PLANT-MIXED ASPHALT PAVEMENT

Similar documents
SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

City of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC CONCRETE SURFACE 1.0 GENERAL. 1.1 Scope

4-07 Asphalt Treated Permeable Base (ATPB)

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

Draft Special Provision for. Asphalt Treated Permeable Base

SPECIAL PROVISIONS - SP2005BOOK Page 237 JUNE 30, 2006 Last Revision 4/16/08

TECHNICAL SPECIFICATION

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

FULL DEPTH RECLAMATION

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following:

SECTION FLEXIBLE PAVING

SECTION 402 HOT MIX ASPHALT, HMA, PAVEMENT

COLD-IN-PLACE PAVEMENT RECYCLING

SECTION ASPHALT PAVING

MN Asphalt Construction & Quality Workshop March 29, 2017 Earle Brown Heritage Center Greg Johnson MnDOT Assistant Bituminous Engineer

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE

BASE CONSTRUCTION MATERIALS A Aggregate

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX

Table L6 Reduced Payment Schedule for Moving Average Test Results Item Pay Factor (1) Gradation (SEE FOOTNOTE #3 BELOW) 75 % (3)

City of Estevan. Construction Specifications

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR PLANT MIX BITUMINOUS BASES AND SURFACES

CITY OF FARGO SPECIFICATIONS ASPHALT LEVELING COURSE

SECTION ASPHALT PAVING AND SURFACING

Special Provision No. 399F01 December 2014

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 315 ASPHALT CONCRETE PAVEMENT. Materials shall be furnished by the Contractor in accordance with Section 200.

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

SECTION 336 ASPHALT CONCRETE PAVEMENT

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

Item P-219 Recycled Concrete Aggregate Base Course

CITY OF FARGO SPECIFICATIONS SEAL COATS

Cement Stabilized Aggregate Base

SECTION ASPHALT PAVING

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 17 ASPHALT CONCRETE PAVEMENT General Materials

CITY OF LAKEVILLE STANDARD SPECIFICATIONS FOR STREET CONSTRUCTION FOR PUBLIC USE TO BE MAINTAINED BY THE CITY SECTION 4

Calhoun County Road Department Schedule of Items (Itemized Bid Sheet)

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT

asphalt (PWMA) processes in accordance with these Specifications. PWMA processes include organic 9

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS.

MIDLAND COUNTY ROAD COMMISSION

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

2005 Stone Matrix Asphalt (SMA)

SPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI)

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

SECTION PAVING AND SURFACING

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 850 CEMENT TREATED FREE DRAINING BASE APRIL 18, 2008

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

SECTION 7 ASPHALTIC CONCRETE SURFACING

MIDLAND COUNTY ROAD COMMISSION BID FORM

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

ITEM 260 LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED)

SECTION ASPHALT PAVING

Compaction Principles

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

SECTION ASPHALTIC CONCRETE PAVING

5-02 BITUMINOUS SURFACE TREATMENT

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

7. Refer to Paragraph 3.08 for unit price adjustments.

Special Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT

SECTION 11 ASPHALTIC CONCRETE PAVING Mar S E C T I O N 11 ASPHALTIC CONCRETE PAVING

SPECIAL PROVISION FOR FURNISHING AND PLACING MARSHALL HMA MIXTURE (WITH SAMPLING BEHIND THE PAVER)

SECTION ITEM P PLANT MIX BITUMINOUS PAVEMENTS FAA AC 150/ A PART V 2/22/99 DESCRIPTION MATERIALS

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

HOT MIX ASPHALT PAVEMENT

.1 This section specifies the requirements for the supply of hot mix asphalt concrete paving.

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

INDEX DESCRIPTION MATERIALS CONSTRUCTION MEASUREMENT PAYMENT 10

Overlay Applications. Overlays and Asphaltic Surfaces. Base Conditions. Subgrade. Existing PCC Pavement. Base Course 7/6/2010

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR ACCEPTANCE OF LONGITUDINAL JOINT DENSITY IN HOT MIX ASPHALT PAVEMENTS

FAA s Mixture Specifications

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 2741 POROUS BITUMINOUS PAVEMENT

Puerto Rico. Pavement Preservation Conference and Technology Implementation. US. Department of Transportation Federal Highway Administration

DIVISION 2100 SITEWORK

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

SPECIFICATIONS FOR BONDED WEARING COURSE

Work shall also include preparation and protection of subgrade, subbase and leveling course specific to PHMA/PWMA.

TECHNICAL SPECIFICATION

SPECIFICATIONS FOR ASPHALT-RUBBER SURFACE TREATMENT WITH AGGREGATE COVER

SECTION 315 ASPHALT CONCRETE PAVEMENT of the Specifications is amended as follows:

KU Medical Center 2018 PAVEMENT RESTORATION PROJECT Project No May 4, 2018

SECTION 503 TEMPORARY PAVEMENT RESTORATION

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR FURNISHING AND PLACING MARSHALL HOT MIX ASPHALT MIXTURE (WITH SAMPLING BEHIND THE PAVER)

TABLE ASPHALTIC CONCRETE MIX DESIGN CRITERIA

SECTION ASPHALT CONCRETE

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

CONSTRUCTION SPECIFICATION FOR HOT IN-PLACE RECYCLING AND HOT IN-PLACE RECYCLING WITH INTEGRAL OVERLAY

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

ITEM 223 LIME-FLY ASH STABILIZED SUBGRADE Description. Mix and compact water, lime and fly ash (LFA), and subgrade in the roadway.

Transcription:

Engineering specifications CITY OF OAKDALE NO.2360 PLANT-MIXED ASPHALT PAVEMENT PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Construction of pavement courses from hot plant-mixed bituminous aggregate mixture. 2. Demonstration of quality control through quality control testing. B. Method of Measurement: 1. Bituminous Mixture: a. Measure each mixture type by weight in tons acceptably placed. b. No deductions for bituminous materials in the mixture. 2. Bituminous Material: Incidental to the bituminous mixture. 3. Contractor Testing and Quality Control: Incidental to bituminous mixture. C. Basis of Payment: 1. Mixture cost includes additives as required. 2. Payment for acceptable quantities of bituminous pavement shall be at the Contract Unit Price as listed on the Bid Form. All associated Work items shall be considered incidental. 3. Only Table 2360.6.B4A payment factors shall apply to the Contract price adjustments for incentives and decentives for all mixtures. All other payment factors specified under Mn/DOT 2360 shall be void. 1.02 REFERENCES 1.03 Mn/DOT 2360 Plant Mixed Asphalt Pavement. A. Product Data/Job Mix Formula: Submit to Engineer 3 copies of job mix formula and data for each mixture designation listed under Mixture Proportions. B. Test Reports: Submit to Engineer 3 copies of all test results required under Source Quality Control and Field Quality Control. #2360 Plant-Mixed Asphalt Pavement PAGE 1

1.04 PROJECT CONDITIONS A. Do not place mixtures when weather or roadbed conditions are determined to be unfavorable. PART 2 PRODUCTS 2.01 MATERIALS A. Aggregate: Mn/DOT 2360.2.A. Class B Aggregate is excluded and shall not be allowed. B. Additives: Mn/DOT 2360-2.F: Add antifoaming agent at the manufacturer s recommended dosage rate. C. Asphalt Binder Material: Mn/DOT 2360.2.G. D. Bituminous Mixture: Mn/DOT 2360.3 2.02 EQUIPMENT A. All equipment used in production and placement shall be in accordance with Mn/DOT 2360.5.C. B. Produce all bituminous mixtures at a Contractor-certified HMA plant in accordance with Mn/DOT 2360.4.A1. 2.03 MIXTURE PROPORTIONS A. Submit a trial mix design for each mixture in accordance with Mn/DOT 2360.3. B. All mixtures shall be in accordance with Mn/DOT 2360.3. C. Mixture Designation (Mn/DOT 2360.1.A): 1. Mix or Design Type, Lift, Aggregate Size, Traffic Level, Voids, Binder. 2. Examples: SPLVWE9.5330C, SPLVNW12.5330C a. Mixture Design Type: 1) SP=Gyratory Mixture Design. 2) LV=Marshall Mixture Design-Low Volume, 50 blow. #2360 Plant-Mixed Asphalt Pavement PAGE 2

2.04 SOURCE OF QUALITY CONTROL 3) MV=Marshall Mixture Design-Medium Volume, 50 blow. 4) SM=Gyratory Mixture Design for Stone Matrix Asphalt (SMA). b. Course: 1) WE=Wearing and Shoulder Wearing Course 2) NW = Non-Wearing Course. c. Maximum Aggregate Size (Letter is used in gyratory designation; number is used in Marshall designation: 1) A or 4=12.5 mm (1/2 inch), 9.5 mm (3/8 inch) 2) B or 3= 19.0 mm (3/4 inch), 12.5 mm (1/2 inch) 3) C or 2=25.0 mm (1 inch), 19.0 mm (3/4 inch) 4) E=See provision for SMA design d. Marshall Design 1) 50 blow design e. Air Void: 1) 40=4.0 percent for SP and SM Wear mixtures. 1) 35=3.5 percent for MV Wear and Non-Wear. 2) 30=3.0 percent for LV Wear and Non-Wear and SP Non-Wear and Shoulder. f. Asphalt Binder Grade: 1. A=PG 52-34. 2. B=PG 58-28. 3. C=PG 58-34. 4. D=PG 58-40. 5. E=PG 64-28. 6. F=PG 64-34. 7. G=PG 64-40. 8. H=PG 70-28. 9. I=PG 70-34. 10. L=PG 64-22. A. Contractor is responsible for all source quality control. B. All bituminous plant testing personnel, facilities, and quality control requirements shall be in accordance with MN/DOT 2360.4. #2360 Plant-Mixed Asphalt Pavement PAGE 3

PART 3 EXECUTION 3.01 PREPARATION A. Treatment of the Surface: Apply bituminous tack coat to existing bituminous or concrete surfaces and to surface of each course except final surface. 3.02 PLACEMENT A. Spreading Operations: 1. Spread each mixture to the required cross section with an approved paver. 2. Spread by hand or motor grader only in areas not accessible to a paver. 3. Coordinate paver speed with rate of delivery of mix to provide a uniform rate of placement. 4. Complete placement of each course over full width of the section each day. B. Compacting Operations: 1. Conduct initial and final rolling with a steel-wheeled roller. 2. Conduct secondary rolling with a pneumatic-tired roller. 3. Commence compaction as soon as possible after mixture has been spread, without causing undue displacement of mixture. 4. Operate rollers continuously until all areas are compacted to required density and all roller marks are eliminated. 5. Compact each course uniformly by Modified Specified Density Method. 6. Perform pavement density acceptance testing in accordance with MN/DOT 2360. C. Thickness and Surface Requirements: 1. After compaction, each course shall be within ¼ of the required thickness. 2. Remove and replace any areas that are not within tolerance. 3. After rolling, each surface shall be free of open and torn sections. 4. Each course shall be smooth and true to the planned grade and crosssection within the following tolerances: #2360 Plant-Mixed Asphalt Pavement PAGE 4

a. Wearing course surfaces shall not vary more than 1/8 inch from the edge of a 10-foot straightedge placed parallel or perpendicular to the centerline. b. Transverse slopes of each surface shall not vary from the proposed slope by more than ½ inch in 12 feet. c. The distance from centerline to edge of each course shall be not less than the proposed distance nor greater than 3 inches more than the proposed distance. 5. Remove and reconstruct all portions of any course not in compliance with the above tolerances. 6. Perform acceptance in accordance with MN/DOT 2360. D. Construction Joints: 1. Compact to produce a tightly bonded joint meeting surface tolerances. 2. Transverse Joints: a. Place at right angles to centerline whenever placement operations are suspended. Suspension of Work will be allowed only at specified transverse joint locations as shown on Drawings. b. Upon resumption of work, cut vertically for full depth of the course. 3. Longitudinal Joints: a. Place parallel to centerline. b. Place joints between strips not less than 6 inches measured transversely from like joints placed in underlying course. c. Place all surface courses to not greater than ¼ inch above adjacent gutters, manhole frames, valve boxes, or other fixed structures. 3.03 FIELD QUALITY CONTROL A. Contractor is responsible for all field quality control. B. All field quality control testing personnel, facilities, and requirements shall be in accordance with MN/DOT 2360. C. Perform compaction testing of bituminous mixtures in accordance with MN/DOT 2360. #2360 Plant-Mixed Asphalt Pavement PAGE 5