FORM min Village. Chowgund, Tehsil. Doru District. Anantnag State

Similar documents
APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I (See paragraph 6) FORM 1

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram

FORM 1 BASIC INFORMATION S.NO.

Annex F Scoping Checklist

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

APPENDIX I (See paragraph 6) FORM 1

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

APPENDIX - I (See paragraph 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

APPENDIX I. (See paragraph 6) FORM 1

FORM-I for seeking clearance for project attracting CRZ notification

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

APPENDIX- I FORM- 1. (I) Basic Information:

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju

Sri.T.N.Balasubramanya

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.

FORM 1 Riverbed Sand Mining Project

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.

APPENDIX I (See paragraph 6) FORM 1

FORM 1 Riverbed Sand/Morrum / Mining Project

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

FORM 1 Riverbed Sand Mining Project

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information

Haridarshan Residency ( Row Type House & School Building )

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

(I) Basic Information:

M/S Overseas Min Tech Consultants, Jaipur 1

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)

APPENDIX I (See paragraph - 6) FORM 1

Sl. No. 1. Name of the Project/s : Chudeshwar Gravel Deposit (Narmada River) 2. Sl. No. of the Schedule : Category B-2 of Activity 1(A)

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I. (See Paragraph 6) FORM 1

Salai Godhani Stone Quarry of Mr. Arvind Janraoji Gajbhiye in Village Salai Godhani, Th Nagpur (Gra) & Dist Nagpur Form I APPENDIX-I FORM-1

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE

APPENDIX I. (See paragraph 6) FORM 1

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)

APPENDIX I. (See paragraph 6) FORM 1

FORM-I Basic Information

FORM 1 (Application for Environment Clearance)

Application for Prior Environmental Clearance (EC)

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project

JAI MAA SHARDA STONE CRUSHING

APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR QUARRYING BRICK EARTH. Natham Group Village. Kamuthi Taluk, Ramanathapuram District

FORM 1 BASREHI SAND DEPOSIT ON BETWA RIVER

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

FORM-I. Environmental Clearance (EC)

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens

FORM-I, PRE-FEASIBILITY REPORT FOR ENVIRONMENTAL CLEARANCE (EC) (Under Clause 6 of S.O.1533 of Environment Impact Assessment Notification, 2006)

30 TPH Fertilizer Blending unit for Customized NPK Production at Zuarinagar, Sancoale, Marmugao, SouthGoa, Goa

MANAKAWAS PLOT-1 TEHSIL-DADRI, DISTRICT-BHIWANI, HARYANA

APPENDIX I (See paragraph - 6) FORM 1

FORM 1. Basic Information. Sl. No.

APPENDIX I. (See paragraph -6) FORM- 1. S.No. Item Details 1 Name of the projects/s: Flag Stone Quarry

Ms.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District

S. Item : Details 1. Name of the Project : Flourspar, Quartz Mine (M.L.No. 4/95) 2. S. No. in the schedule : 1(a)

Ambey Mahila Swa Sahayata Samuh President. Smt. Tuleshwari Vill- Gangikot Post: Gangikot Teh.- Surajpur Dist: Surajpur (C.G.

FORM I (OPENCAST LATERITE MINE ha)

Form-1 FORM 1. Proposed salhan-bagda limestone mine ha( acres) M/s Jharkhand State Mineral Development Corporation Ltd.

Revised FORM - I & PRE-FEASIBILITY REPORT

Proposed Multiplex & Commercial Complex FORM I

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by

Form 1, Form 1(A) and Proposed ToR for Residential Project Pramukh Aura at Chala, Taluka: Vapi & District: Valsad, Gujarat.

UPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT

Form 1, Form 1(A) and Proposed ToR for Residential Project at Chala, Taluka: Vapi & District: Valsad, Gujarat.

Transcription:

Khasra.- 1273-min, Area: 4.459 Ha, Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Limestone Mine 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be/ handled / command and area/lease area/number of wells to be drilled. Area: 4.459 Ha Yearly proposed production in Tonnes is mentioned below: S.. Year Production (Tonnes) 1. 2016-17 40,042 2. 2017-18 57,969 3. 2018-19 61,902 4. 2019-20 67,032 5. 2020-21 69,825 Proposed Capcity: 40,042 TPA upto 69,825 TPA ( I st Year to V th Year) Maximum Production: 69,825 TPA at V th year. 4. New / Expansion / Modernization Existing Mine (Lease deed was executed on date (26.12.2005). w the lessee shall obtained Environmental clearance as per the EIA tification 2006 and the G.O. of J&K state Government. 5. Existing Capacity / Area etc. 2,383 TPA upto 6,275TPA ( 2012 to 2016 ) 6. Category of Project i.e. `A or `B Category B(2) 7. Does it attract the general condition? If yes,, It does not attract general condition please specify 8. Does it attract the specific condition? If yes,, it does not attract specific condition please specify 9. Location Plot / Survey / Khasra. 1273-min Village Chowgund, Tehsil Doru District Anantnag State Jammu & Kashmir 10. Nearest railway station / airport along with distance in km. Nearest Railway Station: Hillar Shahabad Halt Railway Station, Proponent s Signature.. 1

Khasra.- 1273-min, Area: 4.459 Ha, S.. Item Details 10.5 Km, NW Airport: Srinagar International Airport, 73.0 Km, NW 11. Nearest Town, city, District Headquarters along with distance in km. 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) Nearest Town: Verinag, 4.2 km, NW Nearest City & District: Anantnag, 27.0 Km, NNW Gram Panchayat- Chowgund Zila Panchayat Anantnag 13. Name of the applicant Mr. Sajad Ahmad Khan S/o Mr. Mohd. Yaqoob Khan 14. Registered Address Village: Kurigam, Quazigund, Tehsil: Doru, District: Anantnag (J & K) 15. Address for correspondence : Name Mr. Sajad Ahmad Khan Designation (Owner / Partner / CEO) Owner (Lessee) Address Mr. Sajad Ahmad Khan S/o Mr. Mohd. Yaqoob Khan Village: Kurigam, Quazigund, Tehsil: Doru, District: Anantnag (J & K) Pin Code E-mail sajadahmad97@gmail.com Telephone. 09906244733 Fax. ne 16. Details of alternative sites examined, if any. Location of these sites should be shown on a toposheet Mineral is naturally occurring resource and this is a site specific project. Hence no alternative sites can be chosen. 17. Interlinked Projects 18. Whether separate application of interlinked project has been submitted? 19. If yes, date of submission t Applicable 20. If no, reason 21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z tification, 1991? 22. Whether there is any Government Order / Policy relevant / relating to the site? t Applicable t Applicable t Applicable t applicable 23. Forest land involved (hectares) The Project site is free from Forest Land Proponent s Signature.. 2

Khasra.- 1273-min, Area: 4.459 Ha, S.. Item Details 24. Whether there is any litigation pending against the project and / or land in which the project is propose to be set up? (a) Name of the Court (b) Case. (c) Orders/directions of the Court, if any and its relevance with the proposed project. Activity 1.0 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.. Information/Checklist Confirmation / 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan). quantities /rates, wherever possible). As it is stone mining project there will be change in land use of the area. The terrain becomes flat after the excavations of stones. Some quarries will also form. They will act as water reservoir for the local people. Hence the change is beneficial to the local people. t Applicable 1.2 Clearance of existing land, vegetation and buildings? 1.3 Creation of new land uses? The lease area will continue to be wasteland with exposed limestone. However, part of the area will be used for plantation. 1.4 Pre-construction investigations e.g. bore t Applicable holes, soil testing? 1.5 Construction works? t Applicable 1.6 Demolition works? t Applicable 1.7 Temporary sites used for construction construction is required works or housing of construction workers 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations. Mining will be done according to mine plan. 1.9 Underground works including mining or tunneling? underground workings are proposed. There will be only open cast semimechanized. Proponent s Signature.. 3

Khasra.- 1273-min, Area: 4.459 Ha, S.. Information/Checklist Confirmation / quantities /rates, wherever possible). 1.10 Reclamation works? Part of the lease area will be used for plantation. 1.11 Dredging? t applicable 1.12 Offshore structures? t applicable 1.13 Production and manufacturing processes? The mining will be done according to Mining Plan 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? storage is required as collected/extracted material will be transported simultaneously to the destined places. As there is no overburden or soil cover in the area proposed for quarrying, the entire mineral produced will be useful. Laborers from nearby areas will be hired hence no need of housing. Temporary site office and rest shelters will be made. new rail, road is expected during construction & operation, the existing roads & infrastructure is sufficient for the process. The existing road facility is adequate for meeting additional traffic intensity during operational phase of mine. closure or diversion of existing transport routes or infrastructure will take place. As there will be no large scale electricity or water requirement for the project, therefore no transmission lines or pipelines are involved. As such there will be no impounding or damming throughout the year excepting monsoon when rain water will be collected in the excavated pits. Water so accumulated water will contribute to base Proponent s Signature.. 4

Khasra.- 1273-min, Area: 4.459 Ha, S.. Information/Checklist Confirmation / quantities /rates, wherever possible). flow. 1.22 Stream crossings? stream crossing through the site. Neither any surface drain nor any water course (minor) passes through the mine area. 1.23 Abstraction or transfers of water form ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? abstraction of natural flow of water in the form of ground or surface water in the lease area. Working will be done above water table. Water requirement of 7.5 KLD will be met from tanker supply. changes in the water bodies, drainage or runoff are anticipated. During operational phase, labor/personnel shall arrange for their own means of transport either on foot or by bicycle etc. to reach to the mine site. However excavated mineral during operational phase of mine shall be transported by trucks/ tippers/ trolleys hired on contractual basis. Long term dismantling or decommissioning or restoration works are not involved. t Applicable temporary or permanent influx of people is envisaged. The quarrying will be carried out during day time by deploying local workers, who will commute from their home. 1.29 Introduction of alien species? Only locally thriving species will be planted. Proponent s Signature.. 5

Khasra.- 1273-min, Area: 4.459 Ha, S.. Information/Checklist Confirmation / quantities /rates, wherever possible). 1.30 Loss of native species or genetic diversity? such loss is anticipated, as the mining area is stony and barren practically devoid of any vegetation. 1.31 Any other actions? t Applicable 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.. Information/checklist Confirmation / 2.1 Land especially undeveloped or agricultural land (ha) quantities /rates, wherever possible) Mining is proposed in barren area. Agricultural Land is not involved. 2.2 Water (expected source & competing users) unit: KLD Total approx. 7.5 KLD of water shall be required for drinking purpose, green belt development and dust suppression and daily visiting workers. The water requirement shall be met through Tanker Supply. 2.3 Minerals (MT) As this is limestone mineral mining project, so no other minerals are used in it. 2.4 Construction material stone, aggregates, Gitti / soil (expected source MT) construction material is required for this project. Only temporary office, rest shelter will be provided. 2.5 Forests and timber (source MT) t Applicable 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) It is proposed to work in two shifts. Electric power required for mine office and rest room will be taken from State Electricity Board. Mining machines will be taken from nearby retail outlet. 2.7 Any other natural resources (use other natural resources will be used. appropriate standard units) Proponent s Signature.. 6

Khasra.- 1273-min, Area: 4.459 Ha, 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.. Information/Checklist Confirmation / 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. quantities/ rates, wherever possible) t Applicable Suitable drainage and waste management measures have been adopted. This restricts stagnation of water or accumulation of water. change in occurrence of disease, due to proposed mining project. Mining is proposed in barren or pasture land. Therefore, it is expected that due to this activity benefits will be more than the losses. Project will have a positive effect on the welfare of local people by providing direct and indirect employment opportunity. hospital, school exists nearby the mine lease area up to 2.0 km radius from the mine site. 3.5 Any other causes Mining Operations mainly contribute to generation of dust i.e. fugitive dust emission. Sufficient measures have been included in Environment Management Plan to mitigate the adverse effect. Proponent s Signature.. 7

Khasra.- 1273-min, Area: 4.459 Ha, 4.0 Production of solid wastes during construction or operation or decommissioning (MT/month) S.. Information/Checklist Confirmation / quantities/rates, wherever possible) 4.1 Spoil, overburden or mine wastes solid waste will be generated 4.2 Municipal waste (domestic and or commercial wastes) Domestic and municipal waste, generated by the employees in the rest room, will be collected in bins and utilized for composting. 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) t Applicable 4.4 Other industrial process wastes t Applicable 4.5 Surplus product surplus product will be produced as excavation shall be done as per the demand and will be directly sent to destined places. 4.6 Sewage sludge or other sludge from t Applicable effluent treatment 4.7 Construction or demolition wastes t Applicable 4.8 Redundant machinery or equipment Redundancy of machinery or equipment, if any, will be disposed through authorized recyclers/ agencies. 4.9 Contaminated soils or other materials contaminated soil or other materials are envisaged. 4.10 Agricultural wastes Agricultural waste will be produced 4.11 Other solid wastes other solid waste will be generated 5.0 Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.. Information/Checklist confirmation / 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources quantities/ rates, wherever possible) Emissions from transport vehicles are anticipated during operation of the quarry. Proponent s Signature.. 8

Khasra.- 1273-min, Area: 4.459 Ha, S.. Information/Checklist confirmation / quantities/ rates, wherever possible) 5.2 Emissions from production processes Some dust will be generated during excavation of limestone which will be temporary in nature & for a short duration. It can be controlled by sprinkling of water at regular interval of time. 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odors from handling of materials including construction materials, sewage and waste Regular water sprinkling shall be done to minimize dust emission likely to be generated from movement of vehicles and mining activities. Insignificant fugitive dust will be generated during loading and transportation of mine products. construction activity is envisaged. Hence, no emissions are anticipated. Water sprinkling and dust collection system will be adopted wherever necessary so that the impact on the environment will be minimal. Handling of construction materials, sewage and waste is not envisaged. 5.6 Emissions from incineration of waste incineration will be done. 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) such activity will take place. 5.8 Emissions from any other sources ne Proponent s Signature.. 9

Khasra.- 1273-min, Area: 4.459 Ha, 6.0 Generation of ise and Vibration, and Emissions of Light and Heat S.. Information/Checklist confirmation / 6.1 From operation of equipment e.g. engines, ventilation plant, crushers quantities/rates, wherever possible) with source of information data ise will be generated during mining Operation which will be negligible to the surroundings. All the equipment s will be regularly maintained to keep noise level within the prescribed limit. 6.2 From industrial or similar processes industrial process is involved at mine lease area. 6.3 From construction or demolition construction or demolition is proposed. 6.4 From blasting or piling Mine will be worked manually in the initial stages and blasting will be limited to jack hammers holes (32mm dia) which shall be utilized for drilling. Scientific and controlled blasting will be done so noise will be momentary. There will be vibration from blasting but no long term impact on nearby area will be anticipated. 6.5 From construction or operational traffic Transport of mineral will generate noise. 6.6 From lighting or cooling systems Lighting arrangement will be done as per MMR 1961, Regulation 146. 6.7 From any other sources t Applicable 7.0 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.. Information/Checklist Confirmation 7.1 From handling, storage, use or spillage of hazardous materials / quantities/ rates, wherever possible). Explosives will be procured/supplied by Licensed contractor on the day of working and will be handled and used by persons certified under MMR 1961. Proponent s Signature.. 10

Khasra.- 1273-min, Area: 4.459 Ha, S.. Information/Checklist Confirmation 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge. 7.3 By deposition of pollutants emitted to air into the land or into water / 7.4 From any other sources ne quantities/ rates, wherever possible). Domestic sewage will be treated in septic tanks and discharged in soak pits. Other than that no effluent will be generated. Water sprinkling is being done and proper plantation shall be maintained to minimize the environmental impact. Fugitive dust may get deposited into surrounding area which will have negligible impact. 7.5 Is there a risk of long term buildup of pollutants in the environment from these sources? Emission of particulate matter will be controlled through water spray at regular intervals. Therefore, long-term buildup of pollutants is not a problem. 8.0 Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.. Information/Checklist confirmation 8.1 From explosions, spillages, fires etc. from storage, handling, use or production of hazardous substances / quantities/rates, wherever possible) All appropriate measures will be taken as described in mining and environment management plan (prescribed in MMR 1961) during operations. Mining will be done open cast semi-mechanized. in a safe and scientific manner and precaution will be taken against all risks as per norms prescribed by DGMS. 8.2 From any other causes Risk of accidents expected: 1. During loading of minerals into Truck/ tippers-trolley. 2. During transportation. Accidents can be avoided by taking good safety practices. Proponent s Signature.. 11

Khasra.- 1273-min, Area: 4.459 Ha, S.. Information/Checklist confirmation / quantities/rates, wherever possible) 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Possibility of earthquake as the area falls in Seismic Zone-V. Although complete precautions will be taken during the project activity to suppress the chances of any accident. 9.0 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. S.. Information/Checklist Confirmation / 9.1 Leads to development of supporting Utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment etc.) quantities/rates, wherever possible) There will be no development of supporting utilities, ancillary development or development stimulated by the project which could affect the environment. t Applicable Housing development t Applicable Extractive industries t Applicable Supply industries t Applicable Other t Applicable 9.2 Lead to after-use of the site, which could have an impact on the environment. The lease area is stony terrain so it is not feasible to undertake the plantation with in lease hold. The plantation will be undertaken outside the lease area. 9.3 Set a precedent for later developments. The lessee intends to go for proper and planned development of the area, which will set a precedence to follow by other lessees in the area. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects. other mine lease is located within 500m radius of mine lease area. Proponent s Signature.. 12

Khasra.- 1273-min, Area: 4.459 Ha, Environmental Sensitivity: S.. Areas Name/ Identity Aerial distance (within 15 1. Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value. 2. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests. ne Water Sources: Sandran River: Reserve Forest: Yarhun Forest: Km) Proposed project location boundary ne 1.0 Km, NE 1.0 Km, NE Mountain: ne 3. Areas used by protected, important or ne ne sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration. 4. Inland, coastal, marine or underground ne ne waters. 5. State, National boundaries. ne ne 6. Routes or facilities used by the public for Verinag Town 250 m, NE access to recreation or other tourist, Road pilgrim areas. Verinag Feeder 4.5 Km, NW Road NH-44 Hillar Shahabad Halt Railway Station, Anantnag Railway Station 5.5 Km, NW 10.5 Km, NW 30 Km, NW Kokernag Garden 9.0 Km, NNE Proponent s Signature.. 13

Khasra.- 1273-min, Area: 4.459 Ha, S.. Areas Name/ Identity Aerial distance (within 15 7. Defense installations. ne ne Km) Proposed project location boundary 8. Densely populated or built-up area. Bata Gund Kokagund Verinag 1.5 Km, NW 3.2 Km, NW 4.2 km, NW 9. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities). Sadi Wara Education Primary School Army Goodwill School 4.5 km, WNW 4.2 Km, NW 11.0 Km, NW 10. Areas containing important, high quality or scarce resources. (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11. Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme adverse climatic conditions) Hospital Govt. Hospital Worship- Masjid Sharief 4.2 Km, NW 3.2 Km, NW Nil ne The lease area falls under Seismic Zone-V, which indicates high possibility of earthquake. (IV) Proposed Terms of Reference for EIA studies: t Applicable Proponent s Signature.. 14

Khasra.- 1273-min, Area: 4.459 Ha, UNDERTAKING I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date: Place: Signature of the applicant Mr. Sajad Ahmad Khan S/o Mr. Mohd. Yaqoob Khan (Proponent s Signature) Village: Kurigam Quazigund, Tehsil: Doru, District: Anantnag J & K te: 1. The projects involving clearance under coastal Regulation zone tification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendations of the State coastal zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z. tification, 1991 for the activities to be located in the CRZ. 2. The projects to be located within 10 km of the National parks, sanctuaries, Biosphere Reserves, Migratory corridors of wild Animals, the project proponent shall submit the map duly authenticated by chief wildlife Warden showing these features vis-a-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon (at the stage of EC). 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project. Proponent s Signature.. 15