The Grid Diagram The Heat-Content Diagram Pinch Subnetworks Minimum Number of Heat-Exchange Units...

Module 05: Pinch Design Method for HEN synthesis Lecture 27: Rules of Pinch Design Method (PDM) 2 nd Part Key words: PDM, HEN

3.17. PROCESS INTEGRATION AND PINCH TECHNOLOGY

Automatic Synthesis of Alternative Heat-Integrated Water-Using Networks

Quiz Questions. For Process Integration. Fill in the blanks type Questions

Debottlenecking and Retrofitting by Pinch Analysis in a Chemical Plant

Introduction to Pinch Technology

DESIGN OF A HEAT EXCHANGER NETWORK BY GRAPH METHOD

HDA Process. compressor. Reactor. Flash. heat. cool. Stabilizer. Recycle. Product

Retrofit of Crude Units Preheating Trains: Mathematical Programming versus Pinch Technology

Pinch Analysis with crisscross optimization prior to design

International Journal of Pure and Applied Sciences and Technology

Module 04: Targeting Lecture 14: No. of units target Key Words: HEN, Subset, Loop, Separate component, MER design

TEP Energy Utilization and Process Integration in Industrial Plants, or for short: Energy and Process

pinch 70 C 70 C 4 We want to cool both the hot streams to the pinch temperature. The next step is to find the duty for the two heat exchangers:

International Journal of Pure and Applied Sciences and Technology

Pinch Analysis for Power Plant: A Novel Approach for Increase in Efficiency

A New Optimisation Based Retrofit Approach for Revamping an Egyptian Crude Oil Distillation Unit

Heat Exchanger Network Retrofit through Heat Transfer Enhancement

Utilization of THERMOPTIM Optimization Method

Towards the Use of Mathematical Optimization for Work and Heat Exchange Networks

Wastewater Minimization in Process Industry Through Pinch Technology:

Module 03 : Building blocks of PINCH Technology. Lecture 07 : Hot and Cold Composite Curves and The Pinch

On the use of heat pumps in total site heat integration

Module 04 : Targeting. Lecture 11: PROBLEM TABLE ALGORITHM 1 st Part

Stochastic optimization based approach for designing cost optimal water networks

University of Maiduguri Faculty of Engineering Seminar Series Volume 6, december 2015

WATER AND ENERGY INTEGRATION: A COMPREHENSIVE LITERATURE REVIEW OF NON-ISOTHERMAL WATER NETWORK SYNTHESIS

Application of combined pinch and exergy analysis in retrofit of an olefin plant for energy conservation

HIGHER EFFICIENCY TARGETING IN A STEAM POWER PLANT BY USING PINCH TECHNOLOGY

Analysis of Heat Exchanger Network of Distillation Unit of Shiraz Oil Refinery

Modification of Preheating Heat Exchanger Network in Crude Distillation Unit of Arak Refinery Based on Pinch Technology

SENSITIVITY ANALYSIS OF CHANGING PARAMETERS IN METHANOL PROCESS

Energy efficiency and carbon footprint reduction for Croatian regions by Total Site integration

Heat Integration Across Plants Considering Distance Factor

Utility-Heat Exchanger Grid Diagram: A Tool for Designing the Total Site Heat Exchanger Network

Saturday 20 May C 180 C C 130 C C 60 C kw 50 C 30 C C 20 C

Design and Optimization of Total Site Energy Systems for Chemical Plants

Ching-Huei Huang, Chuei-Tin Chang,* and Han-Chern Ling

Heat Exchanger Network Retrofit Design by Eliminating Cross Pinch Heat Exchangers

Energy Optimization Using Pinch Analysis

Targeting Minimum Heat Transfer Area for Heat Recovery on Total Sites

Lecture 8. Design of cooling systems for effluent temperature reduction. L08-1 Energy System Design Update

Heat Integration Improvement for Benzene Hydrocarbons Extraction from Coke-Oven Gas

Design of Crude Distillation Plants with Vacuum Units. II. Heat Exchanger Network Design

OPTIMISATION OF EXISTING HEAT-INTEGRATED REFINERY DISTILLATION SYSTEMS

Heat Exchanger Network Optimization using integrated specialized software from ASPENTECH and GAMS Technology.

emissions reduction from smallscale utility system

Energy Optimisation Of Upstream Separation And Stabilisation Plant Using Pinch Technology

NOTICE WARNING CONCERNING COPYRIGHT RESTRICTIONS: The copyright law of the United States (title 17, U.S. Code) governs the making of photocopies or

Energy Saving in Atmospheric Distillation Unit by Retrofit Design of Heat Exchanger Networks of Al Basra Refinery

Heat Exchanger Network Retrofit Comparison. Trevor Hallberg and Sarah Scribner

Steam System Network Analysis, Synthesis. and Optimisation. Sheldon Grant Beangstrom

Combustion Chamber. Fig Schematic diagram of a simple gas turbine

Multi-effect distillation applied to an industrial case study

PINCH ANALYSIS: For the Efficient Use of Energy, Water & Hydrogen. PULP AND PAPER INDUSTRY Energy Recovery and Effluent Cooling at a TMP Plant

Cost Effective Heat Exchanger Network Design with Mixed Materials of Construction

Energy Retrofit Studies in Diethyl Thiophosphoryl Chloride (DETC) Plant

Retrofit for a Gas Separation Plant by Pinch Technology

Methodology for Batch Heat Integration and Storage System Design for Ideal Integration of Solar Process Heat

NEW RECYCLE PROCESS SCHEME FOR HIGH ETHANE RECOVERY NEW PROCESS SCHEME FOR HIGH NGL RECOVERY INTRODUCTION. Abstract PROCESS FUNDAMENTALS

Minimizing Fresh and Wastewater Using Water Pinch Technique in Petrochemical Industries W. Mughees, M. Al-Ahmad, M. Naeem

MINLP Optimization Algorithm for the Synthesis of Heat and Work Exchange Networks

Optimized Heat Exchanger Network design of GTL (Gas-To-Liquid) process

Design of Integrated Solar Thermal Energy System for Multi- Period Process Heat Demand

Participant Plants and Streams Selection for Interplant Heat Integration among Three Plants

University of Maiduguri Faculty of Engineering Seminar Series Volume 6, december 2015

Retrofit of Refinery Heat Exchanger Network under Different Kinds of Crude Oil by Pinch Design Method using Mathematical Programming

MULTI-PERIOD HEAT EXCHANGER NETWORK RETROFIT UNDER FOULING EFFECTS.

Cost Effective Heat Exchangers Network of Total Site Heat Integration

Cleaning Schedule Operations in Heat Exchanger Networks

PINCH ANALYSIS: For the Efficient Use of Energy, Water & Hydrogen. PULP AND PAPER INDUSTRY Energy Recovery and Effluent Cooling at a TMP Plant

A Modified Energy Transfer Diagram for Heat Exchanger Network Retrofit Bridge Analysis

Dr. Nasr Professor in Chem. Eng. Member of Board of Director RIPI

ENERGY SAVINGS OF INTERCOMPANY HEAT INTEGRATION - A METHODOLOGICAL FRAMEWORK PART I

Fuel saving due to pinch analysis and heat recovery in a petrochemical company

COMPARATIVE ANALYSES OF TWO IMPROVED CO 2 COMBINED COOLING, HEATING, AND POWER SYSTEMS DRIVEN BY SOLAR ENERGY

An optimal sizing method for cogeneration plants

Wastewater Minimization With Differentiated Regeneration of Contaminants using Water Source Diagrams (WSD)

High efficient heat reclaim with CO2

Integrating Recovered Jetty Boil-off Gas as a Fuel in an LNG Plant

Module 05 Lecture 35 : Low temperature process design Key words: Refrigeration system

OPTIMIZATION OF CRYOGENIC CARBON CAPTURE AND LNG PROCESSES BY SHAFTWORK TARGETING AND MATHEMATICAL PROGRAMMING

Methodology for the optimal thermo-economic, multi-objective design of thermochemical fuel production from biomass

APPLYING THE HEAT INTEGRATION IN ORDER TO ENVIRONMENTAL POLLUTANTS MINIMIZATION IN DISTILLATION COLUMNS

Module 5: Process Integration of Heat and Mass Chapter 10. David R. Shonnard Department of Chemical Engineering Michigan Technological University

Grand Composite Curve Module 04 Lecture 12

Process Integration: Unifying Concepts, Industrial Applications and Software Implementation

Investigation of Heat Exchanger Network Flexibility of Distillation Unit for Processing Different Types of Crude Oil

Process Integration Route For Water Conservation In Industrial Plants

Using Demand Solutions APS for Effective Scheduling in the Food Process Industry

An Energy Integration Approach on UHDE Ammonia Process

1. Introduction. 2. Base Case Design

Heat Integration of Crude Organic Distillation Unit

A Linear Mathematical Model to Determine the Minimum Utility Targets for a Batch Process

Pump selection: a real example

Numerical Simulation of the Thermal Performance of a Dry Storage Cask for Spent Nuclear Fuel Chi-Ming Lai, University Distinguished Professor Departme

Pinch analysis of Acrylic Acid Process Plant

Process Integration for Power-dominated Cryogenic Energy Systems 1. Introduction 2. Multi-period Synthesis of Power Systems

Transcription:

Ind. Eng. Chem. Res. 2010, 49, 3967 3971 3967 Retrofitting Heat Exchanger Networks Based on Simple Pinch Analysis Bao-Hong Li Department of Chemical Engineering, Dalian Nationalities UniVersity, Dalian 116600, China Chuei-Tin Chang* Department of Chemical Engineering, National Cheng Kung UniVersity, Tainan 70101, Taiwan, ROC It has been well-established that the energy and capital costs of a heat exchanger network are both dependent upon the minimum allowable temperature approach T min. As a result of the rapidly growing oil prices in recent years, there appears to be an urgent need to retrofit the existing optimal networks so as to reduce the current utility consumption rates with smaller T min values. A simple pinch-based approach is proposed here to accomplish this task while keeping additional capital investment to a reasonable level. In particular, every cross-pinch match is removed, and its heat loads on the hot and cold streams are both divided into two according to the pinch temperatures. At either side of the pinch, the divided heat loads on each stream are combined and then matched according to a systematic procedure derived from simple pinch analysis. Two examples are provided to illustrate this procedure. 1. Introduction The heat exchanger network (HEN) design method is a matured technology for energy integration in the process industries, 1-4 which has already been applied successfully in numerous grass-root and revamp projects for over two decades. With the rapidly growing energy costs in recent years, there is a renewed interest in retrofitting the existing optimal HENs which were designed under the presently outdated cost structure. A number of good reviews on this issue can be found in the work of Yee and Grossmann, 5 Asante and Zhu, 6 and Ponce- Ortega et al. 7 Thus, a full literature survey is omitted here for the sake of brevity. Generally speaking, the existing HEN retrofit methods can be considered as either pinch- or model-based. The former approach is adopted in this study due to the fact that, in practical applications, it is easier to implement the manual design steps and to exercise engineering judgment. Tjoe and Linnhoff 8 proposed a calculation procedure to determine the appropriate minimum temperature approach T min after retrofit by considering the energy savings, investment cost, and payback period. On the basis of a set of general design guidelines, the existing cross-pinch exchangers were then eliminated, shifted, or rematched strictly above or below the new pinch temperature. Additional exchangers could also be placed if necessary. Finally, the resulting network was evolved manually by shifting loads around the heat-load loops and along the heat-load paths so as to yield a retrofit design which is closely compatible with the existing one. 5 Despite the fact that satisfactory results were reported, there is still a lack of systematic and specific procedure to produce the modified HEN designs. An improved pinch-based retrofit procedure is developed in this work to lower the utility consumption levels of any given HEN at the cost of minimal capital investment. For illustration clarity, the remainder of this paper is structured as follows: The identification and partition methods of the cross-pinch heat loads are first presented in the next section. The specific steps to modify a given HEN are then listed in section 3. Two examples * To whom all correspondence should be addressed. Tel.: 886-6- 2757575 ext. 62663. Fax: 886-6-2344496. E-mail: ctchang@ mail.ncku.edu.tw. are provided next in the subsequent sections to demonstrate the effectiveness of the proposed approach. Conclusions are given at the end of this paper. 2. Identification of Cross-Pinch Heat Loads It is assumed in this work that the updated T min after retrofit can be determined in advance by considering the payback period, investment cost, and energy savings. 8 Consequently, the corresponding pinch temperatures can also be computed. The cross-pinch heat loads in the original design can then be identified by comparing the hot and cold temperature spans of each exchanger with the new pinch points. All possible scenarios can be found in Figure 1. Notice that the dashed line in each case denotes the pinch-point location and it can be associated with different temperatures, i.e., T p and t p, for the hot and cold streams respectively. In the exchangers described in Figure 1, the cold-stream temperature rises from t s to t t while the hotstream temperature decreases from T s to T t. The hatched area stands for the cross-pinch heat load. Figure 1. Four types of cross-pinch heat loads. 10.1021/ie9016607 2010 American Chemical Society Published on Web 03/17/2010

3968 Ind. Eng. Chem. Res., Vol. 49, No. 8, 2010 It is obvious that the entire heat duty of the exchanger in Figure 1a is the cross-pinch heat load because the lowest hotstream temperature is above the pinch while the highest coldstream temperature is below pinch. As for the other three scenarios, only part of the exchanger duty is transferred across the pinch and the exact cross-pinch heat load can be easily determined according to the following formulas: Q cr ) FC ph (T s - T p ) Q cr ) FC ph (T s - T p ) - FC pc (t t - t p ) Q cr ) FC pc (t p - t s ) for case (b) where Q cr denotes the cross-pinch heat load, and FC ph and FC pc represent the heat-capacity flow rates of hot and cold streams, respectively. Notice that the cross-pinch heat load(s) can be considered as specific retrofit target(s), i.e., the heat loads that must be removed so as to achieve the desired utility consumption levels due to T min reduction. 3. Retrofit Procedure The proposed retrofit method can be applied according to the following steps: Step 1: Determine the hot and cold pinch temperatures and the corresponding energy targets according to a specified T min. Step 2: Identify and remove all cross-pinch heat matches. Divide their heat loads on the process streams into two parts according to the corresponding pinch temperatures. Step 3: Combine the unmatched split loads of each stream which are on the same side (i.e., below or above) of the pinch. Step 4: At both sides of the pinch, match the above combined heat loads according to a modified version of the pinch design method. 9 (1) Feasibility check at the pinch point: The modified feasibility criteria given below must be satisfied for proper match placement. Number inequalities for unmatched heat loads N H e N C + n C N H + n H g N C for case (c) for case (d) above the pinch below the pinch where, N H and N C denote the numbers of unmatched heat loads at the pinch on hot and cold streams respectively; n C is the number of cold streams just above the pinch which are without unmatched loads but can be reached by at least one heat load path in a general sense; 9 n H is the number of hot streams just below the pinch which are without unmatched loads but can be reached by one or more generalized heat load path. Notice that the above-mentioned n C cold streams above the pinch and n H hot streams below the pinch can be considered as additional unmatched heat loads at our disposal. Such a heat load above the pinch can be viewed as an imaginary sink of the generalized heat load path with the regular heating utility as the source, while the source and sink of a generalized heat load path below the pinch should be associated with an aforementioned hot stream and a cooling utility respectively. Finally, it should be noted Table 1. Stream Data of Example 1 stream no. stream type FC p (kw/k) T s (K) T t (K) 1 hot 2 423 333 2 hot 8 363 333 3 cold 2.5 293 398 4 cold 3.0 298 373 that stream splitting may be necessary if any of the inequality constraints discussed here is violated. CP inequalities for individual matches: For each pinch match, the temperature approach must not decrease away from the pinch, that is, FC ph e FC pc FC ph g FC pc where FC ph and FC pc are the heat capacity flow rates of hot and cold heat loads, respectively. To avoid creating additional matches, splitting process streams is not the preferred measure in the present case to enforce the above constraints. Instead, it may be possible to invalidate the violated CP inequality by eliminating the heat load just above the pinch and placing it at a higher temperature on the same hot stream or by moving the heat load on the cold stream just below the pinch to a lower temperature in a similar fashion. (2) Match placement: Match placement should be started at the pinch and then developed by moving away from the pinch sequentially according to temperature. To minimize the number of extra exchanger units, the conventional tickoff rules should be modified as follows: The heat duty of every match above the pinch should be assigned (by shifting heat load via heat load path if necessary) so as to exhaust the heat load on hot stream. If this is not possible, then the heat duty should equal the heat load on cold stream. The heat duty of every match below the pinch should be assigned (by shifting heat load via a generalized heat load path if necessary) so as to exhaust the heat load on cold stream. If this is not possible, then the heat duty should equal the heat load on hot stream. Step 5: Break the heat load loops above and below the pinch. Recalculate the heat duties, the inlet and outlet temperatures of the involved matches. Step 6: Assign the new matches to available exchangers. Generally speaking, the industrial heat exchangers are almost always over designed by 15-30%. An existing exchanger can Figure 2. Original HEN design in example 1. above the pinch below the pinch

Ind. Eng. Chem. Res., Vol. 49, No. 8, 2010 3969 Figure 3. Operating conditions of exchanger 1 in example 1. Figure 5. Final retrofit design in example 1. Figure 4. Intermediate network obtained after splitting heat loads of crosspinch exchanger in example 1. usually be adopted to realize a new match between the same hot and cold streams if its heat duty is close to the original design level (say (20%). If there are more than one candidate match competing for the same existing exchanger, the one with the largest heat load should be selected. 4. Example 1 This example is taken from the work of Linnhoff and Hindmarsh, 9 and the stream data are given in Table 1. The original network design is shown with standard grid diagram in Figure 2. The inlet and outlet temperatures of each exchanger are shown above the horizontal stream lines in kelvin (K), while its heat duty is given underneath the dumbbell-shaped match symbol in kilowatts (kw). The corresponding minimum cold and hot utility consumption rates are 44 and 111.5 kw, respectively. If the desired minimum temperature approach after retrofit is set to be 20 K, the new energy targets can be determined with the problem table algorithm, 9 i.e., 40 kw of the cold utility and 107.5 kw of the hot utility. The corresponding pinch temperature is 363 K for the hot streams and 343 K for the cold streams. Notice that the utility consumption levels in the original design are both higher than the new energy targets by an amount of 4 kw; that is, a heat flow of 4 kw is crossing the pinch. By inspection, it can be observed that exchanger 1 fits the match pattern described in Figure 1c. To be more specific, the match pattern of exchanger 1 is depicted with actual temperatures in Figure 3. The cross-pinch heat load can be determined by calculating the heat-load deficit above or below the pinch. In the former case, the split heat load of hot stream is the following: Q h ) 2(423-363) ) 120 kw. The split heat load of the cold stream is the following: Q c ) 2.5(389.4-343) ) 116 kw, and therefore, the heat deficit above the pinch should be Q c - Q h )-4 kw. In the latter case, the split heat load of hot stream is the following: Q h ) 2(363-355) ) 16 kw. The split heat load of the cold stream is the following: Q c ) 2.5(343-335) ) 20 kw, and thus, the corresponding heat deficit is Q c - Q h ) 4 kw. From the above simple calculations, it can be clearly seen that there is indeed a heat flow of 4 kw crossing the pinch in exchanger 1. The intermediate network obtained after partitioning its heat loads on the hot and cold streams is provided Table 2. Stream Data of Example 2 stream no. stream type FC p (kw/k) T s (K) T t (K) 1 hot 228.5 432 350 2 hot 20.4 540 353 3 hot 53.8 616 363 4 cold 93.3 299 400 5 cold 196.1 391 538 in Figure 4. Notice that the locations of split loads are marked by green color, and their values are specified in blue. Because there is only one exchanger crossing the pinch, step 3 can be bypassed. As for step 4, we find that both feasibility criteria are satisfied above the pinch while the second criterion is violated below the pinch. The match above the pinch can then be placed according to the modified tick-off heuristic. To circumvent the problem below the pinch, load 1 cb should be moved to the right of exchanger 3 so as to invalidate the second feasibility criterion. As a result, it is possible to match loads 1 hb and 1 cb. Finally, the existing exchanger 1 can be assigned to exchanger 1 (marked by yellow color) and exchanger 1 (marked by green color) represents an added one according to step 6. The resulting network is presented in Figure 5, in which the affected heat duties are marked by blue numbers. It is not surprising to note that this solution is truly optimal. 5. Example 2 The second retrofit example is adopted from the work of Tjoe and Linnhoff. 8 The modified stream data are given in Table 2 in SI units and the corresponding HEN design in standard grid diagram can be found in Figure 6. It should be noted that minor inconsistencies are present in the original data set. There are two alternatives to fix this problem: (1) The target temperature of hot stream 2 can be adjusted from 361 to 353 K. (2) The heat-capacity flow rate of hot stream 2 can be changed from 20.4 to 21.31 kw/k. The former option is adopted here for illustration purpose, while similar results can also be obtained if the latter is selected. Figure 6. Original HEN design in example 2.

3970 Ind. Eng. Chem. Res., Vol. 49, No. 8, 2010 Figure 7. Operating conditions of exchanger 2 in example 2. Figure 10. Intermediate network obtained after matching combined heat loads in example 2. Figure 8. Intermediate network obtained after splitting heat loads of crosspinch exchangers in example 2. Figure 9. Intermediate network obtained after combining split heat loads of cross-pinch exchangers in example 2. Let us assume that the chosen minimum approach temperature after retrofit is 19 K. 8 By implementing the problem table algorithm, 9 it can be determined that the corresponding pinch temperature is 432 K for the hot streams and 413 K for the cold streams. The minimum hot and cold utility consumption rates in this case are 12410.1 and 10323.8 kw, respectively, and each is lower than that required in the original design by an amount of 5186.8 kw. By inspecting Figure 6, it can be found that the temperature spans of exchangers 1, 2, 4, and C2 fit the cross-pinch patterns in Figure 1d, b, a, and b, respectively. Their corresponding crosspinch heat loads can be found to be 2314.0, 699.3, 2000, and 203.2 kw. The sum of these cross-pinch heat loads is 5186.5 kw. Notice that there is an absolute error of 0.3 if this value is compared with the aforementioned energy saving (5186.8 kw), which can be attributed to the roundoff error in hand calculation. The next task is to split the heat loads of these cross-pinch exchangers according to the new pinch temperatures. For illustration convenience, let us consider exchanger 2 as an example (see Figure 7). The heat load on the hot stream in this exchanger is split into 2 ha (above the pinch) and 2 hb (below the pinch), and their values can be computed respectively to be 699 kw and 3712 kw. Since the exit temperature of cold stream is below the pinch, the corresponding heat load below the pinch 2 cb, i.e. 4381 kw, in indivisible. The heat loads of other crosspinch exchangers can also be partitioned according to the proposed method. The resulting network is shown in Figure 8, and all split heat loads are specified in blue numbers. By combining the split heat loads on each stream at both sides of the pinch, the network in Figure 9 can be obtained. The retrofit designs above and below the pinch can then be produced separately: Above the pinch: Notice that N H ) 2, N C ) 1, and n C ) 0 in this case. In order to match cold heat load 1 ca with hot heat loads [4.C2] ha and [1.2] ha, stream 5 should be split into two to satisfy both feasibility criteria simultaneously. The heat duties of the corresponding matches can be assigned according to the modified tick-off rule and, consequently, the utility consumption rate in the heater H is reduced to the target level as expected. Below the pinch: Since N H ) 2, n H ) 1, and N C ) 1, the first feasibility criterion at the pinch is satisfied in this situation. To satisfy the second criterion, the pinch match should be placed between the unmatched heat load [1.4] cb and the imaginary heat source on stream 1 (by shifting heat load from cooler C1). The heat duty of this match can be assigned according to the modified tick-off heuristic, i.e., 4314 kw. The next match should be placed away from the pinch between the unmatched loads 2 hb and 2 cb, and its heat Figure 11. Final retrofit design in example 2.

duty should be 3712 kw. There are two alternative heat sources available for matching the remaining load of 2 cb, i.e., the imaginary load on stream 1 or C2 hb on stream 2. Since both of them lead to the same final retrofit design, only the first option (see Figure 10) is developed in the sequel. Notice that, in this case, C2 hb must be cooled by utility and the two matches between streams 1 and 4 can be merged by breaking the corresponding heat load loop. It should also be noted that the two heat loads on stream 4 should be changed from serial to parallel to restore the temperature constraints on exchanger 3. The resulting network is shown in Figure 11. Finally, the new matches can be assigned to the available exchangers according to the criteria given in step 6. Matches 1, 2, 4, and C2 may be realized with the existing exchangers for the original matches 1, 2, 4, and C2, while exchanger A should be added to achieve the desired energy saving. 6. Conclusions A novel pinch-based retrofit method is developed in this work to reduce the utility consumption rates in any given HEN design. The specific retrofit targets, i.e., the cross-pinch heat loads, are first determined exactly with simple hand calculations. By eliminating these heat loads, the revamped network can then be systematically produced with a revised version of the pinch design method. Since it is only necessary to modify the crosspinch matches and the existing exchangers can be utilized as much as possible, the required capital investment is kept at a reasonably low level. The effectiveness of the proposed approach is clearly demonstrated in the examples provided in this paper. Acknowledgment Financial support provided by National Science Foundation of China under Grant NO. 20806015 is gratefully acknowledged. Literature Cited Ind. Eng. Chem. Res., Vol. 49, No. 8, 2010 3971 (1) Linnhoff, B., et al. User Guide on Process Integration for the Efficient Use of Energy; Pergamon Press Ltd.: Oxford, 1982. (2) Gundersen, T.; Naess, L. The synthesis of cost optimal heat exchanger networks, an industrial review of the state of the art. Comput. Chem. Eng. 1988, 12 (6), 503 530. (3) Linnhoff, B.; Flower, J. R. Synthesis of heat exchanger networks. AIChE J. 1978, 24 (4), 633 654. (4) Linnhoff, B. Pinch analysis-a state of the art overview. Trans. Inst. Chem. Eng., Part A 1993, 71, 503 522. (5) Yee, T. F.; Grossmann, I. E. A screen and optimization approach for the retrofit of heat-exchanger networks. Ind. Eng. Chem. Res. 1991, 30, 146 162. (6) Asante, N. D. K.; Zhu, X. X. An automatic and interactive approach for heat exchanger network retrofit. Trans. Inst. Chem. Eng., Part A 1997, 75, 349 360. (7) Ponce-Ortega, J. M.; Jimenez-Gutierrez, A. J.; Grossmann, I. E. Simultaneous retrofit and heat integration of chemical process. Ind. Eng. Chem. Res. 2008, 47, 5512 5528. (8) Tjoe, T. N.; Linnhoff, B. Using pinch technology for process retrofit. Chem. Eng. 1986, 28, 47 60. (9) Linnhoff, B.; Hindmarsh, E. The pinch design method for heat exchanger networks. Chem. Eng. Sci. 1983, 38 (5), 745 763. ReceiVed for review October 25, 2009 ReVised manuscript received February 5, 2010 Accepted March 4, 2010 IE9016607