Waste Management in Stellenbosch Entering a new era. Presented by M S Haider GreenCape Waste Economy Workshop 26 March 2014

Similar documents
CURRENT STATE OF CONSTRUCTION WASTE IN THE CITY OF CAPE TOWN. A VAN VUUREN / 16 September 2014

BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION

Barry Coetzee (Pr. Eng, MBL) Manager: Technical Strategic Support City of Cape Town South Africa

BACKGROUND INFORMATION DOCUMENT

Rehabilitation of an Abandoned Open Cast Mined Area: From an Open Cast Pit to a Waste Disposal Facility - A Case Study

SOLID WASTE MANAGEMENT WASTE MANAGEMENT PLAN FOR EVENTS ALL QUESTIONS NEED TO BE COMPLETED IN FULL. Name of event: Venue:

INSTITUTIONAL ARRANGEMENTS AND FUNDING OF BULK INFRASTRUCTURE & IMPLICATIONS FOR THE PROVISION OF MUNICIPAL SERVICES TO LOCAL GOVERNMENT

Long Term Waste Management Master Planning for the Ekurhuleni Metropolitan Municipality

CONSTRUCTION AND DEMOLITION WORKSHOP

A secondary materials economy in construction and demolition waste - opportunities and challenges in concrete

SOLID WASTE MANAGEMENT PROGRAM of QUEZON CITY

INTRODUCTION SECTION 24G PROCESS

NEM:WA AMENDMENTS IMPACTS & CONSEQUENCES FOR WASTE MANAGEMENT INDUSTRY

Figure 1.1: Location of Majuba Power Station within the Pixley Ka Seme Local Municipality

Chantal Rudman and Kirsten Barnes IMESA October 2016

PROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE. Background Information Document (BID) ESCIENCE ASSOCIATES (PTY) LTD.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA

BOLAND ENVIRONMENTAL CONSULTANTS CC

BACKGROUND INFORMATION DOCUMENT FOR A PROPOSED SEWER IN GROOT DRAKENSTEIN, WESTERN CAPE

BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT

Public Private Partnership Procurement and Opportunities.

Barry Coetzee (Pr. Eng, MBL) Manager: Technical Strategic Support City of Cape Town South Africa

Colombia Waste NAMA. Strengthening the Solid Waste Sector while Reducing Emissions

Public Private Partnerships

Gracia Munganga Waste Economy Programme Manager GreenCape South Africa

Waste Statistics in the Emairte of Abu Dhabi 2012

Integrated Waste Management in Chiang Mai Province

ANNEXURE B EPWP SECTOR PLAN CITY OF JOHANNESBURG ENVIRONMENT & CULTURE SECTOR FOR THE

BUSINESS PLAN FOR THE MAKANA MUNICIPALITY FOR A MUNICIPAL COMMUNITY PARTNERSHIP PROJECT

Circular Economy Challenges in MENA.

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED REVERSE OSMOSIS PLANT AT HENDRINA POWER STATION, MPUMALANGA EXECUTIVE SUMMARY: FINAL BASIC ASSESSMENT REPORT

Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE

Figure 4. The proposed location of the Zalu Dam a) basin and b) wall.

EXECUTIVE SUMMARY: SCOPING REPORT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROCESS FOR VISSERSHOK NORTH LANDFILL WASTE MANAGEMENT LICENCE

DEPARTMENT OF ENVIRONMENTAL AFFAIRS. No November 2013 NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT NO.

10 September Background:

Manningham Works Code of Practice

1 INTRODUCTION. Figure 1.1: Steve Tshwete Local Municipality

Towards Greener Growth in South Africa

To license or not to license? Listed or Unlisted? Presented by: Stuart Gower-Jackson

Optron Enterprise Solutions

Thailand Policy and Strategy for. Waste Management. Taweechai Jiaranaikhajorn. Environmentalist, Professional Level

Engineering Compliance East London Regional Waste Disposal Site A Case Study

Business Process Outsourcing

COMPLIANCE MONITORING REPORT OF MOOKGOPHONG LOCAL MUNICIPALITY

Waste Statistics in the Emairte of Abu Dhabi 2011

Waste Statistics 2015

Beneficiation of Builders Rubble City of Cape Town PAST TO PRESENT. INFORMAL SETTLEMENTS,WATER AND WASTE SERVICES DIRECTORATE 9 th May 2018

Introduction. Challenges Related to Waste Reduction and Reuse AGENDA ITEM 6

Government Gazette Staatskoerant

Waste Statistics 2016

Waste to Energy Options in Developing Countries: The GIZ Perspective

Guidance for the AML/CFT Statistical return Year ended 31 December 2017 Regulated entities

STRIKING OIL IN KRAAIFONTEIN PRESENTATION TO IMIESA (WESTERN CAPE)

Background Location Objectives Project Activities Project Outcomes Benefits + Consequences

City of Red Deer Waste Management Master Plan

Chair of Southern Africa Regional Secretariat of UN-IPLA Programme and IWWG

Waste to Energy: Anaerobic digestion & Co-digestion technologies

RESPONSIBLE WASTE MANAGEMENT GREEN BUSINESS FORUM

BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE

February 2010 FINAL SURFACE WATER

Rubbish or Resource? Public Consultation

Country Analysis Paper. < Lao PDR>

GROBLERSHOOP WASTE DISPOSAL SITE ENGINEERING NEEDS ASSESSMENT & CONCEPTUAL DESIGN REPORT

Public Private Partnerships Workshop 22 FEBRUARY 2010 INTERNATIONAL CONVENTION CENTRE DURBAN - KWAZULU-NATAL - SOUTH AFRICA

Community Waste Management Initiatives Across India! Case Study 1: Waste Pickers in Pune and KKPKP! Written by: Mariam Abazeri! 3 June, 2014!

Challenges of integrated solid waste management at the local level in emerging countries

FOSTERING RESOURCE EFFICIENT & ZERO WASTE SYSTEMS IN NIGERIA: THE INDISPENSABLE ROLE OF THE PRIVATE SECTOR LAFARGE GLOBAL EXPERIENCE

Background on Prince William County. Balls Ford Organic Waste Management Project. Roles and Responsibilities of the partners

Proposed Expansion of the existing Natal Solvent Recovery facility on ERF 7590, Pinetown (10 Clubhouse Place, Westmead) REF: 12/9/11/L44704/4

ECONOMIC IMPACT STUDY

Phares P. Parayno 1 and N.D. Trang 2

Landfill2015. The Role of the Informal Waste Sector in Affecting Alternate Waste Treatment. Lloyd Wallace, Waste and Environmental Engineer

Current Situation and Challenges to Address on the Landfill of Tripoli

Waste Management Activities. Collection Transportation Storage Re-use, recycling and recovery Treatment Disposal. Waste Management Operators

STRATEGIC PLAN 2015/ /20

COMPLIANCE MONITORING REPORT OF PHUMELELA LOCAL MUNICIPALITY

Appendix 10.1 Community Perceptions of Project Impacts and Proposed Mitigation Measures

Private Public Partnerships: Sample Standard Bidding Documents for Design-Build-Operate (DBO) for Solid Waste Management

Environmental Management Programme (EMP)

2005 GREENHOUSE CHALLENGE PLUS AWARDS ENTRY FORM

BACKGROUND INFORMATION DOCUMENT SEPTEMBER 2014 MDEDET REF NUMBER: 17/2/3N-389

Evaluation of co-operatives as a developmental vehicle to support job creation and SME development in the waste sector

(24 July 2015 to date) NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT 59 OF 2008

James L. Stewart Chairman, BioEnergy Producers Association Waste Conversion Technology Conference August 23, 2017

Terms of Reference. Application type: External vacancy Job Title: Category: Duty station:

Waste Statistics 2017

PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL

Exploring waste to energy opportunities. Thembakazi Mali Senior Manager: Clean Energy Solutions

CDM OPPORTUNITIES UNDER WASTE MGT IN TZ : By Damian Casmiri, Environmental Protection and Management Services (EPMS).

STS 11: LOCAL STRATEGIES FOR ACCESS TO WASTE MANAGEMENT SERVICES TO ALL

DST/NRF/CSIR Chair in Waste and Society

Sustainable energy solutions for South African local government. A practical guide

Fast Tracking Hydro Infrastructure Build in Developing Economies. BJ Rochecouste Collet Technical Director Aurecon South Africa

Composting Organic Waste in Santa Cruz County

BACK GROUND INFORMATION DOCUMENT

Country Report. (Draft) < Malaysia >

Action 5. Monitoring Plan for the implementation of the Local Action Plan in the Region of Eastern Macedonia - Thrace

Transcription:

Waste Management in Stellenbosch Entering a new era Presented by M S Haider GreenCape Waste Economy Workshop 26 March 2014

Definition Contents Stellenbosch Municipality Strategic Objectives The Stellenbosch Devon Valley Landfill site Recycling Organic Waste Management Funding opportunities Section 78.3 and the PPP process Waste to Energy vs Waste to Food Opportunities

Preferred Investment Destination Greenest Municipality Safest Valley Dignified Living Good Governance & Compliance Stellenbosch Municipality Strategic Objectives THE innovation CAPITAL OF SOUTH AFRICA GREATER STELLENBOSCH INNOVATION TRANSFORMATION

Socio-Economic Statistics Income 2001 2006 2011 % of people living in poverty 35.3% 31.5% 29.0% Income inequality (Gini coefficient) 0.62% 0.62% 0.57% Human Development Index 0.64% 0.66% 0.69% Unemployment rate 2006 2011 Total 7633 (16.3%) 11 168(20.2%) Male (% share) 15.1% 20.4% Female (% share) 17.5% 20.0%

The Challenges facing Stellenbosch ito WM 1. Limited Landfill Airspace 2. Separation at source program without MRF 3. Resources, particularly qualified human resources 4. Change management and transformation 5. Compliance vs Outcomes-based approaches

Two distinct areas: The Devon Valley Landfill Site 1. The dump and now closed Cell 1 and Cell 2 2. The current landfill Cell 3 R18.3m airspace which may not even last 3 years, but can get a higher life expectancy.

The Closure, Rehabilitation and Capping of Cells 1 and 2 Closure: Firm to be appointed Aurecon Duration: Estimated to be 222 days Initial phase 27 days Undertake specialist studies - 75 days Draft BA Phase 115 days Final BA Phase 50 days Design making phase 76 days

The Closure, Rehabilitation and Capping of Cells 1 and 2 Rehabilitation and capping appointment of engineering consultant to draft design specifications - JPCE appointed Consultant and I will go through various design parameters to find best fit for site MIG funds of R38 m over 3 year period Will be seeking national and international designs Initial funds will be utilised on fencing and beautification of exterior of the site

The Closure, Rehabilitation and Capping of Cells 1 and 2 Design engineer has 6 weeks to come up with suitable design taking all issues into account Need comment from DWA (this will be a challenge) and D:EA&DP Contractor then to be appointed for cutting, shaping, capping installation and hydroseeding. Options for end-use plan

Drab look of site must be transformed

Drab look of site must be transformed

Drab look of site must be transformed

Waste Minimisation, Recycling and Drop-offs Recycling rate of approximately 8% - separation at source programme System incomplete and a farce Cost to minimise R1900/t vs cost to dispose of R390/t No MRF is biggest problem Recycling should not be a core municipal competency market driven and SM should be a facilitator Pilot project for 12 months to have mini-mrf and outsource an area for collection and distribution

The Wynberg Drop-off

The Wynberg Drop-off

The Wynberg Drop-off

The Wynberg Drop-off

The Wynberg Drop-off

The Wynberg Drop-off

The Wynberg Drop-off

Stellenbosch Drop-offs?? Stellenbosch Franschhoek Klapmuts

ORGANIC WASTE MANAGEMENT Greatest opportunity to explore Bokashi treatment Composting Substitute protein-feed? Eco-logs?

ORGANIC WASTE MANAGEMENT

ORGANIC WASTE MANAGEMENT

VARIOUS CURRENT INITIATIVES Project for Water Dutch Funding MAGIC COGTA funded for green material Youth in Waste EPIP (DEA) Pyrolysis, AD, Ecologs, Composting Waste for energy vs Waste for food

MSA SECTION 78.3 AND THE PPP APPLICATION Completed the S78.1 Funding of R2m to conduct study Need to run PPP process in parallel with S78.3 Training courses to attend from Treasury Appoint Transaction Advisor Feasibility studies to be undertaken Choice of appropriate solutions required Visit to KZN to investigate WtE fast-tracking

WHY WAS WtE NEVER TAKEN SERIOUSLY BY MUNICIPALITIES BEFORE? Cost of landfilling too cheap If we cannot landfill properly, run dumpsites or worse still open burning Perceived to be technologically easier Unknown territory! The anti-burn lobby Environmental Authorisation

Achtung!! No cost to Council Pilot project which we can show Failure to operate on day of visit Give us all your waste Create thousands of jobs Top secret Be the first to try this technology lead the way

WHERE HAVE PROPOSALS GONE WRONG? TECHNICAL PROPOSAL FINANCIAL PROPOSAL Often good only focus Very Poor Too many in pilot stage Unsustainable models Very little actual plants up and running for more than 3-5 years Does not take into consideration ratepayers Municipalities are not cash cows

CURRENT TREND Better understanding of the municipal need and beneficiation Focus on tried and tested technology Financial models are more in synch Realistic and scalable models - PPP

GREEN CAPE FOCUS Move from Waste-to-Energy to realm of Waste Economy Develop DST Taking waste economy out of municipal economy Can guidelines be put in place to simplify PPP process?

Way Forward Stellenbosch Municipality cannot rely on landfill anymore Alternatives need to be found Waste-to-Energy or Waste-to-Food becoming more feasible option Regional landfill still important as back-up, but not primary disposal mechanism Need to put out a Request for Proposals

DIRECTION Innovation Capital of South Africa? Transformation necessary in Stellenbosch Outdated planning must change Resources human and financial required

EVENT GREENING Commenced in Nov 2013 at FEI World Cup Showjumping Qualifier 59% diversion of waste WoordFees 72.3% diversion of waste WOW Festival 79% diversion of waste Need to build on this momentum

EVENT GREENING

EVENT GREENING

Opportunities with rubble With 115,000 cubic meters of clay soils and 20,000 tons of rubble, you could manufacture 22 million blocks which could build almost 8000 50m2 houses.

Opportunities with rubble Act now, make it happen and open opportunities

Thank you Dankie Enkosi Tel: +27 21 808 8224 Fax: +27 21 808 8026 Physical Address: Plein Street, Stellenbosch, 7600 Postal Address: PO Box 17, Stellenbosch, 7599 Website: www.stellenbosch.gov.za