Request for Quotations Arras Weir Maintenance

Similar documents
Request for Quotations Airport Secure Access System

RFQ Drainage Ditching and Culvert Replacement

REQUEST FOR QUOTATIONS Crushed Gravel

Request for Quotations Culverts and Drainage Ditching

REQUEST FOR QUOTATIONS Zero Turn Mower

REQUEST FOR QUOTATIONS KENN BOREK AQUATIC CENTRE TILE REPAIR & REPLACEMENT. No

City of Dawson Creek Request for Proposals No

Supply and Delivery of Boltless Metal Shelving Units

PW # 2-18 TENDER FOR SUPPLY & APPLY CRUSHED GRANITE

Supply and Delivery. Chromebase All-in-One Computers

Oxford & Area Trails Association River Philip Bridge Construction, Oxford, N.S Project No.: OATA003 SECTION 1.0 INSTRUCTION TO BIDDERS

Bidding Conditions Attachment C

REQUEST FOR QUALIFICATIONS Quantity Surveyor Pre-qualified List for Partnerships British Columbia Inc. RFQ #: 3567

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue

BIDDING PROCEDURES FOR GOODS PURCHASES

BIDDING PROCEDURES FOR GOODS PURCHASES

DEAN + TYLER + BURNS ARCHITECTURE

THE CITY OF WINNIPEG BID OPPORTUNITY BID OPPORTUNITY NO SHAMROCK SCHOOL PLAYGROUND ENHANCEMENTS

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017.

INSTRUCTIONS TO BIDDERS

COUNTY OF MERCED REQUEST FOR QUOTATION GENERAL COUNSEL LEGAL SERVICES NO. 7206

RFQ Concrete Repair Program

Q Sealed bids submitted on the included bid form ONLY in a vendor identified envelope marked: Q SharePoint Support Services

REQUEST FOR QUALIFICATIONS LEGAL SERVICES FOR THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY RFQ NUMBER 17-01

City of Santaquin REQUEST FOR PROPOSALS For Engineering Services for the East Side Booster Pump Station

Human Resources Consultant Compensation and Pay Equity Request for Proposal

REQUEST FOR QUOTATION DOCUMENT (For Planning/Engineering Assignment) PART C- FORMS AND NOTICES

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 11, DUE DATE: December 28, 2017

Grand Council of the Crees (Eeyou/Eenou Istchee) Grand Conseil des Cris (Eeyou/Eenou Istchee)

REQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL

EXPRESSION OF INTEREST (EOI) LONG FORM. Construction Contract Administration Services

REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 20, DUE DATE: January 11, 2019.

REQUEST FOR QUOTATION (RFQ)

REQUEST FOR QUOTATION DOCUMENT

PUBLIC WORKS REQUEST FOR QUOTATIONS TOPSOIL SUPPLY

2019 Winter Gravel Stockpile

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders

REQUEST FOR BID MULTI-PURPOSE PAPER FOR ILLINOIS VALLEY COMMUNITY COLLEGE BID # BID2014-B07

EXPRESSION OF INTEREST (EOI) LONG FORM. Planning / Engineering Services Assignment

22 August 2018 RFQ No:11864 REQUEST FOR QUOTATION (RFQ) : Cybersecurity Awareness Program - package upgrade

City of Eagle Point 2017 Paving Instruction to Bidders

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES

T 1.1: Tender Notice and Invitation to Tender SECTION 1: NOTICE TO TENDERERS 1. INVITATION TO BID

2018 Winter/Spring Gravel Stockpile

REQUEST FOR SEALED, COMPETITIVE QUOTES FOR TEMPORARY PERSONNEL SERVICES COMPOST SITE GATEKEEPERS. January 23, 2018 UPDATE: JANUARY 29, 2017

Grand Council of the Crees (Eeyou/Eenou Istchee) Grand Conseil des Cris (Eeyou/Eenou Istchee)

COUNTY OF ALAMEDA. REVISED BID DUE DATE: 2:00 p.m., THURSDAY, NOVEMBER 17, 2016

REQUEST FOR QUOTATION (RFQ)

WINTER SAND TENDER Friday September 7, 2018 at 1:10 p.m.

T Simcoe Street Parking Garage Elevator Cylinder Replacement

FENCING AND FENCE REPAIR

NEW YORK LIQUIDATION BUREAU REQUEST FOR PROPOSAL

FORM OF TENDER 19/2014 SUPPLY AND DELIVERY OF GLASS OVERLAY REFLECTORIZING BEADS

REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF CLAIMS LITIGATION INVOICE REVIEW SERVICES GSMJIF. ISSUE DATE: October 2, 2017

REQUEST FOR QUOTE (RFQ) Track and Field Jump Pits

1 August 2018 RFQ No11543 REQUEST FOR QUOTATION (RFQ)

REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT

INVITATION TO BID CITY OF HOPKINSVILLE

REQUEST FOR QUALIFICATIONS

Re: Request for Quotation for Fuel Management Services (the RFQ ), RFQ 17128

SECTION I: ADVERTISEMENT/ INVITATION TO TENDER... 3 DISPOSAL NOTICE... 3 CONDITION OF SALE... 3 TENDERING INSTRUCTIONS... 3

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado

STANDARD SPECIFICATION SECTIONS. November 2016 Physical Resources Design, Engineering and Construction

Request for Proposal

REQUEST FOR PROPOSALS AUDIT

NOTICE TO PROSPECTIVE BIDDERS REGARDING PRE-QUALIFICATION FOR CONTRACTS FOR ALISAL UNION SCHOOL DISTRICT. Revised February 11, 2015

Request for Quotation (RFQ) for Updation of Best of India in Pharmaceuticals for India Brand Equity Foundation (IBEF)

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

INVITATION TO BID CITY OF HOPKINSVILLE

270 Prince Street, Suite 202 Montréal (Québec) H3C 2N3 Tel: (514) Fax: (514) NOTICE OF TENDER

Please have your pre-qualification document submitted before closing at 3:00:00 p.m. Local Time Thursday January 29, 2009.

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4

All required information must be completed in full, in ink, or typewritten.

REQUEST FOR PROPOSAL ALCOHOL/SUBSTANCE ABUSE TESTING, OCCUPATIONAL MEDICINE FOR PRE-HIRE SCREENING, FIT FOR DUTY, AND WORKERS COMPENSATION

INVITATION FOR BID IFB For: Record Storage Services. Notice to Prospective Bidders

Selection of Contractor Step 5. June 2013

REQUEST FOR PROPOSALS YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

INSTRUCTIONS TO TENDERERS

NOTICE TO BIDDERS FOR

CITY OF MARSHALL, MINNESOTA

Request for Proposal. for. Public Opinion Research

CITY OF HOPKINSVILLE

Request for Quotation (RFQ) for. Conducting audit of Online Campaign for Indian Plantations for IBEF. Request for Quotation [RFQ]

REQUEST FOR OFFER No Supply and Deliver One (1) New Special Service Vehicle for Nanaimo Fire & Rescue

INTERNATIONAL FOUNDATION FOR ELECTORAL SYSTEMS (IFES) RFQ/11/055

REQUEST FOR PROPOSAL Audit and Tax Services ISSUED April 24, 2015 RFP No

Request for Quotation ( RFQ ) Financial Audit Services for RRFB Nova Scotia. RFQ No. RRFB0043

BOONE COUNTY PUBLIC LIBRARY (859) 342-BOOK (2665)

- 1 - TENDER NO

BID No: 04/17 REQUEST FOR PROPOSALS FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES

Dates/Times: p.m. Pacific Time.

SIMLAW Seed CoMpAny LIMIted

Gadsden City Schools

CENTRAL VALLEY OPPORTUNITY CENTER INVITATION FOR BIDS FORKLIFT

Transcription:

Request for Quotations 2015-35 Arras Weir Maintenance The City of Dawson Creek requests written quotes for maintenance at the Arras Weir on the Kiskatinaw River, 1.7 km upstream of the Kiskatinaw Bridge on Highway 97 South. All contract documents are available through the City of Dawson Creek website at www.dawsoncreek.ca. The Proponent is solely responsible for ensuring any addenda are downloaded, reviewed, and included in their bid. Questions regarding specifications can be directed to Chelsea Mottishaw, Watershed Technician, at 250-782-1793 or via email at cmottishaw@dawsoncreek.ca An optional site tour will be held leaving from City Hall on Thursday, July 16 th at 10:00 am. In the alternative, the weir may be viewed in real time on the City website at http://weir.dawsoncreek.ca/control/userimage.html Proposals will be accepted up to 2:00 p.m. (local time), July 22, 2015. Proposals must be sealed in an opaque envelope, clearly marked with the name and the project name/number and will be received by Brenda Ginter, Director of Corporate Administration, at: Regular Mail: Box 150, Dawson Creek, BC V1G 4G4 Physical Address (Courier): 10105 12A Street, Dawson Creek, BC V1G 3V7. It is the sole responsibility of the Proponent to ensure that its proposal is received at the above location and by the time stipulated. Proposals received after the stipulated time will be rejected and returned to the Proponent unopened. Faxed proposals are not acceptable and will be rejected. The City reserves the right to accept or reject all or any proposal and to waive any informality, incompleteness or error in any proposal. Proponents must refer to the RFQ Documents for the terms governing the Bid process. All proposals received by the City of Dawson Creek Director of Corporate Administration become the property of The Corporation of the City of Dawson Creek and as such are subject to the Municipal Freedom of Information and Protection of Privacy Act.

RFQ 2015-35 Arras Weir Maintenance Specifications and Information Page 1 of 3 SPECIFICATIONS 1. Introduction The City of Dawson Creek is requesting quotations for the supply, delivery, and installation of riprap materials needed to stabilize and maintain the Arras Weir on the Kiskatinaw River, located 1.7km upstream of the Kiskatinaw Bridge on Highway 97 South. 2. Scope and Location of Work Project Details and Contractor Responsibilities 1. Supply, delivery and installation of 750m 3 of riprap, 0.8m-1.1m in diameter at the Arras Weir. Existing riprap to be removed and re-used. 2. Riprap to be tested and confirmed as non-acid generating. The bidder will be required to submit certification of the proposed material to the City prior to commencing work. 3. Equipment used to install the riprap must be in good operating condition, free of leaks, and excess oil or grease on any surface. 4. Fuelling of equipment must take place a minimum of 30m away from any watercourse or surface water drainage. 5. Equipment used for this project must use environmentally sensitive hydraulic fluids that are non-toxic to the aquatic environment. 6. The successful bidder will be deemed the prime contractor for this project and as such, will be responsible for site safety and compliance with all provincial and federal regulations, including the BC Water Act, Part 7, and the Standards and Best Practices for Instream Works issued by the then Ministry of Water, Land and Air Protection, (2004). It is the contractor s responsibility to submit an application/notification under Section 9 of the Water Act because of the proposed works within the stream, to ensure all proposed works meet or exceed Water Act requirements. 7. Mobilization and de-mobilization of any personnel, equipment, fuel and tools to complete the work. 8. Coordination with City of Dawson Creek staff to complete sheet pile welding may be required. 9. The contractor shall supply and maintain at all times on site during construction a spill contaminant kit to be used in the event a deleterious substance is released to the environment. 10. The contractor shall be responsible for on-site emergency response if necessary. 11. Work is to be done during low water conditions, (September/ October 2015). If weather and stream conditions do not permit, the project may be deferred to the Fall of 2016. 12. Work is to be completed prior to October 30, 2015.

RFQ 2015-35 Arras Weir Maintenance Specifications and Information Page 2 of 3 3. Submission Requirements 1. Deadline for submission of proposals is 2:00 p.m. local time, July 22, 2015. Proposals must be received by the Corporate Administrator at Dawson Creek City Hall prior to the deadline. 2. The proposal must be signed by a person authorized to sign on behalf of the Proponent. 3. The proposal must be in English. 4. The Proponent must provide written confirmation of the Proponent s independence and that the Proponent has no conflict of interest with respect to the public body. 5. Proposals be submitted in an opaque envelope and clearly marked RFQ 2015-35 Arras Weir Maintenance and must be submitted on the Bid Form provided with all sections completed. 6. In the case of a lump sum price contract, if the Bid contains an error in adding lump sums, the total Bid price is the total resulting from correct addition by the City of the lump sums 4. Rejection of Bids 1. The Owner has the right, in its sole discretion, not to award a Contract and has the right to reject any or all proposals (including the lowest Bid) without giving any reason for doing so. 2. The Owner has the right, in its sole discretion, to evaluate any or all bids on any basis it considers desirable, including the overall cost of the bid in relation to the Owner's budget for the Work, the ability of the Proponents to perform the Work, the finances or creditworthiness of the Proponent, and any experience of the Proponent in performing work of a kind comparable to the Work. 3. Unless otherwise expressly provided in the RFQ, the Owner is entitled, in its sole discretion, to waive any informality, incompleteness or error in any proposal. 4. The Owner may, but is not required to, in its sole discretion, reject any proposal which is conditional or obscure in any respect or does not conform strictly with the requirements of the Request for Quotations. 5. Additional Information 1. Except as expressly and specifically permitted in the RFQ, no Proponent shall have any claim for any compensation of any kind whatsoever, as a result of participating in the RFQ, and by submitting a bid, each bidder shall be deemed to have agreed that it has no claim. 2. The proponent, through submission of a bid, agrees to all terms and conditions contained in the RFQ. 3. The successful bidder will be required to provide the following documents within seven business days of being notified that they are the successful proponent: City of Dawson Creek Business Licence; Proof of good standing with Worksafe BC; Proof of $5,000,000 general commercial liability insurance naming the City as an additional insured. Acceptance of Prime Contractor Designation. Emergency Response Plan.

RFQ 2015-35 Arras Weir Maintenance Specifications and Information Page 3 of 3 6. Requests for Clarification Proponents may inquire into and clarify any requirements of this RFQ. Questions must be communicated to the contact person at least five days prior to the closing date. Inquiries, in writing, must be directed to Chelsea Mottishaw, Watershed Technician, at cmottishaw@dawsoncreek.ca. It is the proponent s responsibility to clarify any details prior to submitting a bid. The Corporation of the City of Dawson Creek will assume no responsibility for any oral instruction or suggestion. 7. Omissions and Discrepancies If a proponent finds discrepancies in, or omissions from the request for quotations, or if he/she is in doubt as to their meaning, he/she should advise the City immediately. Responses, if not already addressed in the RFQ, will be addressed in the form of addendum, if required and posted to the City website at www.dawsoncreek.ca. No oral interpretations will be effective to modify any provisions of the Proposal, unless a written addendum has been issued by the Director of Corporate Administration, prior to the advertised closing date and time. The Proponent is solely responsible for ensuring any addenda are downloaded, reviewed, and included in their proposal. Proponents must also acknowledge receipt of each addendum (if any) in the space provided on the bid form. 8. Proposal Irrevocability By submission of a clear and detailed written notice, the Proponent may amend or withdraw its proposal prior to the closing date and time. Any amendment submitted which results in the disclosure of pricing or other salient points of the original proposal will result in disqualification of the Proponent. At closing time, all proposals become irrevocable. Proposals shall be firm for a period of at least 30 days from the RFQ closing date, and shall be used as the basis for and be included as part of the contractual agreement that will be entered into with the selected firm. By submission of a bid, the Proponent agrees that should its bid be successful, the Proponent will enter into a contract for the work with the City of Dawson Creek, the content and format of such contract to be determined by the City of Dawson Creek. 9. RFQ Documents: Request for Quotations Specifications and Information Bid Form Figure 1 Location Map Figure 2 & 3 Arras Weir Photos

RFQ 2015-35 Arras Weir Maintenance Bid Form Page 1 of 3 Section 1 - Bidder Contact Information CITY OF DAWSON CREEK BID FORM 2015-35 Arras Weir Maintenance Company: Date: Address: Contact: Phone: Cell: Email: Section 2 Pricing Description LUMP SUM (excluding taxes) for supply, delivery and installation of 750 m 3 riprap as per Specifications Section 1 & 2 of RFQ 2015-35. $ **Price PST if applicable $ GST if applicable $ TOTAL $ ** Prices must include all applicable fees, levies and charges except taxes The City reserves the right to negotiate scope with the lowest bidder. Section 3 - References Please provide contact information for your two most recent jobs similar in scope and value to the work specified in the RFQ, ideally for local government and/or in the North. Provision of this information constitutes consent for the City to contact the references. Company Name: Phone: Email: Contact: Company Name: Phone: Email: Contact: Section 4 Addenda By my signature below, I hereby acknowledge receipt of Addendum No.(s) X *Company Representative (signature) Name: Title:

RFQ 2015-35 Arras Weir Maintenance Bid Form Page 2 of 3 Company: Contact: Address: RFQ 2015-35 Arras Weir Maintenance CONTRACTOR ACKNOWLEDGEMENT FORM Postal Code: Phone: Fax: Cell Number: Email: As an authorized representative of acknowledge: Company Name, by my signature below I All employees, subcontractors and representatives of the company will operate in compliance with all applicable federal, provincial and municipal occupational health and safety regulations, laws and bylaws. My company and its employees are qualified to do this work. References will be provided upon request. The successful bidder must provide the additional documents required in the RFQ Section 5.3, Additional Information, no later than one week after notification of the award of the contract. Failure to do so may result in the contract being awarded to a bidder who can meet the requirements. Except as expressly and specifically permitted in this RFQ, no proponent shall have any claim for any compensation of any kind whatsoever, as a result of participating in the RFQ, and by submitting a bid, each bidder shall be deemed to have agreed that is has no claim. I have provided information regarding my company and staff that may lead to a real or perceived conflict of interest, including: o Information regarding company representatives, managers and staff, (and members of their immediate families) who are a member of the Council of the City of Dawson Creek or in a senior management capacity with the City of Dawson Creek. Immediate family is defined as an individual s spouse and those dependent on the individual or the individual s spouse, whether related or not. o Any other information that should be provided to the Council that may influence the consideration of the proposal. o If no conflict exists, I have so indicated in the space provided below. Conflict of Interest Information - Please mark below the appropriate response: Provided on a separate sheet: No conflict exists for my company: Company Representative (signature) X Name & Title: (please print)

RFQ 2015-35 Arras Weir Maintenance Bid Form Page 3 of 3 CITY OF DAWSON CREEK CODE OF CONDUCT CONTRACTORS The relationship between City employees and representatives of contractors providing service to the City is critical to achieving the goals and objectives of the Corporation of the City of Dawson Creek. In providing the highest level of service possible, it is essential that all representatives of the Contractor work together with City staff in a co-operative and congenial manner, always respecting established lines of authority. The efficiency of City operations and the image the Corporation presents to the public may be influenced by any breakdown in the relationship between the Contractor s representatives and City employees. Therefore, the Contractor s representatives are expected to convey a friendly, approachable, positive and helpful attitude to City employees and to be honest, trustworthy, reliable, dependable and punctual in all workplace activities. Contractors unable to demonstrate an ability to meet this standard may be disqualified from the bidding process. Successful bidders subsequently failing to meet this standard should expect termination of any contractual relationship with the City. APPROVED BY COUNCIL: DATE: August 23, 1999 REAFFIRMED BY COUNCIL: DATE: April 30, 2001 REAFFIRMED BY COUNCIL: DATE: November 16, 2009 REAFFIRMED BY COUNCIL: DATE: March 30, 2015 I have read and agree to comply with the above Code of Conduct: Company Representative (signature) X Name: Title:

RFQ 2015-35 ARRAS WEIR MAINTENANCE Figure 1 Arras Weir Location

RFQ 2015-35 ARRAS WEIR MAINTENANCE Figure 2 Photo of Arras Weir August 2014 Figure 3 Arras Weir Structure