COBie Case Study: Case Study & Survey Results

Similar documents
Quantifying the effect of using BIM and COBie for facility management on work order processing times: a case study

Proceedings of BS2015: 14th Conference of International Building Performance Simulation Association, Hyderabad, India, Dec. 7-9, 2015.

Management. Igor Starkov, EcoDomus. EcoDomus, Inc. 2011

CS21793 Transition to Operations with Building Ops: The (Eye) in BIM

APPA Chicago August 2015

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Commissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015

Delivering Building Information to Owners Birgitta Foster Vice President, Facilities Integration VDCO Tech, Inc.

National Institute of Building Sciences

Benchmarking.it is much more than just a bunch of numbers! Teena Shouse, CFM, IFMA Fellow Facility Engineering Associates

COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS ASHRAE STANDARD 202

Big Data to Benchmarking Enjoy the Journey! Laurie Gilmer, PE, CFM, SFP, LEED AP, CxA Facility Engineering Associates

Compiled by Rajan Humagai

Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013)

Value Proposition of COBie at University of Washington

More than 50% of facilities management personnel are expected to retire in the next ten years. 26 july/august 2015 Facilities Manager

Owner has determined that this project is a Major Capital Renovation project as that term is defined herein.

BIM FOR SKILLED TRADES

Agency implements Workfront solution in fewer than four months as standard for managing work for one client spanning 30 offices across 20 countries.

6/10/2018. Building Information Modeling Overview. Pirtle s History with Building Information Modeling (BIM)

TXST BIM-FM Requirements

Presentation Agenda. Introductions. The Key Issues. The Solution

EcoDomus, Inc

ENGINEERING. Trey Price Engineering Systems Applications Supervisor Denton Municipal Electric Esri Electric & Gas Users Group Vice President

NAPA SANITATION DISTRICT

10 BIM for FM Deliverables in 20 Minutes

Preparing for Strategic Enrollment Planning at The University of Texas at San Antonio. December 5-6, 2017

Service Advisor - Create a New Work Order

Build it Right the First Time: Building Envelope Commissioning/ Retro-Commissioning

Welcome to the ITS PMO! Start a new IT Project

Project vs Operation. Project Constraints. Pankaj Sharma, Pankaj Sharma,

Fixed Scope Offering for Oracle Fusion Procurement. Slide 1

CONTRACT SERVICES PHASE 1: PRE-CONSTRUCTION

DEFINITIONS AND KEY MEASURES

Activation, Transition & Close Out Step 7. July 13, 2012

Minnesota State Colleges and Universities. South Central College. Request for Proposals for Commissioning Agent. STEM and Healthcare Renovation

Full-Scope Commissioning for High-Quality Buildings

Trends & Developments. Trends & Developments

Successful Security Consulting

Integration Knowledge Area

Appendix. Process Inputs and Outputs

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th

Construction CPM Conference

CxA Gap Session. April 25, :00 p.m. 4:30 p.m. Instructors: Derek De Jesús, CxA, LEED AP Darren Draper, PE, CxA, LEED AP

Initiation Group Process. Planning Group Process

Automating the Bill of Material (BOM) Setup/Allocation Process with Winshuttle Haris Chowdhry Research in Motion (RIM) Inc.

Salesforce Implementation Services

Implementing Integrated Project Delivery, Lean Construction and BIM through Design Build

Panel: Owner s Strategies for In-house Commissioning

INDUSTRY EXPERT PANEL SESSION

THERMAL ENERGY STORAGE OVERVIEW

Implementing Lean Construction through Design Build. Presented by David Umstot, PE San Diego Community College District

APPENDIX C Configuration Change Management Verification and Validation Procedures

Volume II- Project Development Processes

Tablets and BIM in Construction

Administrative Cost, Efficiency, and Structure Benchmarking Platform

Benchmarking: It's Much More Than Just a Bunch of N umbers! Teena Shouse, CFM, IFMA Fellow, VP, Facility Engineering Associates

Commercial Retro-Commissioning Program Manual for 2015 SECTION 1

CPM Solutions Ltd. Newsletter

Knowledge Areas According to the PMBOK edition 5. Chapter 4 - Integration

Turning Over Validated Space & Equipment Data and O&M Documents by Substantial Completion

Building Information Modeling to Facilities Information Management and Beyond

SPECIAL ISSUE: CRITICAL REALISM IN IS RESEARCH. Clay K. Williams

Dos Rios WRC Chlorine System Improvements

The Basics of ITIL Help Desk for SMB s

VICTAULIC VIRTUAL DESIGN

Systems Analysis for Business Analysts (3 Day)

Part One: Successfully Implementing Your Automation Strategy. Craig Salvalaggio

NAPA SANITATION DISTRICT

APPLICABILITY/ACCOUNTABILITY:

PMP Exam Preparation Course Project Scope Management

Solution Delivery Services Bring your Real-time SPC Program to Life

University of Washington. Request for Qualifications. Commissioning Authority Services for

National Grid s Approach to Commissioning of Smart Grid Pilot Devices. J. VALENZUELA M.L. COOPER National Grid USA

Enterprise Asset Management STREAMLINE FACILITY MAINTENANCE OPERATIONS & REDUCE COSTS

BIM Design & Construction Requirements Indiana University

Design & Development of a Schedule Management Plan. Session #PRJ10

The UK BIM Revolution

Connoisseur Solutions Project Scope Management

Retrospective Testing of an Automated Building Commissioning Analysis Tool (ABCAT)

MRM//McCann Team Saves an Estimated 105 Hours Every Week with Workfront, Translating into Annual Cost Savings of More Than $200,000

Successful Blueprints for Equipping New Facilities

BASELINE SCHEDULING BASICS Part 2: May 3, 2007

PRODUCT AND SERVICE DEVELOPMENT DEFINITIONS AND KEY MEASURE

Staffing Coordinator Guide to COMPASS

What You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President

Commissioning at NYP. Joseph Lorino, PE, LEED Corporate Director April 1, 2014

What to Expect in the Existing Building Commissioning Process

ACEC CAD AND BIM FOR SENIOR FIRM LEADERS

OneStart/EDEN A Description of IU's Transaction Processing/Recordkeeping Environment

PROGRAM MEASUREMENT SERVICE GRANT DETAILS

International Association of Certified Practicing Engineers

Macomb County Renovations Monthly Progress Report March 2017

FINDING THE MONEY: Turning Transactions Compliance into Cash. March John Thompson, Director Tom Grove, Vice President. 1 healthcare IT solutions

State of North Carolina

PROJECT NAME. Duke University. Architect (Specify Design Vs. AOR If Multiple) Construction Manager. Civil Engineer. Structural Engineer

Procedure Yes; No; greater than

Contents. Training Topic Objectives. Benefit Approval Process. Support and Resources 3/23/2016 2

DESIGN + BUILD CONSTRUCTION

Organization Efficiency Study

Transcription:

COBie Case Study: Case Study & Survey Results Presented By: Hyde Griffith, PE, Vice President, Broaddus & Associates t Present: Mark Cervenka, Facility Manager, Texas A&M Health Science Center 04-May-11 / 1 Dec 2011 COBie Case Studies / NIBS Annual Conference 1

Dec 2011 COBie Case Studies / NIBS Annual Conference 2

Texas A&M Health Science Center College Station, TX 100 miles NW of Houston 04-May-11 / 3 Dec 2011 COBie Case Studies / NIBS Annual Conference 3

Project Phase Contracting Phase Information Captured Requirement Design Construction Operations Case Study Scope Programming Space Program Product Program Early Design Documents Schematic Design Coordinated Design Design Reviews Specification Product Specifications Product Discovery Bidding Bid Inquiries Selection Preparation and Submittal Review Shop Drawings Installed Product Installation Inspect Products Punch List Capture Warranty Data Commissioning Capture Maintenance Data Capture Systems Data Capture Commissioning Records t Applicable As-Built Data and Documents Information to Support O&M Needs 04-May-11 / 4 Dec 2011 COBie Case Studies / NIBS Annual Conference 4

Project Context for Using COBie Minimal COBie data within A/E model (2%) Information exchanges not structured for COBie use from design & construction deliverables CMMS chosen at start Multiple benefits exist Why was COBie format chosen? Open Standard Format / Neutral How was data assembled? Dec 2011 COBie Case Studies / NIBS Annual Conference 5

The Challenge: Reduce Work Order Cycle Time previous CMMS in use at enterprise level BIM or COBie data standard in place Needed to determine what information would reduce the typical Work Order Cycle time. 04-May-11 / 6 Dec 2011 COBie Case Studies / NIBS Annual Conference 6

Metrics: What can be improved? Reduction in time spent: Researching O&M data needed to deploy a crew to the field Locating the equipment (building, floor, room, within room, other) Access equipment warranties and other records 04-May-11 / 7 Dec 2011 COBie Case Studies / NIBS Annual Conference 7

Process Scope: The Digitally Enabled CMMS TAM HSC is not necessarily changing their current processes in terms of workflow but rather data content by using the latest CMMS software along with the COBie data. They are re-baselining the enterprise (8 campuses) with a consistent WO process inside of the CMMS. They are looking at the workflow process blocks to determine what information can be provided in a digital manner (in lieu of hardcopy) to digitally enable the CMMS with value added content. 04-May-11 / 8 Dec 2011 COBie Case Studies / NIBS Annual Conference 8

Process Scope: The Digitally Enabled CMMS Validate required COBie data. Reverse engineer the COBie POR back to a project team deliverable matrix. Revise contracts and deliverables that define content and format for COBie data creation. This will create a consistent COBie data deliverable process with repeatable benefits. 04-May-11 / 9 Dec 2011 COBie Case Studies / NIBS Annual Conference 9

Implementation Plan: Allow WO process to stabilize with CMMS / TAM HSC implementation work sessions. Completed Map COBie data fields and documents to WO flow where provision of digital data will reduce time (requirements determination). Completed Evaluate current COBie data provisions and create reconciliation list of any missing data fields / docs (requirements alignment). In Process 04-May-11 / 10 Dec 2011 COBie Case Studies / NIBS Annual Conference 10

Implementation Plan: Estimate former WO cycle times based upon interviews with experienced Facility Managers at each campus by comparison to established flowcharts. This will establish a base case for the WO cycle times. Completed Evaluate new WO cycle times with CMMS and fully enabled digital data / documents being available. Next Phase Compare old cycle times to new cycle times. Prediction Completed 04-May-11 / Dec 2011 COBie Case Studies / NIBS Annual Conference 11

Current Process: Work Order Cycle 04-May-11 / 12 Dec 2011 COBie Case Studies / NIBS Annual Conference 12

Historical Durations: Work Order Activities Per O&M Staff Survey Dec 2011 COBie Case Studies / NIBS Annual Conference 13

New Process: Work Order Cycle (Expected Duration Compressions in Blue) Dec 2011 COBie Case Studies / NIBS Annual Conference 14

New Process: Work Order Cycle (Duration Compressions in Blue) Activities originally thought to be nearly eliminated, but survey proved that activity durations would just compress. 04-May-11 / 15 Dec 2011 COBie Case Studies / NIBS Annual Conference 15

Expected Durations: Work Order Activities per O&M Staff Survey) Dec 2011 COBie Case Studies / NIBS Annual Conference 16

Estimated Results Dec 2011 COBie Case Studies / NIBS Annual Conference 17

Conclusions to Date Work Order flow processes have proven to be similar across the 8 campuses through dialogue. Qualitative understanding that efficiencies can be improved with the availability of digital data. (Avg. 8.7% Prediction) rmalization of data to be used across the enterprise is being established and validated. Key Assumption Reductions in Work Order cycle times are expected at all 8 locations with consistent application of data needs. The CMMS implementation is an optimum time to establish normalized data expectations and prior to full data loading into the CMMS. 04-May-11 / 18 Dec 2011 COBie Case Studies / NIBS Annual Conference 18

Questions Requiring Clarity 2 hours surveyed vs. 4 hours reported Users consider themselves more efficient than survey results proved Wrench turning vs. Admin time Reconcile and set time keeping rules for results quantification effort Are technicians logging all their time into CMMS? Work Order Classifications (difficulty: light, medium, hard) Reactive vs. Preventative vs. Emergency Break out by total and by equipment types / category Dec 2011 COBie Case Studies / NIBS Annual Conference 19

Next Step: Verify the Results Round Rock campus has been using CMMS with no COBie data for 90 days. COBie data has been collected and will be loaded into CMMS for measuring the benefit. Results (update) expected to be ready for next COAA Conference in Summer 2012. Dec 2011 COBie Case Studies / NIBS Annual Conference 20

COBie Case Study: Case Study & Survey Results Presented By: Hyde Griffith, PE, Vice President, Broaddus & Associates hgriffith@broaddusassociates.com Phone: 409-599-9623 t Present: Mark Cervenka, Facility Manager, Texas A&M Health Science Center 04-May-11 / 21 Dec 2011 COBie Case Studies / NIBS Annual Conference 21