Addendum No. 2 February 19, 2014 City University Construction Fund Engineering Design Services Requirements Contracts RFQ Project No.

Similar documents
Department of Public Works Division of Engineering. Nassau County, New York

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

1) Please share the last years expenditure under this contract. Answers: LIPA expects to spend approximately $1.2 million a year.

MARYLAND STADIUM AUTHORITY

MTA - NEW YORK CITY TRANSIT 2 BROADWAY NEW YORK, NY DIVISION OF MATERIEL web.mta.info/nyct/procure/nyctproc.htm

APPENDIX A. Consultant Solicitation for Fiscal Year for Four As-Needed Environmental Services Contracts. Issue Date: January 10, 2014

PRE-QUALIFICATION FOR PROVISION OF TEAM BUILDING CONSULTANCY SERVICES TENDER NO. KPPF /HRA-B/1-A/22/17-18

If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado


Questions received on Creedmoor PC Major Renovation for Outpatient Residence, Building 70 and DASNY s responses:

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW

MARYLAND STADIUM AUTHORITY

Issue Date: August 21, 2015

Introduction. Definitions. The following definitions shall apply to and are used in this Request for Qualifications:

RFP SOURCING SERVICES AND TEMPORARY STAFFING AGENCIES. 1. Is this a new solicitation? If not, please share the name of incumbent vendors.

Request for Proposal For: 2018 American Bar Association Temporary Services

Introduction. Definitions. The following definitions shall apply to and are used in this Request for Qualifications:

Request for Qualifications for Master Agreement

University of Washington. Request for Qualifications ARCHITECTURAL DESIGN SERVICES FOR. UW Fluke Hall Labs and Building Renewal Project Number:

PENNSYLVANIA TURNPIKE COMMISSION

PROFESSIONAL SERVICES PREQUALIFICATION APPLICATION INSTRUCTIONS FOR FORM 48A Revised January 2009

Terminal D South Expansion - Construction Manager-At-Risk (CMAR)

RFP 3512R09 Strategic Consultant Services for the Office of Policy and Public Private Partnerships Addendum 3 Appendix H Questions & Answers

PENNSYLVANIA TURNPIKE COMMISSION

Erie County Medical Center Corporation. Addendum Number 1 to RFP # 21728

REQUEST FOR PROPOSAL # Temporary Staffing Services for Union County

As a state agency, the College administration is required to develop procedures for Construction Manager selection.

St. Lucie Public Schools

REQUEST FOR PROPOSALS

City of Santaquin REQUEST FOR PROPOSALS For Engineering Services for the East Side Booster Pump Station

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 11, DUE DATE: December 28, 2017

Request for Qualifications for Master Agreement

Request for Qualifications for Architectural Services

REQUEST FOR PROPOSAL For Legal Services Bid Number:

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017.

REQUEST FOR QUALIFICATIONS LEGAL SERVICES FOR THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY RFQ NUMBER 17-01

REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m.

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 20, DUE DATE: January 11, 2019.

City of Dawson Creek Request for Proposals No

Addendum 3 publishes and answers questions related to the Request for Qualifications ( RFQ ) issued on November 24, 2014:

REQUEST FOR PROPOSALS FOUR YEAR CONTRACT FOR TEMPORARY EMPLOYEE SERVICES BID NO: Addendum 1: August 16, 2018

Supply of Office Furniture, Fittings, Furnishings & other Equipments.

New York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together

Request for Qualifications Information (RFQI) No C146. Mechanical, Electrical, Plumbing and Fire Protection Engineering Design Services

ADDENDUM NO. 1 Questions and Answers

City of Frederick PURCHASING DEPT.

TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL

BID No: 04/17 REQUEST FOR PROPOSALS FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES

19A NCAC 02E.0702 Solicitation and Award of Contract 19A NCAC 02E.0703 Prequalifying to Award - Professional Services Firms

REQUEST FOR QUOTES (RFQ) Arbor E & T, LLC. Workforce Contractor for Workforce Solutions for South Texas

Request for Qualifications Statements

SUBJECT: REQUEST FOR QUALIFICATIONS FOR ON-CALL INFORMATION TECHNOLOGY SERVICES

Request for Proposals for Enterprise Resource Planning System Replacement Consultants Mariposa County, CA

REQUEST FOR QUOTATION INVITATION

SAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No Solicitation No. B DD

RFP SA 1804-Recruitment Services. Addendum #2

Beaverton School District Capital Program Purchasing SW Merlo Road, Beaverton, OR Phone:

Request for Proposals CONTRACTED LANDSCAPE ARCHITECTURE SERVICES

Consultant for Municipal Engineering Services

REQUEST FOR PROPOSAL (RFP)

08/09 RIGHT OF WAY AND UTILITIES DIVISION PROCEDURES FOR THE PROCUREMENT OF RIGHT OF WAY ACQUISITION CONSULTANTS

Ground Transportation Management Services

REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF CLAIMS LITIGATION INVOICE REVIEW SERVICES GSMJIF. ISSUE DATE: October 2, 2017

PUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD

LOWER MANHATTAN DEVELOPMENT CORPORATION

Request for Qualifications for Historic Resources Services

ADDENDUM NO. 3. Item 3 NOTICE OF OPPORTUNITY - REPLACE in its entirety with the attached ***REVISED 08/03/2018

Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary FOR

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:

SECTION I: Corrections, Deletions, Revisions to RFP

Cedrick T. Fulton President. Solicitation RK-23C. Design-Build Services for New Harlem River Drive Connector Ramp

Quad Cities Chamber of Commerce. Request for Proposals for HUMAN RESOURCES MANAGED SERVICES

Request for Proposal. February 6, 2017

Amendment 01. Issued: August 18, For. RFP 18-KG-0725(BF): Professional Design Services for Douglass Valley Elementary School

QUESTIONS AND ANSWERS Request for Proposals ( RFP ) for Advertising Placements, Marketing and Consultant Services

PIEDMONT TRIAD AIRPORT AUTHORITY

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners)

City and County of San Francisco

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018

REQUEST FOR QUOTATIONS (RFQ)

Invitation for Bid - Standard Office Furniture / Task Chair

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

Request for Proposal for Annual Financial Audit Services

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

CM AT RISK RFQ INTEREST FORM (For Submission to Cambridge Housing Authority Immediately) Revitalization of Frank J. Manning Apartments

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018

A. MISSION AND STRUCTURE OF HARVESTWORKS, INC.

REQUEST FOR QUALIFICATIONS

LOWER MANHATTAN DEVELOPMENT CORPORATION

CITY OF CHICAGO DEPARTMENT OF BUILDINGS

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS

Contracting for Architectural and Engineering (A/E) Services Webinar. August 30, AM to 11:30 AM

State of North Carolina Department of Health and Human Services

REQUEST FOR QUALIFICATIONS ARCHITECTURAL

Transcription:

Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 16 th Floor New York, NY 10019 Tel: 646-664-2700 Addendum No. 2 February 19, 2014 City University Construction Fund Engineering Design Services Requirements Contracts RFQ Project No. CITYW-CUCF-02-14 This Addendum is issued for the purpose of amending the Request for Qualifications ( RFQ ) as below and is hereby made a part of said RFQ to the same extent as though it were originally included therein. The due date for submitting Responses to the RFQ has been extended to Tuesday, March 4, 2014 by 12:00 Noon. Attachment 2 of the RFQ is replaced in its entirety by Attachment 2 (Amended February 19, 2014), included herein. All Responders must use the amended Attachment 2 document in preparing their submission. This Addendum is also issued for the purpose of conveying the attached Questions and Answers, which include responses to the questions that were emailed to the CUNY Contracts Department, and that where applicable amend the RFQ. All other information provided herein is made in good faith for information purposes only and does not in and of itself change the Solicitation. Changes to the Solicitation may only be made by formal amendment if and when required. Contact: Michael Feeney or Michael Rabin, cuny.builds@cuny.edu By signing in the space provided below, the Responder acknowledges receipt of this Addendum. This Addendum must be signed by an authorized representative of the Responder and submitted with the Response. Name of Responder Name of Authorized Signature Date Responder Representative Title

Amended February 19, 2014 ATTACHMENT 2 MEP PROJECT STAFF SALARY RATES MEP Project Staff All-inclusive Hourly Rates: The Responder shall be paid for staffing expenses for project personnel identified in the approved Staffing Plan for each project. All Inclusive Hourly Rates: The All Inclusive Hourly Rate shall apply to all hours during which the individual performs services for the Project. No increase in such rates shall be provided for services performed during overtime hours. Such All Inclusive Hourly Rates shall be deemed to include: (1) all direct salary expenses incurred for each assigned individual; (2) all expenses related to management and oversight, including, without limitation, any time spent by principals performing such duties; (3) all expenses related to overhead; (4) any anticipated profit; (5) all employer payments mandated by law, including without limitation, social security and Medicare taxes, insurance (Worker s Compensation, Employers Liability, Unemployment); (6) all employer contributions, if any, to retirement plans, including without limitation pension and/or deferred compensation plans, and (7) all costs for any and all other fringe and/or supplemental benefits. MEP PROJECT STAFF TITLES Project Executive Project Manager Assistant Project Manager Contract Manager Office Engineer Clerical ALL INCLUSIVE HOURLY RATE NOTE: Do not leave any blanks nor qualify fees in any way. Do not retype this form. Attach additional pages if necessary.

Addendum No. 2 February 19, 2014 City University Construction Fund Engineering Design Services Requirements Contracts Project No. CITYW-CUCF-02-14 The following Questions and Answers pertain to Project No. CITYW-CUCF-02-14, Engineering Design Services Requirements Contracts: 1. I did not see a proposal meeting date the RFQ - CUCF Engineering Design Services. Is there one? No. 2. a. What firms currently hold the Contract for Environmental Engineering Services for CUCF Engineering Design Services? Check the CUNY Website at cuny.edu/cunybuilds. b. Can you provide the number of sites/number of task order projects assigned to each firm, and the dollar amount spent, for each contract/contractor approved to provide Environmental Engineering Services? An answer to this question isn t necessary for the purpose of this RFQ. 3. For Category Environmental Engineering/Pricing: In addition to Attachment 3 - All Inclusive Rates, should the Prime firm provide direct staff salary rates (per hour) and pricing for other items listed in the scope of work including environmental services, and laboratory testing for lead-based paint; lead dust; mold or other biological substances; PCB; and oil contaminated soil? No. 4. For Category Environmental Engineering/Pricing Attachment 3: Please provide Total Square Feet for which an estimate is desired. Not necessary for the purpose of the RFQ. The best competitive unit prices per square foot (both allinclusive and not to exceed all-inclusive) are to be provided by the Responders. The total square feet will be provided subsequent to contract execution when eligible firms compete for project specific task order assignments.

5. Please confirm SF330s and resumes are not required for proposed laboratories performing analysis? See answer to question 20. 6. If the firm submitting as a Prime is a WBE/MBE, is credit applied toward meeting WBE/MBE goals? Yes, if the firm is a New York State Certified WBE/MBE. 7. Please confirm that Form #1 M/WBE UTILIZATION PLAN and Form #5 EQUAL EMPLOYMENT OPPORTUNITY STAFFING PLAN are not required with responses to this RFP. Forms #1 and #5 are not required with responses to the RFQ, but Form #4 M/WBE & EEO Policy Statement is required. Forms #1 and #5 will only be required from Responders who are awarded contracts for each project specific task order issued subsequent to contract execution. 8. Is it allowed for a Prime Consultant to be a sub-consultant of some other Prime Consultant? 9. We can provide MEP & Structural services as a sole source Prime Consultant. Can we retain subconsultant for the 'separate assignment' to provide Building Commissioning, Cost Estimating & AV IT INTERCOM? 10. RFQ calls for MEP & Structural services. Will any related architectural work be provided by others or CUNY? In some cases yes, but not all. 11. For Special Inspections as it pertains to item 7 in Format and Submission of Responses, does the methodology and tracking of the budget for each project refer to the total cost or each individual category of inspection? Both. 12. Can we exclude certain inspections from the list in Attachment 4 that we either don't do or are not accredited to do? Firms proposing to provide special inspection must meet the Minimum Qualification Requirements set out in Section III of the RFQ. In addition, all categories of inspection and testing specified in Attachment 4 must be addressed. However, approved class 1 special inspection firms may retain other approved firms as subs under the rules and regulations of NYC DOB to provide inspection and testing in any uncovered categories.

13. Attachment 2 Direct Salary Rates The RFP instruction is not to alter the Project Staffing Plan form, however, the titles are very limited in light of the requirement that for payment of personnel, all personnel must be listed. For this type of contract we expect to utilize many engineers and CADD personnel in different disciplines and job titles and direct salary rates. We would request that we be allowed to add more titles (for example: HVAC Sr. Engineer, Electrical Sr. Engineer, HVAC Engineer, Jr. Engineer, Sr. CADD, CADD, etc.). Firms are allowed to attach lists of any additional titles they believe necessary. 14. Project Staff Direct Salary Hourly Rates... Multiplier for Overhead of 2.0 Please verify that overhead is to be calculated with a 2.0 multiplier and then added to the direct salary rate (for example, an employee with a direct salary rate of $30 per hour would be billed for one hour at $90, calculated as $30 + 2.0*$30)? If this is not the case and the 2.0 multiplier is used to calculate the total rate to be billed (using the same example: 2.0*$30 = $60 per hour), would CUNY consider a multiplier greater than 2.0 if the consultant can document this with a FAR Audited Overhead Statement? Attachment 2 has been revised to request all-inclusive hourly rates for the MEP Project Staff. It is included herein as Attachment 2 (Amended February 19, 2014). 15. On page 13 in CUNY RFQ Amended 1 23 14.pdf, attachment 2 MEP Project Staff Salary Rates indicates the Staffing expenses shall be calculated based on direct salary rates for specified personnel, subject to a Multiplier for overhead of 2.0. Please clarify the allowable fee. Does the 2.0 Multiplier include profit as well, or will an additional profit multiplier be added to the 2.0? Will additional compensation be allowed for profit for the tasks as they are assigned? See answer to question 14. 16. If a firm is selected and wins design tasks, will this preclude this firm from bidding on construction management services for these tasks? 17. Is Part F: MWBE Goals. Does this section pertain to Special Inspection Agencies as well as we don't typically sub anything out? 18. For the MEP submission, the RFQ doesn t reference architectural services anywhere. Should the Responding firm propose an architect as a sub-consultant or will CUNY handle this? Yes, the responding firm should propose an architect for those projects where a CUNY-contracted architect is not involved.

19. For the MEP submission, the RFQ doesn t reference DOB / Expeditor services anywhere. Should the Responding firm propose a DOB / Expeditor as a sub-consultant or will CUNY handle this? Yes, the responding firm should propose an expeditor. In some cases where a CUNY contracted architect is involved, there will be a need to coordinate efforts. 20. For the MEP submission, the RFQ requests that the Responding firm propose at least a structural engineer, cost estimating firm, AV/IT/INTERCOM firm and lighting consultant (there may also be additional sub-consultants). The RFQ also says that each sub-consultant needs to submit a full SF254/SF255 or SF330, resumes of key personnel and Appendix D. If we are proposing 6 subconsultants, our submission will have hundreds of pages. Will CUNY please consider limiting the amount of information required from sub-consultants? The Responder should propose a team which best meets the scope of work and design assignments described in Appendix A. SF254 & SF255 forms or SF330 form, resumes, and Vendor Disclosure Forms (Appendix D) are not required with Responses to the RFQ for any of the Responder s proposed sub-consultants. Note that all sub-consultants proposed for each project-specific task order issued subsequent to contract execution are subject to CUNY approval and the submission of Vendor Disclosure Forms, and other information as needed. 21. In Attachment 2, a multiplier of 2.0 is well below industry standards. Can this be negotiated? See answer to question 14. 22. Even though the bottom of Attachment 2 says we cannot retype this form, can we add more Titles and Rates of project staff? See answer to question 13. 23. Page 19, Appendix A - Can the Responding firm provide Commissioning Services in-house or must this be an independent sub-consultant? The firm assigned a task order for MEP design services cannot do commissioning for the same project. They can, however, be selected to do commissioning work for projects that were designed by other firms. 24. Page 19, Appendix A - #5 references ACP-5 and ACP-7 which requires an Asbestos consultant. Will the Responding firm or CUNY handle this? Responding firm. 25. Who is on the review committee? CUNY personnel.

26. We have a question regarding the rates and multipliers. In Attachment 2, pg. 13 of 55, the first paragraph defines direct salaries and seems to indicate that direct salaries should be entered into Attachment 2. It also indicates that a 2.0 multiplier will be applied to the direct salary rates. This seems to conflict with the language on Pg. 4 of 55 which requests that fully loaded salary rates be provided in Attachment 2. Can you clarify the requirements? Also can the contract language which defines the allowable components of the multiplier be provided for review at this time? See answer to question 14. 27. On attachment 4 Special inspection all inclusive rates we assume since unit quantity (A) and total cost (AxB) are shaded we do not complete these. Is this correct? 28. Also, how do you wish us to price out staff hours per unit and all inclusive unit price (b) hourly, per visit, or a daily rate (8 hours)? Per service or test. 29. Do we submit the vendor information form in our bid or send to the email address provided on the form (vii.vdf@cuny.edu)? Both. 30. Does our sub consultant need to submit an organization chart with the RFQ? Does the sub consultant need to submit 5 similar projects, narrative, or proposed project team? No. 31. With respect to item 5. A list of up to five (5) similar projects completed in the last three years which demonstrate the firm s ability to carry out the requested Category of Work Does a completed project mean the completion of construction, or can a completed project be considered as one complete with design or complete with an energy study? Complete in this context means completion of the assigned element, not necessarily completion of the physical project. 32. Can we add relevant MEP titles, such as Senior Engineer, Junior Engineer, CADD Designer, etc. to Attachment 2 MEP Project Staff Salary Rates form? See answer to question 13.

33. Please define the responsibilities of the Office Engineer. Office Engineer means design engineer. 34. Will the contract entertain annual escalation of hourly rates over the duration of the contract? No 35. Please confirm that each sub-consultant must complete their own SF 254/SF 255 or SF 330 form. See answer to question 20. 36. Resumes are part of the SF 330 submittal and they are also being requested in Item #6 on page 4 of 55. Would it be sufficient to include in the SF 330 only? 37. Can the (typically 10) projects included within the SF330 (submission format item 3) be used to fulfill the separate request for up to 5 similar projects (submission format item 5)? The responder needs to indicate the up to five (5) similar projects completed in the last three years they want CUNY to evaluate that demonstrates the responder s ability to carry-out the requested Category of Work described in this RFQ and to provide the information requested for each project. 38. Are MEP project staff salary rates subject to a maximum overhead multiplier of 2.0 (i.e., total multiplier of 2.2, assuming 10% profit), or will actual multipliers be negotiated with the selected firms? See answer to question 14. 39. We have several staff of the same title with varying salary rates. Can a range of direct salary rates be presented for MEP Project Staff in Attachment 2? No, these salary rates will be reflected as maximum rates in the contract. 40. Should an environmental sub-consultant be included as part of the MEP team, or will those services be provided by SUCF through the Environmental Engineering Requirements Contract also being solicited? The MEP consultant is responsible to retain an environmental firm to provide ACP-5 or ACP-7 which are required by NYC DOB to file the design documents for plan examination review and approval.

41. May the required Building Commissioning/Retro Commissioning Services detailed be provided by a sub-consultant, or must these be in house disciplines? See answer to question 23. 42. May the required AV IT Intercom Services detailed be provided by a sub-consultant, or must these be in house disciplines? The design consultant can either self-perform or retain their own subs to perform the related AV/IT design services, consistent with the experience requirements set out in the RFQ. 43. Can a WBE certification issued by NYC School Construction Authority (SCA) be accepted by CUNY as compliance of WBE requirements for this project? No. New York State MBE and WBE certification is required. However, firms which are certified by the SCA or other government entities are strongly encouraged to apply on a fast-track basis to NYS Empire State Development for NYS certification. 44. Quality Control Laboratories, LLC (QCL) is a Minority Business Enterprise (MBE) certified by: a. Port Authority of New York and New Jersey (PANYNJ) b. Empire State Development c. NYC Small Business Services (NYC EDC) d. School Construction Authority (NYC SCA). In this regard, can QCL MBE certification be accepted by your office as compliance of MBE requirements for this project? Yes, MWBE certification by NY Empire State Development complies. With regard to the other cited government entities, please see answer to question 43. 45. In regards to Attachment 3. Environmental Engineering All-inclusive Unit Prices, page 14 of 55: Square footage pricing is difficult to estimate for air monitoring and ACP5 & Lead Paint Inspection services. Can unit prices be provided instead of per square foot price? No. ACP7: Please clarify what services are requested? This is typically provided by an abatement firm. The consultant must retain the environmental firm to investigate the area of the work, take required samples, provide laboratory report, and ACP-7.

46. Under Additional Information on Page 5 there is a list of documents and the instructions indicate that we should one (1) original hard copy of each of the following: Does this mean they should be in a separate envelop or can we simply bind them with the Original copy of the proposal and leave it out of the other 9 copies of the submission? They may be submitted along with or separate from the other Response materials specified in Section II.1-7 of the RFQ. The only materials that must be submitted in a separate, sealed interior envelope is the pricing information specified in Section II.8 of the RFQ. 47. According to Appendix C we are required to submit the form as downloaded from the New York State Office of the State Comptroller website. Greenman-Pedersen, Inc. is certified and listed in the Vend Rep system. Can we submit the on-line printout of that file since the questions are the same and this is the official vendor record, instead of filling out the form with the online information? Yes, accompanied by either a Responder-signed update or a statement of no change, as applicable. 48. Regarding Appendix D. The form itself states: Please submit the completed, signed and notarized form by email, as an attachment, to vii.vdf@cuny.edu and also send the original document to: CUNY Facilities Planning, Construction and Management Office of Procurement Services 555 West 57 th Street, 16 th Floor New York, NY 10019 Should we e-mail it, put an original in the proposal, and mail a second original to the procurement office? See answer to question 29. 49. Do we need to submit sub consultants M or WBE certifications as applicable, with our submission? No. See answer to question 7. 50. Regarding Appendix C: New York State Vendor Responsibility Questionnaire. We are currently filling out the For-Profit Construction (CCA-2) Questionnaire from the New York State Office of the State Comptroller website, and are inquiring, whether we also have to fill out Attachment A: Completed Construction Contracts, Attachment B: Uncompleted Construction Contracts and Attachment C: Financial Information.