SECTION ENGINEER'S OFFICE

Similar documents
SECTION TEMPORARY FACILITIES AND CONTROLS

SECTION TEMPORARY FACILITIES AND CONTROLS CONSTRUCTION MANAGER EDITION

TO THE TECHNICAL SPECIFICATION OF WORKS FOR DESIGN, PROCURMENT AND CONSTRUTION OF THE NATURAL GAS INTERCONNECTOR GREECE-BULGARIA (IGB PROJEC)

ADDENDUM NO. 2 CITY OF FORT MORGAN BUILDING MAINTENANCE DEPARTMENT CITY JANITORIAL SERVICES. November 21, 2017

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following:

ATTACHMENT A. Bid # 6793

ADDENDUM No. 2. ITB No WTP LIME RESIDUAL REMOVAL CONTRACT No. 2 DREDGING AND HAULING

REQUEST FOR PROPOSAL FOR UTILITY TRUCK BOX. Instructions

PCC Pavement Mix Proportioning and Strength

Facilities Management Service and Support Function Needs

TABLE OF CONTENTS ARTICLE NUMBER DESCRIPTION PAGE 1 PROJECT DESCRIPTION 2 2 PHYSICAL CONDITIONS/CONTRACT PLANS 2 3 PROJECT COORDINATION 3-5

GENERAL SPECIFICATION FOR WEIGHING OF MATERIALS

University of New Mexico Environmental Services Design & Development Standard Requirements

Butte County Board of Supervisors Agenda Transmittal

Occupational Health and Safety Program Manual Chapter 13 Inspections. Table of Contents. April

11/1/2016. Smoke detectors will be furnished by MHA and installed by contractor.

Drug Store Registration Audit Checklist

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

WATER RULE 11 WATER SERVICE CONNECTIONS, WATER METERS AND RELATED APPARATUS

Vacant Unit Turnover Services Invitation for Bid (IFB) Project No

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

University of Toronto Cleaning Specifications

NC State University Design and Construction Guidelines Division 00 Planning & Design Space Planning

Pennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

in the event of default on payment, CLIENT agrees to pay STRATUS costs for collection and/or attorney fees.

SECTION 807 PUMP STATION REHABILITATION

AMENDMENT TO REQUEST FOR PROPOSALS Janitorial Services UAF Chukchi Campus

PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS

JOINT GUIDELINE #5. Temporary Job Utilities and Services. Construction Industry Survival Kit. The Second in a Series

The University of Alabama General Requirements for Purchase Orders Involving Public Works

1.07 SUPPLEMENTS PRODUCTS (NOT USED) EXECUTION (NOT USED) END OF SECTION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY GROUND STORAGE. Section GROUND STORAGE TANK (GST) MODIFICATIONS, CLEANING AND DISINFECTION

Job Description. Capital & Building Projects and Facility Operations. Deputy Superintendent of Finance and Operations

CITY OF FARGO SPECIFICATIONS SEAL COATS

For Receipt Prior To 3:00 PM Local Time Wednesday, March 29, 2017 And Will Be Publicly Opened And Read At 3:30 PM.

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR

SCOPE OF WORK WORKFORCE ALLIANCE, INC. REQUEST FOR PROPOSAL FOR JANITORIAL

SAN JOAQUIN COUNTY PURCHASING AND SUPPORT SERVICES PURCHASING DIVISION

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

The following information is required when submitting a building permit application:

SECTION PROJECT CLOSEOUT

Santa Monica Pier Vending Cart Guidelines

EMPLOLYMENT APPLICATION P.O. BOX 3810 BUTTE, MT

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

ADDENDUM No. 1 July 11, 2013 ASBESTOS ABATEMENT SPECIFICATIONS. Crawlspace Abatement and New Beginnings Academy

A. Comply with governing regulations and rules/ recommendations of franchised utility companies, local ordinances, and regulations.

The University of Texas at Austin September 30, 2011

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE

Pennsylvania Department of Transportation District 8-0 Rest Area Sites 45 and 46 Specifications for Landscaping and Grounds Maintenance

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS

Main Building Auditorium

This section applies to service areas and loading docks for new construction and major renovations.

MATERIAL ALLOWANCES AND UNIT PRICES

Request for Proposal for Cleaning Services. City of Columbus 300 E. Maple Columbus, KS

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

Community Action Partnership of Kern TH Street, Bakersfield, CA Fax: REQUEST FOR PROPOSAL

SECTION 503 TEMPORARY PAVEMENT RESTORATION

Specific requirements for individual units of work are included in the appropriate sections in Divisions 2 through 16.

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

**BID NO: 3823 Service Contract JANITORIAL

A. The Contractor shall limit his construction activities, including materials storage, to areas designated by the Owner's Representative.

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

PROVIDE A BRIEF DESCRIPTION OF THE PROPOSED DEVELOPMENT

Title 13 PUBLIC SERVICES

A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

Lost Canyon II LLC EXHIBIT B SCOPE OF WORK DESIGNATED TASK STUCCO

OFFICE OF PROCUREMENT COOLING TOWER REPLACEMENT, CT BUILDING RFP NO.: RFP OPENING DATE: APRIL 16, 3:00 PM ADDENDUM #4.

HORRY COUNTY SOLID WASTE AUTHORITY, INC.

NOTICE TO HOME IMPROVEMENT CONTRACTORS INVITATION TO BID Project # Housing Rehabilitation Shelby County, Tennessee

Date of Addendum: June 4, 2015 Bid Opening: Wednesday June 10, 2015, 1:30 P.M. Local Time

SECTION EMBANKMENT

August 2015 INTERIM No. 180 (I)

University of North Carolina at Charlotte Design and Construction Manual Section 2, Division 11 Equipment SECTION 2 DIVISION 11 EQUIPMENT

SECTION 2 DIVISION 11 EQUIPMENT

CONSTRUCTION GUIDELINES

City of Willow Park 516 Ranch House Road Willow Park, Texas Phone: (817) * Fax: (817)

City of Roanoke. Commercial Permit Submittal Guidelines

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

RESIDENTIAL FIRE SERVICE METERS Addendum #1

REQUEST FOR QUALIFICATIONS ARCHITECTURAL

Commercial Construction Reference Guide

REQUEST FOR PROPOSAL

SECTION GENERAL EXCAVATION

COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

Job Order Sewer Repair Services

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

CHARTER TOWNSHIP OF SHELBY REQUEST FOR QUOTE

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM

INVITATION TO BID CITY OF HOPKINSVILLE

SPECIFICATIONS JANITORIAL SERVICES

Janitorial Services. If interested in participating, this RFQ will be posted in on our website at

SECTION 920 SANITARY AND STORM SEWER MANHOLES

BID # 19-6 UNDERGROUND ULITILITY SERVICE CONTRACT SECTION C SPECIFICATIONS OWNER

Greenix 3w Emergency Shelters. SIP Supply, LLC

SECTION TEMPORARY FACILITIES AND CONTROLS

Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington

Transcription:

01200-1 of 5 SECTION 01200 ENGINEER'S OFFICE 01200.01 GENERAL A. Description This item shall consist of furnishing and maintaining in good condition a suitable office in a location acceptable to the Engineer in the immediate vicinity of the project site. The office shall be separate from any Office used by the Contractor and shall be for the exclusive use of County personnel and/or the Owner's representatives. B. Related Work Included Elsewhere Mobilization; Section 01100. C. Quality Assurance The engineer will inspect the condition and contents of the engineer's office at the beginning of the project and periodically for duration of the project. Any deficiencies will be reported to the Contractor who will promptly take whatever actions are necessary to correct the deficiency. D. Submittals The Contractor shall furnish proof to the Engineer that insurance is in effect which covers the engineer's office and contents as specified in Section 01200.02, Article C, prior to the start of any construction activity. The insurance must be kept in effect until the completion of the project, and evidence renewal of the policy, as necessary, shall be furnished by the Engineer. The insurance shall be in form, substance, and coverage satisfactory to the Engineer. 01200.02 MATERIALS A. Materials Furnished by the County 1. The County will not furnish any materials for the engineer's office. 2. The Contractor may purchase water from the County's potable water system and may be allowed to make a temporary sanitary sewer connection to the public system. The Contractor shall contact the Department of Utilities, Meter Section for availability of potable water and conditions. Temporary connection permits to either water or sewer systems, if allowed, shall be obtained through the Inspections and Permits Department.

ENGINEER S OFFICE 01200-2 of 5 B. Contractor's Options The Contractor may furnish a built-in-place, trailer type, or other office space meeting the requirements specified herein. C. Detailed Material Requirements 1. Type Engineer's office types specified in the Contract Documents shall have minimum square foot floor areas as follows: 2. General Requirements Type 1-150 square feet Type 2-200 square feet Type 3-400 square feet Offices shall be waterproofed, sealed, and insulated. All doors, both exterior and interior, shall be equipped with locks. Windows to furnish natural light shall be constructed so as to open and close and shall have latches. Screens shall be provided for all exterior windows and doors. Screen doors shall be equipped with springs and latches. Satisfactory electric lighting and lighting services shall be furnished, and a minimum of two duplex convenience outlets shall be provided in each room. Heating and air conditioning equipment shall be furnished to maintain a temperature of not less than 70 Degrees Fahrenheit and no more than 78 Degrees Fahrenheit. Buildings shall be attractively painted on the outside and provided with a sign at least 4 feet long and 1 foot high, lettered to read as follows: FIELD OFFICE - ANNE ARUNDEL COUNTY - Department of Public Works. The letters, not less than 3 inches high, shall have a white border at least 1.5 inches wide. Floors shall be double thickness with building paper between. 3. Facilities and Office Equipment Potable, cool water and neat, lockable sanitary toilet accommodations shall be provided. Toilet facilities shall be furnished with a sanitary napkin dispenser. They shall meet the requirements of the State Department of Health and/or the County Health Department. The following are minimum requirements for office equipment: a. Office type desks shall have at least two drawers on each side and minimum top dimensions of not less than 32 inches x 60 inches. b. Comfortable chairs and stools as required. c. Fire resistant filing cabinet(s) (D Label) equipped with lock. d. A plan rack.

ENGINEER S OFFICE 01200-3 of 5 e. Utility tables 30 inches high and having top dimensions of not less than 30 inches x 72 inches. f. Slant top drafting tables about 40 inches high at the front edge and having top dimensions not less than 36 inches x 72 inches. g. Closets, extending the full height from floor to ceiling, measuring not less than 24 inches x 30 inches in plan and equipped with locks and at least two shelves. h. Overhead cabinets not less than 15 inches deep and 18 inches high, equipped with a hinged door for each 2 feet of length, satisfactory door latches, and at least one shelf. i. One sanitary type water cooler supplied with water, which shall be kept cooled. j. One electric printing calculator with an instruction manual. k. One fire extinguisher - Dry Chemical, Multi-Purpose ABC (minimum size, 10 pound), equipped with a visual air pressure gauge. The fire extinguisher shall be checked monthly for stored pressure, etc.; also it shall be checked and tagged by a licensed company annually, and after each use. l. One first aid kit equivalent to 24-unit first aid kit as described in Title 29, Code of Federal Regulations 1926.50 (d) 2. The first aid kit shall be checked monthly and replenished to full complement monthly and after any accidents. m. One "Army litter" type stretcher. n. Electric typewriter. o. Telephone(s) for the exclusive use of the Engineer. Emergency telephone numbers of local doctors, ambulance services, hospitals, police, fire and rescue departments shall be conspicuously posted in the office. Telephone(s) shall be a domestic brand of telephone(s). The two telephones required for the Type 3 office shall be on separate lines with hold and intercom buttons for each phone. The system shall be of a modular design. p. Telephone answering machine. 4. Maintenance The engineers office is to be maintained in a clean and sanitary manner. It will be the responsibility of the Contractor to have trash removed daily. The floors

ENGINEER S OFFICE 01200-4 of 5 shall be swept, damp mopped, and waxed bi-weekly. Interior and exterior windows shall be cleaned monthly. Sanitary facilities shall be cleaned and stocked daily, and the water cooler refilled as necessary. 5. Insurance Insurance of twenty thousand dollars ($20,000) (non-deductible) shall be provided to protect the County against any loss of its property due to fire, theft, vandalism, storm, or flood. It shall also include losses and damages to property of the County's employees stored in the office for use in performance of their duties. 6. Parking A designated parking area shall be provided for all field offices for the exclusive use of County employees. Signs shall be posted by the Contractor to designate the assigned parking areas and enforcement of parking rules shall be the responsibility of the Contractor. This parking area will be stabilized as directed by the Engineer. 7. Tabulation of Detailed Requirements for Specific Type of Office Office Type Designation Minimum Requirements 1 2 3 Minimum Floor Space (Square Feet) 150 200 400 Minimum Inside Dimensions (Feet) 10 x 15 10 x 20 20 x 20 Rooms, Number & Size (Feet) 1 1 2-10 x 20 Desk, Office Type 1 2 2 Exterior Door(s) 1 1 2 Minimum Window Area (Square Feet) 30 45 40 Per Room Chairs 3 4 6 Stool(s) 1 1 2 Filing Cabinet, Fire Resistant with lock 1-Two Drawer 1-Two Drawer 1-Four Drawer Filing Cabinet with lock ---- ---- 1-Four Drawer Utility Cabinet with three (3) adjustable 1 1 1 shelves Plan Rack 1 1 1 Utility Table(s) 1 1 2 Drafting Table(s) 1 1 2 Closet(s) 1 1 2 Overhead Cabinet (length in feet) 6 8 8 Printing Calculator (as specified) 1 1 1 Fire Extinguisher (as specified) 1 1 1 First Aid Kit 1 1 1 Electric Typewriter 1 1 1 Modern Paper Copy Machine with single ---- ---- 1 step operation County Parking Spaces 4 4 6 Telephone(s) 1 1 2

ENGINEER S OFFICE 01200-5 of 5 01200.03 EXECUTION The office shall be set up, equipped, and made ready for use prior to commencement of any work on the project and shall remain until all field records have been completed. Upon removal, the location shall be cleaned up and, if necessary and appropriate, reseeded. The area shall be left in a condition acceptable to the Engineer. 01200.04 METHOD OF MEASUREMENT Engineer's office will not be measured but will be paid for on a lump sum basis. 01200.05 BASIS OF PAYMENT A. General Payment of 50% of the lump sum bid price will be made as part of the first monthly estimate subsequent to complete installation of the engineer's office. The remaining 50% will be prorated and paid in equal amounts on each subsequent monthly estimate. The number of months used for prorating will be the number estimated to complete the work. The final month's prorata amount will not be paid until the final estimate. The price bid shall include furnishing all labor, materials, equipment, services, and incidentals necessary to provide, equip, maintain, insure, remove, and dispose of the office and clean up the site. Payment will also include installation, maintenance, and removal of the engineers parking area. The lump sum price bid shall prevail for offices built as described, equivalent trailer space, or other office space when such substitution is permitted. B. Utility Services Utility services including water, sanitary sewerage, fuel, electric, telephone shall be furnished, installed, and paid for by the Contractor including all monthly usage bills. The cost of utility services including monthly utility bills are included in the lump sum bid price for Engineers Office.