Total Site Utility Systems Optimisation for Milk Powder Production

Similar documents
Sustainable Milk Powder Production using Enhanced Process Integration and 100 % Renewable Energy

Hybrid-Heating-Systems for Optimized Integration of Low-Temperature-Heat and Renewable Energy

A Comparison of Utility Heat Exchanger Network Synthesis for Total Site Heat Integration Methods

Energy Efficiency Measures for Batch Retort Sterilization in the Food Processing Industry

Utility-Heat Exchanger Grid Diagram: A Tool for Designing the Total Site Heat Exchanger Network

Total Site Heat Integration of Multi-Effect Evaporators with Vapour Recompression for Older Kraft Mills

Optimal Selection of Steam Mains in Total Site Utility Systems

Cost Effective Heat Exchangers Network of Total Site Heat Integration

Targeting and Design of Evacuated-Tube Solar Collector Networks

Optimal Design Technologies for Integration of Combined Cycle Gas Turbine Power Plant with CO 2 Capture

Pinch Analysis of an Industrial Milk Evaporator with Vapour Recompression Technologies

Design of Integrated Solar Thermal Energy System for Multi- Period Process Heat Demand

A Modified Energy Transfer Diagram for Heat Exchanger Network Retrofit Bridge Analysis

Evaluating the Potential of a Process Site for Waste Heat Recovery

A Novel Synergistic 4-column Methanol Distillation Process

Integration of Steam Power Plant with Process Utility System

Participant Plants and Streams Selection for Interplant Heat Integration among Three Plants

Comparison Between a Detailed Pinch Analysis and the Heat Load Model for Pulp and Paper Case Study for a Swedish Thermo-Mechanical Pulp and Paper Mill

Process Integration for Bromine Plant

Energy-Efficient Co-production of Hydrogen and Power from Brown Coal Employing Direct Chemical Looping

Targeting Minimum Heat Transfer Area for Heat Recovery on Total Sites

Maximizing the Efficiency of a Heat Recovery Steam Generator for Solid Oxide Fuel Cell-Based Trigeneration Systems

Roman Hackl*, Simon Harvey VOL. 29, Introduction

Exploitation of Low-Grade Heat in Site Utility Systems

STRATEGIES FOR REDUCTION IN ENERGY DEMANDS IN DAIRY INDUSTRY

Optimization on Scheduling for Cleaning Heat Exchangers in the Heat Exchanger Networks

Juergen Fluch a, *, Christoph Brunner a, Bettina Muster-Slawitsch a, Christoph Moser b, Hermann Schranzhofer b, Richard Heimrath b VOL.

The Novel Design of an IGCC System with Zero Carbon Emissions

Combined Heat and Power

Heat Integration Across Plants Considering Distance Factor

Grand Composite Curve Module 04 Lecture 12

Comparison of Heat Exchanger Designs Using Vipertex 1EHT Enhanced Heat Transfer Tubes

VOL. 29, Introduction

Techno-Economic Analysis of Low Temperature Waste Heat Recovery and Utilization at an Integrated Steel Plant in Sweden

Process Integration for Power-dominated Cryogenic Energy Systems 1. Introduction 2. Multi-period Synthesis of Power Systems

Utilizing Solar Energy in Order to Reduce Energy Loads of Building

Industrial Pasteurisation Process Improvement Possibilities

H 2 S Oxidative Decomposition for the Simultaneous Production of Sulphur and Hydrogen

Modelling and Simulation of MSF Desalination Plant: The Effect of Venting System Design for Non-Condensable Gases

Total Site Heat and Mass Integration and Optimisation using P-graph: A Biorefinery Case Study

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET

Investigation of Heat Exchanger Network Flexibility of Distillation Unit for Processing Different Types of Crude Oil

Consider a simple ideal Rankine cycle with fixed turbine inlet conditions. What is the effect of lowering the condenser pressure on

Steam balance optimisation strategies

Integrated production of liquid sulphur dioxide and sulphuric acid via a lowtemperature

Eng Thermodynamics I: Sample Final Exam Questions 1

Heat Integration of an Oxy-Combustion Process for Coal- Fired Power Plants with CO 2 Capture by Pinch Analysis

Supercritical CO2 Brayton Cycles and Their Application as a Bottoming Cycle. Grant Kimzey UTSR Intern Project Summary Webcast September 7, 2012

Fault Tolerant Model Predictive Control for the BioPower 5 CHP Plant

Thermo-hydraulic Design of Solar Collector Networks for Industrial Applications

Eng Thermodynamics I - Examples 1

Eng Thermodynamics I - Examples 1

MARAMA Webinar August 7, Angelos Kokkinos Chief Technology Officer Babcock Power, Inc.

Application of P-graph Techniques for Efficient use of Wood Processing Residues in Biorefineries

Multi-Variable Optimisation Of Wet Vapour Organic Rankine Cycles With Twin-Screw Expanders

Techno-Economic Analysis of Seawater Freezing Desalination using Liquefied Natural Gas

Faculty of Engineering 2 nd year 2016 Mechanical Engineering Dep. Final-exam (code: M 1222)

A Linear Mathematical Model to Determine the Minimum Utility Targets for a Batch Process

Permanent City Research Online URL:

Integrating Renewable Energy to Power, Heat and Water Systems

Utilization of THERMOPTIM Optimization Method

Waste Energy Recovery Including Pressure and Thermal Energy From LNG Regasification

OPTIMIZATION OF CHP SYSTEMS USING PINCH TECHNOLOGY

Tuning Parameters of PID Controllers for the Operation of Heat Exchangers under Fouling Conditions

Low temperature cogeneration using waste heat from research reactor as a source for heat pump

EFFECT OF AMBIENT TEMPERATURE, GAS TURBINE INLET TEMPERATURE AND COMPRESSOR PRESSURE RATIO ON PERFORMANCE OF COMBINED CYCLE POWER PLANT

Environmental Index for Palm Oil Mill

Problems in chapter 9 CB Thermodynamics

David J. Kukulka a, *, Rick Smith b, Wei Li c VOL. 45, Introduction

September 10, Megan Huang* & Dr. Chandrashekhar Sonwane

Module 05 Lecture 35 : Low temperature process design Key words: Refrigeration system

Sensitivity Analysis of Industrial Heat Exchanger Network Design

Chapter 8. Vapor Power Systems

Optimal High-Speed Passenger Transport Network with Minimal Integrated Construction and Operation Energy Consumption Based on Superstructure Model

Pinch Analysis for Power Plant: A Novel Approach for Increase in Efficiency

Comparison of Sweepgas and Vacuum Membrane Distillation as In-Situ Separation of Ethanol from Aqueous Solutions

Industrial Waste Heat Recovery

Opportunities for combined heating and cooling A case study from Nestle Halifax

Chapter 10 VAPOR AND COMBINED POWER CYCLES

Assessment of Hydrogen and Power Co-Generation Based on Biomass Direct Chemical Looping Systems

Efficiency Improvement and Cost Saving Opportunities for the Processing Industry. Ron-Hendrik Peesel Jakarta, Indonesia

Overview of Waste Heat Recovery Technologies for Power and Heat

Specific Energy Consumption of Sugar Cane Mills in Thailand

Thermo-Economic Modelling and Process Integration of CO 2 -Mitigation Options on Oil and Gas Platforms

Optimisation of Fin Selection and Thermal Design of Plate- Fin Heat Exchangers

Thermal Desalination Process Based on Self-Heat Recuperation

Feasibility of Utilizing Boiler Blowdown Waste Heat for Operating an Absorption Refrigeration Chiller

Evaluation of a 1EHT Enhanced Heat Transfer Tube Bundle for Processes Involving Boiling

OUTCOME 2 TUTORIAL 2 STEADY FLOW PLANT

Thermal Distribution in District Energy and Cogeneration Systems

Opportunities for Low-Grade Heat Recovery in the UK Food Processing Industry

Development of a Dynamic Fouling Model for a Heat Exchanger

The Study of Heterogeneous Condensation of Water Vapor on Submicron Particles in Cooled Tube by Population Balance Model

BU Power Generation Energy efficiency presentation PSPG Services

Feedwater Heaters (FWH)

Using Experimental Measurements of the Concentrations of Carbon Dioxide for Determining the Intensity of Ventilation in the Rooms

Numerical Simulation of Spray Cooling Gas with High Temperature and Velocity in Compressor Inter-Stage

OPTIMIZATION OF PARAMETERS FOR HEAT RECOVERY STEAM GENERATOR (HRSG) IN COMBINED CYCLE PLANTS

Transcription:

235 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 52, 2016 Guest Editors: Petar Sabev Varbanov, Peng-Yen Liew, Jun-Yow Yong, Jiří Jaromír Klemeš, Hon Loong Lam Copyright 2016, AIDIC Servizi S.r.l., ISBN 978-88-95608-42-6; ISSN 2283-9216 The Italian Association of Chemical Engineering Online at www.aidic.it/cet DOI: 10.3303/CET1652040 Total Site Utility Systems Optimisation for Milk Powder Production Timothy G. Walmsley* a, Martin J. Atkins a, Michael R.W. Walmsley a, James R. Neale a, Matthias Philipp b, Gregor Schumm b, Ron-Hendrik Peesel b a Energy Research Centre, School of Engineering, University of Waikato, Private Bag 3105, Hamilton, New Zealand b Universität Kassel, Dep. Umweltgerechte Produkte und Prozesse, Kurt-Wolters-Straße 3, 34125 Kassel, Germany timgw@waikato.ac.nz This study applies the Total Site Heat Integration method, in conjunction with a detailed process and utility model, to investigate three methods to increase the energy efficiency of the utility supply system for milk powder production. Sequentially explored opportunities are: (1) increasing boiler efficiency through condensing economisers, (2) waste heat recovery from the chiller unit, and (3) Combined Heat and Power (CHP) for electricity production. The basis for the analysis is the anticipated future milk powder process design, which incorporates results from recent studies that have focused on improving the process design and integration of the heat treatment and evaporator systems and recovering heat from the spray dryer exhaust, which show a combined specific fuel consumption reduction of 29.6 % and a relatively small increase in electricity use of 4.5 %. To maximise boiler efficiency, the study concludes that a condensing economiser for the flue gas can be indirectly matched with heating fluidised bed air flows through the boiler condensate system, which results in specific fuel use reduction of 227 MJ/tp. Chiller waste heat can be upgraded and integrated as a heat source to replace the equivalent specific fuel use of 101 MJ/tp through integration with the site low temperature hot water loop. By designing the steam system to maximise electricity generation in a new turbine, results show that 51 % of the site s electricity demand may be satisfied by CHP. The combined effect of implementing these three utility systems opportunities is a specific fuel use of 3,868 MJ/tp, of which 530 MJ/tp result from electricity production, and a specific grid electricity demand of 113.4 kwh/tp. 1. Introduction Conversion of raw milk into powdered milk is an energy intensive process requiring steam heating, chilling and electrical utilities. The milk powder process has four main processing steps: milk separation, heat treatment, evaporation, and spray drying. Over the past four decades, there has been significant progress in the energy efficiency of milk powder plants. Specific fuel consumptions have decreased from about 12,000 MJ/tp of powder to between 5,000 6,000 MJ/tp, while the specific electricity uses are in the order of 150 to 400 kwh/tp (Ramírez et al., 2006). The absolute fuel and electricity use and split depends on the installed technology, the degree of heat integration, the scale of production, and the utility system efficiency. Significant improvements to the energy efficiency of the heat treatment, evaporation and spray dryer process through process redesign and additional heat recovery have been reported in literature. Using the appropriate placement principle for a heat pump, Walmsley et al. (2016) demonstrated the optimal use of vapour recompression technology in the process and network design of the combined heat treatment and evaporation systems. The result was a dramatic 78 % reduction in steam use at the expense of a 16 % increase in electricity. For spray dryer systems, exhaust heat recovery presents another significant opportunity to increase energy efficiency. Walmsley et al. (2015b) developed a dryer exhaust heat recovery model, which included economic calculations and fouling predictions, and found that a 14 % reduction in steam through heat recovery was economic for the given site. Beyond these two opportunities, there are more prospects to reduce energy use in milk powder production. Please cite this article as: Walmsley T. G., Atkins M. J., Walmsley M. R. W., Neale J. R., Philipp M., Schumm G., Peesel R.-H., 2016, Total site utility systems optimisation for milk powder production, Chemical Engineering Transactions, 52, 235-240 DOI:10.3303/CET1652040

236 Total Site Heat Integration (TSHI) provides a graphical method for the selection, design, and optimisation of utility systems (Klemeš, 2013). With respect to milk powder factories, TSHI may be applied to target the minimum boiler flue gas temperature (thus maximising boiler efficiency) and Combined Heat and Power (CHP) production for a site. Even though the milk powder process can have a low Pinch Temperature, very few sites in New Zealand have steam boilers equipped with condensing economisers. Likewise, out of the 82 NZ dairy processing sites, only four use CHP technology NZ Heat Plant Database cited in (Walmsley et al., 2015a). Given the low uptake, it is valuable to explore options for maximising CHP as a means for improving and developing a more attractive business case. Such options include raising the initial steam pressure, the addition of new steam pressure levels to improve the overall heat and powder cascade (Sun et al., 2013), and the complete design optimisation of a new CHP system (Manesh et al., 2012). Another area in the utility system that can contribute to energy cost reduction is waste heat recovery from chiller units. In most instances this opportunity requires an additional compressor unit to increase the pressure of the chiller s condenser, thereby upgrading its heat so that it may be integrated to fulfil process heat demands. TSHI can aid the selection of the condenser pressure and identify the method for its integration, either direct with process stream and/or via the hot water utility network, using the appropriate placement principle for heat pumps (Yang et al., 2014). The aim of this paper is to investigate methods to increase the energy efficiency of utility supply operations that are required for milk powder factories given the proposed future designs of the heat treatment, evaporation, and spray dryer processes. In particular the three investigated energy reduction opportunities for the milk powder plant utility system are: (1) increasing boiler efficiency through condensing economisers, (2) waste heat recovery from the chiller unit, and (3) Combined Heat and Powder (CHP) for electricity production. 2. Methods 2.1 Milk powder plant model A comprehensive heat and mass balance process and utility model of a milk powder factory has been implemented in an Excel TM spreadsheet and validated against industrial data from NZ s current milk powder plant design as well as an anticipated future plant design. Model results are based on a plant capacity of 30 tp/h, which can be modified for other desired capacities. The model plant without modification has a specific fuel consumption of 5,200 MJ/tp and an electrical use of 210 kwh/tp. These are applied as a comparative baseline for the future plant design and the utility optimisation opportunities. The future plant design incorporates a redesigned evaporation system (Walmsley et al., 2016) and dryer exhaust heat recovery (Walmsley et al., 2015b). 2.2 Steam boiler and back pressure steam turbine model The natural gas steam boiler model, including a deaerator, blowdown vessel and feed water pump, was modelled using Excel Add-in JSteam TM (www.inverseproblem.co.nz). TSHI techniques are applied to maximise boiler efficiency. The composite curve of boiler flue gas (initially at 140 C), after generating steam and preheating combustion air using a standard economiser, is shifted and pinched against the Total Site Source Profile to target the minimum flue gas temperature, which leads to maximising boiler efficiency. For CHP, the back pressure steam turbine model estimated performance using the M-P turbine model (Medina-Flores and Picón-Núñez, 2010), which is the best available empirical correlation for single and multiple extraction turbines. Where a turbine (or steam drive) rating falls below the M-P turbine model s lower limit, the model estimates work assuming an isentropic efficiency of 65 %. 2.3 Ammonia chiller model The chiller model uses the vapour compression cycle with ammonia as the working fluid, a compressor efficiency of 53 %, a condenser pressure of 2,000 kpa, and a Co-efficient of Performance (COP) of 2.3. Thermophysical properties are called from REFPROP TM (http://www.nist.gov/srd/nist23.cfm). The combined chiller/heat pump unit uses a higher condenser pressure (2,600 kpa) that has a saturation temperature of 60 C. The COP of this unit is 1.8 for chilling and 2.8 for heating. Since the process requires a chiller, it s useful to understand the performance of expending additional electricity to upgrade the condenser heat. The marginal COP* for heating in the combined system may be defined by: COP * H Q W H( HP) HP Q W rej. LP Where subscripts HP refers to a high pressure condenser, LP refers to a low pressure condenser, and rej refers to rejected heat. If all the condenser heat is able to heat process streams (i.e. the rejected heat is zero), then the marginal COP of heating is 13.4. (1)

3. Envisaging future energy efficiency opportunities for the utility system This section explores three energy efficiency opportunities in the utility system for the future milk powder process design (1.0), as previously described. 3.1 Maximising boiler energy efficiency through condensing economisers Standard industrial steam boilers for milk powder production operate at 40 bar (250 C saturated) and are fitted with an economiser. The economiser preheats pressurised boiler feed water before it enters the main evaporation tubes. Depending on the boiler design the flue gas enters the economiser at up to 350 C and leaves above the acid dew point at 140 C. An additional condensing economiser can be installed to capture more flue gas heat. There is also a water dew point, which for a natural gas boiler (as considered in this study) is about 60 C while a coal fired boiler is 40 C. Extracting additional heat, both sensible and latent (if useful), maximises boiler efficiency and minimises fuel use. Two sinks within the boiler plant to match with the flue gas in a condensing economiser are the combined condensate return / make-up water flow and the combustion air inlet. The condensate returns from servicing the process at 85 C, and once combined with the make-up water, the temperature decreases to 68 C for the current process design and 82 C for the future design. This difference in temperature is due to current plant design having a lower condensate return percent compared to the expected percent in the future design (74 % to 94 %). The future process design uses less direct steam injection and therefore has a higher condensate return percentage. Matching the combined water flow with the flue gas has a maximum duty of 69 MJ/tp. Preheating the combustion is another option, but is undesirable due to poor heat transfer coefficients of gas to gas heat exchange. Further sink options beyond the boiler system may be found using TSHI techniques. The source profile of the Total Site Profiles together with targeted steam and hot water utility profiles may be pinched with the shifted boiler flue gas flow using a ΔTcont of 12.5 C. Figure 1 plots these source, sink and utility profiles for the future process design. The targeted final flue gas temperature is 58.4 C and the additional heat extraction from the flue gas is 180 MJ/tp. The target is influenced by the hot water utility temperature selection. The additional heat extraction from the flue gas has the knock on effect of reducing boiler fuel consumption to meet the process heat demand, which in turns means the flue gas flow rate slightly decreases. As a result the process and utility model becomes an important tool to capture these superimposing effects. The hot water utility system, as shown in Figure 1, is one sink option for the condensing economiser. This option would require additional piping from the boiler house to the processing buildings. At present the boiler supplies the process with only two steam pressure levels (using a let-down valve) and returns hot condensate in a separate line. Another sink option that requires minimal additional piping between the boiler and process locations is to return cold condensate (35 C) by placing the heat in a process sink. For the future process design, the Fluidised Bed air flows may be matched with the hot condensate flows to achieve a duty of 232 MJ/tp. The cold condensate, combined with a small amount of make-up water, then extracts an additional 197 MJ/tp in a condensing economiser. The overall result is a specific fuel reduction of 227 MJ/tp, which is actually greater than the initial integration target. 250 HPS 237 T** [ C] 200 150 100 T t(real) = 58.4 C Boiler Flue Gas (T dew =59.9 C) HTHW MPS Site Sink Profile 50 LTHW 0-500 0 500 1,000 1,500 2,000 2,500 3,000 3,500 H [MJ/t p ] Figure 1: Target for the minimum boiler flue gas temperature by pinching the flue gas profile with the site hot water utility system

238 3.2 Chiller waste heat upgrading and recovery The chiller system is an essential utility supply operation of chilled water for process cooling. The condenser is normally air-cooled in a closed loop. With ammonia as the working fluid, the condenser operates at 2.0 MPa, which is a saturation temperature of 49 C. By increasing the compression to 2.6 MPa, the saturation temperature increases to 60 C and the heat may be integrated into the LTHW, which has a supply temperature of 55 C. This can be achieved by installing a second compression stage. Figure 2 presents how a combine chiller/heat pump system appropriately integrates with the Site Source and Sink Profiles. The Site Sink Profile excludes the portion of heat demand for the Fluidised Bed air streams that is satisfied indirectly through the condensate system using the boiler flue gas. The target boiler heat displacement is 85 MJ/tp and its integration results in a specific fuel reduction of 101 MJ/tp. Electrical use increases by 1.8 kwh/tp, which is a marginal COPH of 13. In the future plant design, the LTHW system is used to heat HVAC air flows and direct use water applications such as process cleaning, tanker washing, and lactose powder reconstitution. At some existing dairy factories there is a substantial amount of waste heat, not just from the chiller unit, rejected at about 40 C. Future work will look at both the integration of heat pumps using chiller and other waste heat, as well as the internal design of the heat pump cycle to match process demand profiles while maximising its COP. 100 80 HTHW T** [ C] 60 40 Heat Pump Condenser LTHW Site Sink Profile (after flue gas heat recovery) Site Source Profile 20 CHW 0-100 -50 0 50 100 150 200 250 300 H [MJ/t p ] Figure 2: Combined chiller (through chilled water) and heat pump condenser integration with Total Site Profiles. Note: axes are zoomed; only a portion of the Total Site Profiles is shown 3.3 Combined heat and power The final investigated opportunity within the utility system is CHP using a back pressure steam turbine for electricity production. Using the existing two steam levels and a turbine to drop the required steam from 40 bar to 10 bar for the MPS demand gives an electricity production of 46.4 kwh/tp, which for a production rate of 30 tp/h is a 1.4 MW turbine, at an isentropic efficiency of 67 %. A turbine installation for only 1.4 MW of electricity generation struggles to find economic justification. Alternatively, plant equipment such as fans may be driven by steam turbines instead of electric motors. CHP can be increased by adding a VHPS level with superheat and an LPS level. The LPS level requires additional piping to go from the boiler house to the process building. Figure 3 presents the enhanced CHP system using the Total Site Profiles. These changes to the steam system increases electricity production by 133 % to 108.1 kwh/tp. In this case self-generation of electricity reduce grid draw by 49 %.

239 400 350 300 VHPS 250 HPS T** [ C] 200 150 100 HTHW 108.1 kwh/t p LPS MPS Site Sink Profile 50 0 LTHW 0 500 1,000 1,500 2,000 2,500 3,000 H [MJ/t p ] Figure 3: Combined heat and power system using Total Site Profiles. Table 1: Specific energy use of major processing units in future generations of milk powder plants excluding (1.0) and including (2.0) utility systems optimisation opportunities. Major Equipment Thermal Energy Use [MJ/tp] Electrical Use [kwh/tp] Zone 1.0 2.0 1.0 2.0 Cream pasteurisation 11 11 - - Milk Separation Process pumps - - 13.1 13.1 Heat treatment 208 210 9.7 9.7 Heat Treatment MVR and TVR units - - 93.9 93.9 & Evaporators Process pumps - - 2.6 2.6 Spray Dryer Utility Services Totals Air heaters 2,610 2,377 - - Feed heater and pump 131 131 7.8 7.8 Process fans - - 46.4 46.4 Product handling 10 10 22.1 22.1 CIP 74 74 - - HVAC 83 83 7.3 7.3 Chiller unit - - 6.7 8.5 Compressed air unit - - 6.8 6.8 Boiler pump and fan - - 3.3 3.2 Thermal losses 537 441 - - Electricity generation - 530-108.1 Excluding CHP 3,663 3,338 219.9 221.6 Including CHP - 3,868-113.4 4. Comparison of energy use for current and future milk powder plant designs The milk powder plant model has been applied to calculate thermal and electrical energy demand for three designs: the current plant design, the future process design (Design 1.0), and the future optimised process and utility design (2.0). Table 1 compares the thermal and electrical energy for the two future designs, broken down into processing zone and major plant equipment. The figures are presented as specific energy per tonne of milk powder produced.

240 The future process design, which includes improvements to the heat treatment, evaporator and spray dryer process, achieves an overall specific fuel reduction of 29.6 %. A key element of the new designs is the increased use of Mechanical Vapour Recompression technology in the evaporator process. This is the main driver for electricity use increasing by 4.5 %. The air heaters contributes 55 % of thermal energy demand in the current process design and 71 % in the future process design. As Table 1 shows, the reduction in process heat demand has the natural consequence of reducing boiler thermal losses since less steam is required. Implementing a condensing economiser in the boiler system and upgrading chiller waste heat further reduces fuel use by 6.3 %, which is an overall reduction of 35.9% compared to the current plant design. CHP uses an extra 530 MJ/tp of fuel (15.9 % increase compared to the fuel use in design 1.0) to efficiently generate electricity, which lowers the site s grid draw. In the 2.0 design, CHP provides 51 % of the total electricity requirement. 5. Conclusions Maximum boiler efficiency for milk powder production is achieved by installing a condensing economiser for the flue gas to indirectly heat fluidised bed air flows through the boiler condensate system. This is best achieved by matching the hot condensate return flows to heat the fluidised bed air and then returning the cold condensate to the boiler to be reheated in the condensing economiser prior to deaeration. As a result specific fuel use decreases by 227 MJ/tp. Chiller waste heat can be integrated as a heat source with a marginal COP of 13 by expending more electricity to increase the pressure of the condenser. The condenser may replace the equivalent specific fuel use of 101 MJ/tp through integration with the site low temperature hot water loop. By designing the steam system to maximise electricity generation in a new turbine, results show that 51 % of the site s electricity demand may be satisfied by CHP. The combined effect of implementing these three utility systems opportunities is a specific fuel use of 3,868 MJ/tp, of which 530 MJ/tp results from electricity production, and a specific grid electricity demand of 113.4 kwh/tp. Future work will extend the search to longer-term energy efficiency opportunities in the processing system as well as performing a cost-benefit analysis. Without CHP, the new specific fuel use is 3,338 MJ/tp, which is a 35.9 % reduction from the current plant design, and the increased electricity use is 221.6 kwh/tp, which is a 4.5 % increase. Future work will extend the search to longer-term energy efficiency opportunities in the processing system as well as performing a detailed cost-benefit analysis. References Klemeš J.J. (Ed.), 2013, Handbook of Process Integration: Minimisation of energy and water use, waste and emissions, Woodhead Publishing, Cambridge, UK. Manesh M.H.K., Abadi S.K., Ghalami H., Amidpour M., Hamedi M.H., 2012, A New Cogeneration Targeting Procedure for Total Site, Chemical Engineering Transactions 29, 1561 1566. Medina-Flores J.M., Picón-Núñez M., 2010, Modelling the power production of single and multiple extraction steam turbines, Chemical Engineering Science 65, 2811 2820. Ramírez C.A., Patel M., Blok K., 2006, From fluid milk to milk powder: Energy use and energy efficiency in the European dairy industry, Energy 31, 1984 2004. Sun L., Doyle S., Smith R., 2013, Cogeneration improvement based on steam cascade analysis, Chemical Engineering Transactions 35, 13 18. Walmsley M.R.W., Walmsley T.G., Matthews L., Atkins M.J., Neale J.R., Kamp P.J.J., 2015a, Pinch analysis techniques for carbon emissions reduction in the New Zealand industrial process heat sector, Chemical Engineering Transactions 45, 1087 1092. Walmsley T.G., Walmsley M.R.W., Atkins M.J., Neale J.R., Tarighaleslami A.H., 2015b, Thermo-economic optimisation of industrial milk spray dryer exhaust to inlet air heat recovery, Energy 90, Part 1, 95 104. Walmsley T.G., Walmsley M.R.W., Neale J.R., Atkins M.J., 2016, Appropriate Placement of Vapour Recompression in Ultra-Low Energy Industrial Milk Evaporation Systems using Pinch Analysis, Energy, accepted article. DOI:10.1016/j.energy.2016.04.026 Yang M., Feng X., Liu G., 2014, Heat Exchanger Network Design Considering the Heat Pump Performance, Chemical Engineering Transactions 39, 1099 1104.