Mecklenburg Initiatives for LNG Technologies and Cryo Tank Systems

Similar documents
South Baltic Sea Area

Design Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit)

Ship Transportation of Natural Gas

Cargo Handling Systems. for LPG, NH3 & Ethylene. Oil & Gas Systems

RISKS ASSOCIATED WITH THE MARINE ASPECTS OF LNG FPSOs (FLOATING PRODUCTION, STORAGE AND OFFLOAD) UNITS. Braemar Engineering

Technological potential within the scope of prefabrication of steel structures for offshore wind energy

The case of Poseidon Med, LNG Bunkering Challenges at Port

American Institute of Marine Underwriters

GS-Hydro Non-Welded Piping Solutions for Offshore

The Low Motion Floater (LMF)

What I ll try to (briefly) tell you...

Innovative Technologien zur Erzeugung und Verwertung von Biogas

The Technical & Practical challenges of FLNG

A Leader In Maritime Technology

LNG as a marine bunker fuel

GALILEO based Maritime Applications in Rostock and the Baltic Sea region

Our Motto aims to be "NEW ZESCO" New Value Creater. Endless Innovation. Work with Passion for Stakeholders

Technological potential within the scope of prefabrication of large steel structures for offshore and power industry

S&N Metall UG GmbH. Welcome to a brief company presentation

General presentation May 2016

handling your requirements

Introduction to KC-1 CARGO CONTAINMENT SYSTEM

LNG as a marine fuel in BC. West Coast Marine LNG Workshop 26 th June 2012

ClassNK Business Planning Department ACADEMY ClassNK Academy Center, South Asia and Oceania

Why LNG? LNG is mainly produced for transportation purposes. More economical to transport gas as LNG compared to pipelines over long distances

ASSOCIATION OF SINGAPORE MARINE INDUSTRIES (ASMI)

BT-4900N HARSH ENVIRONMENT ACCOMMODATION UNIT

Caspian Energy Group. an EPCI contractor in the Caspian Sea

The world s first commercial LNG fuel tank made of high manganese austenitic steel

LNG BUNKERING VESSELS AND CNG CARRIERS -Innovative solutions to improve sustainability- LNG/SHORE POWER Workshop TRIESTE 10 th of March 2016

Ship & Power Total Solution Provider

TTS plays a key role in improving the global transport infrastructure through its continuous investment in safe, efficient and cost-effective marine

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

PORT DUES AND CHARGES

Caspian Energy Group

Fire Safety Products. Marine & Offshore

ADVANCING LNG FOR CLEANER MARINE

Sofchem and WRS Group - Innovative partners - supported by

Product Categories SMM 2018

In order to achieve major productivity and cost-efficient breakthroughs, a solution is

World Marine of Mississippi, LLC

LNG: strategic challenge for the Mediterranean Shipping

PRIVATISATION: LESSONS LEARNT FROM EUROPEAN EXPERIENCES

Green Offshore structures and Shipyards transformation

Part 0 - Classification and Surveys Classification and Surveys I Classification and Surveys I

TRAINING CATALOGUE. Academy Korea SAFER, SMARTER, GREENER

Innovative solutions for LNG carriers. A classification society view.

TRAINING CATALOGUE. Academy Korea SAFER, SMARTER, GREENER

The Offshore Way. WIPOS Wind power offshore substation. Answers for energy.

Printed on elementary chlorine-free bleached paper.

Floating offshore gas units

Norwegian LNG Network

LNG AS FUEL: THE TIPPING POINT?

Marine Service GmbH LNG. Technical Services. Commercial Advisory Services. Offshore Wind Power. Siemens presspicture. Pioneering Solutions

Marine Transportation of LNG. Intertanko Conference March 29, 2004 Bob Curt Ship Acquisition Manager, QatargasII Development

Danube Ports centres of intermodal logistics and economic growth

Update: January 1 st, 2019

LNG INFRASTRUCTURE AND INSTALLATIONS. George Pratikakis General Director Naval Architecture Progress (NAP)

SOLUTIONS FOR THE OIL & GAS INDUSTRY IN THE CASPIAN REGION

YOUR PARTNER IN CUSTOMISED OFFSHORE VESSELS

Nauticor: Comprehensive LNG supply for maritime customers in the Baltic Sea. Gdansk, March 7th 2018

Member of DP World Group

ConferenzaGNL 2014 GENOVA 27/10/2014. Tipologie e caratteristiche di navi con propulsione GNL e relative sistemazioni degli impianti M.E.S.

PORT OF SILLAMÄE, ESTONIA THE MOST EASTERN PORT OF THE EU

Adriatic LNG Terminal (ALT) Roger D. Leick ALT Topsides Manager

Pella Sietas Shipyard presenting at the. Canadian German Conference on Maritime Industries. Vancouver, 09/19/2017. Speaker: Mr.

Ship Design for EEDI Phase 3 and Beyond

PO Box: 5881, Ajman United Arab Emirates. Website:

Publishable final activity report

Faculty of Marine Technology

Prof. Ph. RIGO, University of Liege, Belgium

The World First Ever Very Large Ethane Carrier (VLEC)

NASSCO Shipbuilding & LNG Propulsion. Kevin Mooney, VP of Programs September 18, 2013

Multiple screw pumps on FPSO vessels

Toolkit for Highly Complex Assembly and Logistics Processes

INVENTIVE SOLUTIONS for an Evolving Industry

Lecture 3-1: Hull production - Product hierarchy and block division

Mass Production of Pipes for Nord Stream 1 and prepared for Nord Stream 2 Berlin, Oct. 20th, 2015 H.G. Hillenbrand

Introduction. FLNG: Costs and Cost Drivers. What is FLNG (and what isn t) FLNG Project Costs

Investor Presentation

LNG sloshing for new designs, new operations and new trades

LNG Logistics A complete LNG supply solution along waterways

BUSINESS CASE: Green bunkering of cruise vessels with sustainable fuel options

LNG Carriers Ship Life Extension. Ed Waryas. Lloyd s Register North America, Inc.

CUSTOMISED SOLUTIONS FOR

SCF Shipping Solutions for Yamal LNG Innovative Design for the Arctic Sergey Frank, President & CEO

Scalable FLNG for Moderate Metocean Environments. R M Shivers LoneStar FLNG

Update: November 1 st, 2018

...YOUR RELIABLE STEEL PARTNER

MARINE & OFFSHORE Rules, Rule Notes and Guidance Notes Update September 1 st, 2018

SHARJAH DUBAI BANGALORE KOCHI

FOR ALL CONTAINERS AND REQUIREMENTS. Individually equipped containers as mobile workplaces.

MARINE & OIL AND GAS SOLUTIONS

STRONGER SMARTER STRONGER SAFER

Matthias Ritters

Need update. Maritime Forecast to 2050 SAFER, SMARTER, GREENER DNV GL 2018

Port Harcourt Site at Aker Base. ShipMultiVision Nig. Ltd. Shipyard development

Small Scale LNG From Concept to Reality. Chris Johnson, General Manager, LNG New Markets, Shell

OUR EXPERIENCE: BALLAST WATER MANAGEMENT SYSTEM (BWMS) RETROFIT

Company Profile. Atlas Offshore Co. No.8, Negar Ave. Vali e Asr St., Tehran, Iran

Transcription:

Mecklenburg Initiatives for LNG Technologies and Cryo Tank Systems Klaipeda LNG Forum 16.09.2010 Anatoli Beifert EU Project Manager anatoli.beifert@hs-wismar.de www.hs-wismar.de

2 Mecklenburg LNG stakeholders / players (1) Nordic Yards (former Aker Yards Wismar, Wadan Yards Products portfolio: Ice-breaking and Ice-going Tonnage Offshore constructions Specialized tankers Passenger vessels projects RoRo and RoPax projects Container Ships

3 Mecklenburg LNG stakeholders / players (1) Nordic Yards Production capacities Wismar Location Rostock Location Manufacturing and production completely independent from weather conditions * High steel throughput (up to approx. 60,000 t/p.a.) Crane capacity (up to 1,000 t) Large vessel and offshore projects can be built with standard assembly procedures at the dry dock (dry dock surface: 340 x 67 x 13.2 m., completely roofed) Substantial space available for transportation and interim storage (850,000 sq. m. total shipyard area, thereof 85,000 sq. m. roofed) High steel throughput (up to 55,000 t/p.a.) Large space available at the final assembly Large offshore projects can be built by special assembly procedures at the dry dock Long water edge, close to the open sea

4 Research and Development Products innovations / optimization Arctic ships / LNG tankers Offshore WEA Jack-ups LNG containment systems E.g. ADBT Aluminium Double Barrier Tank Procedures Numerical simulation Holistic optimization Risk-based design Welding and manufacturing techniques During the past 10 years extensive investments in research and development have been made at the yards. Page 4

5 Mecklenburg LNG stakeholders / players (2) Products portfolio - Concept development for new shipyards / terminals - Development and production of technical equipment for shipbuilding yards - Specialized mechanical engineering, incl. ship and oversize transport systems - Feasibility studies - Logistics and software solutions - Installation, maintenance and after-sale service

Mecklenburg LNG stakeholders / players (3) 6 Products portfolio

Mecklenburg LNG relevant Projects (1) cooperative project of 8 companies and 2 research institutions duration 3 years (2007-2009) 7 CTS goals: development of a new LNG-containment system with low production costs and time low boil off rate high operating safety (sloshing, grounding) CTS results: development of a new membrane type LNG containment system - approval in principle (LR) - mock up built development of a prismatic LNG containment system (ADBT) - approval in principle (ABS, BV, DNV, LR) - general/design approval (BV, DNV) - mock up built CTS financing: co financiered by German government total project costs ca. 15,5 Mio 7

POLAR goals: Mecklenburg LNG relevant Projects (2) cooperative project of 11 companies and 3 research institutions duration 3 years (2010-2013) 8 System Solutions for Harsh and Arctic Environment - development of: - ice going/breaking LNG Carrier, FPSO and Platforms (ARC 7-8) 7 - living quarters for arctic regions - high lifetime corrosion protection - anti icing systems - maintenance, access and rescue devices - optimization of: - production processes - transportation equipment - topside LNG-equipment - LNG pipe systems 8 POLAR financing: co financiered by German government total project costs ca. 21,5 Mio

9 ADBT General information: Double wall LNG tank for marine application GBS tank and barges Tank top Self carrying structure Tank walls Tank bottom

10 layouts for LNG containment fabrication Moss spherical, Mark III, NO 96 System: - different general layouts for prefabrication shops - specification of main equipment - estimation of investment costs ADBT System: - general layouts of stand alone and yard integrated fabrication sites - estimation of investment costs - specification of main equipment - basic design for friction steer welding equipment - evaluation of transportation operations and workflow 10

11 If reality doesn't fit the theory, change the reality. Albert Eistein ready to start production of arctic LNG systems ready to start production of LNG containment system 11 Project s s progress Product maturity first concepts Material Tests Conceptual Design Development Tank system DIFFERENT PILOT PROJECTS arctic LNG Carrier FPSO Platform Mock up / Prototype today Großtanksysteme * * planned

12 Contacts Nordic Yards Wismar GmbH Wendorfer Weg 5 D-23966 Wismar Tel.: +49 3841 77-0 Fax: +49 3841 76 36 24 Nordic Yards Warnemünde GmbH Werftallee 10 D-18119 Rostock-Warnemünde Tel.: +49 381 510-0 Fax: +49 381 5 25 74 IMG - Ingenieurtechnik und Maschinenbau GmbH Industriestraße 8 D-18069 Rostock Reinhart Kny Tel.: +49 3841 77-0 Fax: +49 3841 76 36 24 E-Mail: info@img-tech.de Hochschule Wismar University of Applied Sciences Philipp-Müller Straße D-23966 Wismar Anatoli Beifert Tel.: +49 3841 753 634 Fax: +49 3841 753 131 E-Mail: anatoli.beifert@hs-wismar.de