NCHRP Report 687 Guidelines for Ramp and Interchange Spacing

Similar documents
NCHRP 3-88 Guidelines for Ramp and Interchange Spacing

THE HIGHWAY SAFETY MANUAL

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Geometric Design: Past, Present, and Future

INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM)

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

LOCATION AND DESIGN DIVISION

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

TRB WEBINAR PROGRAM Planning and Preliminary Engineering Applications Guide to the Highway Capacity Manual: Contents

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM

Interactive Highway Safety Design Model (IHSDM) AASHTO Subcommittee on Design July 21, 2009

TxDOT X-Ramps vs Diamonds: Safety and Operational Issues for Conversion

Chapter GRADE SEPARATIONS & INTERCHANGES

Highway Safety Analysis Tools for Engineers

Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual

Interchange Justification Report (IJR) I-75 at Bethlehem Road Henry County

HIGHWAY SAFETY MANUAL WORKSHOP

Breaking the Diamond: DDIs, CFIs, and SPUIs

Interactive Highway Safety Design Model (IHSDM) Traffic Records Forum Biloxi, MS October 28,

Route 7 Connector Ramp MODIF IE D I N T ER C H A N G E M OD IFICATIO N R E PO RT TRA N S F O R M I : I N S ID E THE BE LTWAY

LOCATION AND DESIGN DIVISION

Interchange Design. Nick Hoernke, Bill Roth and Eric Sorensen

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

The Secrets to HCM Consistency Using Simulation Models

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

CHAPTER 2: MODELING METHODOLOGY

500 Interchange Design

New Analytical Tools for Safety Management of Urban and Suburban Arterials. Douglas W. Harwood Midwest Research Institute Kansas City, MO

AASHTO s Highway Safety Manual and Performance Measures / Targets

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS

INTERCHANGE MODIFICATION REPORT

Data-Driven Safety Analysis (DDSA) Implementing Safety Innovations Every Day Counts 3

500 Interchange Design

I-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

Technical Memorandum. 720 SW Washington Suite 500 Portland, OR dksassociates.com. DATE: July 12, 2017

Past, Present, and Future

ACTION TRANSMITTAL

Statewide Roundabout Guidance

An Introduction to the. Safety Manual

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

C-TEP is pleased to present a short course; Innovative Intersections & Interchanges, March 14-16, 2016 in Calgary, Alberta.

Updating Virginia s Statewide Functional. Brad Shelton, VDOT Chris Detmer, VDOT Ben Mannell, VDOT

Adaptation of HERS-ST Models for the South Carolina Interactive Interstate Management System

Urban Street Safety, Operation, and Reliability

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

TRANSPORTATION RESEARCH BOARD. Resurfacing, Restoration, and Rehabilitation Projects: Geometric Design. Tuesday, October 2, :00-3:30 PM ET

Overcoming Highway Safety Manual Implementation Challenges

PERFORMANCE-BASED ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAYS AND STREETS SUPPLEMENTAL RESEARCH MATERIALS REPORT

The TIS is to be signed and sealed by a Florida Registered Professional Engineer.

Eng. Benjamín Colucci-Ríos, PhD, PE, PTOE, FITE, API, JD

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

COMPARISON OF SPUI & TUDI INTERCHANGE ALTERNATIVES WITH COMPUTER SIMULATION MODELING

The sections below include examples of HSM implementation activities undertaken by various transportation agencies.

Conclusions & Lessons Learned

I-270 NORTH EA PERFORMANCE MEASURES IN NEPA

APPENDIX D ACCESS MANAGEMENT GUIDELINES

Chapter 1. FHWA Guidance & Policies Traffic Analysis

Performance Based Practical Design (PBPD)

INSIDE THIS ISSUE. mctrans.ce.ufl.edu VOLUME 64 \\ OCTOBER Streets Heat Map Freeways Animation HSM Supplement

TOWN OF BARGERSVILLE DEPARTMENT OF DEVELOPMENT TRAFFIC STUDY GUIDELINES

I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge

Status of Highway Safety Manual Implementation. October 2015

Geni Bahar, P.E. Describe key concepts and applications

Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning. Hiron Fernando, BSCE. A Thesis CIVIL ENGINEERING

DRAFT: SUBJECT TO CHANGE PRIOR TO COMMISSION ACTION

Aashto Highway Design Guide

Application of Human Factors Guidelines for Road Systems. June 15, 2016

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.

1000 Performance Based Project Development (PBPD)

Benefit-and-Cost Analysis of Strategic Acquisition of Limited Access Right-of-Way near Interchanges

COFFEE WITH THE MAYOR. September 10, 2010

1. Controlling the number of vehicles that are allowed to enter the freeway,

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

Transportation Model Report

Woodburn Interchange Project Transportation Technical Report

Traffic Analysis. Appendix I

TRAFFIC SAFETY EVALUATION. Using the Highway Safety Manual and the Interactive Highway Safety Design Model. I 15 Dry Lakes Design Exception

All Roads Do Not End at the State Line: Methodologies for Enabling Geodata Sharing Across Boundaries

Evaluation of Freeway Work Zone Merge Concepts

Environmental Consequences and Mitigation

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD

Appendix B Highway 407 Interchange Review - Cochrane Street Area

DIVERGING DIAMOND INTERCHANGE. Informational Guide

Update on the Human Factors Guidelines (HFG) for Road Systems: Status and Implementation Activities

Interchange. Resource Guidebook. March 2007

Authority: N.J.S.A. 27:1A-5, 27:1A-6 and 27:7-44.1, and 27:7-89 et seq., specifically 27:7-91. Expires on February 27, 2021.

Military Highway Interchange

Updating Virginia s Statewide Functional Classification System. Briefing to MPOs, PDCs, and Local Governments

Exit 73 I-29 Interchange Modification Justification Study

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

TRANSPORTATION RESEARCH BOARD. Design of Interchange Loop Ramps and Pavement/ Shoulder Cross-Slope Breaks. Monday, November 13, :00-3:30PM ET

Michigan Department of Transportation Diverging Diamond Interchange (DDI) Informational Guide. April 2015

Informational Brochure. Proposed Interchange. Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013

FHWA/TX April 1996 TWO-SIDED WEA YING ANALYSIS ON ONE-WAY FRONT AGE ROADS. Research Report R. Lewis Nowlin and Kay Fitzpatrick

Transcription:

Updates on NCHRP-Funded Geometric Design Research Projects NCHRP Report 687 Guidelines for Ramp and Interchange Spacing Brian L. Ray, PE Kittelson & Associates, Inc Portland, Oregon bray@ kittelson.com July 26, 2011

Presentation Outline Project Overview Guidelines Conclusions

2004 Guidance is based on 1975 recommendations Jack Leisch. Region 2 AASHTO Operating Committee on Design. 1975 Became Green Book Values

Project Overview Identify factors that influence ramp and interchange spacing needs: Geometric Design Traffic Operations Safety Signing Conduct operations and safety research Develop Guidelines for ramp and interchange spacing Document overall project research in a final report

Project Overview Team KAI, Joel Leisch, John Mason, Roger Roess, TRA, and the University of Utah Schedule June 2008 to December 2010 Final Products NCHRP Report 687 NCHRP Web-Only Document

Presentation Outline Project Overview Guidelines Conclusions

Guidelines Chapter 1 Introduction Chapter 2 Ramp and Interchange Spacing Overview Chapter 3 Design and Signing Considerations Chapter 4 Operational and Safety Considerations Chapter 5 Spacing Guidance Chapter 6 Scenario-Based Case Studies References Appendix A Traffic Operations Tools

Guidelines - Principles Avoid one size fits all spacing values Customize spacing recommendations based on factors that affect ramp and interchange context Apply a systematic approach that considers Geometric design Traffic operations Safety Signing Recommend replacing Exhibit 10-68 of Green Book Focus on ramp spacing Deemphasize interchange spacing

Definition of Spacing Used in Project 3-88 Project 3-88 focuses on ramp spacing

Definition of Spacing Used in Project 3-88 3-88 ramp spacing definition is consistent with HCM 2010 s Base Length (L B ) Measurement of ramp spacing eliminates variations due to ramp terminal design Next edition of Green Book will use this ramp spacing definition

Guidelines Chapter 1 (Introduction) Key points Interchange spacing is measured between cross-street centerlines Ramp spacing is measured between painted gores (merging and diverging tips) Guidelines are intended to supplement, not supersede, major resource documents such as Green Book, HCM, HSM, MUTCD

Guidelines Chapter 2 (Ramp and Interchange Spacing Overview) Key Points Spacing needs should be considered early in the project development process. As the process progresses, there is decreased flexibility in changing spacing Many states have a process by which potential new interchanges are considered. Spacing to adjacent interchanges often a factor FHWA has a separate policy for Interstate Highways (8 points) Green Book, HCM, and MUTCD all contain information relevant to spacing

Guidelines Chapter 3 (Design and Signing Considerations) Key Points Freeways are complex environments with many design features that affect spacing needs - Single- vs. multiple-exit designs - Lanes (number, type, configuration) - System vs. service interchanges - Ramp types - Interchange forms - Freeway ramp terminal (merge and diverge) design - Ramp terminal interchange design and queuing - Ramp metering and acceleration needs Techniques such as collector-distributor roadways and ramp braids are useful when ramps and interchanges are close together Consider signing and other human factors early in the design process

Guidelines Chapter 4 (Operational and Safety Considerations) - Operations Key Points Traffic operations analysis should be conducted throughout project development. - Planning level tools should be used in the earliest stages - HCM procedures and/or microsimulation should be used at later stages Historically there was limited research on effects of ramp spacing on freeway speed this project helps to fill gap

Guidelines Chapter 4 (Operational and Safety Considerations) - Safety Key Points For EN-EX and EN-EN ramp combinations, total crash frequency increases as ramp spacing decreases. Crash frequency sensitivity is negligible when spacing is greater than 2200 to 2600 feet Similar trends observed for injury crashes

Guidelines Chapter 5 (Spacing Guidance) Consider each of these four elements when assessing ramp spacing

Spacing Guidance - Safety Example: Planners must choose between 1600 and 1200 EN-EX ramp spacing will there be a safety impact? Small impact 10% more crashes with 1200 spacing

Guidelines Chapter 6 ( 5 Case Studies) 1) Converting an at-grade intersection to interchange on rural highway 2) New interchange on Interstate on edge of suburbs 3) New interchange on Interstate in built-out suburban area with one-mile arterial spacing 4) Modernizing an interchange on 1950 s vintage freeway 5) New interchange in urban area near system interchange

Conclusions NCHRP Report 687 provides ramp spacing guidance to replace values that originated in the mid 1970 s A one-size-fits-all approach of AASHTO Exhibit 10-68 is not sensitive to a wide range of project contexts Ramp Spacing values should guide ramp and interchange design considerations over interchange spacing Geometry, Operations, Safety, and Signing needs should be considered at the earliest project stages Performance based considerations should guide project decision making

Thank you Contact Information: Brian Ray bray@kittelson.com 503-228-5230