FUGITIVE DUST CONTROL PLAN FOR VULCAN MATERIALS COMPANY PLEASANTON FACILITY

Similar documents
FUGITIVE DUST CONTROL PLAN FOR SMP-32 JULY 31, 2017

DUST CONTROL MEASURES

PORTABLE CONCRETE/ASPHALT RECY BACT Size: Minor Source BACT Crusher, Screen, Transfer & Storage. BACT Determination Information

RULE FUGITIVE DUST - CONSTRUCTION, BULK MATERIAL HANDLING, BLASTING, OTHER EARTHMOVING ACTIVITIES AND CARRYOUT AND TRACKOUT PREVENTION

BEST MANAGEMENT PRACTICES PLAN FOR FUGITIVE DUST Greenwood Aggregates Company Limited Violet Hill Pit > Town of Mono, ON

H. Dust Suppressant - water, hygroscopic materials, or non-toxic chemical stabilizers used

Fugitive Dust Management Plan

Asbestos Dust Mitigation Plan (ADMP) Application

CITY OF PALM DESERT FRED WARING DRIVE PALM DESERT, CALIFORNIA TEL: (760) FAX: (760)

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

APPENDIX I DUST SUPPRESSION/CONTROL PLAN

Annual CCR Fugitive Dust Control Report. Tucson Electric Power Company Springerville Generating Station Springerville, Arizona

RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004)

CCR Fugitive Dust Control Plan

Targeted Constituents Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics. Potential Alternatives. EC-5 Soil Binders

Presented by: Chris Ethridge District Supervisor Air Quality Division MDEQ Southeast Michigan District Office

Air Pollution Control District

FUGITIVE DUST CONTROL PLAN

DUST MANAGEMENT PLAN MILLER PAVING LIMITED BRAESIDE QUARRY. Prepared by: Church & Trought Inc. 885 Don Mills Road, Suite 106 Toronto Ontario M3C 1V9

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

FUGITIVE DUST CONTROL PLAN

I. Site Name and Location

I. Site Name and Location

CONSTRUCTION PERMIT. PERMIT NO: 09LP0202F Final Approval

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona

APPENDIXG FUGITIVE DUST CONTROL PLAN

Jim Bridger Plant Document Type: PLANT POLICIES & PROCEDURES Document ID Number: ENV-CCR001

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN

Prepared for: IPA OPERATIONS, INC. Coleto Creek Power, LLP Fannin, Texas. Prepared by:

Chapter 12. Abrasive Blasting

State of Utah. Department of Environmental Quality DAQE-AN October 26, 2009

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION

Appendix A Air Quality Data

FUGITIVE DUST CONTROL PLAN

Exhibit G. Construction Mitigation Plan

Appendices. CO Localized Emissions CO Screening Procedure and Flow Charts CO Analysis and CALINE4 Model Output Files

Plant Yates - Operations Procedures Fugitive Dust Control Plan AMENDMENT SUMMARY. Date Amendment # Comments I Notes. Page 2 of 5

Coal Combustion Residuals Fugitive Dust Control Plan

CONCRETE BATCHING PLANT

AEP GENERATION RESOURCES

Concrete Waste Management

Re: Erosion Control Report and Drawings Requirements Accompanying Document

Mitigation Monitoring and Reporting Program

NELSON PLANT CCR FUGITIVE DUST CONTROL PLAN

AEP GENERATION RESOURCES

ZAB Hearing May 14, 2015

Last updated Sept. 15, Fugitive Dust. Cassie Archuleta and Jenna Channel

El Dorado Avenue

STORM WATER POLLUTION PREVENTION PROGRAM SAILOR BAR/ CUTTERS PIT SATELLITE STORAGE YARD

INSTRUCTIONS FOR AIR QUALITY COMPLIANCE PLAN APPLICATION

BACT Determination Information

Annual CCR Fugitive Dust Control Report

STORAGE, HANDLING, AND TRANSPORT OF COKE, COAL AND SULFUR

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Concrete Waste Management

DRAFT AUTHORITY TO CONSTRUCT

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

Crushing and Screening Management Procedure Environment

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm

Fugitive Dust Control Plan Sherburne County Generating Plant

RUNWAY 7L/25R RUNWAY SAFETY AREA (RSA) AND ASSOCIATED IMPROVEMENTS PROJECT MITIGATION MONITORING AND REPORTING PROGRAM 2017 PROGRESS REPORT

Job Name: London School of Hygiene & Tropical Medicine, Tavistock Place, London

FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK. PREPARED FOR: Huntley Power, LLC Tonawanda, New York

Appendix B Maricopa County Dust Abatement Rule 310

Environmental Leadership Program Inspection Form Portable Asphalt Facility

Report to the Montrose County Board of County Commissioners Prepared by the Montrose County Planning and Development Department #1

Appendix 1. Air Quality Management Plan

APPALACHIAN POWER COMPANY

Prologis Oakland Global Logistics Center. Diesel Emissions Reduction and Air Quality Plan for Construction of

South Coast Air Quality Management District Copley Drive, Diamond Bar, CA (909)

AEP INDIANA MICHIGAN POWER COMPANY

SECTION AIR POLLUTION AND HAZARDOUS WASTE CONTROLS

CCR RULE FUGITIVE DUST CONTROL PLAN

Environmental Leadership Program Inspection Form Permanent Asphalt Facility

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Plant Bowen - Operations Procedures Fugitive Dust Control Plan AMENDMENT SUMMARY. Date Amendment # Comments I Notes. Page 2 of 5

Standard Test Procedures Manual

ATTACHMENT B: CONDITIONS OF APPROVAL. Triple J Ready Mix Batch Plant and Concrete Recycling Project Case No. 17CUP

SECTION STORMWATER POLLUTION PREVENTION

Rule Fugitive Dust - Asbestos Hazard Mitigation EDCAQMD Page 1 of 23

Table OCO 8.1 Air Quality Management. Audit Check. Ref Subject Reference Control Activity Responsibility Timing Performance Measure

KENTUCKY POWER COMPANY

CITY OF CAMARILLO STORMWATER POLLUTION CONTROL PLAN Demolition or Stockpile Activity Under One Acre

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT

Ordinance No NOW THEREFORE, be it hereby ordained by the Glasgow City Council as follows:

KENTUCKY POWER COMPANY

Content Copy Of Original

Pervious Pavement Placement

FUGITIVE DUST CONTROL PLAN DUNKIRK GENERATION STATION 106 POINT DRIVE NORTH DUNKIRK, NEW YORK. PREPARED FOR: Dunkirk Power, LLC Dunkirk, New York

Attachment 1 Findings and Conditions

Content Copy Of Original

106 CONTROL OF MATERIALS SECTION 106 CONTROL OF MATERIALS

FORT CARSON Environmental Management System

MITIGATION MONITORING & REPORTING PLAN

IV.E. HYDROLOGY AND WATER QUALITY

Coal Combustion Residuals Fugitive Dust Control Plan

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment

Transcription:

www.haleyaldrich.com FUGITIVE DUST CONTROL PLAN FOR VULCAN MATERIALS COMPANY PLEASANTON FACILITY By Haley & Aldrich, Inc. Costa Mesa, California For Vulcan Materials Company Pleasanton, CA File No. 43105 100 February 2016

Table of Contents Page 1. Purpose and Scope 1 2. Facility Information 2 3. Description of Operations 3 4. BAAQMD Rules and Regulations 4 5. Fugitive Dust Source and Control Measures 5 5.1 EARTH MOVING ACTIVITY 5 5.2 DISTURBED SURFACE AREAS 5 5.3 INACTIVE DISTURBED SURFACE AREAS 5 5.4 UNPAVED ROADS 5 5.5 OPEN STORAGE PILES 6 5.6 PAVED ROAD TRACK OUT 6 6. Administrative Control Measures 7 6.1 INSPECTION AND MAINTENANCE PROCEDURES 7 6.2 EMPLOYEE TRAINING 7 6.3 MONITORING 7 6.4 PLAN REVIEW 8 Appendix A Fugitive Dust Log Appendix B Plan Review

1. Purpose and Scope This Fugitive Dust Control Plan ( Plan ) provides facility contact information, applicable rules and regulations, and a description of site operations. In addition, this Plan identifies potential sources of fugitive dust and documents the facility s control measures for dust control. The Plan also identifies administrative controls, including monitoring and training procedures, as well as procedures for annual review and update. This plan will detail the daily control measures in accordance with South Coast Air Quality Management district Rule 403 (Fugitive Dust) as required by the condition use permit of surface mining permit SMP 16. In addition, the plan identifies a contingency measure which will be implemented during high wind conditions when instantaneous wind speeds exceed 25 miles per hour or when the opacity limitations of Rule 6 1 301 or 6 1 302 cannot be meet through the control measures. 1

2. Facility Information Facility Name: Facility Address: Facility Contact: Pleasanton 50 El Charro Road Pleasanton, CA 94588 Plant Manager: Bart Mayer Phone Number (925) 249 3060 Cell Phone (559) 217 6268 24 Hour Dust Supervisor: Bart Mayer Phone Number (925) 249 3060 Cell Phone (559) 217 6268 Environmental Manager: Tom Ferrell Phone Number (559) 434 1201 Cell Phone (559) 978 2215 Applicable Air Permits: Bay Area AQMD Permit to Operate Plant #8507 and Plant #705 2

3. Description of Operations Vulcan Materials Company owns and operates the Pleasanton mining operation, a 1,078 acre site consisting of several process ponds, sand and gravel mining, recycled concrete and asphalt, landfill and two Hot Mix Asphalt operations within the unincorporated area of Alameda County, between the cities of Livermore and Pleasanton. The facility is located approximately 1.0 miles south of Interstate 580, off of El Charro Road in Pleasanton, California. The facility consists of the North and South Pit. The North pit is boarded by the Jamieson Horse Ranch to the north, Stanley Blvd to the south, City of Livermore property to the east, and the former Hanson Aggregates property to the west. The South Pit is bordered by Stanly Blvd to the north, Isabel Avenue/Highway 84 to the east, and the CEMEX operation to the south and west. The facility activities include surface mining of sand and gravel reserves, operation of an aggregate crushing and screening plant, recycled concrete and asphalt, landfill operation and operation of two Hot Mix Asphalt plants. Located on the property are two Ready Mix Plant operations which are not owned by Vulcan Materials Company and are outside of the scope of the plan. Potential sources of fugitive dust include: mining, stockpiles, haul road travel and material processing equipment such as conveyors, screens and crushers. 3

4. BAAQMD Rules and Regulations The operations at Pleasanton are subject to Bay Area Air Quality Management District (BAAQMD) prohibitory rules. The applicable rules are restated below: Regulation 1, General Provision and Definitions, Rule 1 301, Public Nuisance: 1 301 Public Nuisances: No person shall discharge from any source whatsoever such quantities of air contaminants or other material which cause injury, detriment, nuisance or annoyance to any considerable number of persons or the public; or which endangers the comfort, repose, health or safety of any persons or the public, or which causes, or has a natural tendency to cause, injury or damage to business or property. For the purpose of this section, three or more violations notices validly issued in a 30 day period to a facility for public nuisance shall give rise to a rebuttable presumption that the violation resulted from negligent conduct. Regulation 6, Particulate Matter Rule 1, General Requirements: 6 1 301 Ringlemann No. 1 Limitation: Except as provided in Sections 6 1 303, 6 1 304 and 6 1 306, a person shall not emit from any source for a period or periods aggregating more than three minutes in any hour, a visible emission which is dark or darker than No. 1 on the Ringlemann Chart, or of such opacity as to obscure an observer s view to an equivalent or greater degree. 6 1 302 Opacity Limitation: Except as provided in Sections 6 1 303, 6 1 304 and 6 1 306, a person shall not emit from any source for a period or periods aggregating more than three minutes in any hour an emission equal to or greater than 20% opacity as perceived by an opacity sensing device, where such device is required by the by the District regulations. 4

5. Fugitive Dust Source and Control Measures In accordance with the conditions use permit of surface mining permit SMP 16, this facility will implement control measures as stipulated in South Coast Air Quality Management District Rule 403 (Fugitive Dust). The following section outlines the sources of fugitive dust and also the control measures which will be implemented. Also included are contingency measures to be implemented during high wind conditions when wind speeds exceed 25 miles per hour or when the opacity limitations of Rule 6 1 301 or 6 1 302 cannot be meet through the control measures. Vulcan Materials Company will maintain a daily log which will record the dust control measures implemented to meet the Rule 6 1 301 and 6 1 302. A copy of the dust log is included in Appendix A. 5.1 EARTH MOVING ACTIVITY Control Measure Conduct watering as necessary to prevent visible emissions from extending more than 100 feet beyond the active cut or mining area unless the area is inaccessible to watering vehicles due to slope conditions or other safety factors. Contingency Control Measure Apply water to soil not more than 15 minutes prior to moving such soil, or Cease all active operations. 5.2 DISTURBED SURFACE AREAS Control Measure Apply dust suppression in sufficient quantity and frequency to maintain stabilized surface. Any area which cannot be stabilized, as evidence by wind driven fugitive dust must have an application of water at least twice per day to at least 80 percent of unstabilized area. Contingency Control Measure Apply water to all unstabilized disturbed areas three times per day. If there is any evidence of wind drive fugitive dust, watering frequency is increased to minimum of four times per day. 5.3 INACTIVE DISTURBED SURFACE AREAS Control Measure Apply dust suppressants in sufficient quantity and frequency to maintain a stabilized surface. 5.4 UNPAVED ROADS Control Measure Water all roads used for any vehicular at least once per every two hours of active operations normal (3 times per 8 hour work day); or Apply a chemical stabilizer to all unpaved road surfaces in sufficient quantity and frequency to maintain a stabilized surface. 5

Contingency Control Measure Apply chemical stabilizers prior to wind event; Apply water twice per hour during active operations; or Stop all vehicular traffic. 5.5 OPEN STORAGE PILES Control Measure Apply chemical stabilizer; or Apply water to at least 80 percent of the surface area of all open storage piles on a daily basis when there is evidence of wind driven fugitive dust. Contingency Measure Apply water twice per hour. 5.6 PAVED ROAD TRACK OUT Control Measure Track out shall not extend 25 feet or more in cumulative length from the point of origin. All track out shall be removed at the conclusion of each work day or evening shift. Control Measure Pave at surface extending at least 100 feet and at least 20 feet wide from vehicle egress from the site to a public road. Contingency Measure Comply with vehicle freeboard requirements of Section 23114 of the California Vehicle Code to both public and private roads. 6

6. Administrative Control Measures In addition to implementation of site specific control measures outlined above, Vulcan Materials Company implements procedural and administrative controls to ensure employees, subcontractors and customer observe applicable dust control measures. The follow sections detail additional best management practice (BMPs) which include, inspection and maintenance procedures, employee training, signage, dust control supervisor, periodic review and update of this Plan. 6.1 INSPECTION AND MAINTENANCE PROCEDURES The following inspection and maintenance procedures are intended to ensure the proper operation and implementation of dust control measures: Conduct daily inspection of water spray and dust suppression systems to ensure proper function. Timely repair or replace malfunctioning dust control systems. Maintain fugitive dust log to ensure control measures are adequately implemented. Maintain a current copy of this Fugitive Dust Control Plan and Fugitive Dust Log onsite at all times. 6.2 EMPLOYEE TRAINING The following employee training procedures are intended to ensure the proper implementation of dust control measures. Have at least one person on staff trained in US EPA Method 22 (Visible Determination of Fugitive Emissions) At least one month, during tailgate meetings discuss and educate plant personnel on identification and implementation of corrective dust control measures. Have at least one person identified as a Dust Control Supervisor that: 6.3 MONITORING Is on the site or available on site within 30 minutes during working hours; Has the authority to expeditiously employ sufficient dust mitigation measures to ensure control measures are adequate; and Has completed South Coast AQMD Fugitive Dust Control Class and has a valid Certificate of Completion for the class. The following monitoring procedures are intended to ensure the dust control and contingency measures are implemented: A daily fugitive dust log will be utilized to record to ensure proper implementation of control measures to ensure the opacity limitations of Rule 6 1 301 and 6 1 302 are being met. A 7

current copy of the Fugitive Dust Plan and fugitive dust log will be maintained on site, and made available for review to County or BAAQMD inspectors upon request. Two (2) signs will be posted with the telephone number and person to contact at Vulcan Materials regarding dust complaints. The signs will conform to SCAQMD Rule 403 requirements. 6.4 PLAN REVIEW In addition to the control measures and contingency measures outlined above, Vulcan Materials Company will implement the following plan review procedures: At least annually, conduct a review of this Plan to determine if the existing control measures and contingency measures are adequate and weather additional control measures are warranted. Document the findings of the annual plan review, including review date, persons conducting inspection and if any follow up actions will be documented on the form provided in Appendix B. 8

APPENDIX A FUGITIVE DUST LOG

Fugitive Dust Source Category/Control Measures FUGITIVE DUST CONTROL LOG (CONTROL MEASURES) MONTH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Control Actions Earth (1c) Conduct watering as necessary to prevent visible emissions Moving from extending more than 100 feet beyond the active cut or mining area unless the area is inaccessible to watering vehicles due to slope conditions or other safety factors. Contingency Control Measures (1A) Cease all active operations, OR (2A) Apply water to soil not more than 15 minutes prior to moving such soil OPERATORS INITALS: Fugitive Dust Source Category/Control Measures 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 (2 a/b) Control Measure Apply dust suppression in sufficient quantity and frequency to maintain stabilized surface. Any areas which cannot be stabilized, as evidenced by wind driven fugitive dust must have an application of water at least twice per day to at least 80 percent of the unstabilized area. Disturbed Contingency Control Measures Surface (2B) Apply water to all unstabilized disturbed areas 3 times per Area day. If there is any evidence of wind driven fugitive dust, watering frequency is increased to a minimum of four times per day; Control Measure Inactive (3b) Apply dust suppressants in sufficient quantity and frequency Disturbed to maintain a stabilized surface; Surface Area OPERATORS INITALS:

FUGITIVE DUST CONTROL LOG (CONTROL MEASURES) MONTH Fugitive Dust Source Category/Control Measures 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Control Measure (4a) Water all roads used for any vehicular traffic at least Once per every two hours of active operations normal [3 times per 8 hour work day]; OR (4c) Apply a chemical stabilizers to all unpaved road Unpaved surfaces in sufficient quantity and frequency to Roads maintain a stabilized surface. Contingency Control Measures (1C) Apply chemical stabilizers prior to wind event, OR (2C) Apply water twice per hour during active operation, OR (3C) Stop all vehicular traffic Control Measure (5a) Apply chemical stabilizers; OR Open (5b) Apply water to at least 80 percent of the surface area Storage of all open storage piles on a daily basis when there is Piles evidence of wind driven fugitive dust; Contingency Control Measures (1D) Apply water twice per hour Paved Road 403 (d)(4) Control Measure Track- Shall not allow track-out to extend 25 feet or more in Out cumulative length from point of origin. All track out shall be removed at the conclusion of each work day or evening shift; and 403 (d)(5) Pave the surface extending at least 100 feet and at least 20 feet wide from vehicle egress from the site to a paved public road. Contingency Control Measures (2E) Comply with the vehicle freeboard requirements of Section 23114 of the California Vehicle Code for both public and private roads. OPERATORS INITIALS:

APPENDIX B PLAN REVIEW

APPENDIX B PLAN REVIEW Review Date: Field Verification Conducted: Current Plan Deemed Effective: YES/NO (circle one) YES/NO (circle one) Plan Reviewed by: Key Findings: Plan Changes: Plan Revision Date: