Project Delivery Symposium: Delivering the future PROJECT DELIVERY STRATEGIES

Similar documents
PROJECT DELIVERY METHODS

Welcome! Achieving Collaborative IPD-ish Delivery with basic D-B, P3 or CM contracts: Yes, there is a way

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO

A/E-LED INTEGRATED PROJECT DELIVERY

Construction Documents Education Program

Integrated Project Delivery

2014 PMKC Webinar. PM Series The Business Case for the 2030 Challenge

1/4/2014. Alternative Project Delivery Methods 1. Agenda

PROFESSIONAL PRACTICE 544

Partnering for Alternative Delivery Projects

CONSTRUCTION DOCUMENTS Part 1

Progressive Design-Build

ALTERNATE FORMS OF PROJECT DELIVERY

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN

ROLES AND RESPONSIBILITIES

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright

Different Ways to Contract for Lean Project Delivery. Joel Darrington San Diego COP 3/27/19

Progressive Design-Build

Professional Practice 544

Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing

Professional Practice 544

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at

DESIGN IS GOOD BUSINESS

PROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA

The Owner s Role in Successful Design-Build Project Delivery

Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery

Audio Sessions. Session 5 MEETINGS. Construction Contract Administration Education Program

1/12/2015. Collaborative IPD-ish Project Delivery using Design-Build, P3 or CM at-risk: the Einstein Approach

Conference For Catholic Facility Management. Track 8 Making Cents of Financing and Building in this Economy

Project Delivery Symposium: Delivering the future CONTRACTORS PANEL

ConsensusDocs. Catalog. Updated Docs Inside

A Primer Indianapolis, Indiana June 16, 2010

Session THREE. Face 2 Face (4 hours) Stage 1 Initial actions & appraisals: Self-directed (6 hours)

2008 Questions & Solutions Engineering, Inc.

AIA Contract Documents

Design-Build Trifecta A joint presentation of DBIA WESTERN PACIFIC REGION

Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at

Procurement Documents for Progressive Design-Build Projects

Projectwide ROI. A team approach to gaining BIM Benefits (Arizona State University ISTB IV) Dan Russell / Sundt Construction / November 2, 2011

Maximizing Success on Integrated Projects: An Owner s Guide

DRAFT. Request for Proposal for Construction Manager at Risk Services ASHRAE. New Headquarters Building. Peachtree Corners, GA

ConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K

From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process

Continuing Education Credits

Four Project Management Trends: What They Mean to Your Firm TOP 4 PROJECT MANAGEMENT TRENDS & WHAT THEY MEAN TO YOUR FIRM

AIA Continuing Education

Design Build - Project Delivery Model Trends

Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division

WATERTOWN ELEMENTARY SCHOOLS SCHOOL BUILDING COMMITTEE MEETING: OCTOBER 3, 2018

Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013

WE MAKE YOUR HEALTHCARE REAL ESTATE WORK FOR YOU PROJECT DELIVERY METHODS FOR HEALTHCARE CONSTRUCTION

Hindsight is 20/20: Lessons Learned in Courthouse Construction

Project Delivery Selection Matrix If the Project Delivery Approach Fits, Use It

Lease-Leaseback Project Delivery Method

ConsensusDOCS are the only standard contract documents endorsed by 23 leading construction associations Construction Contracts Built by Consensus

ALTERNATIVE CONTRACTING METHODS

Document Synopses by Series

Copyright Materials 11/8/2012. Learning Objectives

Senior ILA, Conwy and Denbighshire. Between 30 & 37 hours per week

Qualifications Based Selection of Contractors

Choosing a Project Delivery Method. A Design-Build Done Right Primer

Project Management. Total Construction. George J. Ritz Sidney M. Levy. Second Edition. Graw. Hill

From View Calculation to Fabrication A Manhattan Residential Project

Discussion. SYMPOSIUM 101 PART II An Overview of the Essential Information You Need to Serve the Healthcare Market

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

Building Information Modeling Exhibit SAMPLE. Document No. E-BIMWD Second Edition, 2010 Design-Build Institute of America Washington, DC

REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS

Best Practices for Exceeding Project Goals and Reducing Risk on Construction Projects

Legal Issues Related to Design Build

Construction Contracting Methods. By: Nick Thornsbury Falcon Engineering

Construction Project Delivery Methods

Outsourcing: Managing Interorganizational Relations

Recent developments in contract procurement models

ECI: Two-Stage Contracts

Integrated Project Delivery

The Efficient Construction Delivery Method

DEFINING THE SPECTRUM OF PROJECT DELIVERY OPTIONS AND THEIR IMPLICATIONS FOR YOUR PROJECT 2017 Airport Construction Strategy Summit

Is Your District Ready For the New Law?

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR

4 BIG TRENDS. Owners Guide to. In Construction Project Delivery And The Technologies They Need To Work

FACILITY PROJECT BIDDING OPTIONS OVERVIEW

Connecting the Pieces: Fundamentals of Modular Building Design

Get the Best Price for Energy with EnerNOC Energy Procurement and Advisory Services

Sounds good. What could possibly go wrong? 5/6/2014. Potential Benefits of Design Build. Potential Downsides of Design Build

Joint Ventures & Teaming Agreements Opportunities 2018 Making Dollars and Sense Selling to the Government

QA/QC and Efficiency Tactics for Design Professionals

CMAA has met the standards and requirements of the Registered Continuing Education Program. Credit earned on completion of this program will be

Construction coordination

Maximizing Success on Integrated Projects: An Owner s Guide. An Overview of the Research and Owner s Guide

Measuring the Impact of BIM in Design-Bid-Build

Construction Family of Documents

Considerations for Mechanical, Electrical and Plumbing (MEP) Engineers Pursuing Design Build Projects

Rice Building Institute September 13, 2007

Design-Build (DB) and Construction Manager / General Contractor (CMGC)

2013 Small & Emerging Contractor Webinar Series. Estimating and Bidding

PREFAB AND MODULAR SYSTEMS A CASE STUDY ON RISKS/REWARDS

Construction Auditing: Where To Start And How to make It Work For Your Organization. Baker Tilly refers to Baker Tilly Virchow Krause, LLP,

Transcription:

2018 Project Delivery Symposium: Delivering the future PROJECT DELIVERY STRATEGIES

This presentation is protected by U.S. and international copyright laws. Reproduction, distribution, display and use of the presentation without written permission of the speaker is prohibited.

This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to constitute approval, sponsorship or endorsement by the AIA of any method, product, service, enterprise or organization. The statements expressed by speakers, panelists, and other participants reflect their own views and do not necessarily reflect the views or positions of The American Institute of Architects, or of AIA components, or those of their respective officers, directors, members, employees, or other organizations, groups or individuals associated with them. Questions related to specific products and services may be addressed at the conclusion of this presentation.

Moderator: Greg Gidez AIA DBIA Director of Design Services Hensel Phelps Panelists: Bennett Greenberg Partner Seyfarth Shaw LLP Ed Hanzel Project Executive LF Driscoll Company, LLC Patrick Duke Managing Director CBRE Healthcare Craig Unger DBIA Principal and CEO of Unger Security Solutions

2018 Project Delivery Symposium: Delivering the Future PROJECT DELIVERY STRATEGIES Bennett Greenberg

Transferred Design Risk In Design-Build Procurements Bridging Wholesale Contract Assignment

Bridging AE1 Owner Design Builder A/E 2 Trader Trades Trades

Why Owners Use It Help Define Progress and Scope Distrust of Design-Build Process Risk Transfer

Downside of Bridging Confusion As to Roles of AE1 and A2 Split Design Liability Increased Costs To Owner

Contract Assignment A/E Owner Design Builder Assignment Can Take Place At Any Stage

Why Owners Use It Need To Get A/E On Board Before Selection of A Design-Builder Risk Transfer

Downside of Contract Assignment A/E and DB Contractor May Not Be A Good Fit A/E Is Serving Two Masters Insurance Considerations

2018 Project Delivery Symposium: Delivering the Future PROJECT DELIVERY STRATEGIES Craig Unger - DBIA

Project Delivery Strategy INOVATION IN DESIGN-BUILD Best Value Integrated Design-Build Progressive Design-Build Design-Build first build the Team then build the Project

Best Value Integrated Design-Build Select Best Design-Build Team Qualifications Based Selection Past Performance with the Best Proposal (solution) Quality Quantity Energy Efficient Durable Sustainable Ease of Maintenance - etc within Budget

Progressive Design-Build Design-Builder selected by Owner early in Project s life Design-Builder selected primarily, if not exclusively, on qualifications Final Project price & schedule commitment is not established as part of the selection process Two phases of work Preliminary design & pre-con services Final design & construction, once the Parties have agreed upon price & other commercial terms

Progressive Design-Build (cont d) Design-Builder collaborates with Owner during Phase 1 to create or confirm Project s basis of design Design-Builder advances design Decisions based on cost, schedule, operability, life cycle & other considerations Ongoing, transparent, cost estimates to achieve budget requirements

Progressive Design-Build (cont d) Formal commercial proposal for Phase 2 Appropriate level of definition, often at 40-60% design completion Dependent on amount of control Owner desires to maintain over design definition & reduction of contingency Phase 2 initiated upon acceptance of commercial proposal

Why Owners Choose Progressive D-B Interest in contracting with Design-Builder very early in design process Complex projects requiring high level of collaboration Site issues: i.e., easements; permitting; ROW s; NEPA; etc Higher degree of cost certainty & transparency during design development Owner wants to remain actively involved in making design decisions Avoids time & expense of Owner creating design baselines for procurement Streamlines & simplifies procurement process

Why Owners Choose -Progressive D-B (cont d) Ability to use early work packages & fast track Removes some of Owner s time pressures in reviewing & acting upon design submittals Allows Owner participation in subcontractor & supplier selection Offers transparency into Design-Builder s proposal cost Provides collaborative way to establish single point of responsibility there is no design handover

Thank You QUESTIONS COMMENTS? Design-Build first build the Team then build the Project

2018 Project Delivery Symposium: Delivering the Future PROJECT DELIVERY STRATEGY Patrick Duke

An Owner s challenge Owner s Capital Project Risk Elements Healthcare Facility Life Cycle Cost Components 87% 13% 0.1% 0.9% 8.7% 3.1% Operations Planning Design Construction Transition

Whole of life delivery concept Decisions in one cost category will impact the others Driving down construction costs can have an adverse impact on long term costs Long term Whole of Life costs instead of first cost construction Good decisions during design process consider Value for Money and best investment approach Results in lower whole-oflife facility cost (the box is smaller)

Risk transfer defines delivery models Level of Risk Transfer Design Build Maintain Operate Finance Own Design Build Multiple Designs + Innovation Design Build Maintain Incorporates Maintenance View Design Build Maintain Operate Innovations Life Cycle costing Design Build Maintain Operate Finance Risk transfer time / cost + availability Design Build Maintain Operate Finance Own Long-term redundancy risk

Culture defines delivery models Relational Versus Transactional Organization Relational Organization Long term strategic approach to business Considers partnerships rather than today s transactions Negotiates in a relational manner Fears only making a poor choice Looks for experts they can trust Promotes a culture of continuous improvement Empowers all levels of organization and supports an up the line philosophy Transactional Organization Reactive and short term approach to business Focused on today s transactions Focuses on the process of negotiation more than the outcomes Fears only paying more than I had to pay or should have paid Considers they have all the experts and answers Hinges every transaction on price Wants to win on their terms only Top down leadership culture PGF IPD IPD Lite CM at Risk Design-Build Hard Bid Capital Project Delivery Model Fit

2018 Project Delivery Symposium: Delivering the future PROJECT DELIVERY STRATEGIES Ed Hanzel

30 Years Delivering Construction Projects First 10 years a mixture of CM GMP and Lump Sum Contracts Last 18 years only CM GMP at Risk Contracts for 2 Health Care Clients Currently on an IPD Team Delivering a Project for one of those Clients

Lump Sum/Hard Bid Can work If: Owner know exactly what they want to build Design Team has the time to fully design and coordinate the contract documents Contractors provide complete & responsible bids But.. Owners make changes thru the process = change orders Design Team time constraints = change orders Competitive Bidding = cut corners and find change order opportunities Constant Contractural and Confrontational Culture

GMP CM At Risk Design and Budget not Collaborative - Check-in s along the way to validate design and budget Value Engineering with rework to fix budget problems Subcontractor input after design User input limited Mockups and BIM occur late in the process Owner the referee for design and construction issues

Integrated Project Delivery Committed and Engaged Owner IPD Agreement with Shared Risk Reward of Owner/Designer/Contractor Jointly Developed Project Cost Target Value Design Process using constant Cost Modeling Innovative tools BIM/Goggles/Mockups and Simulations Target Value Design Process using constant Cost Modeling Subcontractor Involvement Last Responsible Moment for Decisions

Thank You QUESTIONS COMMENTS?