CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

Similar documents
Erosion & Sedimentation Control Policy

EROSION CONTROL AND GRADING PERMIT APPLICATION

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

SITE DESIGN ENGINEER'S STATEMENT:

Please print or type.

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

CONSTRUCTION PLAN CHECKLIST

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

3.0 Planning and Submittal Requirements

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

Items in this checklist identify the base requirements that are to be provided by the design professional.

CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist

Middle Tennessee State University (MTSU) Stormwater Plan Review Checklist

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

STORMWATER POLLUTION PREVENTION PLAN (SWP3)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Building Better Storm Water Quality

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS

CCSD#1 Stormwater Standards

Stormwater Pollution Prevention Plan Engineering Department Requirements

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

Single Family Residential Construction Erosion/Sediment Control Standards

SACHSE EROSION CONTROL GUIDELINES

E. STORMWATER MANAGEMENT

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

Construction Phasing Bad

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

Permit Application Review Permit No Received complete: March 19, 2019

Regulatory Requirements

CHAPTER 6 - How to Prepare a SWPPP

VILLAGE OF HODGKINS 8990 LYONS STREET, HODGKINS, ILLINOIS OFFICE: FAX:

City of Glendale Stormwater Management Plan Checklist

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO:

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

Performance Standards Compliance Checklist

LAND DISTURBANCE PERMIT

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

SWPPP Inspection Procedures and Form 247 Instructions

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

Water Resources Management Plan

Storm Water Pollution Prevention Plan (SWP3) Checklist

E & S Plan Approved. Not required but may be a municipal requirement** Not required but may be a. municipal. requirement** Not required but may be a

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST

Residential Site Soil Erosion and Sedimentation Control Permit Application

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

CITY OF CAMARILLO STORMWATER POLLUTION CONTROL PLAN Demolition or Stockpile Activity Under One Acre

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)

Re: Erosion Control Report and Drawings Requirements Accompanying Document

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

STANDARD PLAN FOR MINOR EARTH DISTURBANCES

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

SUDAS Revision Submittal Form

CITY UTILITIES DESIGN STANDARDS MANUAL

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Demolition Permit Application

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT

Module 4 Regulatory requirements for Land Disturbing Activities

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Erosion Control Inspection Form

Texas Commission on Environmental Quality 401 Water Quality Certification Conditions for Nationwide Permits Attachment 1

S.O.P. No. HMD

LAND DISTURBANCE PLAN AND IMPLEMENTATION REQUIREMENTS

Washoe County PLAN SUBMITTAL

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010.

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

A. PROJECT LOCATION. B. PERMITTEE (Responsible party for day to day supervision and control of the MANAGMENT PLAN)

GRADING, EROSION AND SEDIMENTATION CONTROL

Construction Site Runoff (CSR) Permit Application Permit Fee $150.00

1.2 REGULATORY REQUIREMENTS

City of El Centro. Erosion and Sediment Control Plan Review Checklist. Reviewer: Review Date:

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES

LOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE

Appendix E. Coordinating Erosion and Sediment Control With Low-Impact Development Planning

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Charter Township of Garfield Grand Traverse County

Good Housekeeping. Phones Weather related emergencies Breaks and facilities. Introductions

JEFFERSON COUNTY STORM WATER MANAGEMENT

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

Richland County Department of Public Works Engineering (Land Development) Division

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

16.0 Water Quality Management Criteria for Developed Land

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

APPENDIX I. Plan Reviewer Checklist

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Lake Elmo, MN Code of Ordinances STORM WATER AND EROSION AND SEDIMENT CONTROL

Transcription:

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION Any applicable State or Federal permits must be attached to this application or must be applied for with copies attached to this application if this permit is to be valid upon approval. A $20.00 non-refundable application fee is required at submittal EXCEPT when the application is processed concurrently with a building permit on the same tract having a fee in excess of $20.00 (total fees not to be less than $20.00). A separate permit is required for each separate, non-contiguous tract. (APPLICATION MUST INCLUDE ALL CHECKLIST INFORMATION/DATA AND BE COMPLETE. AN INCOMPLETE APPLICATION MAY DELAY ACTION) 1. Name of Owner/Applicant: Print or Type 2. Business Telephone: 3. Other Telephone: 4. Address of Owner/Applicant: 5. Legal Description of Property: 6. Street Address of Property: 7. Location Map of property provided: (Include area within 300 feet of property) 8. TYPE OF EARTH CHANGE: (Check all applicable) 8a. EXCAVATING 8b. GRADING 8c. FILLING 8d. RE-GRADING 8e. BERMING 8f. DIKING 8g. PAVING 8h. RE-ALIGN/RELOCATE DRAINAGE ROUTE(S) 9. Name of Contractor: 10. Business Telephone: 11. Other Telephone: 12. Address of Contractor: 13. Proposed Start Date of Work: 14. Projected End Date of Work: 15. Total area to be disturbed: acres 16. Does the lot or tract of record contain any natural or man-made water course? YES NO If yes, specify: 17. Is lot or tract in floodplain area? YES NO If yes, specify FEMA Map Code: Panel No.: 18. Name of Watershed: 19. Drainage Area of Project: acres 20. Estimate of Site Discharge: cfs 21. Owner s/applicant s Professional Engineer: Name: Address: Telephone:

22. SUMMARY DESCRIPTION OF PROPOSED WORK: Page 2 of 5 23. Are data/information required on attached Checklist attached to the application? YES NO If some data are not attached, explain: 24. Have you read the provisions of Jenks City Code? YES NO (Chapter 4, Article 17 Regulation of Earth Change ) By signing below, the Owner certifies that the approved plans will be implemented under the direct supervision of a registered professional engineer. 25. Owner s/applicant s Name: 26. Owner s/applicant s Signature: Print or Type 27. Telephone No.: 28. Date: 29. SUBMIT COMPLETED APPLICATION TO: City Engineer (with appropriate application fee) City of Jenks P.O. Box 2007 211 North Elm Jenks, OK 74037 FOR CITY OF JENKS USE ONLY 30. City Engineer: APPROVED DISAPPROVED Subject to the attached Earth Change Permit Conditions and additional provisions as follows: 31. Issued by: 32. Title: 33. Date: 34. Permit Expiration Date: 35. Distribution: Owner/Applicant City Engineer Engineering Inspections Public Works Supervisor Planning City Manager Tulsa County (levee) (if applicable) OWNERS/APPLICANTS HOLDING APPROVED PERMITS MUST NOTIFY THE CITY ENGINEER S OFFICE PRIOR TO STARTING WORK AT 299-5884 Forms/Earth Change Permit (10-12-12)

Page 3 of 5 Earth Change Permit Conditions Name of Project: Location: 1. Earth Change Permit is for the referenced project/development only. 2. Should the owner/developer choose to proceed with earth change excavation and/or construction, all work is performed at risk and may be subject to modification prior to final plan review. The City of Jenks assumes no liability or responsibility for any conditions deemed necessary in the future by the City of Jenks, Planning Commission, and/or Technical Advisory Committee. 3. All areas downstream of all excavation and earth fill activities associated with the Earth Change permit shall have erosion control measures in place prior to the start of any excavation that comply with the City of Jenks and Oklahoma Department of Environmental Quality (ODEQ) standards. 4. The project shall be designed and constructed to minimize the potential for soil erosion that fits the topography and soils of the site. Deep cuts and fills in areas with steep slopes shall be avoided, wherever possible. Natural contours shall be followed as closely as possible. Drainage channels and swales shall be designed, constructed and adequately protected so that their final gradients and resultant velocities will not cause erosion in the receiving channel or at the outlet. 5. All construction activities shall be conducted in such a manner as to minimize erosion and prevent the discharge of rock, sand, and soil from the site. These activities shall be conducted in a logical sequence so that the smallest practical area of land will be exposed for the shortest practical period of time. 6. Existing natural vegetation shall be retained and protected, wherever possible. Areas immediately adjacent to watercourses, lakes, and ponds (within 35-feet of top of bank) shall be left undisturbed wherever possible. 7. Unvegetated areas or vegetated areas with less than 70% cover that are scheduled or likely to be left inactive for 15-days or more must be temporarily or permanently stabilized using measures appropriate for the season to reduce erosion potential. 8. Persons conducting the construction shall implement and maintain adequate structural and/or nonstructural stormwater control best management practices as outlined in the Stormwater Pollution Prevention Plan (SWP3). Best management practices shall include, but not be limited to, seeding, sodding, sprigging, silt fences, straw bale dikes, earthen dikes or swales, temporary stream crossings, storm sewer inlet protection, temporary sediment basins, and stabilized construction entrances. 9. All physical erosion control measures used are to be maintained so that that they are working properly at all times throughout the duration of the project. 10. At all times, public or private roadways, alleys or sidewalks shall be kept cleared of accumulated sediment that is a result of runoff or tracking from the site. 11. Appropriate measures shall be implemented to prevent removed vegetation or waste materials (including, but not limited to, garbage, debris, fuels and petroleum products) from being carried from the project site by stormwater runoff or wind. Trash containers or enclosures of sufficient size shall be located on the project site.

Page 4 of 5 12. The adequacy of any Best Management Practice shall be based upon the fulfillment of each of the following requirements: a. The discharge of stormwater from the site shall not result in a violation of the City of Jenks Stormwater Phase II NPDES permit; b. The discharge of stormwater from the site shall not cause contamination of surface water, stormwater or groundwater within the City of Jenks; and c. The discharge of stormwater from the site shall not transport sediment into the City of Jenks stormwater collection, conveyance and/or detention facilities. 13. The Earth Change Permit does not provide permission to construct any infrastructure without written preapproval by the City of Jenks. 14. All Earth Change activities are allowed so long as they do not impose any adverse affects upon adjacent properties (private and public), the community at-large, and/or existing drainageways. No silt or debris is allowed to flow off of the property onto adjacent properties (public or private). 15. At any time during construction, at the discretion of the City Engineer, should it be determined that additional sediment and erosion control measures are needed, the Developer shall be required to immediately take whatever action(s) are required to correct and/or prevent further impact on adjacent or downstream drainageways or properties. 16. If the total disturbed area exceeds one (1.0) acres, it is the responsibility of the owner/developer to: File with the Oklahoma Department of Environmental Quality a DEQ Notice of Intent (NOI) for Storm Water Discharges (SWD) Associated with Construction Activity (DEQ Form 605-002A). Prior to the start of any earth change activities a copy of this form is to be furnished to the City Engineer for the City of Jenks records; and Prepare a Storm Water Pollution Prevention Plan (SWP3) that will be available on-site at all times for inspection. Prior to the start of any earth change activities a copy of this plan is to be furnished to the City Engineer for the City of Jenks records.

Page 5 of 5 Checklist For Earth Change Permit Application Submittals Each Earth Change Permit Application shall provide the following information as required by City of Jenks Code, Chapter 4, Article 17 entitled Regulation of Earth Change, unless specifically waived by the City Engineer: Permit Fee $20.00 fee attached Ownership information: Name and address of the legal owner of the tract Legal description of the tract Mapping requirements (provide two (2) sets of 11 x17 scale drawings): Location Map of the site (including area within 300-feet of the property) Boundary line survey Existing and proposed contours at one (1) foot intervals Location of any existing and/or proposed structure or natural features on the site Location of any structures or natural features on the tract(s) adjacent to the site and within 50-feet of the tract boundary Plans of all drainage provisions, retaining walls, cribbing, planting and erosion control measures to be constructed in connection with or as part of the proposed work Map showing the drainage area of the lands tributary to the site 100-year and 500-year floodplain boundaries with floodplain elevation and/or water course location(s) Schedules: Schedule indicating the starting and anticipated completion date of the project Schedule indicating the project construction sequencing and the time of exposure of each area prior to completion of effective erosion and sediment control measures Hydraulic and Hydrologic Analyses: Hydraulic and hydrologic analysis for runoff and/or detention facilities (if on-site detention is deemed necessary) Hydraulic and hydrologic analysis for any alterations within the flood hazard area or for the alteration of any water course Excavation and backfill: Estimate of the quantity of excavation and fill involved, with drawings indicating each separate excavation or fill Sediment and erosion control: Plans for control of on-site and off-site sedimentation for the prevention of deposits of sediment from the tract upon any other off-site public or private property or water course during all phases of the project construction (provide copy of Stormwater Pollution Prevention Plan and Notice of Intent (NOI)). Additional certifications: A summary statement concerning the effect(s) the propose project will have on the existing and future drainage system(s) of the area Owner s statement and signature certifying that the approved plans will be implemented under the direct supervision of a registered professional engineer