Thermal Bridge Analysis

Similar documents
Dr.-Ing. Kai Schild. Chair of building physics and building services Univ.-Prof. Dr.-Ing. habil. Wolfgang M. Willems. technische universität dortmund

MASTER THESIS FACULTY OF INDUSTRIAL ENGINEERING CAMPUS GENT

INTERNATIONAL CODE COUNCIL 2009/2010 CODE DEVELOPMENT CYCLE

Thermal Performance of Nvelope NV1 Clip System

Thermal Performance of Nvelope NV1 Clip System

9.36. Energy Efficiency

Building Envelope

Thermal Bridging and Whole Building Energy Performance

Thermal Characteristics of Exterior Building Wall (Above Heritage Building

OPTIWIN MOTURA. Technical Description. Synopsis:

Is Your Envelope Effective? BCBEC Luncheon January 29, 2009

Thermal Bridging From Cladding Attachment Strategies Through Exterior Insulation

Local Temperature Measurements on Full-Size Systems in the Laboratory: Insight into the Extent of Thermal Bridges in Building Envelope Components

ENCLOSURE SOLUTIONS THERMAL BRIDGING GUIDE FIBERGLAS FOAMULAR THERMAFIBER

Guidance on U Values from Domestic Heating Design Guide

3-Dimensional Thermal Analysis of Lenmak EnvaTherm and SpandrelTherm Backpan Assemblies

Armatherm Structural Thermal Bridging Solutions

Certification Report

NBC Calculator Tool Manual

PART 1 BUILDING ENVELOPE THERMAL ANALYSIS (BETA) GUIDE

DYNAMIC EFFECT OF THERMAL BRIDGES ON THE ENERGY PERFORMANCE OF RESIDENTIAL BUILDINGS IN BC. Fuad Baba*, Hua Ge

Building Design Data

Bridging on Building Envelope Performance. A Whole Building Energy Perspective

Unitised Curtain Wall Beaded

OPTIWIN PURISTA. Technical Description. Synopsis:

Break it, or Lose it: Thermal Bridging in Building Envelopes

2017 SeaBEC Symposium. Advancing Building Enclosures Beyond Code Conformance. Medgar Marceau, PE Principal, Senior Building Science Engineer

The Importance of Slab Edge & Balcony Thermal Bridges

NATIONAL GYPSUM COMPANY 3-Hour Area Separation Wall System

Light steel frame walls

Thermal bridge calculation for the certification of the window frame PROGRESSION as a suitable component for Passive Houses

2010 National Building Code Adoption and Associated Process Changes

Specifications for Insulation Board wall and ceiling applications

kwh(m2a) U-Value Floor Primary Energy W/(m2K) Renewable 48 kwh/(m2a) U-Value Roof Generation of W/(m2K) renewable energy

THERMAL PERFORMANCE CALCULATION. Analysis undertaken and report prepared on behalf of XXXXXXX for. XXXXXXX

Certified Thermal Details and Products Scheme

Table 1. Insulation Type and R-Values. Avg. R-Value Per Inch (h*ft 2 *deg F/Btu*in)

Thermal Control Layers: Insulation Materials and Systems

OUTLINE. Building Envelope Thermal Bridging Guide. High Level Overview and Themes. The Code Context. The Energy Context. Where do we go from here?

Available online at ScienceDirect. Energy Procedia 78 (2015 ) th International Building Physics Conference, IBPC 2015

APPENDIX DETAIL (1) INSULATION HAS 3-INCH TOP INSPECTION GAP AND EXTENDS 24 INCHES BELOW GRADE

Energy Efficiency For Housing

Blast Resistant Enhanced Curtain Wall. Reference Brand: Sapa Building System Elegance 85PF GENERAL DESCRIPTION PERFORMANCE

Using Thermal Modeling to Evaluate Cladding Support Systems

The Concept of Linear and Point Transmittance and its Value in Dealing with Thermal Bridges in Building Enclosures

NATIONAL GYPSUM COMPANY 2-Hour Area Separation Wall System

Thermal Performance of Northern Facades ISO Clip System Summary

Guidelines for Using HOT2000 with the Performance Path of the 2010 National Building Code of Canada Subsection

WHOLE-WALL R-VALUES IAN R. COX-SMITH

Energy equivalent R-value

Thermal Analysis of CL-TALON Cladding Support System

Acceptable Construction Details, Thermal Bridging and Air Permeability. Sean Armstrong, Technical Adviser, Building Standards, DEHLG

Curtain Wall Stick System (Capped)

Welcome to this continuing education seminar. This is the second of three parts of the Building Enclosure Fundamentals series.

2006 Building Science Press All rights of reproduction in any form reserved.

Manitoba Energy Code for Buildings. Part 3 Building Envelope

Design No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1

Warm climate - Passivhaus system

1.1 BUILDING DESCRIPTION:

Supplementary Standard SB-12. Energy Efficiency For Housing

Cool temperate climate - Passivhaus system

Energy Efficiency For Housing

Welcome to this con-nuing educa-on seminar. This is the second of two parts of the High-Performance Building series.

Plan /Submission Requirements

THERMAL BRIDGING CALCULATIONS AND IMPACTS

Supplementary Standard SB-12. Energy Efficiency For Housing

ASHRAE Research Project Report RP-1365

Heat & Temperature. Heat Flow. Heat Flow. Overview. Why control heat flow? Dr John Straube Presentation 1. Insulation and Beyond:

ISO INTERNATIONAL STANDARD. Thermal performance of buildings Heat transfer via the ground Calculation methods

Passive House Solutions Guide

NSAI Agrément. Form Title WEP AUDIT REPORT Reference F-IAB-031 Page Page 1 of 10 Revision. NSAI Approved Thermal Modellers Scheme

Concrete Faced Insulated Perimeter Wall Panels. Durability. Sustainability. Energy Efficiency. Durable Finish & Superior Insulation in One Easy Step

Thermal Control in Buildings by John Straube (updated )

Zero Energy Ready Home Training

System WV410 Storefront Window System

URSA TF Roll URSA GLASSWOOL.

Energy Efficiency Requirements 9.36

Thermal Laminate Board.

1. PREINSPECTION RESIDENTIAL ENERGY EFFICIENCY 7

A handbook of thermal bridging details incorporating Porotherm blocks

Technical presentation

June Residential New Build Timber Frame Walls

Thermal optimization of curtain wall façade by application of aerogel technology

Curtainwalls. Brussels Window. Objectives. Windows & Curtainwalls. Curtainwalls. 1 R2 R3. High tech? Low tech?

Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)

Insulation - History. Heat Flow, in 2 and 3 D. Insulation - History. Insulation - History

Faculty of Heat and Material Transfer Rheinisch-Westfälische Technische Hochschule, Aachen Professor R. Kneer (Dr. Ing)

# +,, - - -!! " #$!! % &! ' (! ) % * *! & &

THE EFFECT OF WINDOW-WALL INTERFACE DETAILS ON WINDOW CONDENSATION POTENTIAL

ROCKWOOL FLEXI Insulation Application Guide

Deer Ridge Consulting, Inc.

Technical note 2012/03 Complex bridging

WASHINGTON STATE ENERGY CODE, APPENDIX CHAPTERS

Insulation - Products

GAF EnergyGuard Polyiso Wall Sheathing

6 th INTERNATIONAL CONFERENCE

Building Regulations for the Conservation of Fuel and Power

PASSIVE HOUSE OBJECT DOCUMENTATION

ThermaSteel Corporation ASSEMBLY MANUAL

Window Standards Compared:

Transcription:

Thermal Bridge Analysis

Basics of the Modeling The definition of the calculation model according to the Standards consists of 3 parts: Geometry Materials Boundary Conditions

Model: Geometry Using flixo: either by DXF-Import, by connecting predefined components or by drawing directly inside flixo To check The model must be large enough, cut-off planes should be positioned concerning the central element as follows (EN ISO 10211): In general at least 1 meter or if the thickness of the flanking element is greater than 33 centimeter, 3 times of the thickness of the flanking element At the line of symmetry, if one is present Omit the cladding and the air layer if the air layer is well ventilated (EN ISO 6946)

Model: Geometry Using flixo: either by DXF-Import, by connecting predefined components or by drawing directly inside flixo PHI recommendations: Length of components should be 4 5 x width, when measured using exterior dimensions Some components (with steel and concrete especially) may need even longer lengths. The goal is to achieve stable isotherms before they reach the cutoff plane. Inserting a cut off plane before isotherms have achieved a stable pattern introduces error.

Model: Materials Using flixo: either by Drag & Drop materials from the material database or the material list or using the «Assign Property»-Tool PHI recommendations: For unventilated air layers, use the still air U value calculator built into PHPP U values tab. Or use the database contained in Flixo (organized by direction of heat flow and offering large range of thicknesses)

Model: Materials Using flixo: either by Drag & Drop materials from the material database or the material list or using the «Assign Property»-Tool To check Proper «Air»-Material: Air cavities: equivalent conductivities according to EN ISO 10077-2 Air layers: equivalent conductivities according to EN ISO 6946 Well ventilated air layers: boundary conditions according to EN ISO 6946 Fillings of glazing: equivalent conductivities according to EN ISO 673 or by using the glazing wizard

Model: Boundary Conditions Using flixo: Defining the start points by using the «Boundary Condition»-Tool. The boundary conditions will be applied counter clockwise up to the next start point The boundary conditions depend on the type of analysis 1) Energy balance calculation (e.g. Uf-value, Psi-value) 2) condensation risk analysis

Model: B.C. for Energy Balance Calculation Surface resistances R si / R se [m 2 K/W]

Model: B.C. for Condensation Risk Analysis Surface resistances R si / R se [m 2 K/W] Note: These surface film resistances change if conducting a condensation risk analysis (f rsi )

Model: B.C. for Energy Balance Calculation Surface Temperatures for modeling constructions Exterior temperature: 10 Celsius (14F) Interior temperature: 20 Celsius (68F) Surface Temperatures for modeling windows Exterior temperature: 0 Celsius (32F) Interior temperature: 20 Celsius (68F) Note: The different BC temperatures can cause some headaches when calculating psi install values for windows. Must use surface temperatures for modeling constructions, but heat flux for the window may have been calculated with 0C exterior. If so, window heat flux needs to be recalculated at 10C.

U-Value: Periodic Thermal Bridges The influence of periodic thermal bridges are considered in a special U-value: equivalent U-value Φ Δ Φ Δ Recommendation: Calculate a U eq for any inhomogenous layer (that is, a layer interrupted by periodic thermal bridges studs, rafters) Using flixo: U eq -value object (U-value tool) Click 1 and click 2: start- and end point of the internal or external surface counter clockwise > Click 3: position of the dimension line

U-Value: Periodic Thermal Bridges PHI recommendations: For most of the inhomogenous layer, use a different material representing a combination of studs and insulation, with a lambda value calculated using U eq Only insert the actual periodic bridging elements at the intersection/junction

U-Value: Periodic Thermal Bridges Recommendations: U eq calculation for inhomogenous layer To create this model: 1) Use one bay width, with stud centered 2) End BCs are adiabatic 3) Assign one side interior conditions (20C), the other exterior ( 10C) 4) Make sure the surface film resistances are set to 0!

U-Value: Periodic Thermal Bridges Recommendations: Once U eq is known, calculate lambda value for the inhomogenous layer. U eq x thickness (m) = λ Go back to the TB model and create a new material with this lambda value.

-Psi value calculation: Above grade junction Note: Flixo needs homogenous layers to calculate the U values used in its psi value calculation.

-Psi value calculation: Ground Calculation according to EN ISO 10211 Often several 2dimensional calculations are needed Often the U-value of the base constructions are unknown or can t be applied 3 standard cases No Cellar Unheated cellar Heated cellar

-Psi value calculation: Ground Calculation according to EN ISO 10211 Often several 2dimensional calculations are needed Often the U-value of the base constructions are unknown or can t be applied 3 standard cases Not covered today: No Cellar Unheated cellar Heated cellar

-Psi value calculation: Ground Here s the problem: What is the U value of the ground?

-Psi value calculation: Ground 2 thermal bridge calculations are needed 1. Heat flow through the slab + ground alone (this allows determination of the ground effect) 2. Heat flow through the complete construction (slab + footing + wall + ground) (this allows determination of the thermal bridge effect)

-Value calculation: Ground, no cellar Model 1 Calculation The heat flow through the floor without thermal bridge effect has to be calculated in a separate 2dimensional calculation just the slab plus ground This model is built using slab and insulation thickness as designed, but placed on top of the ground block. The edges are given adiabatic BCs, so all heat flow is to the ground. All elements of the footing or thickened edge are removed.

-Value calculation: Ground, no cellar Model 2 Calculation 2nd model is built showing the complete junction. Rather than using a U value for the slab, Flixo uses the heat flux calculated from the first model. A-E-C, * = T - T - U 2 b 2 = 50.498 30.000-33.935 30.000-0.278 1.410 = 0.160 W/(m K)

Model: Ground - Geometry 4m 20m Recommendations: For most models, dimension b = 8m is acceptable 4m is then the exact distance from the edge of the slab insulation to cut off plane 20m x 20m is the size of the ground block 20m

Model: Ground - Geometry b: effective floor dimension if known, 8 meter if the floor dimension is unknown or greater than 8 m

Model: Ground - Material, B.C. Material -value of soil is 2.0 W/mK, if no other values are known (EN ISO 10211) Temperatures External Temperature Surface temperatures: -10 C Interior Temperature Surface temperatures: 20 C Surface Resistances Adiabatic condition applies to all cut-off planes and edges of ground block (except top) Top of ground block is standard Rse - 0.04 Interior and exterior surface resistances of the assemblies as normal

Model: Interior footing Linear footings away from perimeter For interior footings, ground block is not modeled. BC on bottom of insulation is 10 C, with no film resistance. 88.58 A-B = 5.201 W/m 88.58 B D U - = 0.117 W/(m 2 K) U - = 0.117 W/(m 2 K) E 19 19 17 17 15 15 11 13 11 13 A C C-G-D = T - U 1 b 1 - U 2 b 2 = 5.201 10.000-0.117 2.250-0.117 2.250 = -0.005 W/(m K) Post footings away from perimeter Modeled same as the linear footing, but entered in PHPP with length of 1m

Model: Frame Geometry: Uf-Value Calculation, -Value Wall-Frame Replacing glazing by insulation panel (EN ISO 10077-2) d: effective thickness, if the frame is designed for a specific thickness, 24 mm for double glazing, 36 mm for triple glazing otherwise

Model: Frame Geometry: Uf-Value Calculation, -Value Wall-Frame Replacing glazing by insulation panel (EN ISO 10077-2) Notes: To calculate U f and install : Solid glazing panel always used instead of glass. Glazing panel λ = 0.035 Length of panel has to be at least 190mm starting from the sightline Thickness of panel = actual thickness of glass. Or 36mm for triple glazing, if unknown.

Model: Frame Boundary Conditions: Uf-Value Calculation, -Value Wall-Frame Temperatures > T i =20 C, T e =0 C Resistances > Internal > Normal (R=0.13 m 2 K/W) (shown in red) > Reduced radiation/convection (R=0.20 m 2 K/W) (shown in yellow) > External (R=0.04 m 2 K/W) (shown in blue) Note: Exterior temperature for U f calculation = 0 C Exterior temperature for install calculation = 10 C

Model: Frame - Cavities Unventilated cavities > Completely closed > Slits 2 mm Slightly ventilated cavities > Slits between 2 mm and 10 mm Well ventilated cavities and grooves > Slits greater 10 mm Note: Flixo will automatically detect type of cavity and assign associated properties accordingly

Model: Frame - Cavities Determining factors > Geometry of the cavity > Temperature distribution in the cavity and on the cavity surfaces > Emissivity of the surfaces

U f -Value: Frame U f -value according to EN ISO 10077-2 Material [W/(m K)] Aluminium (Si Alloys) 160.000 0.900 EPDM (ethylene propylene diene monomer) 0.250 0.900 Elastomeric foam, flexible (1) 0.050 0.900 Panel 0.035 0.900 Silicone, pure (1) 0.350 0.900 Slightly ventilated air cavity Softwood 500, typical construction timber 0.130 0.900 Unventilated air cavity Boundary Condition q[w/m 2 ] [ o C] R[(m 2 K)/W] Epsilon 0.9 0.900 Exterior, frame 0.000 0.040 Interior, frame, normal 20.000 0.130 Interior, frame, reduced 20.000 0.200 Symmetry/Model section 0.000 - = -5.392 W/m A 191.50 122.60 U - = 0.649 W/(m 2 K) U f x b f + U p x b p = φ/δt Using flixo: U f -value object (U-value tool) > Click 1: Select the result object > Define the width of the frame b f > Flixo calculates U p and φ, then solves for U f B U f A,B = T - U p b p b f = 5.392 20.000-0.649 0.192 0.123 = 1.19 W/(m 2 K)

install value 2 thermal bridge calculations are needed 1. Heat flow through the frame + glazing panel alone (at -10C) 2. Heat flow through the complete construction (wall + frame + panel) with the same boundary conditions

install value B Material [W/(m K)] Aluminium (Si Alloys) 160.000 0.900 EPDM (ethylene propylene diene monomer) 0.250 0.900 Elastomeric foam, flexible (1) 0.050 0.900 Panel 0.035 0.900 Silicone, pure (1) 0.350 0.900 Slightly ventilated air cavity Softwood 500, typical construction timber 0.130 0.900 Unventilated air cavity Boundary Condition q[w/m 2 ] [ o C] R[(m 2 K)/W] Epsilon 0.9 0.900 Exterior, normal -10.000 0.040 Interior, frame, normal 20.000 0.130 Interior, frame, reduced 20.000 0.200 Symmetry/Model section 0.000 A-B = 8.1 W/m Model 1 Calculation The heat flow through the frame + glazing panel Exterior BC is now -10C Flux value is higher A

install value Model 2 Calculation 2nd model is built showing the complete junction (wall + frame + panel). Rather than using a U value for the frame + panel, Flixo uses the heat flux calculated from the first model. 314.10 1028.70 012 A B E 16 18 18 Material [W/(m K)] Aluminium (Si Alloys) 160.000 0.900 EPDM (ethylene propylene diene monomer) 0.250 0.900 Elastomeric foam, flexible (1) 0.050 0.900 Fiberglass batt Lambda 0.044 0.044 0.900 Gypsum plasterboard (1) 0.250 0.900 Panel 0.035 0.900 Plywood Lambda 0.12 0.120 Silicone, pure (1) 0.350 0.900 Slightly ventilated air cavity Softwood 500, typical construction timber 0.130 0.900 Boundary Timber 450 kg/m3 Condition (softwoods) q[w/m 2 ] [ o C] R[(m 0.120 0.900 Unventilated air cavity Epsilon 0.9 0.900 XPS Lambda 0.029 0.029 Exterior, normal -10.000 0.040 Exterior, ventilated, horizontal -10.000 0.130 Interior, frame, normal 20.000 0.130 Interior, frame, reduced 20.000 0.200 Interior, heat flux, downwards 20.000 0.170 Interior, normal, horizontal 20.000 0.130 Symmetry/Model section 0.000 A-C = -14.161 W/m U - = 0.168 W/(m 2 K) A-E-C, * = T - T - U 2 b 2 C -8-4 0 4 8 10 14 18 D = 14.161 30.000-8.060 30.000-0.168 1.029 = 0.030 W/(m K)

-Psi value calculation: Reference Point Exterior Corner Exterior Reference Point > Choose the reference point based on exterior dimensions > Exterior dimensions should be taken from the outside face of thermal envelope > Flixo will automatically measure from the cut-off planes to the reference point. -9-9 18 18 Interior -9-6 0 6 15-9-6 0 6 15

-Psi value calculation: Reference Point Interior Corner -9 0 3 6 9 15 18 Reference Point > Choose the reference point based on exterior dimensions > Exterior dimensions should be taken from the outside face of thermal envelope > Flixo will automatically measure from the cut-off planes to the reference point. Exterior -9-9 0 6 12 15 18 Interior

-Psi value calculation: Reference Point Parapet Exterior Reference Point > For parapet TB, do not include any part of the parapet above the top surface of the roof s thermal boundary -8 0 6 10 16 Interior 0 10

-Psi value calculation: Reference Point Perimeter Exterior Interior Reference Point > For perimeter TB, do not include any part of the footing below the lowest surface of the slab s thermal boundary

-Psi value calculation: Reference Point Rim joist -9 0 6 9 15 Reference Point > For rim joist, position of the reference point doesn t matter much if the two wall assemblies are the same. Exterior Interior -9 0 6 9 15

-Psi value calculation: Reference Point Rim joist -90 6 15 Reference Point > For rim joist with two different assemblies, the reference point needs to be aligned according to the assembly dimensions used in PHPP. Exterior Interior Notes: Does the above grade wall extend to here in PHPP? -90 15

-Psi value calculation: Reference Point Rim joist -90 6 15 Reference Point > For rim joist with two different assemblies, the reference point needs to be aligned according to the assembly dimensions used in PHPP. Exterior Interior Notes: Or here? -90 15

-Psi value calculation: Reference Point Windows 012 Reference Point > For the window install psi value, the reference point is aligned with the bottom of the window frame, even if the frame is overinsulated. Exterior 16 18 18 Interior -8-4 0 4 8 10 14 18

Model: Standards Thermal Bridge, Model EN ISO 10211 (geometry, mesh, accuracy, ground) EN ISO 10077-2 (frame U-value, edge -value) EN ISO 12631 (Ucw-value, 3D elements like screws) Materials EN ISO 10456 (general materials) EN ISO 6946 (air layers) EN ISO 10077-2 (frame) EN ISO 673 (filling of glazing) Boundary Conditions EN ISO 6946 (general) EN ISO 13788 (mold, condensation) EN ISO 10211 (ground) EN ISO 10077-2 (frame)

-value: Spacer 2 calculations are needed a) U f -value calculation with insulation panel instead of glazing b) Heat lost calculation with glazing and spacer T U f b f U g b g Using flixo: Psi-value Edge (context menu) > Click 1: selection of the result object > Select the file with the U f -value calculation