Request for MNRE assistance for Biomass sector. Presented by: Indian Biomass Power Association

Similar documents
SUPPORT EXISTING FOR AND

Biomass Power Generation: Prospects and Issues

Jawaharlal Nehru National Solar Mission

November Explanatory memorandum for CERC Regulations for implementation of REC mechanism in India

Market Mechanisms in India s Clean Energy Efforts

SOLAR POWER PROJECTS - STANDARD. Build Own Operate and Transfer BOOT MODEL

SECTOR OVERVIEW. be restructured with commercial banks. In turn, the utilities commit to implement annual tariff increases. 8

Renewable Energy Market Potential and Policy Overview in India

Amar Variawa Director - Marketing & Public Affairs Vestas India and SE 16th June 2016

Jawaharlal Nehru National Solar Mission Building Solar India Ministry of New and Renewable Energy Government of India

A Multi Stakeholder Perspective

Transmission Policy and Wind Energy

Table 1: Financial Analysis for without and with storage scenarios

Section 86(1)(e): Specify Renewable Purchase Obligation. (RPO), grid connectivity. Section 61(h): Tariff regulations to be guided by promotion

Development and Financing of Renewable Energy Projects in India

Sanjay Upadhyay Advocate Supreme Court of India Enviro Legal Defence Firm April 2012

Renewable Energy: Changing the Energy Scenario and Achieving Sustainable Growth

Chhattisgarh State Electricity Regulatory Commission

Overview of the Legal Framework. New Policy Initiatives. Renewable Energy Certificate Mechanism

Q3 & 9M FY15 Results. Leading Diversified Renewable Energy Generation Company

Vietnam Renewable Energy development project to 2030 with outlook to 2050

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

National Energy Policy of Ethiopia

National Stakeholders Workshop on Accessible and Affordable Sustainable Energy. Brief Report

WIND POWER TARIFF POLICY INDIAN SCENARIO

Illinois Energy Policy

Energy scenario in Himachal Pradesh and make in India vision 2030

The power situation in India is precarious with

RE Tariff Setting Approach

Flexibility in Indian Power System

Impact of Renewable Energy Certificate (REC) Mechanism in India

Centre for Science & Environment comments on the draft policy document of the Jawaharlal Nehru National Solar Mission, Phase II

Member State Perspectives

Emerging issues relating to RE grid integration beyond F&S regulations

The Role of Renewable Energy and Energy Efficiency in Addressing Climate Change in Indonesia. with

Expert Report on Budgetary, Fiscal & Financial Reforms for Development of Renewable Energy in India

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

ADB Support for Solar Power In India

Renewable Energy Sector Profile

Q2 & H1 FY15 Results. Leading Diversified Renewable Energy Generation Company

Renewable Energy Tariffs, RPO and REC Mechanism

Sustainable Development Guidance

Renewable Energy Market Updates

Biomass Asia Conference, May G. Ilango Bharathi YTL SV Carbon Sdn. Bhd. Malaysia

The Current Policy and Investment Opportunities in Laos

Renewable Energy Market in India 2014

Renewable Energy Programmes in India

Jammu and Kashmir State Electricity Regulatory Commission

PIGEO s Detailed Position. on Oversupply of Green Certificates

Off-Grid Renewable Energy Systems: Technologies, Advantages, Challenges

Staff Paper Determination/Fixation of generic levellised generation tariff for various Renewable Energy Technologies / Projects for the year

GET FiT Viet Nam Proposal

New Business Opportunities. Repowering, Offshore, MW scale Wind-Solar hybrids and Small Wind Turbines

RENEWABLE ENERGY TECHNOLOGY. tel: Web: 8(800) vetrox.ecomurman.ru

Biomass Energy Development in Thailand Yaowateera Achawangkul, Ph.D.

Grid-Connected Renewable Energy

FARAN SUGAR MILLS LIMITED TITLE OF DOCUMENT

SMALL HYDRO PROGRAMME IN INDIA. Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy

Townhall Presentation

Renewable Energy Technologies - Present and Future Prospects in Indian Economy

(Draft Captive and Renewable Energy Generating Plants) Regulations

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

International Journal of Advance Research in Engineering, Science & Technology

Technology: An Indian Scenario

The Energy Solutions Company OPEN ACCESS

Role of Renewable Energy in Combating Climate Change by

The employment and growth effects of sustainable energies in the European Union

Public Private Partnership in Wind Power in India

Renewable Energy Promotion and Training through SMEs in Rural India-Potentials and Challenges

Discussion Paper. Development of Renewable Energy Framework for Maharashtra For New Control Period (FY to FY )

ACCELERATING GREEN ENERGY TOWARDS 2020 ACCELERATING GREEN ENERGY TOWARDS The Danish Energy Agreement of March 2012

IMPERATIVE FOR RENEWABLE ENERGY SOURCES AN INSIGHT INTO THE REGULATORY AND POLICY FRAMEWORK

Renewable Energy. These Slides Accompany the YouTube Video Tutorial:

Gujarat Electricity Regulatory Commission

The Potential for Renewable Energy in India

Solar for the CEO. The big picture on rooftop solar for your enterprise

1. What are the different parameters used to measure the size of business?

CDM: Experience and way ahead?

Development of renewable energy sector in the Kyrgyz Republic

Session 2: Theme Presentation On Issues in Scaling-Up of RE Deployment

Renewable & Alternative Energy Resources: What s the difference? 2

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR)

Executive Engineer (Electrical) Damodar Valley Corporation (DVC), West Bengal, India India DOI: /ijarcsse/SV7I5/0112

MADHU SHARMA University of Petroleum and Energy Studies, Dehradun, India

COMBINED HEAT AND POWER (CHP) IN THE PULP AND PAPER INDUSTRY.

South Asia Media Briefing Workshop on Climate Change Centre for Science and Environment

WELLSPUN RENEWABLES Metamorphosis competition Metamorphosis Vista The Metamorphosis challenge: Metamorphosis Disclaimer: Metamorphosis

Evolution of RPO and REC Mechanisms : Indian Experience

CO 2 tax or fee as a single economic instrument for climate protection policy promoting Renewable Energy Sources and enhancing Energy Efficiency

ECONOMIC AND FINANCIAL ANALYSES I. ECONOMIC ANALYSIS

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Comprehensive Tariff Order for Biomass based Power Plants

Solar Power Policy Uttar Pradesh 2013

IEEJ: June 2009 TANZANIA ENERGY POLICY

INTEGRATED RURAL ENERGY PROGRAMME (A PROGRAMME FOR RURAL ENERGY MANAGEMENT)

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems

DECC CONSULTATION RESPONSE: RO Grace periods consultation

INDIA: LONG-TERM ENERGY ISSUES I POST-2003 ELECTRICITY ACT - POWER SECTOR CHALLENGES AND OPTIONS WORKSHOP OUTCOMES ON SELECTED ISSUES

TERMS OF REFERENCE: FRAMEWORK FOR STRENGTHENING INVESTMENT CLIMATE FOR RENEWABLE ENERGY IN COUNTRY X

GENERATION USING SOLAR THERMAL. Jaideep N. Malaviya (Secretary General) Solar Thermal Federation of India

Transcription:

Request for MNRE assistance for Biomass sector Presented by: Indian Biomass Power Association

Indian Power Scenario Renewable Date Total Power Generation Power Generation % 31.03.1990 63636 18 0.03% 31.03.1992 69065 32 0.05% 31.03.2002 105046 1658 1.58% 31.03.2007 132329 7761 5.86% 31.03.2008 143061 11125 7.78% 31.03.2009 147965 13242 8.95% 31.03.2010 159398 15521 9.74% 31.03.2011 173626 18455 10.63% 31.03.2012 199877 24503 12.26% 31.03.2017 ** 318414 54503 17.12% ** Projection

Indian Power Sector Today Predominantly dependent on depleting fossil fuel and driven by imports of Coal Raising prices internationally affects balance of Trade in India State utilities under going difficult times financially affecting down stream generators Renewable Energy Sector affected by higher cost of funding and infrastructure costs Capacity additions behind plans --resulting in demand supply gap

Need For Renewable Energy Carbon dioxide emissions (CO2), thousand metric tons of CO2 in India 1990 1995 2000 2005 2006 2007 2008 690577 920047 1186663 1411128 1504365 1612384 1742698 Source : Global Climate Change Initiative To mitigate the above increase in the CO2 Emissions, there is an urgent need to increase the renewable power

Potential comparison Biomass and Wind as on 30-09-2012 Particulars POTENTIAL (MW) INSTALLED CAPACITY (MW) Biomass 18000 1210 WIND 102000 17967

Biomass as RE Power The Advantages Can be located even in the remote areas, unlike other RE Sectors. All investment are done in backward rural areas and meets the power requirement of rural area The only FIRM Power amongst all Renewable source of energy that can generate over 80% PLF. Current potential of 18000 MW in India Commissioned only 1210 Mw till 30th Sep. 12 Apart from the up liftment of rural economy, it also saves transmission and distribution losses 70% of biomass tariff goes into the rural communities who are the suppliers of Fuel. Only Renewable energy that supports Agriculture by: Direct Local employment 50000 people Indirect employment 400000 people Generates additional income to the farmers by the sale of Agri waste and waste wood to the Biomass industry to use as fuel. Can put to use Arid land for Energy Plantations which will provide additional income to Farmers All Plant and Machineries are indigenous hence unlike other RE technologies the entire investment supports domestic industries

Barriers Sector Current Status & difficulties Current Status The sector is on the brink of closure simply because of the lack of support from the policy makers and regulatory commissions 70% of the biomass tariff spent for fuel only, which is purchased from the rural systems & Farmers. The fuel has value, which gets affected on change of financial condition which has inflated rapidly in the last 3 to 5 years. Biomass sector apart from generating green power, meets the hopes and aspiration of rural population and rural India. Out of 1142 mw, 70% have closed and balance running in losses. Difficulties Biomass is the only RE sector, for which the fuel is not natural or free for operation though it is said to be abundantly available The cost of fuel is not correlated properly with the tariff and during rainy season it almost matches with the tariff. The rigidity of SERC and their independent approach on the fixation of tariff for Biomass sector is a biggest hurdle.. In the absence of definite national policy, the sector is desperately seeking for lifeline and solution to its problem for survival

Why the Low Growth, despite the advantages? Higher cost of Finance to the Industry almost at almost 15-17% interest Inadequate Government Support on Policies Increasing Capital & O&M Costs Lack of attractive Capital Subsidy Uneconomical sourcing of raw material in spite of current availability of biomass, say about 500 million tons equivalent to 18000 MW after adjusting for other usage/collectability. Ever Increasing prices of Fuel Competition for Fuel by other Industries Unviable Tariff set by the SERC /CERC Absence of National Level Policy Competition by Fossil Fuel Generators on the sale front.

Why the request to MNRE Being the Apex body for the development of Renewable energy in our country. The investment done in the biomass sector is at highest risk and the sector has been forced to a brink of closure, it requires support and help from the government for operation and revival. The association request MNRE to take up the matter with Finance & Power Ministry for approving suitable provisions enabling the sector to a survival & revival path. The association also request MNRE to initiate and approve within its policy promotion measures for biomass sector enabling the sector to survive and revive.

Urgent Request to MNRE on the Financial Front The rate of Interest for biomass sector to be limited to 10% or at Priority Sector levels as current interest rates of 15-17% is making it extremely difficult for any additional investment. Majority of the biomass investment has either become NPA or operating in huge losses. A financial restructuring on lending with interest subvention may be provided for the next 5 years enabling the sector to climb back. The interest subvention may be linked to prompt and regular payment of interest. Enhancement of Central Financial Assistance (Capital Subsidy ) - Not revised for years. To make it on par with Biogasification at Rs.50 lacs/mw

Urgent Request to MNRE on the Fuel Security Biomass Mission - to be implemented across the Country with definite and exclusive fuel availability to this sector by prioritizing. Fuel Adjustment Mechanism (FAM) should be formulated yearly and request MNRE to extend support to CERC in tariff fixation annually. Allocation of unused/waste land for Captive Energy Plantations for Fuel Sustainability. Can model it on Rajasthan Policy of 500 Hectares per MW across States

Coordination with Power Ministry MNRE must urgently coordinate with Power Ministry to find the solution of SERC via forum of regulators to look into the issues faced by the biomass sector as RE power. Though the electricity act has various provisions laid down to support RE power, SERC s are not keen on implementing those due to their own state related issues. MNRE should monitor and enforce and address such issues. The Power Ministry and MNRE should work out urgent solutions for the survival of the biomass sector by framing a support policy waiver of Cross Subsidy, Electricity Tax, adjustment of power import against export and the like

Request to MNRE by Indian Biomass Power Association The ministry must initiate suitable measures for the revival of investment already done in the biomass sector. The association request clear steps for the revival of the biomass sector and an opportunity to redeem the losses forced due to past difficulties by giving them opportunity to recover the past losses in future generation by approving suitable generation based incentive. A suitable GBI may be explored through the clean energy fund for this sector survival. Indexing of biomass REC at 2 times and recommending the same to CERC considering the cost of fuel and its operation in the rural sector. Alternatively as separate Floor and Forbearance prices can be set as in case of Solar RECs

Biomass Mission The launch of Biomass Mission similar to Solar Mission by the Ministry, which would specifically look into: a) Guiding the States to Formulate separate Biomass policy b) Framing a Suitable policy to promote energy plantation development for captive use. c) Enhancing the Current subsidy levels for sustained operation of the Biomass Power Generation. d) Revival and operation of existing investment in biomass sector. e) Development and promotion of biomass sector f) A suitable option for meeting the electricity requirement and hopes and aspiration of rural India.

To Sum up Key Issues needing urgent support are.. Interest subvention on par with Agri/Priority Sector--- since all Biomass Plants are in rural India supporting the farmers by sourcing the agri residues Annual tariff adjustment for Fuel Cost increase Separate REC Slab for Biomass RECs like Solar considering the fact that this is the only Renewable Energy depending on sourced fuel. Alternatively indexing with Non-Solar RECs as 2 RECs for 1 MwH of Biomass Power Effective implementation of RPO/REC Mechanism to ensure compliance levels envisaged are met. Perhaps use of National Clean Energy Fund by MNRE for RPO Compliance by State Utilities thru suitable support for a year or two Review of Tariff structure considering inputs given by Industry Support to develop Energy Plantations & Biomass Mission by MNRE