMENT STRUCTURE, ROLES, RESPONSIBILITIES AND REQUIREMENTS

Appendix C: Analysis of BLM Required Design Features for Greater Sage Grouse

SOIL EROSION AND SEDIMENT CONTROL

ORDER OF THE MINISTER OF ENVIRONMENT ENVIRONMENTAL MANAGEMENT ACT SECTION 79 AMENDED SPILL PREVENTION ORDER: MO1701

ORDER OF THE MINISTER OF ENVIRONMENT ENVIRONMENTAL MANAGEMENT ACT SECTION 79 AMENDED SPILL PREVENTION ORDER: MO1701

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

Orange County Central Utility Facility Upgrade IP

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE

Building Better Storm Water Quality

APPENDIX A ENVIRONMENTAL MANAGEMENT PLAN - CONSTRUCTION

Transcription:

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES SAND AND GRAVEL PERMIT APPROVING WORK SYSTEM AND RECLAMATION PROGRAM (Issued pursuant to Section 10 of the Mines Act R.S.B.C. 1996, C.293) Permit: G-9-282 Mine No.:1641309 Issued to: British Columbia Hydro and Power Authority Suite 1100, Four Bentall Centre, 1055 Dunsmuir Street Vancouver BC V7X 1V5 for work located at the following property: Area A As described in Notice of Work applications 1641309-201501 and 1641309-201502 The approval for Notice of Work 1641309-201501 is valid beginning July 24, 2015 and ending prior to December 31, 2015. The approval for Notice of Work 1641309-201502 is valid beginning January 1, 2016 and ending prior to December 31, 2023. This approval and permit is subject to the appended conditions. Issued this 24th day of July in the year 2015. Victor Koyanagi P.Geo. Inspector of Mines

Page 2 of 8 July 24, 2015 PREAMBLE Notice of intention to commence work on a sand and gravel pit, including a plan of the proposed work system and a program for the protection and reclamation of the surface of the land and watercourses affected by the Notice of Work 1641309-201501 and 1641309-201502 was submitted to the Regional Inspector of Mines on March 06, 2015. This permit contains the requirements of the Ministry of Energy and Mines for reclamation. Nothing in this permit, however, limits the authority of other provincial ministries to set other conditions, or to act independently, under their respective permits and legislation. The Site C Clean Energy Project (the Project) has undergone an environmental assessment in accordance with the Canadian Environmental Assessment Act, 2012 (CEAA 2012), the BC Environmental Assessment Act (BCEAA), and the Federal- Provincial Agreement to Conduct a Cooperative Environmental Assessment, Including the Establishment of a Joint Review Panel of the Site C Clean Energy Project. The assessment found that the effects of the Project will largely be mitigated through careful, comprehensive mitigation programs and ongoing monitoring during construction and operations. Mitigation, management and monitoring plans for the Project have been developed taking into account the measures proposed in the EIS, information received during the Joint Review Panel hearing process, and the Report of the Joint Review Panel on the Project. Those plans are consistent with, and meet requirements set out in, the conditions of the Environmental Assessment Certificate (EAC) and of the Decision Statement issued on October 14, 2014 and November 25, 2014 respectively. Under the EAC, the proposed works must be conducted in accordance with the requirements of the CEMP. Mitigation measures specific to the activities proposed are described in the Construction Environmental Management Plan (CEMP). CONDITIONS The Chief Inspector of Mines (Chief Inspector) hereby approves the work plan and the program for protection and reclamation of the land surface and watercourses subject to compliance with the following conditions: 1. Reclamation Security Reclamation security for this approval is waived. The Permittee remains responsible for reclamation of the mine site to the satisfaction of the Chief Inspector of Mines.

Page 3 of 8 July 24, 2015 2. Land Use The surface of the land and watercourses shall be reclaimed to the following land use: Wetland, Wildlife. 3. Productivity The level of land productivity to be achieved on reclaimed areas shall not be less than existed prior to mining on an average property basis unless the Permittee can provide evidence which demonstrates, to the satisfaction of the Chief Inspector, the impracticality of doing so. 4. Revegetation Land shall be re-vegetated to a self-sustaining state using appropriate plant species. 5. Use of Suitable Growth Medium (a) (b) (c) On all lands to be re-vegetated, the growth medium shall satisfy land use, productivity, and water quality objectives. Topsoil, overburden (to rooting depth), subsoil, and non-merchantable coarse woody debris shall be removed from operational areas prior to any disturbance of the land and stockpiled separately on the property for use in reclamation programs, unless the Permittee can provide evidence which demonstrates, to the satisfaction of the Chief Inspector, that reclamation objectives can otherwise be achieved. No topsoil shall be removed from the property without the specific written permission of the Inspector of Mines. Reclamation material stockpiles shall be appropriately protected from invasive plant species, erosion, degradation and contamination, and shall be clearly marked to ensure that they are protected during all construction and mining activities 7. Treatment of Structures and Equipment Prior to abandonment, and unless the Chief Inspector has made a ruling otherwise, such as heritage project consideration or industrial use, (a) (b) all machinery and equipment shall be removed, and all scrap material shall be disposed of in a manner acceptable to the Regional Inspector of Mines. 8. Roads (a) All roads shall be reclaimed in accordance with land use objectives unless permanent access is required to be maintained.

Page 4 of 8 July 24, 2015 (b) Individual roads will be exempted from the requirement for total reclamation under condition 9(a) if either: (1) the Permittee can demonstrate that an agency of the Crown has explicitly accepted responsibility for the operation, maintenance and ultimate deactivation and abandonment of the road, or (2) the Permittee can demonstrate that another private party has explicitly agreed to accept responsibility for the operation, maintenance and ultimate deactivation and abandonment of the road and has, in this regard, agreed to comply with all the terms and conditions, including bonding provisions, of this reclamation permit, and to comply with all other relevant provincial government (and federal government) regulatory requirements. 9. Temporary Shutdown If this sand and gravel pit ceases operation for a period longer than one year the Permittee shall either continue to carry out the conditions of the permit or apply for an amendment setting out a revised program for approval by the Chief Inspector. 10. Alterations to the Program Substantial changes to the program must be submitted to the Inspector of Mines for approval prior to initiating the changes to the program. 11. Notice of Closure Pursuant to Part 10.6.1 of the Health, Safety and Reclamation Code for Mines in British Columbia, a Notice of Completion of Work shall be filed with the Regional Inspector of Mines not less than seven days prior to cessation of work. 12. Annual Report Annual summary of activities shall be submitted to the Regional Mines office in Prince George prior to March 31 of each year the permit remains valid. This shall also include, but is not limited to, an as-built map of the mine site. The origin, storage locations, quantities, and stockpile protection activities for stored reclamation materials shall be documented and reported in the Annual Summary Report. 13. Site Stability a) The Regional Inspector of Mines shall be advised in writing at the earliest opportunity of any unforeseen conditions that could adversely affect the extraction of materials, site stability, erosion control or the reclamation of the site.

Page 5 of 8 July 24, 2015 b) The stability of the slopes shall be maintained at all times and erosion shall be controlled at all times. c) The discovery of any significant subsurface flows of water, seeps, substantial amounts of fine textured, soils, silts and clays, shall be reported to the inspector as soon as possible and work shall cease until the inspector advises otherwise. 14. Training and Orientation The Manager shall ensure that all workers are adequately trained to do their job or are working under the guidance of someone who has competency both in the job and in giving instruction, and ensure that all employees receive thorough orientation and basic instruction in safe work practices. The manager shall maintain a record of all training workers and supervisors have received, and make this record available to an inspector upon request. 15. Hazards and Confined Spaces The Manager shall ensure hazardous areas and confined spaces on the mine site are identified and documented in a formal report. Confined spaces shall be clearly marked near the entrances to the confined space. Upon completion of the report, the report shall be provided to all emergency responders (police, fire, ambulance, etc.) that may potentially enter the mine site. 16. Emergency Response Plan: An emergency response plan (ERP) shall be developed and implemented prior to commencement of exploration activities. In addition to addressing daily operational issues, the plan shall specifically address emergency evacuation of personnel due to injury and forest fire hazard. All persons on the mine site shall be familiar with the ERP. The plan shall be available on site for review. 17. Access Control The Manager shall ensure, pursuant to section 1.3 of the Health, Safety and Reclamation Code for Mines in British Columbia, other than an inspector, only persons authorized by the manager shall enter or be permitted to enter the mine site. This shall be accomplished through the use of locked gates or other suitable means. In addition, notice to this effect shall be posted at all road entrances to the mine. If a lock is installed on an access gate, a key shall be provided to the Regional Inspector of Mines. 18. Environmental Protection: a) The Permittee shall conduct works in accordance with the Project (Site C) Construction Environmental Management Plan.

Page 6 of 8 July 24, 2015 b) The Permittee shall ensure that all practical means are taken to minimize the amount of new development and new land disturbance. c) Waste containers and garbage shall be removed from site at the earliest possible opportunity. d) The Permittee shall control erosion and sedimentation on site and ensure impacts to the land, watercourses and wildlife are minimized as a result of the mining activities. 19. Wildlife The Permittee shall ensure all practicable measures are taken to minimize impacts to wildlife. 20. Noise Abatement a) The Manager shall ensure compliance with 2.6.1 of the Code and ensure any machinery or equipment which, when operating, exposes the operator or persons in the vicinity to noise levels in excess of those prescribed in Table 2-2, Part 2, for unprotected ears, shall if practicable, be fitted with a properly maintained muffler or other noise reducing device. b) Stationary engines and portable compressor installations shall be enclosed in noise attenuating structures. c) Site equipment shall be fitted with high efficiency muffling devices. 21. Dust Control a) All dust on the mine site shall be suitably controlled at the source. Dust shall not be allowed to impact adjacent properties. All dust inside building and structures shall be suitably controlled at the source. b) All roads on the mine site shall be appropriately constructed and topdressed such that dust is controlled. c) A sprinkler system, water truck, or other appropriate means shall be utilized to ensure dust is adequately controlled on the mine site. d) The Permittee shall ensure all vehicles exiting the mine site are adequately washed to minimize the potential spread of dust. e) Covered trailers shall be utilized on all haul trucks exiting the mine site. 22. Authorizations from Other Agencies The Permittee is responsible for obtaining all permits and authorizations as required from other government agencies and complying with terms and conditions as set out by those agencies. 23. Compliance: All activities on the mine site shall comply with terms and conditions listed in:

Page 7 of 8 July 24, 2015 a) the Mines Act, b) the Health, Safety and Reclamation Code for Mines in British Columbia c) the Metal Leaching and Acid Rock Drainage Guidelines for Mines in British Columbia, and d) Approved Notice of Work and Reclamation applications 1641309-201501 and 1641309-201502 24. Fuels and Lubricants Fuels and Lubricants, if stored on the mine site, shall conform to the requirements of the Field Guide to Fuel Handling, Transportation, and Storage The Permittee shall develop and implement a hydrocarbon management plan that deals with fueling, operational servicing, spill prevention and clean-up for fuels and lubricants stored on or off the mine site. The plan shall account for the following: i) Fuel and lubricants shall be delivered to site as needed to resupply and oil tanks on mobile and fixed equipment. ii) iii) iv) Impermeable, oil absorbent matting shall be used when refueling and servicing equipment. While refueling the operator shall be in control of the refueling nozzle at all times. If any Petroleum, hydrocarbon or other product (no matter how small) is spilled the contaminated soil/gravels shall be forthwith collected and removed for appropriate disposal. v) Fuel or oil leaks on equipment shall be effectively repaired as soon as they are discovered or the equipment shall be removed from the site and not operated until repairs have been made. vi) 25. Chance Find Plan An emergency spill containment and clean up kit shall be maintained at the site while it is in operation. The kit shall have the capacity to contain and clean up 100% of a spill from a failure of the largest volume of a fuel or lubricant tank or system plus 10% Prior to initiating mining activities as approved under this permit, the Permittee shall develop and implement a suitable Archaeological Chance Find Procedure (CFP). The Manager shall ensure all workers on the site are aware of and understand the CFP and adhere to the procedure. 26. Crushing and Screening The Manager shall ensure written notice is provided to the Regional Inspector of Mines a minimum of seven days prior to initiating crushing or screening activities on the mine site.

Page 8 of 8 July 24, 2015 27. Dangerous Occurrences The Manager shall ensure compliance with section 1.7.1 of the Health, Safety and Reclamation Code for Mines in British Columbia report all dangerous occurrences to the Regional Health and Safety Inspector of Mines. 28. Reclamation a) The Manager shall ensure a suitable progressive reclamation plan for the entire Area A mine site is developed and implemented by a qualified registered professional prior to January 1, 2017. This plan shall ensure maximum habitat restoration. This plan shall be provided prior to January 1, 2017 to the Provincial Reclamation Inspector of Mines, Regional Inspector of Mines Permitting and to Northeast Ecosystems MFLNRO for review and approval. This plan shall be provided to Treaty 8 First Nations for information and review. b) The Manager shall take reasonable measures to prevent the establishment of invasive plant species on the mine site. c) Re-vegetation species shall be selected based on the principles of ecological succession, traditional use and cultural significance, including all reasonable efforts to use only native species unless short-lived agronomic species are required to temporarily control erosion. 29. Mine Plan Prior to March 31, 2016 and prior to initiating mining activities as approved under Notice of Work 1641309-201502, the Manager shall provide to the Regional Inspector of Mines for review and approval, a detailed mine plan including but not limited to: a) Surveyed as-built map of the mine site, b) Mining Method and Bench Design c) Mining Equipment List d) Traffic Control Plan e) Adequate cross sections illustrating the current ground profile, f) Adequate cross sections illustrating the proposed ground profile at relevant times throughout the life-of-mine including profile at end of life-ofmine. 30. 5 Year Mine Plan Update The Permittee will provide an updated mine and reclamation plan on the fifth anniversary of the issuance of this permit. This shall include updated maps and cross sections, which show as-built conditions, as well as the upcoming 5 year mine and reclamation activities.