Distributed Energy Resources Roadmap

Similar documents
NYISO Pilot Program Update

DER: NYISO Operations Perspective

Expanding Capacity Eligibility

Distributed Energy Resources Market Design Concept Proposal

BTM:NG Initiative Energy Market Design Concepts

NYISO Pilot Program Guide

NYISO Market Initiatives Distributed Energy Resource (DER) Roadmap & Integrating Public Policy (IPP)

Participation in the monthly auction and the capability period auction shall consist of:

Demand Response. Mathangi Srinivasan. New York Market Orientation Course (NYMOC) Senior Market Trainer, NYISO. March 20-23, 2018 Rensselaer, NY 12144

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Behind the Meter Net Generation Initiative: Energy Supplier Participation Requirements

Large Scale Solar Integration

NYISO s Integrating Public Policy Project

NYISO Carbon Charge Proposal for: Wholesale Suppliers Subject to the Carbon Charge and Applicable Carbon Emissions

Wholesale Markets for the Grid of the Future Whitney Lesnicki Manager, Energy Market Design DRAFT FOR DISCUSSION PURPOSES ONLY

CRIS for External-to-ROS Transmission Investment External-to-ROS Deliverability Rights (EDR)

Market Design Concepts to Prepare for Significant Renewable Generation

BILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. [Docket No. RM ]

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

FERC Order 841 Electric Storage Resource Compliance Straw Proposal Overview

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Coordination with PJM

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Concepts for Behind-the- Meter Net Generation

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Relevant changes will be made to corresponding sections of OA and RAA.

Issue Paper. Direct Participation of Demand Response Resources in CAISO Electricity Markets. December 22, CAISO JEP / BDC/ JDG 12/22/08, page 1

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

RDRP Stakeholder Initiative

2017 Project Prioritization & Budgeting Process

SPP at a Glance. Located in Little Rock. Approximately 600 employees

Revision: 67. Prepared by

Measurement and Verification Standards Wholesale Electric Demand Response Recommendation Summary

Concepts for Aggregation Participation In Demand Side Ancillary Service Program (DSASP)

Solar Integration Study

Demand Response Availability Data Systems Definitions

Less than 20 MW Constraint Reliability Margin Values

Attached to this Notice is a description of the seven panels that will be conducted at the technical conference.

Market Impact Assessment: Preliminary DAM Results Overview

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Consumer Impact Analysis: Transmission Constraint Pricing

Demand Response Issues Facing ISO New England. August 2016

PJM Strawman Proposal

Demand Response and Scarcity Pricing

Energy Imbalance Market

Energy Storage and Distributed Energy Resources Phase 3 ( ESDER 3 ) Issue Paper

Energy Imbalance Market Design Straw Proposal and Issue Paper. Stakeholder Meeting April 11, 2013

Demand Response Working Group and Stakeholder Meeting Agenda January 15, 2009

FERC s Standard Market Design Proposal

ENERGY STORAGE: FERC S TECHNICAL CONFERENCE AND NOPR

Ethan D. Avallone Senior Market Design Specialist, Energy Market Design ICAPWG/TPAS February 21, 2018 Rensselaer, NY

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION POST-TECHNICAL CONFERENCE COMMENTS OF SOUTHERN CALIFORNIA EDISON COMPANY

2019 Project Prioritization and Budgeting Process

Carbon Pricing: Treatment of Existing REC Contracts. Michael DeSocio Senior Manager, Market Design IPPTF. October 11, 2018, Rensselaer, NY

Energy Storage and Distributed Energy Resources (ESDER) Stakeholder Initiative. Revised Straw Proposal

Roadmaps for Demand Response & Storage

Demand Response Data Task Force Draft Report Outline and Work Plan

New York Independent System Operator, Inc. NYISO Tariffs. OATT Schedules

Scarcity Pricing Informational FERC Filing

2017 Integrating Public Policy Detailed Scope

Expanded Metering and Telemetry Options Phase 2. Distributed Energy Resource Provider (DERP) Draft Final Proposal

20 Nov IEEE Chapters Seminar Grid Energy Storage: Policies. John Martin, AESO

The Critical Value of New York s Energy Markets. NYISO s role in powering a reliable, efficient grid

Constraint Specific Transmission Demand Curves

Carbon Pricing Import/Export Transaction Examples

Con Edison. Evolution of Con Edison efforts in Energy Efficiency and Demand Management:

Small Generator Interconnection Procedures

Electric Storage as a Transmission Solution in the MTEP Reliability Planning Process. Planning Advisory Committee September 26, 2018

A Path To New York's Energy Storage Goal

Joint Workshop on Multiple-Use Applications and Station Power for Energy Storage CPUC Rulemaking and CAISO ESDER 2 Stakeholder Initiative

Carbon Pricing Carbon Residual Allocation

Broader Regional Markets Report

Price Correction Deadlines: Proposed Tariff Changes

IESO Stakeholder Feedback for Demand Response Auction November Demand Response Auction Review/ Summary of October 20 Meeting

Straw Proposal. Post-Release 1 MRTU Functionality for Demand Response

PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, Prepared by Interconnection Planning Department

DRAFT Work in Progress CAISO Integration of Renewable Resources Program (IRRP) - High-Level Program Plan -

APS Stakeholder Meeting. September 9 th 2016

Revised Draft Final Proposal for Participation of Non-Generator Resources in California ISO Ancillary Services Markets

Special Case Resources: Evaluation of the Performance and Contribution to Resource Adequacy

Alberta Capacity Market

Proposed ICAP Manual Revisions Regarding Deliverability Requirements for Capacity Imports from PJM

Securing 100+kV Transmission Facilities in the Market Model Market Design Complete Presentation

LS Power Stakeholder Comments

Broader Regional Markets Report

Stepped Constraint Parameters. Issue Paper

SAN DIEGO GAS & ELECTRIC COMPANY

Reliability Demand Response Product

Energy Imbalance Market Overview

Distribution System Operator (DSO) Construct as a Bridge for End-to-End Transactive Operation

Congestion Assessment and Resource Integration Study (CARIS)

Concepts for Changes to ACL for SCRs

Metering Fundamentals for Demand Response

2018 DRAFT Annual Incentive Goals

Distributed Energy Resources

Day-Ahead Market Enhancements Phase 1: Fifteen-Minute Granularity. Second Revised Straw Proposal

Ramapo Phase Angle Regulator Cost Recovery Discussion

Financial Transmission Rights

Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit

Regulation Energy Management Market Simulation. June 14, 2011

Transcription:

Distributed Energy Resources Roadmap Updates Overview James Pigeon Senior Market Design Specialist Distributed Resources Integration MIWG December 19, 2016 Krey Corporate Center - Rensselaer, NY 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY

Agenda Initiative Scope and Key Objectives DER Roadmap Development Process, Discussion, and Timeline Summary of feedback received between 11/29/16 and 12/13/16 Roadmap Purpose Roadmap Updates Overview Next Steps 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 2

Initiative Scope Roadmap for next 3-5 years for integration of DER and evolution of current Demand Response programs DER is a resource or set of resources -- typically located on an end-use customer s premises and operated for the purpose of supplying customer electric load -- that seeks to Microgrid provide NYISO wholesale market Distributed Storage Demand Response services Curtailable load, generation, storage, or various combinations Community Solar Distributed Energy Resource Combined Heat and Power Individual resources or aggregations Net load or net generation 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 3

Key Objectives Integrate DER into energy, capacity, and ancillary services markets Ability for real-time scheduling Minimize out-of-market actions Align with goals of NYS REV Appropriate measurement and verification Align payments with performance Focus on wholesale market 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 4

DER Roadmap Development Process Kickoff Overview of Roadmap Concepts May 24, 2016 Review Stakeholder Input for Roadmap Development June /July 2016 Initial Draft Published August 2016 Stakeholder Comments and Feedback Summer/Fall 2016 Publish DER Roadmap (living document) 2016 Follow Roadmap and Execute Projects 2017-2021 MIWG DER Session 10/24 MIWG DER Session 11/21 MIWG DER Session 12/5 MIWG DER Session 12/19 Publish DER Roadmap 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 5

DER Roadmap Development & Discussion MIWG DER Session 10/24 Review of Feedback, Updated Schedule, Discussion: Measurement and Verification, Stakeholder presentations MIWG DER Session 11/21 Stakeholder presentations, Review of Feedback, Updated Schedule, Discussion: Aggregations, Dual Participation and Performance Obligations MIWG DER Session 12/5 Stakeholder presentations, Review of Feedback MIWG DER Session 12/19 Overview of Updates to the DER Roadmap Publish DER Roadmap 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 6

FERC Notice of Proposed Rulemaking Electric Storage Participation in Markets Operated by Regional Transmission Organizations and Independent System Operators Docket Nos. RM16-23-000; AD16-20-000 Issued November 17, 2016 (Comments due January 30, 2017) NYISO is currently reviewing and will provide comments at a later date 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 7

Feedback Received 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 8

Feedback Received General Align DER Roadmap to NY PSC REV & FERC NOPR on Energy Storage and DER Aggregations Refine definition of DER to explicitly specify which technologies are included Allow passive / non-dispatchable DER to participate in NYISO markets Allow 100 kw DER aggregations to participate in NYISO markets Heterogeneous / mixed technology aggregations should be allowed Stakeholder engagement & process thus far has been valuable. Continue this process moving forward Pilot programs should be designed to provide feedback to program design process 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 9

Feedback Received Performance Obligations Performance obligations should be at the aggregation level, not at the individual customer/resource level Need comprehensive review of non-performance penalties for DER Existing wholesale market penalties are not designed to consider simultaneous wholesale and retail participation models Recommend having only the full day (24-hour) tier DER performance obligation and uniform capacity payments for all capacity resources 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 10

Feedback Received Coordination with Utilities NYISO and Utilities should work together to develop coordinated approach to interconnection, dispatch, communication, and forecasting of DER Coordination should continue throughout the roadmap development timeline Operational coordination between NYISO and Utilities should be established to minimize operational issues with heterogeneous/ mixed technology aggregations 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 11

Feedback Received Dual Participation A single DER/Aggregation should not be compensated twice for providing a single service to the wholesale market and a retail provider NYISO should continue to allow simultaneous participation in wholesale and retail programs when DER provides distinctly different and incremental services 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 12

Roadmap Purpose 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 13

Roadmap Purpose The purpose of the Roadmap is to describe high level concepts that will be addressed in designing and implementing a Dispatchable DER program Aggregations Measurement & Verification Performance Obligations Simultaneous Participation in Wholesale/Retail Programs Other Supporting Initiatives 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 14

Roadmap Purpose (cont d) The Roadmap will not include detailed market rules for each high level concept To the extent that NYISO has begun to fill in detail to high level concepts, that detail will be included in the Roadmap 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 15

2017 & Beyond Beginning in 2017 NYISO will work with stakeholders, discussing detailed market rules and tariff language needed to implement the high level concepts as we continue to develop and implement Dispatchable DER We may need to adjust the DER Roadmap concepts and timeline due to unforeseen events as we proceed ahead 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 16

Roadmap Updates Overview 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 17

Roadmap Concepts Details on the following concepts are necessary to develop the Dispatchable DER program: Aggregations Measurement and Verification Operational Requirements and Resource Obligations Real-time Day-Ahead Eligibility Criteria and Performance Obligations Simultaneous participation in wholesale markets and retail programs Additional issues that need to be addressed in conjunction with these big concepts 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 18

Aggregations A DER Coordinator Entity (DCE) is the aggregator The DCE Aggregation (DCEA) will be at the Transmission Node Level DCEAs must be a minimum of 100kW DCEAs can be: One or more DER Technology agnostic Homogeneous or heterogeneous The NYISO is evaluating options for aggregations of Intermittent Power Resources 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 19

Aggregations (cont d) NYISO uses Security Constrained Economic Dispatch (SCED) to optimally dispatch resources to meet load while respecting transmission constraints every five minutes This is a computationally complex mathematical optimization that needs to be performed every five minutes Adding a multitude of smaller resources below a certain size to this already complex optimization problem adds significant computational time with each small resource having little to no impact on the total production cost NYISO will use a threshold of 1 MW to decide whether a DCEA gets optimized by SCED DCEA less than 1 MW will still be able to participate in the energy and capacity market, just not optimized by SCED This is the same threshold applied to traditional generators 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 20

Aggregations (cont d) To accommodate smaller DCEAs, NYISO will aggregate DCEAs less than 1 MW into super aggregations for scheduling purposes If the super aggregation is 1 MW or greater, the super aggregation will be eligible to set price If the super aggregation is less than 1 MW, the super aggregation will NOT be eligible to set price DCEAs less than 1 MW in size can offer only capacity and energy Will receive schedule based on the price identified by SCED at the transmission node Ineligible to offer Operating Reserves or Regulation Service For scheduling Operating Reserves or Regulation, SCED trades-off between what portion of a resource provides energy versus Operating Reserves or Regulation Since NYISO will super-aggregate DCEAs less than 1 MW with other DCEAs and create a super aggregated bid stack, this trade-off is challenging when disaggregating schedules to individual DCEA 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 21

Aggregations (cont d) DCEAs greater than or equal to 1 MW can offer capacity, energy and ancillary services Eligible to set price If a DCEA is 1MW or larger, qualifies and elects to offer ancillary services it will be modeled as a single resource Further coordination will be required between NYISO and the utilities in identifying aggregation mapping to the transmission network 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 22

Aggregations (cont d) 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 23

Aggregations (cont d) Example 1 single transmission node @ Substation Aggregation Breaker Transmission Node Price Substation Lines Transformer Transmission Line A 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 24

Aggregations (cont d) Example 2 two transmission nodes @ Substation Aggregation Breaker Transmission Node Price Substation Lines Transformer Transmission Line B C 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 25

Aggregations (cont d) Example 3 three transmission nodes @ Substation D F Aggregation Breaker Transmission Node Price Substation Lines Transformer Transmission Line E 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 26

Aggregations (cont d) Example 4 two transmission nodes, one node has multiple DCEAs less than 1MW aggregated into NYISO super aggregation C Agg. X 500kW Agg. Y 100kW Aggregation Breaker Transmission Node Price Substation Lines Transformer Transmission Line B C 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 27

Measurement & Verification DCEAs at least 1MW in size SCADA Telemetry (per DCEA) Must have 6-second telemetry to offer regulation service 30-second telemetry is required for each DCEA not offering Regulation Service Telemetry communications must be through utility to NYISO or to utility and NYISO at the same time Settlement/Revenue/Billing Data (per DCEA) Minimum of ANSI C12 hourly interval metering Verification/Auditing/Data Requests (per resource in DCEA) Minimum of Hourly interval data from each resource s net meter Additional metering may be required for resources with energy storage 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 28

Measurement & Verification (cont d) NYISO intends to use: Customer Baseline Loads (CBL) methodology for instances when they are net loads Net meter data for instances when they are net injections Baselines may still be needed for special situations Detailed requirements will be established as part of market design effort 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 29

Measurement & Verification (cont d) Aggregation Sampling Optional for those DCEAs that are less than 1MW in size Intended for small residential or C&I customers Could be used for settlement, revenue, verification and telemetry At least 30% of customers must have ANSI C12 hourly net meters Detailed requirements will be established as part of market design effort 2017 Meter Data Policy initiative Who is the Meter Data Service Provider going forward? Is it the utility/dsp? 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 30

Dual Participation Aggregations participating in utility Demand Response programs would continue to be eligible to participate in NYISO SCR program and EDRP The utility notifies the NYISO when they are calling on their DR participants Exploring whether resources used as Non-Wire Alternatives (NWA) (i.e., distribution system investments that defer or replace the need for distribution equipment upgrades) are eligible to participate in the dispatchable DER program 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 31

Dual Participation (cont d) NYISO is in ongoing conversations with utilities to explore the possibility of additional dual participation opportunities This issue is also still being evaluated by FERC 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 32

Performance Obligations Payments from NYISO should be aligned with the value of the service provided by dispatchable DER to the transmission grid The Roadmap envisions multiple service tiers (e.g., full day, onpeak and daytime peak [see following examples]) The value of these service tiers will be established as part of the dispatchable DER program market design The dispatchable DER performance obligations will be at the DCEA level NYISO is still considering feedback received including, whether alternative Capacity market obligations or eligibility criteria for DER are feasible with the current market structure 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 33

Performance Obligations (cont d) Note: NERC defines On-peak as 7am to 11pm (HB 7 to HB 22) for the Eastern Interconnection 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 34

Performance Obligations (cont d) Note: NERC defines On-peak as 7am to 11pm (HB 7 to HB 22) for the Eastern Interconnection 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 35

Performance Obligations (cont d) DCEAs that are awarded Capacity market payments will be subject to the Day-Ahead Energy Market must offer obligation This obligation also applies to Supplement Resource Evaluation The DCEA must submit offers for consecutive hours of the Day-Ahead Market that correspond to the number of hours in the service tier in which it participates 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 36

The Roadmap Path Forward NYISO will develop the following Dispatchable DER program concepts as we move ahead Aggregations Measurement and verification Operational requirements and resource obligations Real-Time Day-Ahead Performance obligations Simultaneous participation in wholesale and retail programs Evaluation of changes to existing SCR program and EDRP as well as development of a transition plan for such changes Additional issues that need to be addressed in conjunction with these big concepts 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 37

MIWG DER Session 10/24 Next Steps Review of Feedback, Updated Schedule, Discussion: Measurement and Verification, Stakeholder presentations MIWG DER Session 11/21 Stakeholder presentations, Review of Feedback, Updated Schedule, Discussion: Aggregations, Dual Participation and Performance Obligations MIWG DER Session 12/5 Stakeholder presentations, Review of Feedback MIWG DER Session 12/19 Overview of Updates to the DER Roadmap Publish DER Roadmap 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 38

Comments & Questions DER_Feedback@nyiso.com August 2016 Draft DER Roadmap 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 39

The Mission of the New York Independent System Operator, in collaboration with its stakeholders, is to serve the public interest and provide benefit to consumers by: Maintaining and enhancing regional reliability Operating open, fair and competitive wholesale electricity markets Planning the power system for the future Providing factual information to policy makers, stakeholders and investors in the power system www.nyiso.com 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 40