Guidance Note Emergency Planning - Knowledge, Understanding and Responsibilities

Similar documents
Guidance Note Planning for Special Events

ATOC. ATOC Operational Resilience & Security Forum Competency Assessment of Station Incident Officers (SIOs)

ATOC Guidance Note Planning for Special Events

Guidance Note Competence of Train Operator Liaison Officers (TOLOs)

ATOC. ATOC Operational Resilience & Security Forum Good Practice Guide Competence of Train Operator Liaison Officers (TOLOs)

ATOC Approved Code of Practice Incident Response Duties of Primary Support Operators

Incident Response Planning & Management

ATOC Guidance Note Competence of Train Operator Liaison Officers (TOLOs)

OFFICIAL JOB DESCRIPTION. Before completing this form, please read the BTP Guide to writing job descriptions for Police Staff roles document.

ANEURIN BEVAN HEALTH BOARD. Civil Contingencies and Emergency Planning

Pipelines Safety Regulations 1996

Unless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version

NARU. NHS Ambulance Services Emergency Preparedness, Resilience & Response. Quality Assurance Framework. National Ambulance Resilience Unit

JESIP Awareness Quiz. Module 1: Getting Together

UNCLASSIFIED Emergency Management Plan

WILTSHIRE POLICE FORCE POLICY

JESIP programme Summary JESIP JOINT EMERGENCY SERVICES INTEROPERABILITY PROGRAMME. Working Together Saving Lives

ATOC Guidance Note Responding to Ill Customers on Trains

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY

Health and Safety Management Profile (HASMAP)

AUDIT SCOTLAND REPORT ON IMPROVING CIVIL CONTINGENCIES PLANNING IN SCOTLAND

CAMBRIDGESHIRE COUNTY COUNCIL SAFETY OF SPORTS GROUNDS FUNCTION POLICY DOCUMENT

NOT PROTECTIVELY MARKED BUSINESS CONTINUITY. Head of Protective Services Specialist Operations. Business Continuity Manager

Bill Emery, Chief Executive, Office of Rail Regulation 14/9/06. Geoffrey Podger, Chief Executive, Health and Safety Executive 26/9/06

BUSINESS CONTINUITY MANAGEMENT A MANAGER S TOOLKIT A

Ref Domain Standard Detail

Emergency Preparedness, Resilience & Response (EPRR) Policy

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note

29700 POLICY POLICING OPERATIONS

1. Introduction 1. INTRODUCTION. Summary

Accident and Emergency Planning

Emergency Preparedness, Resilience and Response Annual Report

O I L SPILL RES PO NSE TRA INING SERVICE S

NOT PROTECTIVELY MARKED. HM Inspectorate of Constabulary in Scotland. Inspection Framework. Version 1.0 (September 2014)

Structural Engineering & Civils Scope of Services

South Yorkshire Local Resilience Forum Annual Report 2016/2017

ATOC Guidance Note Checklist for Major Incident Response

Emergency Planning College Position Paper. Preparing People: a Critical Element of UK Resilience

SERVICE PROCEDURE NOVEMBER 2011

SCOTTISH AMBULANCE SERIVCE JOB DESCRIPTION

Scottish Parliament Finance and Constitution Committee. Call For Evidence On The Railway Policy (Scotland) Bill

WILTSHIRE POLICE FORCE POLICY

Business Continuity Management Policy. Date Version Number Planned Review Date Oct 2014 Issue 1 Oct 2017

NOT PROTECTIVELY MARKED JOB DESCRIPTION

Area Manager, Protection

Asset Management Policy

Greater Manchester Shared Services Resilience Team

OPERATOR S QUALITY SYSTEM 1.0 PURPOSE

JESIP Embedding Checklist Version 1.0 October 2016

Response to a Bridge Strike. at a Bridge carrying the Railway. over a Road

EDINBURGH NAPIER UNIVERSITY BUSINESS CONTINUITY POLICY AND FRAMEWORK

18 Business Continuity Management

Joint Doctrine: the interoperability framework JESIP JOINT EMERGENCY SERVICES INTEROPERABILITY PROGRAMME. Working Together Saving Lives

Work Related Vehicle Safety Programme

BOARD OF DIRECTORS 31 August 2017

Policy Safety Improvement

Health, Safety and Wellbeing Policy

13. Lifeline utilities

Women s Empowerment Coordinator Grade 7a

POLICY Operational Briefing and Debriefing. Number: D 1600 Date Published: 21 November 2017

Business Continuity Management Plan. Policy

CAPITAL DELIVERY HUB. Programme Manager Education Construction. Permanent Placement Package to 67,000. Background

OFFICIAL. Date 28 June 2018 Rothes Halls, Glenrothes, Fife. Update

JOINT DOCTRINE: ThE INTEROpERabIlITy framework EDITION 2

HAWKE S BAY REGIONAL COUNCIL

Protocol on Climate Change Adaptation and Disaster Risk Management in Fisheries and Aquaculture under the Caribbean Community Common Fisheries Policy

RESPONDING TO EMERGENCIES THE UK CENTRAL GOVERNMENT RESPONSE CONCEPT OF OPERATIONS

Consolidated Version of Emergency Management Bylaw

2.1 Sixth annual report to TSLG from Chair of the Vehicle/Vehicle System Interface Committee (V/V SIC).

Scottish Ambulance Service. Job Description

BYLAW NO.18/006 A BYLAW OF THE REGIONAL MUNICIPALITY OF WOOD BUFFALO TO PROVIDE FOR EMERGENCY MANAGEMENT

Planning, Reporting and Regulatory Framework

Application Note 7 The Yellow Book, Safety Management Systems and the ROGS Regulations

ATOC. Approved Code of Practice Train Driving Traction Knowledge. Contents. Withdrawn Document. Association of Train Operating Companies

RISQS Audit Protocol. Plant Operations Scheme. Document no.: RISQS-AP-004. Plant Operations Scheme

Health and Safety Management Standards

The Advantage of Implementing a Safety Management System. Integrating Occupational Safety Management into Other Management Functions

Health and Safety Policy Standard

Pipelines Safety Regulations 1996

Recommended Practice for Security & Emergency Management Aspects of Special Event Service

RESILIENCE. Welcome to the EPC. Assurance Against Adversity AND CRISIS MANAGEMENT UK NATIONAL AUTHORITY ON. Emergency Planning

GOVERNING BODY MEETING held in public 30 November 2016 Agenda Item 4.3

Developing Emergency Planning Step by Step Guidelines for Museums Louise Lawson: Consultant

Phoenix Energy Holdings Gas Ltd Health & Safety Policy

SITXEVT606 Develop crowd management plans

The Sector Skills Council for the Financial Services Industry. National Occupational Standards. Risk Management for the Financial Sector

ESSEX POLICE, FIRE AND CRIME COMMISSIONER, FIRE AND RESCUE AUTHORITY

Stakeholder Engagement and Communications Manager. Information about the appointment and candidate brief

PN CBRN Deputy Head of Centre ( Chief Inspector or ES Equivalent)

Prevent duty monitoring in higher education in England. Supplementary information note

JESIP Awareness. Getting Together. Introducing JESIP. 1. Getting Together

RAILWAY POLICING (SCOTLAND) BILL

ATOC Guidance Note Provision of Drinking Water for On-Train Use

External Supplier Control Obligations

Catch22 policy Health and Safety

PREPARED. The Emergency Planning newsletter of London Fire Brigade. Issue 19 May What s inside

IDENTIFY HOW THE OUTCOMES CAN BE DELIVERED SUSTAINABLY STAGE 3. Sport England: Guide to Research

PHILOSOPHY PRINCIPLES STRUCTURES REGULATORY DUTIES SCOTTISH GUIDANCE ON RESILIENCE

Guidance on the Storage and Recommissioning of Traction and Rolling Stock

NOT PROTECTIVELY MARKED. Emergency Services Interoperability Speech. Keynote Speech for the JESIP National Interoperability Summit

Transcription:

Uncontrolled when printed RDG-GN011 Guidance Note Emergency Planning - Knowledge, Understanding and Responsibilities Synopsis This Guidance Note provides advice on requirements with regard to knowledge, understanding and responsibilities for those accountable for emergency planning. Applicability This Guidance Note has been prepared for passenger operators. However, its content may also be of use to others. Authorised by --------------------------------------------------------- James Burt Chair, RDG Train Operators Emergency Planning Group Rail Delivery Group Limited Registered Office, 2nd Floor, 200 Aldersgate Street, London EC1A 4HD www.raildeliverygroup.com 020 7841 8000 Registered in England and Wales No. 08176197

RDG-GN011 Uncontrolled when printed RDG Guidance Note Emergency Planning - Issue record Issue Date Comments One June 2012 Original version Two April 2015 Following periodic review Three November 2017 Updated following periodic review and also reformatted as an RDG document RDG Page 2 of 14

Uncontrolled when printed RDG Guidance Note Emergency Planning RDG-GN011 Contents Part 1 About this document... 5 1.1 Responsibilities... 5 1.2 Explanatory note... 5 1.3 Guidance Note status... 5 1.4 Supply... 5 Part 2 Introduction, Purpose and Scope... 6 2.1 Introduction... 6 2.2 Purpose... 6 2.3 Scope... 6 Part 3 Structure... 6 3.1 Overview... 6 Part 4 Legislation, Railway Group Standards and guidance... 7 4.1 Overview... 7 4.2 Applicable UK Health & Safety legislation and guidance... 7 4.3 Civil Contingencies Act (CCA) and Supporting Documents... 7 4.4 Railway Industry Standards... 8 4.5 RDG ACoPs and Guidance Notes... 8 Part 5 ResilienceDirect... 8 5.1 Introduction... 8 Part 6 Time allocation to Emergency Planning... 9 6.1 Factors affecting the amount of time needed for emergency planning... 9 6.2 Recommended time... 9 Part 7 The Joint Emergency Services Interoperability Programme (JESIP)... 10 7.1 Overview... 10 Part 8 Business context and strategy... 10 8.1 Introduction to Parts 8 to 13... 10 8.2 Crisis management... 10 8.3 Strategy... 10 Part 9 Risk management... 11 9.1 Safety and operational risk management... 11 9.2 Train and station operation and depot related risks... 11 9.3 Command and Control... 11 Part 10 Planning... 11 10.1 Principles... 11 10.2 Management of emergency plans... 12 10.3 Testing and exercising... 12 Part 11 Training... 12 RDG Page 3 of 14

RDG-GN011 Uncontrolled when printed RDG Guidance Note Emergency Planning - 11.1 Requirements... 12 Part 12 Crowd management... 13 12.1 Requirements... 13 Part 13 Post incident review... 13 13.1 Requirements... 13 Part 14 Interfaces... 13 14.1 Internal... 13 14.2 Network Rail... 13 14.3 Other Transport Providers... 13 14.4 British Transport Police (BTP)... 14 14.5 Emergency services... 14 14.6 Local Authorities... 14 14.7 RAIB / ORR... 14 RDG Page 4 of 14

Uncontrolled when printed RDG Guidance Note Emergency Planning RDG-GN011 Part 1 About this document 1.1 Responsibilities 1.1.1 Copies of this Guidance Note should be distributed by RDG members to persons within their respective organisations for whom its content is relevant. 1.2 Explanatory note 1.2.1 RDG produces RDG Guidance Notes for the information of its members. RDG is not a regulatory body and compliance with RDG Guidance Notes is not mandatory. 1.2.2 RDG Guidance Notes are intended to reflect good practice. RDG members are recommended to evaluate the guidance against their own arrangements in a structured and systematic way. Some or all parts of the guidance may not be appropriate to their operations. It is recommended that this process of evaluation and any subsequent decision to adopt (or not to adopt) elements of the guidance should be documented. 1.3 Guidance Note status 1.4 Supply 1.3.1 This document is not intended to create legally binding obligations between railway duty holders and should be binding in honour only. 1.4.1 Copies of this Guidance Note may be obtained from the RDG members web site. RDG Page 5 of 14

RDG-GN011 Uncontrolled when printed RDG Guidance Note Emergency Planning - Part 2 Introduction, Purpose and Scope 2.1 Introduction 2.2 Purpose 2.3 Scope 2.1.1 Though planning for emergencies is a critical role within a railway undertaking, it is typically not one which justifies a full time dedicated position and is hence often combined with other roles such as security, ICT Champion or fire safety. In some cases emergency planning is integrated within individual business functional units, with each responsible for such arrangements within its own area. 2.1.2 As a consequence, many of those who take on emergency planning responsibilities do so with limited previous experience. In addition to providing a check list/reference document to support reviews and audits of those already performing emergency planning duties and the associated processes, a key use of this Guidance Note is therefore to assist with a training needs analysis of those new to the role. 2.1.3 It should be noted that this document is intended as a guide only and not as a standard with which compliance is required. 2.2.1 Railway Industry Standard RIS-3118-TOM sets out requirements in respect of Incident Response Planning & Management. The associated RSSB Guidance Note GO/GN3518 provides guidance on how to interpret the requirements contained within it. However, while the latter makes various references to the competency of Rail Incident Officers (RIOs), no mention is made of the knowledge, skills, understanding, etc. needed on the part of those responsible for emergency planning within railway undertakings. This Guidance Note seeks to address this absence. 2.3.1 This Guidance Note is produced for the benefit of all member organisations of the RDG Train Operations Scheme. Part 3 Structure 3.1 Overview 3.1.1 As for any other role, effective emergency planning requires a combination of knowledge, understanding, skills and behaviours. This Guidance Note sets out those considered key in respect of each of the broad components of the emergency planning role, i.e. applicable legislative requirements and guidance, emergency planning within the context of the business as a whole, risk management, planning, training and post-incident review. Specific sections on ResilienceDirect, the Joint Emergency Services Interoperability Programme, crowd management and interfaces with other organisations are also included. 3.1.2 In some cases, reference is also made to specific tasks/responsibilities while Part 6 considers how to identify the amount of time which should be dedicated to the emergency planning role. RDG Page 6 of 14

Uncontrolled when printed RDG Guidance Note Emergency Planning RDG-GN011 Part 4 Legislation, Railway Group Standards and guidance 4.1 Overview 4.1.1 Those responsible for emergency planning should be familiar with the requirements of relevant legislation and standards and how they are applied, along with associated guidance, including specifically that referred to in the sections which follow. 4.2 Applicable UK Health & Safety legislation and guidance 4.2.1 These comprise: i) Management of Health & Safety at Work Regulations 1999. ii) Regulatory Reform (Fire Safety) Order 2005. iii) HSE publication Managing crowds safely A guide for organisers at events and venues (http://www.hse.gov.uk/pubns/priced/hsg154.pdf), published 2014. 4.3 Civil Contingencies Act (CCA) and Supporting Documents 4.3.1 Understanding of the concept of Category 1 and Category 2 responders as defined within the Civil Contingencies Act 2004 (CCA) along with their respective roles, responsibilities and duties. Specifically those responsible for this element of emergency planning should: i) Participate in relevant meetings, forums or workshops with both Category 1 and Category 2 responders where specific input is required to consolidate interfacing arrangements and exchange of relevant information. ii) Maintain dialogue with Category 1 and Category 2 responders as appropriate for the mutual development of emergency plans. iii) Arrange for company participation in exercises arranged by Category 1 and other Category 2 Responders. 4.3.2 Emergency Preparedness, published in 2006 by the Cabinet Office Civil Contingencies Secretariat and last updated in 2012, is intended to accompany Part 1 of the Act and its supporting Regulations (The Civil Contingencies Act 2004 (Contingency Planning) Regulations 2012) - see https://www.gov.uk/government/publications/emergency-preparedness. 4.3.3 Emergency Response and Recovery, published by the Cabinet Office in 2010 and last updated in October 2013, is a volume of non-statutory guidance which describes the multi-agency framework for responding to, and recovering from, civil emergencies in the UK. It is targeted at all personnel who may become involved in emergencies and aims to develop a shared understanding of multiagency response and recovery arrangements across responding agencies. It seeks to establish good practice based on lessons identified from responding to and recovering from emergencies both in the UK and internationally and provides the definitive guide to emergency planning within the UK. See https://www.gov.uk/government/publications/emergency-response-and-recovery. RDG Page 7 of 14

RDG-GN011 Uncontrolled when printed RDG Guidance Note Emergency Planning - 4.3.4 Human aspects in emergency management, published by the Cabinet Office in October 2016, is intended to provide information and advice for those involved in planning and delivering activities to address the human aspects during and following an emergency see https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/56 4306/human_aspects_guidance_2016_final.pdf. 4.4 Railway Industry Standards 4.4.1 Rail Industry Standard RIS-3118-TOM Incident Response Planning & Management and associated Guidance GN/RT3518. 4.5 RDG ACoPs and Guidance Notes 4.5.1 To complement Railway Group Standards, RDG issues a number of documents for the benefit of its members. These include operations related topics and address areas where the subject matter falls outside the criteria for inclusion within a Group Standard. They comprise Approved Codes of Practice (ACOPs) and Guidance Notes (GNs). Those of greatest relevance to emergency planning are: i) RDG-ACOP011 - Joint Industry Provision of Humanitarian Assistance Following a Major Passenger Rail Incident. ii) RDG-ACOP016 - Incident Response Duties of Primary Support Operators. iii) ATOC FLU/GN001* - Contingency Planning Arrangements for a Flu Pandemic. iv) ATOC/GN003 - The Training of On Train Staff in On Train Emergency Procedures. v) RDG-GN014 Major Incidents Preparation of Aide-Mémoires for Senior Managers. vi) ATOC-/GN015 - Extreme Weather Arrangements including Failure or Non-Availability of On-Train Environment Control Systems. vii) RDG-GN016 - Competence of Train Operator Liaison Officers (TOLOs). viii) RDG-GN017 - Competence of Station Incident Officers (SIOs). ix) RDG-GN023 Checklist for Major Incident Response. x) RDG-GN025 Post Incident Management of Personal Property. xi) ATOC NR/GN SP01* - Managing the Needs of Passengers When Trains are Stranded. * Issued jointly with Network Rail Note: All former ATOC guidance documents are being re-named as RDG ones as and when they are re-issued. Thus all those shown above as ATOC/xxx will become RDG-xxx. Part 5 ResilienceDirect 5.1 Introduction 5.1.1 ResilienceDirect is an online private network which enables civil protection practitioners to work together across geographical and organisational boundaries during the preparation, response and recovery phases of an event or emergency. RDG Page 8 of 14

Uncontrolled when printed RDG Guidance Note Emergency Planning RDG-GN011 5.1.2 The Civil Contingencies Act 2004 requires that emergency responders cooperate and share information in order to efficiently and effectively prepare for and respond to emergencies and ensure that action is coordinated. ResilienceDirect helps organisations fulfil these duties by supporting the adoption of common working practices and ensuring that key information is readily and consistently available to users. 5.1.3 ResilienceDirect helps to facilitate multi-agency collaboration in many ways. Activities include: i) Sharing emergency plans among Local Resilience Forum (LRF) members and others such as national/sub-national partner organisations and neighbouring LRFs. ii) Maintaining awareness of forthcoming exercises, events and meetings, and accessing related documentation such as agendas and minutes. iii) Sharing situation reports and briefings between local responders, to enable integrated management of events and consistent provision of information to the public. iv) Communicating situation reports to lead government departments and/or the Cabinet Office Briefing Rooms (COBR), facilitating national coordination/action in response to an incident if necessary. v) Gathering and reviewing comments on new policies or plans before publication and collating lessons learned following events. vi) Managing contact information to ensure a single, up-to-date version of distribution lists. vii) Issuing news and guidance from central government to local responders via the Resilience Gateway. 5.1.4 Those responsible for emergency planning should be aware of the existence and purpose of ResilienceDirect and consider subscribing to it. Part 6 Time allocation to Emergency Planning 6.1 Factors affecting the amount of time needed for emergency planning 6.1.1 The amount of time required by railway undertaking Emergency Planners may vary dependent upon a number of factors including; geographical area, Primary Support Operator status, size of operation and number of employees with active responsibilities for ensuring that emergency planning and response requirements are met. 6.2 Recommended time 6.2.1 Railway undertakings should carry out a review of their own circumstances and requirements and from that reach a view as to the appropriate amount of time that should be allocated to emergency planning duties. 6.2.2 TOC senior management should avoid overburdening those responsible for Emergency Planning by ensuring that adequate time is made available for them to properly undertake the role. RDG Page 9 of 14

RDG-GN011 Uncontrolled when printed RDG Guidance Note Emergency Planning - Part 7 The Joint Emergency Services Interoperability Programme (JESIP) 7.1 Overview 7.1.1 JESIP is primarily about improving the way the Police, Fire & Rescue and Ambulance services work together when responding to major multi-agency incidents. 7.1.2 JESIP has produced practical guidance to help improve multi-agency response. The Joint Doctrine: the interoperability framework sets out a standard approach to multi-agency working, along with training and awareness products for organisations to train their staff. 7.1.3 Further information may be found at http://www.jesip.org.uk/home. Part 8 Business context and strategy 8.1 Introduction to Parts 8 to 13 8.1.1 Those responsible for emergency planning should have the knowledge and ability needed to meet the requirements set out in Parts 8 to 13 of this document 8.2 Crisis management 8.3 Strategy 8.2.1 Understanding the implications of incidents on corporate reputation and how public perception is influenced by the nature and circumstances of and the response to the event. 8.2.2 Ability to engage with and influence the senior management team in the development of a strategy to address corporate and reputational impact, specifically in respect of contact with the media and through social media. Associated responsibilities include: i) Determining corporate roles and responsibilities for the Crisis Management Team, including identification of key stakeholders with whom there should be communication. ii) Developing a crisis management plan to encompass identified requirements, including how meetings should be structured. iii) Ensuring that the relationship between the crisis management team and Strategic Command is clearly defined. 8.3.1 Ability to determine a strategy for emergency planning that includes: i) The engagement of key internal and external stakeholders. ii) Agreeing budgetary provision. iii) The development and management of emergency plans. iv) Arrangements with interfacing agencies, businesses and other organisations. v) Arrangements for command and control. vi) Arrangements for crisis management. RDG Page 10 of 14

Uncontrolled when printed RDG Guidance Note Emergency Planning RDG-GN011 vii) viii) Identification of training needs and delivery thereof for personnel resources required for the implementation of emergency plan content. Determining processes for incident response review and taking forward lessons learnt. Part 9 Risk management 9.1 Safety and operational risk management 9.1.1 Understanding of safety and operational risk management and the potential consequences of risk control failures: i) Principles of railway operations (trains, stations and engineering). ii) Principles of health and safety management. iii) Understanding of how incidents happen root causal effects. Study of investigation reports into rail related accidents and incidents affecting own company and on a national basis. 9.2 Train and station operation and depot related risks 9.2.1 Understanding risks to train and station operations specific to the company s business operations: 9.3 Command and Control i) Knowledge of company train/station operations and interfaces and specifically those that carry risk (stations that are railheads for major events or are prone to overcrowding during peak hours for example). ii) Knowledge of fleet engineering depots including the storage and use of hazardous substances. 9.3.1 Understanding of Command & Control: i) Knowledge of the principles for command and control (Strategic, Tactical, and Operational formerly referred to as Gold, Silver and Bronze), who in the company will undertake these roles in the event of an emergency and how this interfaces with Network Rail, the British Transport Police (BTP) and the emergency services. ii) Understanding the relationship between incident management and crisis management (difference between Strategic Command and Crisis Management Team for example). Part 10 Planning 10.1 Principles 10.1.1 Familiarity with the principles of integrated emergency planning, i.e. i) Anticipation ii) Assessment iii) Prevention iv) Preparation v) Response RDG Page 11 of 14

RDG-GN011 Uncontrolled when printed RDG Guidance Note Emergency Planning - vi) Recovery 10.1.2 Appreciation of the need to include as a core element within emergency plans provision of humanitarian assistance to those directly affected and how the RDG Incident Care Team initiative contributes to this. 10.2 Management of emergency plans 10.2.1 Ability to engage internal and external stakeholders to identify what type of emergency could occur at the locations concerned and what measures are required to: i) Address the immediate consequences to ensure a safe environment. ii) Remove persons from imminent danger. iii) Establish a structured response to address the subsequent issues arising. iv) Promote recovery and return to normal operations. 10.2.2 Ability to develop documented arrangements for dealing with the types of emergency identified above including the roles and responsibilities of personnel at the location: 10.3 Testing and exercising i) Arrangements for ensuring that emergency plans are distributed on a controlled basis to key stakeholders. ii) Arrangements for ensuring that emergency plans are exercised and reviewed on a regular basis. iii) Arrangements for the amendment and reissue of emergency plans as and when required. 10.3.1 Ability to organise a programme of exercises at all levels to validate emergency plan content and specifically roles and responsibilities within the plan. 10.3.2 Ability to determine who will participate in exercises (in consultation with internal and external stakeholders as necessary). 10.3.3 Arrangements for personnel to participate in exercises organised by external stakeholders and other railway undertakings. 10.3.4 Ability to undertake debriefs with exercise participants and capture issues arising. 10.3.5 Ability to compile an exercise report, identify actions required, how they will be closed out and by whom. Part 11 Training 11.1 Requirements 11.1.1 Determination of knowledge and experience requirements and skill levels for personnel undertaking specific roles in emergency plans. 11.1.2 Arrangements for the delivery of training courses and maintenance of training records. RDG Page 12 of 14

Uncontrolled when printed RDG Guidance Note Emergency Planning RDG-GN011 11.1.3 Arrangements for any requirement for ongoing training and assessments. Part 12 Crowd management 12.1 Requirements 12.1.1 Knowledge of managing crowds at stations for major public events (such as a sporting fixture or music festival). 12.1.2 Knowledge of crowd dynamics at relevant stations on company lines of route and how arrangements are implemented to control access to stations and platforms. Part 13 Post incident review 13.1 Requirements 13.1.1 Ability to undertake a review (jointly with key stakeholders as necessary) into the response to and management of emergencies as implemented in accordance with emergency plans and associated procedures. 13.1.2 Ability to produce a detailed report of the review, identify actions required as a result and how they will be closed out, and by whom. Part 14 Interfaces 14.1 Internal 14.1.1 These include: 14.2 Network Rail i) Control Office ii) Senior management iii) Media/comms teams (including social media) iv) HR v) Incident Care Team Champion 14.2.1 Knowledge of Network Rail s National Emergency Plan and the roles and responsibilities therein (such as the Rail Incident Commander (RIC) and Rail Incident Officer (RIO)). 14.2.2 Understanding of the command and control structure and how key railway undertaking roles (such as the Train Operator Liaison Officer (TOLO)) interface. 14.2.3 Arrangements for sharing of relevant information (emergency plans for example) and participation in relevant Route Emergency Planning and Coordination Committee (REPACC) meetings. 14.3 Other Transport Providers 14.3.1 Understanding of interfacing transport operations both at stations and on adjacent infrastructure (including train, underground, bus and tram). RDG Page 13 of 14

RDG-GN011 Uncontrolled when printed RDG Guidance Note Emergency Planning - 14.3.2 Arrangements to share relevant information (emergency plans for example) and as a possibility to consolidate mutual aid potential. 14.4 British Transport Police (BTP) 14.4.1 Understanding of the role of the BTP (including preservation of the scene) and how they interface with civil police forces in the response to a rail related incident, including in respect of primacy. 14.4.2 Arrangements to exchange relevant emergency information (such as emergency plans) and participate in emergency exercises/workshops. 14.5 Emergency services 14.5.1 Understanding of the role of the emergency services in a rail related incident and the command and control relationship with both Network Rail and railway undertaking incident response teams. 14.5.2 Understanding of how a major incident site is managed by the emergency service in conjunction with the BTP, and how Network Rail and railway undertakings interface. 14.5.3 Arrangements to exchange relevant emergency information (such as emergency plans), specifically in accordance with CCA requirements and participation in emergency exercises/workshops. 14.6 Local Authorities 14.6.1 Understanding of the role of the Local Authority in a rail related incident and specifically the services, personnel and facilities that could be made available should such a need arise, including their statutory duties with regard to setting up emergency reception centres. 14.6.2 Arrangements for exchanging relevant information, specifically in accordance with CCA requirements and participation in emergency exercises/workshops. 14.6.3 Establishing specific links between Incident Care Team and Local Authority humanitarian assistance provision. 14.7 RAIB / ORR 14.7.1 Understanding of the role of inspectors from both the Rail Accident Investigation Branch (RAIB) - including the use of accredited agents - and the Office of Rail and Road (ORR) in the event of an incident in relation to evidence preservation and investigation. 14.7.2 Understanding of the legislation and protocol relating to rail accident investigation. RDG Page 14 of 14