Lessons Learned Schedule Updating and Maintenance using Primavera P6

Similar documents
Lessons Learned Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International

How to Develop, Manage and Communicate Effective Schedules Using Primavera P6 Professional

P6 Instructors Sample Presentation

3-Day Oracle Primavera P6 Professional Fundamentals - Training Outline -

P6 Instructors Sample Presentation

PROMASTAR Instructor led Professional Training Services Primavera Accredited/Certified Class Courses

Primavera P6 R8.3 Professional Fundamentals Training Course Outline

(Really) Understanding Microsoft Project

Welcome to the Eastwood Harris Pty Ltd Primavera P6 Version 7 and Earlier Versions 3 day training course

Schedule Management User Guide

P6 Version 8.2 to 8.4 EPPM Web Power Sample Point Slide Show

Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.1 & 8.2 Professional and Optional Client 3 day training course SAMPLE SLIDE SHOW

User Guidance Manual. Last updated in December 2011 for use with ADePT Design Manager version Adept Management Ltd. All rights reserved

IPECC C ONSULTANTS Course Title: Primavera Enterprise 6.0. Primavera Enterprise. Project Management, Training & Contract Workforce

by Ron Winter Consulting LLC January 6, 2015

P6 Instructors Sample Presentation

1Z

Project Planning and Control Using Oracle Primavera P6 : P8.3, 8.4, 15.2

Administration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT AND PMBOK GUIDE FOURTH EDITION training course presented by.

2-Day Oracle Primavera P6 Professional Advanced Scheduling - Training Outline -

Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

Sample Slide Show THIS SLIDE REQUIRES NEW PICTURE. Administration. Course Objectives. Course Agenda. Course Agenda

EXHIBIT 2-2-C SCHEDULES

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

P3 to P6 Professional Migration Guide

Project Forecast Survey Results Good Scheduling Practices June 2016

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Contents Getting Started... 9 Sample Dashboards... 17

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster

Massport Capital Programs Enterprise Schedule Management. Document 11 A. Primavera Schedule Toolkit Vertical Projects. July 2017 Version 1.

Welcome to the Eastwood Harris Pty Ltd PRINCE2 TM Revised 2009 and Microsoft Project 2010 training course

Primavera Training - P6 Basic Course (102)

Primavera P6 Exercise Worksheet

Microsoft Office Project 2007, Managing Projects

Andrew Avalon, P.E., PSP

The Survey Says! Source: The Project Manager, Pinnell-Bush, Inc. Owner s say 31% of contractors do not submit monthly updates. 41% don t submit recove

Borderlink Resources Limited.

SECTION NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10

Team Member Application

RiskyProject Lite 7. Getting Started Guide. Intaver Institute Inc. Project Risk Management Software.

A Xymphonic Systems White Paper Anyplan Product Overview

Workshop: Advanced Cost Management Techniques Using Cobra

6 PROJECT TIME MANAGEMENT

2017 Construction CPM Conference Ron Winter, PSP, FAACE Schedule Analyzer Software CPM ACTIVITY STATUS

Microsoft Project Tips & Tricks. Project Solutions Group, Inc.

Mastering Microsoft Project 2010

Exam Code: Number: Passing Score: 800 Time Limit: 120 min File Version: 35.4.

Analytics Cloud Service Administration Guide

1Z Oracle 1Z0-567 Primavera P6 Enterprise Project Portfolio Management 8 Essentials Version: 4.9

Index. Backup plans for presentations, Backward pass, 55 59, 72 73, 102. Saleh Mubarak

Strategic Management Guide

Project Management User Guide. Release

RiskyProject Professional 7

Project Management Courses

What s new in PrimaveraReader

Sample book with two chapters

Microsoft Project 2013 Core Essentials

Software Application Lab 2018 PROJECT PLANNING & SCHEDULING USING PRIMAVERA. CIT, Gubbi, Dept. Of Civil Engg. Page 1

RiskyProject Lite 7. User s Guide. Intaver Institute Inc. Project Risk Management Software.

Design & Development of a Schedule Management Plan. Session #PRJ10

Contents Getting Started... 7 Sample Dashboards... 12

Views and Layouts for Program Management

PrimaveraReader. Product Overview

Useful P6 EPPM Terms Security Configuration Process in P6 EPPM Defining Global Security Profiles in P6 EPPM... 19

Exposition Metro Line Construction Authority CRITICAL PATH METHOD SCHEDULE AND COST/SCHEDULE INTEGRATION SYSTEM

Can I change an activity from an 8-hour workday to a 10-hour workday in my schedule?

Scheduling Challenges in the Industrial Construction Sector

P6 Analytics Reference Manual

Your easy, colorful, SEE-HOW guide! Plain&Simple. Microsoft Project Ben Howard

Payroll Process Guide

Planer ET 2011 professional. Programming time-location Economic planning

Week 5 Project Work Plan

Network Diagram 11/10/2016 WORK BREAKDOWN STRUCTURE (WBS)

SAMPLE. SCHEDULE LOGS TCM Framework: 10.1 Project Performance Assessment. AACE International Recommended Practice No. 93R-17

Q&As. Managing Projects with Microsoft Project Pass Microsoft Exam with 100% Guarantee

1 - Introduction to Microsoft Project Describe how Project relates to the discipline of Project management.

Risk Management User Guide

KeyedIn Projects Project Manager User Guide

Project Time Management

Schedule Design Planning for Schedule Development

What's New New Features in Primavera P6 EPPM 18

SECTION CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) UNIT PRICE CONTRACTS

Retained Logic and Progress Override in Primavera P6

Sample book with one chapter

SCH202: Manage Schedules

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

Planning and Scheduling Training Program Course Brochure and Competency Matrix

PMBOK Guide Fifth Edition Pre Release Version October 10, 2012

Exam Code: Number: Passing Score: 800 Time Limit: 120 min File Version: 35.4.

What's New New Features in Primavera P6 EPPM 18

Scott M. Francis, P.E., PSP

IBM TRIRIGA Application Platform Version Introduction to the Gantt Scheduler

MSP How to guide session 3 (Updating)

2-Day Oracle Primavera P6 Professional Advanced Resource & Cost Management - Training Outline -

Ultimate Study Guide: Foundations Microsoft Project Dale A. Howard Gary L. Chefetz

What's New - Task Planning

we also provide training on Project Mangagement software like Primavera and Microsoft Project (MSP).

Transcription:

Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI SP, LEED AP Hill International Charlie Jackson, PSP Project Life Span Construction CPM Conference - 2017

Author Biography Charlie Jackson Position / Company: Consultant/Founder Project Life Span, LLC Degree / University: BA Journalism Baylor University, Waco, TX Years of Experience / Background: 17+ years in the construction industry, primary focus on planning and scheduling, as well as implementation of and training scheduling software (P3, SureTrak, and P6 and Microsoft Project) also work with project control systems (Primavera Contract Management, and Meridian Prolog) Clients Owners, Developers, Construction Managers, General Contractors, Subcontractors Project experience: public works, infrastructure, retail and commercial, military housing, education, casino, pharmaceutical, oil and gas, and healthcare

Author Biography Hannah Schumacher Position/Company: Managing Consultant, Construction Claims Group Hill International Degree/University: BS Construction Management BS Building Construction Technology Wentworth Institute of Technology, Boston, MA Years of Experience / Background: 23+ years in construction industry, primary focus on planning, scheduling, project controls, and claims services Clients: Owners, Developers, Construction Managers, General Contractors, Subcontractors Project experience: commercial, residential/custom homes, multifamily/student housing, retail, hospital, medical, hospitality, education, casino, correctional, infrastructure, public works and industrial sectors

Many specifications are requiring the use of the latest Primavera software (P6). Our presentation focuses on the use of Primavera P6 to update and maintain schedules. The Schedule Update Process consists of 4 main steps: 1. PLAN 2. UPDATE 3. REVIEW / ANALYZE 4. COMMUNICATE 4

PLAN 5 Understand Contract and Specification Requirements Determine Update Frequency Establish Baseline / Contract Schedule Assign Responsibility to each activity Provide Training Gather Data Visit Job site, hold update meeting, and validate data Understand P6 settings that affect updates

Understand Contract and Specification Requirements 6 Frequency of updates Procedures for updates versus revisions Earned Value requirements Cost and/or resource status requirements Change management procedures Software requirements

Determine Update Frequency Factors to consider: Contract Requirements Internal company policy Project budgeting Considerations Benefits to frequent updates: 7 Greater accuracy of as built documentation Promotes early identification of issues Promotes timely issue resolution / mitigation Enhances user s skill in application & management of schedule Provides starting point to which user can return if errors are made in updating process

Establish Baseline / Contract Schedule Baseline is the accepted as planned schedule (Contract Schedule) In Primavera Baseline is a snapshot of project plan (similar to Target in P3) 8 Number of baselines (maximum number is set by Administrator) User can assign up to 3 baselines to current schedule for data comparisons Can copy baselines when copying project

Assign Responsibility to each activity Use Activity Code 9 Global vs. Project Specific Group and Sort by Activity Code

Assign Responsibility to each activity Assign Resource / Role 10 CAUTION: Resources and Roles are Global (use unique identifier) Group by resources in Assignments window

Provide training 11 How to update the schedule How to review the schedule How to add fragnets for change management Content of update reports What information is needed from each individual

Gather Data Use Update Layout or Report Visit the jobsite, hold an update meeting, and validate data 12

Understand P6 settings that affect updates Security access settings 13 Based on Organizational Breakdown Structure (OBS) Read / Write access can be defined down to the Work Breakdown Structure (WBS). Set by the Administrator (Admin, Security Profiles)

Understand P6 settings that affect updates Percent Complete Types 14 Duration Percent Complete (default) if used, update based on Remaining Duration not based on % complete Physical Percent Complete Units Percent Complete Default type defined at the Project Level (Projects Details, Defaults tab) and can be changed at the Activity Level (Activity Details, General Tab) Project Level defaults only apply to new activities.

Understand P6 settings that affect updates Duration Types 15 Fixed Duration and Units (default) Fixed Duration and Units/Time Fixed Units Fixed Units/Time

Understand P6 settings that affect updates Activity types 16 Milestones Task Dependent and Resource Dependent Level of Effort and WBS Summary Default Activity type is set at Project Level (Project Details, Defaults tab) Change type at Activity Level (Activity Details, General tab)

Understand P6 settings that affect updates Calculation settings (General) Relationships to and from other projects Make open ended activities critical Schedule Calculation options Retained Logic holds the tie Progress Override out of sequence Actual Dates actuals Critical activity definition Calculate SS lag Float definition Calendar for scheduling relationship lag 17

Understand P6 settings that affect updates Resource settings Resource Details for Labor, Nonlabor, Material Auto Compute Actuals Calculate costs from units Activity Details Override Resource Details settings (Calculate costs from units) 18

Understand P6 settings that affect updates Resource settings at Project Level (Project Details, Calculations tab) 19 Link Actual and Actual This Period Units and Costs (when using Financial Periods) Resources Drive activity dates by default (Project Details, Resources tab)

Understand P6 settings that affect updates Financial Periods used to store resource actuals 20 Defined at Admin Level (Admin menu, Financial Periods) CAUTION: Financial Periods are GLOBAL

UPDATE 21 Opening the file (Exclusive / Shared / Read Only) Importing and Configuring Outside Information Maintain Baseline Rename File Assign and Compare Baselines Enter Status (dates, percent complete, resources, costs) Enter Revisions / Forecast (activities, durations, logic)

Opening the file Exclusive Shared multiple users can change / modify the schedule AT THE SAME TIME CAUTION: this is the default when selecting project from Project Window, right click, select Open Read Only 22 only one user can change / modify the schedule Recommended to use when updating / statusing view only mode can not change / modify the schedule

Importing and Configuring Outside Information Import Configuration utility how to handle duplicate data. Do Not Import Insert New Keep Existing Update Existing Delete 23

Maintain Baseline (Activity window, Project, Maintain Baseline) Rename File to new version (i.e. EX00 EX01) (Project Window) P6 allows user to copy current schedule as a Reflection, make changes and merge back into current schedule CAUTION: The following data items when deleted in a Reflection copy WILL NOT be deleted in current schedule during the merge: Activities, Relationships, Resource Assignments, WBS elements, Work Products and Documents, Project Expenses, Project Issues and Project Risks. These would need to be manually deleted. (Oracle 24 Knowledgebase ID 908732.1)

Assign and Compare Baselines Project: Standard baseline for comparison for all users (typically the Contract Baseline Schedule) User Baseline (Primary, Secondary, Tertiary) Primary Baseline allows for dates, resource, etc. comparisons Secondary and Tertiary compare date information only Check earned value settings (Admin, Earned Value, Earned Value Calculation) These settings determine which baseline dates will be used for comparison. 25

Prior to statusing, make sure time is shown to alleviate non standard start/finish times (Edit, User Preferences) 26

Enter Status Manually Note: Update Progress (Tools menu) Not Recommended. CAUTION: Update Progress uses PLANNED Dates versus Scheduled Dates or Early Dates which may be different Actual Start dates Actual Finish dates Remaining duration entering % complete is not recommended (Primavera calculates to the minute 50% of 3 days = 1.5 days) Resources and/or Costs Calculate the schedule (Tools, Schedule) with new Data Date Recommendation: To improve speed and efficiency of the program, turn off option to Schedule automatically when a change affects dates Review data entered Maintain Baseline (with Status only in title) Store the updated schedule as an exported file 27

Enter Revisions / Forecast New Activities Delete Activities (Do not reuse Activity IDs) Revise Logic Revise Durations Calculate the schedule (Tools, Schedule) with new Data Date CAUTION To improve speed and efficiency of the program, turn off option to Schedule automatically when a change affects dates Review data entered Maintain Baseline (with Revision added to title) Review compared to status only update as well as previous update and Baseline schedule Store the updated schedule as an exported file 28

REVIEW & ANALYZE 29 Review and Verify data input (Scheduler self check) Compare to previous update and Contract schedule Review Logic reports / Layouts and Changes made Finalize and Maintain Baseline (of this finalized update)

Review and Verify data input (Scheduler self check) Open Ends (activities with no Predecessors and / or Successors) Dangling Relationship ties (Start to Start and/or Finish to Finish ties without a Predecessor and/or Successor) Incorrect and non overlapping lag ties that result in gaps in sequencing 31 Start to Start lag that exceeds the activity duration Finish to Finish lag that exceeds the successor duration Finish to Start lag Out of Sequence progress Actual dates in the future Incorrect times Calendars Activities on the data date (verify predecessor logic) Excessive float values Negative float New activities, durations, logic and impact to plan Critical Path and Near Critical Path Constructability issues Stacking of trades

Compare to previous update and Contract schedule Create comparison layouts Assign appropriate baseline (Project menu, Assign Baseline) Select baseline bars (View, Bars) and baseline data columns Note: varying baseline types (Project vs. User Baselines Primary, Secondary, Tertiary) allow for different levels of data for comparison. Check earned value settings (Admin Preferences, Earned Value) 32 Determines what dates will be used for comparison Planned or Start/Finish Recommendation: use Budgeted values with current dates CAUTION: Setting is global, not project specific, affects all projects in the database

Comparison layout: 33

Review Logic reports / Layouts and Changes made Schedule Log Claim Digger Tabular Reports Schedule Analyzer for the Enterprise (SAe) 34

Once the entire team has reviewed and approved the draft update, finalize and Maintain Baseline Maintain Baseline (Project, Maintain Baseline, Save Copy) Export backup to safe location(s) 35

COMMUNICATE 36 Layouts Reports

Layouts Global (available to all projects in the database) User (available to only the user) Project (specific only to the project) 37 Bar charts Lookahead schedules Critical Path Near Critical Path Responsibility sorts

Time Scale Logic (available in P6 v7 Service Pack 3) Visualizer in 8.3 and later (Tools, Time Scale Logic Diagram) 38

Standard Reports Schedule Resource Cost Customize reports using Report Editor or Report Wizard 39

Examples of Tabular Reports created in the Report Wizard or Editor: 40 Schedule reports Activity reports Logic reports Total float reports Earnings reports

CONCLUSION Understand contract and specification requirements Understand the P6 settings that affect updates Provide training to those responsible for providing and reviewing the update data Visit the jobsite and walk the job Hold an update meeting and verify data Update Frequently Review and Analyze the schedule Maintain Baselines for comparison Compare to previous updates and Baseline Schedule Communicate the schedule using Reports and Layouts 41

We hope that you can use these implementation and execution lessons learned outlined in this presentation to develop schedules quickly and efficiently using Primavera P6 Please contact us should you have questions regarding Primavera P6 implementation or general use Questions? 42