SMALL WASTEWATER FACILITY APPLICATION PACKET

Similar documents
***NO SEPTIC SYSTEM EXCAVATION WITHOUT AN APPROVED PERMIT IN POSSESSION****

To The Applicant For A Small Wastewater System Permit Sheridan County, Wyoming

Public Health STARK COUNTY HEALTH DEPARTMENT

APPLICATION FOR PERMIT TO CONSTRUCT A PRIVATE SEWAGE DISPOSAL SYSTEM. 1. Name (Owner): Phone # ( )

Wyoming Water Quality Application Form Permit to Construct Small Wastewater System. Complete attached package and submit to appropriate office:

STARK COUNTY HEALTH DEPAIRmEm

The Presby Wastewater Treatment System

PARK COUNTY PLANNING DEPARTMENT 1002 SHERIDAN AVE. CODY, WY OR

The Presby Wastewater Treatment System

SMALL WASTEWATER (SEPTIC SYSTEM) APPLICATION FREMONT COUNTY, WYOMING

Property Owner's Name: Telephone #: Mailing Address: System Address (if different): Directions to location of installation:

System Address (if different): Directions to location of installation:

A. GENERAL PROPERTY INFORMATION. Applicant s name Day Phone Installer Name Send permit to installer. B. PROPERTY DESCRIPTION

GRAY WATER RECYCLING SYSTEMS

A. GENERAL PROPERTY INFORMATION. Applicant s name Day Phone Installer Name Send permit to installer. B. PROPERTY DESCRIPTION

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

Land Use Office, PO Box 197, 6683 County Road 13, Conejos CO Phone #: Fax:

Woodford County Health Department 1831 S. Main Street, Eureka, IL Phone: (309) Fax: (309)

Application for On-Site Wastewater Treatment System Permit

San Joaquin County. Residential Onsite Systems Bulletin

Ellis County Environmental Office

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide

INSTALLING A SEPTIC SYSTEM IN LIVINGSTON COUNTY LIVINGSTON COUNTY PUBLIC HEALTH DEPARTMENT 310 TORRANCE AVENUE PONTIAC, IL /

Contact Information Owner s Name Home Phone Cell Phone Mailing Address City Zip Code

Last Updated March 15, Cass County On-Site Sewage disposal system repair/replacement permit application

DRIP EMITTER SYSTEM STUDY GUIDE

INYO COUNTY ENVIRONMENTAL HEALTH SERVICES RESIDENTIAL ONSITE SEWAGE TREATMENT AND DISPOSAL GUIDE

Contact Information Owner s Name Home Phone Cell Phone Mailing Address City Zip Code

Klickitat County. On-Site Sewage System. Construction Manual

Mono County Health Department Construction Guide for Residential and Commercial On-Site Sewage Treatment & Disposal System I.

Yes No System will be constructed according to specifications on page 3 of this permit.

If you have any questions, feel free to contact the office of the Planning Commission at

VARIANCE APPLICATION PLEASE PRINT

On-Site Wastewater Application Requirements

ON-SITE SEWAGE CONTRACTOR EXAMINATION STUDY GUIDE

PRODUCER STATEMENT SYSTEMS (T.P.58) DESIGN: ON-SITE EFFLUENT DISPOSAL

West Virginia Department of Health & Human Resources Department of Health

WARREN COUNTY, IOWA CHAPTER 31 CHAPTER 31 ON-SITE WASTEWATER TREATMENT AND DISPOSAL SYSTEMS

provides a list of licensed on-site sewage designers.

REPAIR PERMIT FOR A SEPTIC SYSTEM PROCEDURE & CRITERIA

Sudbury & District Health Unit

Individual Sewage Disposal Systems Site Review and Permit Procedure

Existing System Evaluation Report for Onsite Wastewater Systems

ON-SITE SEWAGE PERMITTING PROCESS

Form NDI ON-SITE WASTEWATER SYSTEM NEW DEVELOPMENT INSTALLER INFORMATION Update: September 12, 2014

APPENDIX E SELECTION EXAMPLE

APPENDIX 5 On Site Sewage Treatment and Disposal 1. Site Requirements

Chisago County Environmental Services 313 No. Main St., Room 243 Center City, MN

1.0 BACKGROUND 2.0 DIAGRAMS. The attached diagrams illustrate a typical NDDS system. 3.0 CDPHE OWTS REGULATION #43

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

Chisago County Environmental Services

Gilmer County Department of Public Health

REQUIRED SEPTIC DRAWINGS

LIVINGSTON COUNTY PRIVATE SEWAGE DISPOSAL SYSTEM ORDINANCE

Soil and Site Evaluation for OSS

LENAWEE COUNTY HEALTH DEPARTMENT Environmental Health Division Well and/or Sewage Disposal Construction Permit Application

Last Updated March 15, 2016

Unit 1 - Introduction, Testing Criteria, and Design Criteria 1-1 Introduction 1-2 Testing Criteria Requirements 1-3 System Design Requirements

Site investigations: B103e and Technical Standards Section VII & VIII Single Lot Plan Review: only

Application for Permit INSTRUCTIONS

SANDERS COUNTY ENVIRONMENTAL HEALTH PROPERTY OWNER SEPTIC INSTALLATION BOOKLET

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Soil Class Handouts Greeley Colorado October 22 & 23, 2015

ONSITE SEPTIC DISPOSAL PERMIT APPLICATION

SepticDesign.ca Gunnell Engineering Ltd.

Mariposa County Sewage Disposal Rules

Grading & Excavation Information Application & Checklist

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual New York

Cayuga County Health & Human Services. Environmental Division Wastewater Treatment System Inspection Form

Township of Georgian Bluffs

City of Vineland Health Department 640 E. Wood Street, Vineland, NJ (856) (ph.) / (856) (fax)

Producer Statement. Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2000)

RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form

GUIDANCE DOCUMENT FOR THE PREPARATION OF ENGINEERED SEWAGE DISPOSAL SYSTEM & SEWAGE FEASIBILITY REPORTS

Private Sewage Permit Application

Subdivision Standards

Schedule 2A: Sewage System Information

Land Use Office th Street - PO Box Saguache CO Phone (719) Fax (719)

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT

I/We propose to install enlarge replace a sewage system to serve a: proposed single family dwelling existing single family dwelling other premises.

TOWNSHIP OF FRANKLIN YORK COUNTY, PENNSYLVANIA ORDINANCE NO

ALTERATION PERMIT FOR A SEPTIC SYSTEM PROCEDURE & CRITERIA

Producer Statement. Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2012)

Complex Sewage Disposal Course 2017

1 Exam Prep Chapter 64E -6 Questions and Answers

City of Malibu Stuart Ranch Road Malibu, California Phone (310) Fax (310)

SUMMIT COUNTY PUBLIC HEALTH DEPARTMENT ENVIRONMENTAL HEALTH

RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF GROUND WATER PROTECTION

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT

BURLINGTON COUNTY HEALTH DEPARTMENT 15 PIONEER BOULEVARD, WESTAMPTON PO BOX 6000 MOUNT HOLLY, NEW JERSEY 08060

SEWAGE PERMIT APPLICATION

Section 9: Sand Mounds. 9. Sand Mounds

Ordinance No Lot Surface Drainage

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 641. INDIVIDUAL AND SMALL PUBLIC ON-SITE SEWAGE TREATMENT SYSTEMS

DISTRICT SANITARY CODE

Wastewater treatment for single houses. D. O Dowd

All new construction, mobile home placement & additions.

GRAYWATER STANDARD PLAN For Simple Residential System

Prestige Home Inspection LLC Propery Inspection Report Cover Page

Transcription:

SMALL WASTEWATER FACILITY APPLICATION PACKET A PERCOLATION TEST AND/OR AN APPLICATION ALONG WITH AN ADDRESS MUST BE COMPLETED AND SUBMITTED TO THE DIVISION OF ENVIRONMENTAL HEALTH BEFORE A PERMIT TO INSTALL OR MODIFY A SMALL WASTEWATER FACILITY (SEPTIC SYSTEM) CAN BE ISSUED IN LARAMIE COUNTY. Page one (1) of the packet is the application for a permit to construct or modify a Small Wastewater Facility. a. The top portion is for the landowner(s) legal description of the property on which the Small Wastewater Facility is being considered and MUST BE COMPLETELY FILLED OUT. b. The middle portion is for recording Percolation Test Readings and for the signature of the person running the test. c. The lower section of the application is for the property owner s signature and date of the property owner. The person running the percolation test and the property owner must sign the application. The completed application is to be returned to Environmental Health with a THREE HUNDRED ($300.00) DOLLAR INSPECTION FEE FOR EACH SMALL WASTEWATER SYSTEM. All new construction requires an approved zoning certificate or official address assignment from the City Building Department. The owner/legal representative will be notified to appear at Environmental Health to sign the permit. *** ***STATE LAW REQUIRES that the signature of the property owner appear on the permit. *** Page two (2) shows an example site location map that must be included with the perc application. Page three (3) is the Percolation Test Guidelines, which explains the procedures for running a percolation test. a) A perc test is used to determine the ability of soils to support a Small Wastewater Facility, and to size the facility. b) Anyone can run the test. Instructions are available. c) An onsite evaluation of the property, including the test holes, will be conducted by an Environmental Health Inspector. Page four (4) is the Question & Answer brochure for obtaining an address from the City Building Department and a list of the contractors/installers licensed through Environmental Health. ***ALL SEPTIC SYSTEMS MUST BE INSTALLED BY A LARAMIE COUNTY HEALTH DEPARTMENTAPPROVED SMALLWASTEWATER CONTRACTOR/INSTALLER, *** UNLESS OTHER ARRANGEMENTS HAVE BEEN APPROVED THROUGH ENVIRONMENTAL HEALTH. Submit to Environmental Health Department: Small Wastewater Facility Application. Site location Map. Inspection Fee of $300.00. Provide Proof of Address Assignment.

APPLICATION FOR SMALL WASTEWATER SYSTEM PERMIT ENVIRONMENTAL HEALTH 100 CENTRAL AVE. RM 261 CHEYENNE, WY 82007 (307) 633 4090 FAX: (307) 633 4038 DATE SUBMITTED: / / INSPECTION FEE $300.00 (Inspection Fee Must Accompany This Application) PARTIAL INSPECTION FEE $50.00 per trip. Make Checks Payable to: ENVIRONMENTAL HEALTH. PLEASE FILL OUT FORM COMPLETELY! LANDOWNER: PHONE:(CELL/ HM) (WK) MAILING ADDRESS: CITY: ST.: ZIP: PROPERTY ADDRESS: MANDATORY BEFORE PERMIT WILL BE WRITTEN RANGE: TOWNSHIP: SECTION: SUBDIVISION: LOT/TR: BLOCK: PROPOSED NUMBER OF BEDROOMS: BASEMENT: Y N ACREAGE: DIMENSIONS: X PREVIOUSLY PERMITTED: YES NO IS THIS TO BE A HOMEOWNER INSTALL? YES NO IF NO, WHO WILL BE THE LICENSED SYSTEM INSTALLER: PERC HOLE DEPTH: (Minimum 3' - Maximum 7'- SEE INSTRUCTIONS) BUILDING DRAIN DEPTH: DATE TEST RUN: / / ROCK OR CHAMBER SYSTEM H O L E S #1 #2 #3 #4 #5 #6 READINGS 1 2 3 4 5 6* 7 8** Inspector Notes: TIME INTERVAL: (CHECK ONE) *10 MINUTES/6 READINGS **30 MINUTES/8 READINGS SIGNATURE OF PERSON RUNNING PERC TEST: PLEASE PRINT AND SIGN PLEASE ATTACH ON A SEPARATE SHEET OF PAPER: SKETCH home, perc hole location, well, septic tank, drainfield, garage, driveway, easements and drainage ways. Where possible, indicate soil type in drainfield area (perc site). Indicate NORTH. Include location of replacement field. INDICATE ALL WELL LOCATIONS ON ADJACENT PROPERTY(ies). (All wells shall be at least 50' from septic tank and at least 100' from drainfield. Well to drainfield distance may be greater in some subdivisions). DIRECTIONS & DISTANCES TO PROPERTY. BE SURE PERC HOLES ARE OPEN AND MARKED. I, THE UNDERSIGNED LANDOWNER, CERTIFY THAT THE ATTACHED SKETCH IS AN ACCURATE REPRESENTATION OF MY PROPOSED HOMESITE: LANDOWNER NAME: PRINT DATE: SIGN Updated July 1, 2015

PERC HOLE READINGS EXAMPLE ONLY (REFER TO GUIDELINES FOR DETAILS) READINGS SHOULD GO HORIZONTALLY 1 2 3 4 5 *6 7 **8 #1 HOLE 8 7.5 7 6 4 4 #2 HOLE 7 6.5 6.5 5.5 5 5 #3 HOLE 7 6.5 6 5 4 4 #4 HOLE 8 7.5 7.5 6 5 4.5 #5 HOLE 7 6 6 5.5 5 5 #6 HOLE 8 7.5 7.5 6 5 5 1. Perc holes should be completely filled with water the night before test is run to saturate the holes. 2. Create a fixed measuring line in each hole. 3. Fill each hole with water to the fill line. 4. If running 30 min. test (Example): - Fill holes @ 8:00 a.m. & refill every 1/2 hour to measuring line. - Take 1 st reading @ 8:30 a.m. on each hole & read every 1/2 hour thereafter, until all 8 readings are completed. *6 - Taking 6 readings on each hole, every 10 minutes. N **8 - Taking 8 readings on each hole, every 30 minutes. Proposed Well (Minimum 100') Nearest Well 1000' West Home FIELD MAP No wells North Min. 10' Tank Drainfield Minimum 50' Nearest Well 300' East No wells South Information needed on map: 1. Boundary Roads 2. North Direction 3. Location of: Driveway Well Tank Perc Holes Drainage Easements Drainfield Chalk Bluff Road SITE MAP EXAMPLE ONLY

PERCOLATION TEST GUIDELINES SITE SELECTION FOR SEPTIC TANK ABSORPTION FIELD (PERCOLATION TEST HOLE SITE SELECTION). BEFORE YOU PLAN YOUR SEWAGE DISPOSAL SYSTEM, BECOME FAMILIAR WITH THE HEALTH REGULATIONS IN THE COMMUNITY, THE PERMIT, INSPECTION REQUIREMENTS AND THE PENALTIES THAT MAY BE IMPOSED FOR VIOLATIONS. IN SELECTING A SITE FOR THE ABSORPTION FIELD (PERCOLATION TEST HOLE SITES), KEEP IN MIND THE FOLLOWING: PROCEDURE: 1) Soil permeability should be moderate to rapid and the soil percolation rate should be at least one (1) inch per hour. This will be determined by the percolation test which will be run. 2) Groundwater level, during the wettest season, shall be at least four (4) feet below the bottom of the trenches in a subsurface tile (plastic pipe) absorption field. That is eight (8) feet minimum or more from ground surface to the water table, or seasonally high groundwater mark. 3) Rock formations or other impervious layers shall be more than four (4) feet below the bottom of the trenches in a subsurface tile (plastic pipe) absorption field. That is eight (8) feet minimum or more from ground surface to the impervious layer. 4) Trenches and seepage beds are difficult to lay out and construct on slopes steeper than 15 percent. If steep, shallow soils that are underlain by rock or the impervious materials are used as absorption fields, the septic tank effluent is likely to seep to the surface. 5) Do not select a site for an absorption field that is within fifty (50) feet of a stream or other body of water or drainage way. Never install a sewage system on a flood plain that may be subject to flooding. Wells and springs should be located up slope from planned sewage disposal systems and at a distance of at least 100 feet from proposed leach fields (i.e. trench or seepage bed). Fields should be constructed to provide sufficient land area for entire new absorption system if needed. 1) NUMBER AND LOCATION OF TEST HOLES: Six (6) test holes shall be dug in the proposed absorption field according to the following plan. NOTE: TEST HOLES ARE DUG TO THE BOTTOM OF THE DRAINFIELD TRENCH. One hole located in each corner of a 30 foot by 60 foot rectangle with one hole in the middle of each of the long sides. Typical layout for test holes will look like this: 30 60 30 NOTE: 6 HOLE AND 3 HOLE METHOD: See step #5 & #6 before starting. 2) TYPE OF TEST HOLE: Dig or bore a hole with a diameter of between 4 and 12 inches and vertical depth to the bottom of the proposed drainfield. Deep drainfield, deep perc test: SURFACE X=4", 6" or 12" DIAMETER Bottom of drainfield trench or X Minimum 3' depth - maximum 7' NOTE: REMOVE ALL DIRT AWAY FROM MOUTH OF HOLE. (3)

3) PREPARATION OF TEST HOLE: Carefully scratch the bottom and sides of the hole with a sharp pointed instrument (knife blade) in order to remove any smeared soil surfaces and to provide a natural soil interface into which water may percolate. Remove all loose material from the hole and from around the surface and perimeter at the ground level. Add two (2) inches of coarse sand or fine gravel to protect the bottom of the hole from scouring and sediment. 4) SATURATION AND SWELLING OF THE SOIL: It is important to distinguish between saturation and swelling. Saturation means that the void spaces between soil particles are full of water. This can be accomplished in a short period of time. Swelling is caused by intrusion of water into the individual soil particle. This is a slow process, especially in clay-type soil and is the reason for requiring a prolonged soaking period. To conduct the test, carefully fill the hole completely full of water approximately 12-24 hours prior to the actual percolation. NOTE: IN SOME SOILS IT IS NECESSARY TO REFILL THE HOLE BY SUPPLYING A SURPLUS RESERVOIR OF WATER TO KEEP THE WATER IN THE HOLE FOR AT LEAST 12 HOURS. The procedure is to insure that the soil is given ample opportunity to swell and to approach the conditions it will be in during the wettest season of the year. Thus, the test will give comparable results in the same soil, whether made in a dry or wet season. 5) PERCOLATION RATE MEASUREMENT: Percolation rate measurement shall be made on the day following the procedure described under item 4 above, by one of the following methods: A) IF water remains in the test holes after the overnight swelling period, adjust the depth to approximately 6-12 inches over the gravel or hole bottom. From a fixed reference point, measure the drop in water level every 30 minutes, for four hours in each hole - refilling each hole to the same (original) depth after recording the amount of drop. B) If no water remains in the holes after the overnight swelling period, add enough clear water to a depth of 6-12 inches over the gravel. From a fixed reference point, measure the drop in water level every 30 minutes for four (4) hours, in each hole - refilling each hole to the same (original) depth after recording the amount of drop. The drop that occurs during the final 30 minute period is used to calculate the percolation rate. The drop during prior periods provide information for possible modification of the procedure to suit local circumstances. C) In sandy soil (or other soils in which the first six (6) inches of water seeps away in less than 30 minutes, after the overnight swelling period, the time interval between measurements shall be taken as ten (10) minutes and the test run for one hour. Add 6-12 inches of water over the top of the gravel (in the hole bottom). From a fixed reference point measure the drop in water level every ten (10) minutes for one hour, in each hole - refilling each hole to the same (original) depth after recording the amount of drop. The drop that occurs during the final (10) minute period is used to calculate the perc rate. 6) PERCOLATION TESTS MAY BE EITHER 6 HOLES OR 3 HOLES: A) In the first case, the 6 hole results will be averaged to size the system. B) In the second case, the worst hole result will be used to size the system. IF YOU HAVE ANY QUESTIONS OR NEED CLARIFICATION CONCERNING THE ABOVE, PLEASE CALL THIS OFFICE. Updated July 1, 2015