International Power s CCS Initiatives.

Similar documents
THE DEVELOPMENT OF A VERSATILE IGCC TO MEET THE UK MARKET

Adoption of USC CFB Technology to Achieving Lower Cost Generation and Environmental Sustainability. Gerd Heiermann & Douglas Spalding

Impact of novel PCC solvents on existing and new Australian coal-fired power plants 1 st PCC Conference, Abu-Dhabi

Panel II Jänschwalde Oxyfuel demonstartion plant.

Oxyfuel Combustion R&D Activities

- The Osaki CoolGen Project -

Advanced Coal Power Plant Water Usage

MIT Carbon Sequestration Forum VII Pathways to Lower Capture Costs

Carbon (CO 2 ) Capture

Techno-Economic Evaluation of. with Post Combustion Capture

COAL WATER SLURRY FUEL Alternate Fuel for Thailand

IEA Clean Coal Centre.

The WTA technology An advanced method of processing and drying lignite

Review of. for Power Generation Industry

MODERN COAL-FIRED OXYFUEL POWER PLANTS WITH CO 2 CAPTURE ENERGETIC AND ECONOMIC EVALUATION

Coal Combustion Plant with Carbon Dioxide Capture and Storage.

Advances in Brown Coal Power Generation

Callide Oxyfuel Project Development and Progress

Power Generation: A Continued Role for Coal?

The Progress of Osaki CoolGen Project

Oxy-Coal for Electric Power Generation: Status and Prospects

CO2 Capture - Technicalities of attaching a capture plant to Eskom s power stations

Majuba Underground Coal Gasification

Efficiency Improvement and Biomass. Robin Irons

DEVELOPMENT OF HITACHI OXY-COMBUSTION TECHNOLOGY WITH NEW TYPES OF BURNER AND FLUE GAS RE-CIRCULATION SYSTEM

World Bank Energy Week

Update on CCS Project in the Tees Valley.

The current state of oxy-fuel technology: Demonstrations and technical barriers

Circulating fluidized bed technology for utility-scale lignite power plants

Perspectives for an Economic and Climate Friendly Power Generation

Post-Combustion Capture (PCC) R&D and Pilot Plant Operation in Australia. IEA GHG 11th Post Combustion CO 2 Capture Network Meeting

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

Drying of High-Moisture Coals For Power Production & Gasification

Power Engineering II. Technological circuits of thermal power plants

Babcock Borsig Steinmüller GmbH. Bełchatów - Retrofitting the EU s Largest Power Plant Site

PB GPA presentation. Overview of recent studies for the Electricity Commission 16 th October 2009

CO 2 Capture and Storage: Options and Challenges for the Cement Industry

INTEGRATION OF A NEW CCGT PLANT AND AN EXISTING LNG TERMINAL AT BARCELONA PORT Abstract ID Number: 155

Electricity Generation Technology Overview

From clean coal power plants to the zero emissions power plants: 10 years of experiences of ENEL

Creating the Future of Coal-Fired Power Generation

sco 2 Cycle as an Efficiency Improvement Opportunity for Air-Fired Coal Combustion

Chilled Ammonia Technology for CO 2 Capture. October, 2006

Meeting the Challenge of Climate Change

CO 2 Capture. John Davison IEA Greenhouse Gas R&D Programme.

Oxyfuel the way forward and the drivers

CLEAN COAL TECHNOLOGIES, CHALLENGES AND FUTURE SCOPE

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION

2. TECHNICAL DESCRIPTION OF THE PROJECT

Water-Saving Technologies for Coal-Fired Power Plant N. HU, Y.F. PEI

How Green Can Brown Coal Be? Thursday 19th April, 2012, 1.00pm with lunch in the Legislative Council Committee Room

Development of Integrated Flexi-Burn Dual Oxidant CFB Power Plant

CHAPTER 8 CONCLUSIONS

8 th SGC International Seminar on Gasificaton October 15 th -16 th, 2014 Malmö, Sweden

The challenges in drying and use of dried lignite

Oxyfuel CFB Combustion discussion on challenges for development

A New Age for Coal with CCSU

NTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013

Overview of HELE coal combustion technologies. Dr Andrew Minchener OBE General Manager IEA Clean Coal Centre

ESKOM S UNDERGROUND COAL GASIFICATION PROJECT. Eskom s Clean Coal Programme

Clean Coal Technology

Carbon Capture Options for LNG Liquefaction

Role for coal in a cleaner world

JOINT STATEMENT ON THE CHP DIRECTIVE

Future of Coal in America Update on CO 2 Capture & Storage Project at AEP s Mountaineer Plant

Coal power generation technology status and future requirements

Towards New Milestones In CFB Boiler Technology CFB 800MWe

nat Presentation Title ( Arial, Font size 28 ) Control of Sulphur Dioxide, Oxides of Nitrogen and Mercury Date, Venue, etc..( Arial, Font size 18 )

BU Power Generation Energy efficiency presentation PSPG Services

Circulating Fluidized Bed Technology for Large Scale Power Generation Using Coal and Petroleum Coke

Available online at Energy Procedia 4 (2011) Energy Procedia 00 (2010)

Fighting against the carbon challenge sequestration and new coal burning technology

State of the art CFB technology for flexible large scale utility power production

Happipoltto. Arto Hotta Foster Wheeler Energia Oy. CCS Seminaari Hanasaari, Espoo

Gasification Combined Cycles 101. Dr. Jeff Phillips EPRI

Development of High Efficiency CFB Technology to Provide Flexible Air/Oxy Operation for Power Plant with CCS FLEXI BURN CFB

Foster Wheeler BFB Boilers Licensee Expertise for Brazilian Markets. October 29, 2014

Particulate Control in the Power Industry

Mitigating carbon penalties clean coal technologies and carbon dioxide capture and storage

Circulating Fluidised Bed Technology for Indian and other coals Dr John Topper IEA Clean Coal Centre, London

Stephen Nelson COO. Longview Power, LLC

CHEM 103: Chemistry in Context

Toshibaʼs Activities in Carbon Capture

Techno-Economic Assessment of Oxy-Combustion Turbine Power Plants with CO 2 Capture

Environmentally Sound Technology Biomass Fuelled Energy Plants. Combined Heat and Power Supply. Biomass Fired Steam Generator

Commercialization of Clean Coal Technology with CO2 Recovery

Integration and Onsite System Aspects of Industrial Post-Combustion CCS

Combined Cycle Gasification Plant

High Efficient Cogeneration in Seshasayee Paper -Erode

Oxy-fuel combustion integrated with a CO 2 processing unit

HOW PYROLYSIS WASTE TO ENERGY WORKS

A Technology in Transition. John Topper

Japanese Strategy for CO Reduction

COAL-FIRED POWER PLANT PLANNING ASSUMPTIONS

Foster Wheeler Energia Oy P.O.BOX 201, FI Varkaus, Finland

High efficient multi-fuel CYMIC concept for biomass, rejects and coal for Hamburger Hungaria Katriina Jalkanen Valmet Technologies Oy

Capture 3 Post-Combustion Capture

What we need to know about Coal : the view of a Utility Ian Wright, Fuel Procurement Officer Robert Ghent, Performance Engineer

Samcheok Green Power 4 x 550 MW e Supercritical Circulating Fluidized-Bed Steam Generators in South Korea

Stanwell Corporation Queensl Government owned power generator Set world benchmark for automation of coalfuelled power stations in 1993 Built Australia

Transcription:

The Coal Research Forum. 18th Annual Meeting and Advanced Power Generation Divisional Meeting. Zero Emissions Power Current Developments. Rugeley Power Station, Wednesday 20 th June 2007 International Power s CCS Initiatives. Andrew Sinclair Operations and Engineering 1

About International Power 1990 National Power created out of the break-up of the CEGB by the privatisation of the UK electricity industry. 2000 Demerged UK generation and retail business from National Power as Innogy (now RWE npower) and renamed company International Power (IPR). 2007 40 operational assets in 19 countries, 34 GW gross with three additional plants under construction in the Middle East. In the UK, International Power own and operate 4 GW net of generation with plants at Dinorwig, Ffestiniog (pumped storage), Deeside, Saltend (CCGT), Indian Queens (OCGT), Derwent (CoGen) and Rugeley (Coal). 2

International Power Coal Fleet Operational Rugeley, UK 2 x 500 MW units operational 1970 Pego, Portugal 2 x 314 MW units operational 1993 Opatovice, Czech Republic 6 x 60 MW units Paiton I, Indonesia 2 x 615 MW units operational 1999 Hazelwood, Australia 8 x 200 MW units operational 1964 Loy Yang B, Australia 2 x 505 MW units operational 1993 Coleto Creek, USA 1 x 632 MW unit operational 1980 Under development Paiton III, Indonesia 1 x 800 MW supercritical Mmamabula, Botswana 3 x 900 MW supercritical 3

IPR - Carbon Reduction Review Biomass co-firing Immediate CO 2 reductions, rapid implementation. Rugeley 2003 2006, commercial scale installation. Hazelwood 2005 2006, pilot plant and small-scale commercial. Cycle optimisation Immediate CO 2 reductions, short-term implementation. Hazelwood 2030, new turbines, flue gas heat recovery and coal drying. Rugeley 2008, new HP turbines. Dedicated Biomass Reduced CO 2, new generation. IPR Opatovice, 100MWe CFB with 100% biomass capability. Biox, developing portfolio of small-scale bio-fuel generating plant. Post Combustion CO 2 Capture. Hazelwood 2030, 25tpd pilot plant with 16tpd chemical sequestration. Investigating cryogenic separation of CO 2 using LNG regasification facility integrated with CCGT. Other: 34% owner of the ISAB IGCC in Italy (refinery residues rather 4

International Power, Hazelwood Hazelwood Power Station Latrobe Valley, Victoria, Australia. 1,635 MW gross 8 x units (non-reheat) Brown coal supplied by integrated open cast mine 5

Hazelwood 2030 Project Package of CO 2 reduction measures at Hazelwood Power Station, Victoria, Australia. Part-funded through Australian Federal and State grants. Cycle optimisation on earliest two units (1964 and 1966), including new turbines and installation of feed heating surface after the precipitators (replaces HP heaters removed due to reliability problems in early 90 s). Retrofit of pre-combustion coal drying to the oldest unit [RWE developed WTA process] and installation of new low-nox burners with over-fire air and flue gas recirculation sized for 50% BMCR heat input. 25 tpd post combustion capture, to be run on commercial basis, with possible expansion to 50 tpd. Includes 16 tpd sequestration in calcium carbonate. 6

Hazelwood 2030 Why Hazelwood? Greenhouse Intensity 1.549 te CO 2e / MWh s.o. Oldest of the Latrobe Valley Base Load Stations with Unit 1 commissioned in 1964. Small, relatively inefficient, units (200MWe, 28% cycle efficiency LHV basis), requiring significant ongoing investment. Various forward curves suggests new base-load generation required early to mid next decade. Legislative environment will require 0.8te CO 2e /MWh s.o. or better. Current clean coal technologies such as IGCC not commercially proven for low-ranked coals (61 68% water total moisture content). 7

Hazelwood 2030 Objectives Part 1 Demonstrate and commercialise the technologies required for the next generation of reduced-carbon, baseload lignite generation (0.7 0.8 te CO 2e /MWh s.o.) when combined with ultra-supercritical technology. Demonstrate Carbon Capture technology on a commercial basis Demonstrate that the technologies can be retrofitted to existing stations, so as to facilitate immediate large-scale reductions. Reduce CO2 emissions by > 10.0Mt per annum, for the Australian stationary generation sector, by 2020 (assuming that the technologies are taken up, subject to commercial drivers being in place). 8

Hazelwood 2030 Objectives Part 2 Unit 1: Reduction in G.I. - 21% from current for 50% dried coal retrofit [100% dried coal retrofit would give Unit G.I. of 1.20 te CO 2e / MWh s.o.] Unit 1: Increase in cycle efficiency 7.5% (LHV). Unit 1: Additional Output 15MWe. ** Unit 2: Reduction in G.I. 15% from current. Unit 2: Increase in cycle efficiency 4.5% (LHV). Unit 2: Increase in Output 20MWe. ** ** New output is available through-year due to improved condenser performance, reduced fouling and increased fan margin. 9

Hazelwood 2030 Schedule Limited Notice to Proceed (LNTP) for early start Q2 2007 Extensive coal testing: (1,500te) December 2006 - Jul 2007 CO2 capture plant: Operating by Q2 2008 WTA Design Issued: April 2008 Unit 2 outage: May Jul 2009 Unit 1 outage: Aug Nov 2009 Unit 1 commissioning: Sep Nov 2009 Optimisation: Nov 2009 Jan 2010 Full maintenance cycle: Dec 2009 to Dec 2012 Desktop studies for ultra-supercritical application Preparation for new baseload plant to commence in 2009/10 (permitting, consortium & technology selection) 10

Hazelwood 2030 Scope of Work Turbine - replacement of existing turbine with new two-cylinder machine; HP and combined IP/LP (Units 1 & 2). Installation of HRSG style finned-tube heat exchanger between precipitator and chimney (Units 1 & 2). Installation of 70 tph evaporative capacity WTA coal drying system, sized to provide 50% of the BMCR heat input (Unit 1 only). Installation of 6 low NOx PF burners, supplied from dedicated PF silo, sized for 50% BMCR and used for start-up via integral LPG torches [6 out of 8 existing ROM coal burners retained, sufficient for at least 80% BMCR]. 11

WTA Fine Grain Coal Drying Raw Coal >60% moisture Milling - Fine grinding Vapour-ESP Vapour to Atmosphere (or potential condensation) 0-2 mm Circulation Cyclone Heating Steam from ST Dryer Circulation Fan Dried Coal Fuel to Boiler TBK-Cooler Condensate to DA 12

Carbon capture project. CO 2 capture using BASF MEA process. Slipstream capacity for 50 te/day with first process stream rated at 25 te/day. Approximately 16 te/day sequestered as limestone in PFA via reaction between CO 2 and calcium hydroxide in wet ash system purge water. Remaining production sold for industrial use. 13

Hazelwood 2030 vision. To demonstrate a package of improvements that will deliver a clean coal pathway through a combination of new-build ultra-supercritical base-load generation and the retrofit of existing assets. To continue to utilise the abundant, but high moisture, brown coal within the Latrobe Valley (~100 billion te). Thus ensuring continued availability of cost-competitive generation for Eastern Australia, whilst significantly reducing emissions. To provide a realistic alternative to IGCC in the near and medium term. 14

Hazelwood 2030 Post Project Phase 1 - Roll-out of pre-combustion coal drying to Units 2 to 4. Phase 2 - Hazelwood Unit 9 800MWe ultra-supercritical unit with pre-combustion coal drying. Phase3 Demolition of existing units 7 & 8 (Stage 4) and construction of Unit 10 800MWe ultra-supercritical unit with pre-combustion coal drying. Phase 4 Roll-out of technology to other Latrobe Valley generators. Phase 5 - Demolition of existing units 5 & 6 (Stage 3) and construction of Unit 11 800MWe ultra-supercritical unit with pre-combustion coal drying. 15

Hazelwood 2030 - Pathway to Commercialisation Units 7& 8 CO 2 capture plant with sequestration through calcium carbonate production Unit 1 WTA Coal drying plant & Boiler & Turbine Retrofit (Units 1 & 2) New Hazelwood USC 800 MW units HD1 (2016) Cooling Tower HD 2&3 (2022/28) Cooling Pond Stages 1 & 2 to potentially be decommissioned (2030), depending on market, plant performance and life-cycle status Hazelwood IGCC 600 MW unit HD4 (2025) Air Cooled 16

Hazelwood 2030 Notes: Assessment by Burns & Roe Worley. Roll-out requires value for CO 2 abatement Roll-out & Scheme duration 2006 to 2030 (up to 2030 to meet 9.5 MtCO 2 e pa) 154Mt cumulative abatement by 2030 assuming commercialisation roll-out occurs. 17

Thank you Andrew Sinclair andrew.sinclair@ipplc.com 01793 441 842 http://www.ipplc.com 18