The Construction General Permit and Erosion Prevention and Sedimentation Control

Similar documents
Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

METROPOLITAN UTILITIES DISTRICT No Page: 1 of 10

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Building Better Storm Water Quality

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

E & S Plan Approved. Not required but may be a municipal requirement** Not required but may be a. municipal. requirement** Not required but may be a

SECTION EROSION AND SEDIMENTATION CONTROLS

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Stormwater Management. Cayuga County NY 20 July 2016 Presenter : John B. Zepko, CPESC

Jackson County Environmental Health Department Lansing Avenue Ste. 221 Jackson, MI Phone (517) Fax (517)

GRADING, EROSION AND SEDIMENTATION CONTROL

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

Construction Site Inspections

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

Sediment Control Practices

Diversion Dikes. Fe=0.95

Unit E: Basic Principles of Soil Science. Lesson 7: Understanding Soil Erosion and Management Practices

WAKULLA SITE PLANNING

Earth Dikes and Drainage Swales

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Maine s Land Use Regulations and Erosion Control Techniques

Construction Stormwater Best Management Practices

Recommended Resources: The following resources may be useful in teaching this lesson:

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

Erosion Control Inspection Form

Slash Water Bar Video

SECTION 903 EROSION CONTROL

PART 1 GENERAL REQUIREMENTS

Town of Fortville Utility Street Standards

CCSD#1 Stormwater Standards

Best Management Practice (BMP) Guidance Manual

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENTIAL HOMEBUILDING SITES

4. Ponds and infiltration BMPs can achieve 60 to 100% removal efficiencies for sediment.

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Erosion Control Blankets

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

SECTION EROSION AND SEDIMENTATION CONTROLS

Common Construction-Site BMPs Quick Reference Guide

GRASS-LINED CHANNEL (acre) CODE 840

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

TEMPORARY STREAM DIVERSION

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

CHAPTER 2 EROSION CONTROL

ACTIVITY: Silt Fence ES 14

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY FACT SHEET

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

Single Family Residential Construction Erosion/Sediment Control Standards

Please print or type.

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

D EROSION AND SEDIMENT CONTROL. Table of Contents

Understanding Soil Erosion and Management Practices

Rock Sock (RS) Rock Sock height.

APPENDIX C DURING CONSTRUCTION BMP TABLES

Erosion & Sedimentation Control Policy

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

E. STORMWATER MANAGEMENT

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector

Organic Filter Tubes. Fe= (Depends on soil type)

Erosion and Sediment Control (ESC) Bylaw: Best Management Practices November 2014

Middle Tennessee State University (MTSU) Stormwater Plan Review Checklist

Wildfire Recovery PROTECTING YOUR PROPERTY FROM SOIL EROSION

Index. outlet protection Rev. 12/93

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Chapter 2: Selecting Best Management Practices (BMPs)

Permit Application: Soil Erosion and Sediment Control Program

How Climate Change Impacts Urban Runoff and Water Quality Design

Soil Erosion and Sedimentation Control Application Packet 2011

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

Richland County Department of Public Works Engineering (Land Development) Division

Construction Phasing Bad

Appendix B Construction SWPPP Short Form

Non-Vegetative Stabilization

1.2 REGULATORY REQUIREMENTS

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Performance Standards Compliance Checklist

BMP-5. A temporary sediment barrier consisting of a synthetic filter fabric stretched across and attached to supporting posts and entrenched.

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

Suitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion.

Post Construction Erosion Controls

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

EROSION AND SEDIMENT CONTROL

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

SC-01 Surface Outlet and Baffle Sediment Basin

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

IN T R A / M IN T R A M

Transcription:

The Construction General Permit and Erosion Prevention and Sedimentation Control Presented at the Tennessee Gas Association Conference April 23, 2008

More than thirty years ago, two-third of the nation's waters were unsafe for uses such as fishing and swimming.

National Pollutant Discharge Elimination System (NPDES) Program To improve water quality, the National Pollutant Discharge Elimination System (NPDES) Program was established to prohibit the discharge of pollutants through a point source unless covered under a permit.

What is a Point Source? A point source is any discrete conveyance, such as a pipe, ditch, channel, tunnel, conduit or container. Point sources include discharges from sewage treatment plants, industrial activities and vessels.

Non-Point Source Pollution The next step in water water quality protection came when the NPDES Storm Water Program was implemented to specifically address non-point source pollution.

What is Non-Point Source Pollution? Non-Point Source pollution is storm water runoff moving over the ground picking up pollutants and flowing into our rivers, lakes, wetlands and sources of drinking water.

While the impact of an individual nonpoint source may be small, the cumulative effect can kill aquatic life, limit the use of waters for consumption, recreation, and other purposes.

Siltation is the number one non-point source pollutant in our creeks and streams Habitat Alteration 24% Pathogens 22% Sediment 24% Others 1% Pesticides 1% Flow Alteration 1% ph 1% Metals 3% Low DO 7% Toxic Organics 3% Nutrients 12% State s 2006 305(b) report

The effects of siltation currently impact 5,800 stream miles and 18,000 lake acres in Tennessee.

Siltation causes impairment by altering the waters physical, chemical and biological properties.

Siltation also has a significant economic impact due to increased water treatment costs, system maintenance and flooding.

Siltation and the Erosion Process

There are Two Types of Erosion Natural wind, water, ice and gravity slow and continual produces 30% of all sediment in US Accelerated destroys natural vegetation alters contour of the ground produces 70% of all sediment in US

Examples of Erosion: Stream channel erosion is due to increased runoff volume and velocity and removal of natural vegetation resulting in channel degradation and sedimentation.

Examples of Erosion: Shoreline erosion is due to wave action and removal of native vegetation resulting in bank instability and sedimentation.

Examples of Erosion: Overland erosion is caused by land disturbance activities and removal of vegetation. Erosion progresses from sheet, to rill then gulley.

Examples of Erosion: Wind erosion is due to the removal of vegetation resulting in traffic hazards, increased equipment maintenance and nuisance conditions.

Main variables in erosion potential Rainfall Soil Properties Length and Steepness of Slope Vegetation

Rainfall The average amount of rainfall in Tennessee is 48 inches per year. Average volume of rainfall is 1,440,000 gallons per acre (30,000 gallons per acre per inch of water). Hydrologic Cycle

Return Interval A return interval of a 25 year 24 hour storm means the maximum 24- hour rainfall amount with a probable return interval of once in 25 years, or a 4% chance. In Middle Tennessee a 25 year 24 hour storm is 6 inches, and a 100 year 24 hour storm is 7 inches.

Soil Properties Soil size, structure, texture, weight and shape determines erodibility. Soils with high concentrations of silt, fine sand and clay are most susceptible to erosion.

Length and Steepness of Slope The steeper the slope, the faster the water flows and the greater is it s ability to erode soil.

Vegetation Vegetation provides excellent protection against erosion. It shields soil from the rain drop impact, binds soil together and slows run-off velocities.

When You Prevent Erosion, You Have Less Sediment to Control Minimize erosion by absorbing the raindrop impact energy by using temporary and permanent stabilization Slow runoff water down by reducing slope length and steepness, using check dams, diversions, sediment traps, sediment ponds and barriers

Construction Storm Water Permitting The construction general permit (TNCGP) was issued in 1992 to prevent impairment due to siltation Coverage is required for activities with land disturbance greater than 1 acre or less if part of a larger common development

The TNCGP requires implementation, inspection and maintenance of erosion prevention and sedimentation controls during land disturbance activities.

Tennessee s Erosion Prevention and Sediment Control Handbook TENNESSEE EROSION & SEDIMENT CONTROL HANDBOOK A Guide for Protection of State Waters through the use of Best Management Practices during Land disturbing Activities Second Edition March 2002 Handbook provides definition, purpose and design criteria for numerous erosion prevention and sediment controls Controls are divided into Structural and Vegetative

Examples of Common Erosion Prevention and Sediment Controls

Silt Fence Silt fence is a temporary structure constructed of silt fence fabric supported posts Must be installed on contour, trenched, backfilled and compacted Do not install across streams or ditches

Silt Fence Continued

Diversions Use diversions to reduce erosion by reducing slope lengths and steepness Divert storm runoff to a stable outlet at a non-erosive velocity

Diversions Continued: A diversion consists of a ridge and channel Diversion channel should be stabilized appropriately

Erosion Matting and Blankets Matting can be used to stabilize slopes, swales and channels Specify matting type by application and install per manufactures directions

Erosion Matting Continued Matting must be anchored by trenching, anchor slots, stakes or staples Final grade disturbed areas to ensure mat to soil contact

Construction Exit 1.5 to 3.5 inch size stone with a minimum thickness of 6 inches Excavate to a depth of 3 inches A filter fabric must be placed the full length and width of the exit

Construction Exit Continued Knoxville Engineering Department

Stabilization with Mulch Straw, hay or wood chips will reduce erosion or aid in seed germination Implement where construction activities have temporarily or permanently ceased

Stabilization with Seed Select seed suitable to the area and season of the year Seed can be applied by hand, cyclone seeder, drill or hydraulic seeder Track to catch seed and fertilizer in grooves

Questions Thank You. Robert Karesh Storm Water Coordinator Tennessee Department of Environment and Conservation Division Of Water Pollution Control robert.karesh@state.tn.us (615) 253-5402