PROCEDURES. Cementitious Patch Repair

Similar documents
METHOD STATEMENT. BluSeal Tekflex EXTERNAL CEMENT LATEX MEMBRANE

BluCem HB Range CONCRETE REPAIR AND SHOTCRETE PRODUCTS

EN R4 High Strength High Build Concrete Repair Mortar

Polymer bonding aid and mortar additive bonding agent for old and new concrete. Test method Typical result Control. Compressive strength (BS6319,Pt2)

Construction. SikaTop 111 Plus. Application Instructions. Sika Corporation

SECTION CONCRETE REPAIR AND PATCHING

R4 Hand Placed / Wet Spray Repair Microconcrete

R4 Hand Placed / Wet Spray Repair Microconcrete

Construction. SikaRepair 223. Application Instructions. Sika Corporation

Construction. SikaRepair 223. Application Instructions. Sika Corporation

SITE HANDBOOK. Repair of Concrete Structures. - Patch Repair and Spray Applications

Construction. SikaRepair SHA. Application Instructions. Sika Corporation

Intercrete 4802 Application Guidelines

DIVISION 3 - CONCRETE Section Concrete Toppings Section Concrete Resurfacing Section Concrete Rehabilitation

FIVE STAR PRODUCTS, INC. (800)

DIVISION 3 CONCRETE Section Concrete Rehabilitation

Author: M Shaw, Sika Limited. Construction. A Guide to the Concrete Repair European Standards BS EN 1504 Series

Vertical and Overhead Spall Repair by Hand Application

TECHNICAL DATA SHEET SIKA RAPID REPAIR MORTAR 25KG

Section Shotcrete

R4 Fast Setting Cementitious Repair Mortar

PRODUCT DATA SHEET Sika MonoTop Dynamic HP

DIVISION 3 - CONCRETE Section Concrete Rehabilitation

ASH GROVE KOLORSTONE BROOMCOAT MIXING KIT. Spec Sheets Contents: Kolorstone Broomcoat Mixing Spec Sheet Kolorflex Admixture Spec Sheet

ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar

Cementitious Concrete Repair Mortar

DIVISION 9 - FINISHES Section Protective Coatings

VISHWAS. Vill.-Radawas, Via-Amarsr, Teh-Shahpura, Distt.-Jaipur, Rajasthan Ph , ,

Application Instructions for Keystone Kool Deck on Existing Concrete

EPILOX EPOXY BINDER TECHNICAL DATA SHEET. Multi-purpose High Performance Epoxy Binder System DESCRIPTION FEATURES AND BENEFITS

Spall Repair of Horizontal Concrete Surfaces

Supaflow HF Grout. Dual Expansion Class C Grout. Description. Areas of application. Features

Construction. R4 Low Resistivity Dry Sprayed Repair Concrete. Product Description. Product Data. Tests. Form. Storage

MasterEmaco S 488 TIX

High strength fibre reinforced structural repair mortar

Setting holding down bolts Floor screeds Bedding blocks Stone and bricks In contact with potable water Fine moulding.

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

DIVISION 3 - CONCRETE Section Concrete Rehabilitation

prospec.com Concrete Repair & Restoration

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

DIVISION 3 - CONCRETE Section Concrete Toppings Concrete Resurfacing Concrete Rehabilitation

A. ASTM C 150 Standard Specification for Portland Cement. B. ASTM C 595 Standard Specification for Blended Hydraulic Cements.

BluCem HS200 CEMENT GROUT FOR PT CABLES & GROUND ANCHORS

Construction. Sika FerroGard Method Statement for Application Corporate Construction. Scope:

CONCRETE REPAIR SITE HANDBOOK Hand Placed and Spray Applications

Florock Seamless Flooring Systems

Product Data Sheet Product Description Uses Characteristics / Advantages Tests Approval / Standards Product Data Construction Form

Water resistant bonding agent and mortar additive

TECHNICAL DATA. General Purpose Epoxy Mortar Binder

High strength mortars and concretes are conveniently prepared by combining General Purpose Epoxy Mortar Binder (133) and Epirez Aggregates.

R3 Cementitious Pore Sealer and Levelling Mortar

1 Exam Prep Guide to Shotcrete Questions

ARDEX GUIDE SPECIFICATION ARDEX FDM Full Depth Repair Mortar Concrete Repair Mortar with Corrosion Inhibitor

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

SUPER multi purpose structural adhesive. Polymer admixture for cement systems

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound

Renderoc HB40. Technical Data Sheet. High performance, medium weight, very low shrinkage, patch repair mortar TECHNICAL SUPPORT USES ADVANTAGES

MS-2A LINER SPECIFICATIONS: for STRUCTURAL REPAIR and SEALING of MANHOLES

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

Repair Application Procedures As you may have seen on our website, ICRI s

SECTION MAINTENANCE OF STONE ASSEMBLIES

3 Nitomortar PE CI/SfB: (4-) Pr4 December 1999

Con-Spec Industries Ltd.

PRODUCT DATA SHEET SikaTop -111 Plus

DIVISION 7-THERMAL & MOISTURE PROTECTION Section Cementitious & Reactive Waterproofing

profile-mix-plus, Page 1 of 8, Rev

Application Guide for MasterTop Dry Shakes MasterTop 200

Waterproofing Systems. Cementitious.

DIVISION 7-THERMAL & MOISTURE PROTECTION Section Cementitious & Reactive Waterproofing

2/16/17. Copyright Material. A Repair Technician s Guide to the ACI Chapter 10 Quality Assurance. The Big Picture. Who is a Repair Technician?

Florock Seamless Flooring Systems

FIVE STAR PRODUCTS, INC. (800)

Technical Data Sheet. Ultralevel Bulkout. Self Levelling High Build Cementitious Underlay

Contractor Support for the Concrete Repair and Protection of Chimneys and Cooling Towers (in Accordance with EN 1504)

TECHNICAL DATA SHEET SIKADUR 31 CF NORMAL 6KG

Planitop Smooth & Repair

Construction. Sikadur 31, Hi-Mod Gel. Application Instructions. Sika Corporation

FIVE STAR PRODUCTS, INC. (800)

Concrete Repair & Restoration

Application Guide for MasterTop dry shakes. MasterTop 105. February 2016 Page 1 of 15

Editing notes to assist users are included within bordered boxes. Delete these notes prior to final printing.

CHARACTERISTICS / ADVANTAGES

DUAL EXPANSION. facilitate casting and ensure the total filling of voids even in tight or complex spaces and when working on large surfaces.

DESCRIPTION CHARACTERISTICS

PRODUCT DATA SHEET Sika Level-315 F

Rebar Corrosion Crack Repair [Excerpts from Dr. Fixit Guide to Healthy Construction, Cracks & Crack Repair (Unpublished)]

MasterEmaco S Lightweight, polymer modified, fibre reinforced, structural repair mortar. Formerly: Emaco Nanocrete R3 DESCRIPTION

Florock Seamless Flooring Systems

Analysis, Design & Strategy of Repair Lecturer: Professor Dr. Mohammad Ismail Faculty of Civil Engineering, UTM-Skudai, Johor Darul Ta zim, MALAYSIA

Technical Data Sheet StoCrete TS 100

ALADIN (formerly known as Jeene Joint)

Florock Seamless Flooring Systems

Fosroc Renderoc HB40. constructive solutions. High performance, medium weight, very low shrinkage, patch repair mortar. Description.

BRANZ Appraisal Certificate # 461 (2010) Internal wet areas.

PRODUCT DATA SHEET Sikadur -31 DW

SPECIFICATION FOR INSTALLATION OF WALKER ZANGER KAZA CONCRETE TILES ONTO VARIOUS SUBSTRATES

Complete compatibility with existing cured concrete properties, ensuring excellent monolithic performance

TECHNICAL DATA SHEET SIKADUR 31 RAPID 1.2KG

CP-24CC Potassium Silicate Concrete

Transcription:

Cementitious Patch Repair

CEMENTITIOUS PATCH-REPAIR SYSTEMS Bluey Technologies has produced this document to aid our clients in the application of cementitious patch-repair systems that we provide. The specific products in our range include BluCem HB30, BluCem HB60, and BluCem HB70. WHY AND WHEN TO USE A PATCH REPAIR A patch-repair system restores structural integrity and renews or preserves steel reinforcement or both in areas where concrete has spalled or is defective. CHARACTERISTICS OF REPAIR MORTARS Repair mortars are highly durable, adhesive to the substrate, provide an alkaline environment when reinforcing steel is present, produce minimal shrinkage and cracking, have low permeability, and are chemical-resistant in aggressive environments. The repair mortars from Bluey Technologies have been modified with polymers and other admixtures in order to promote these characteristics. They constitute a specialist range that accommodates a wide variety of client requirements. In order to maintain these enhanced characteristics it is important to follow the mixing procedure strictly in regard to the amount of water you add to the powder, as incorrectly high volumes of water result in weaker repair mortars with greater shrinkage properties. We at Bluey Technologies advise the use of BluCem AP10 for priming the substrate to increase its adhesion with the mortar. It is an acrylic concrete primer that we specify for use with our high-build cementitious mortars. The specialist repair mortars that Bluey Technologies has developed provide good workability, extremely low permeability, and excellent non-shrink characteristics. SELECTING A REPAIR MORTAR The repair material needs to have properties that are compatible with the substrate material. Such properties include its modulus, strength, and coefficient of thermal expansion, which is the change in unit volume of the material per degree of temperature change, and the substrate s permeability and dimensional stability. The material also needs to be compatible with the environmental conditions and with the primary reason for the repair. We at Bluey Technologies advise all our clients to review the products thoroughly before purchasing any to ensure that they meet all project requirements. Our technical engineers are always ready to help should you require further advice. GENERAL EQUIPMENT REQUIRED You will need the equipment presented below as a minimum for the correct application of our repair mortars, but the requirement for certain equipment varies from project to project. The mixers, pumps, and concrete surface-preparation equipment are available for hire or purchase from Kennards Concrete Care. Their website is at www. concretecare.com.au. The minimum protective clothing you need includes protective overalls, safety helmets, safety boots, good-quality gloves, goggles, and face-masks. The minimum equipment for preparation is water and a power supply; marker chalk or a pen disc saw, an electric or pneumatic concrete breaker, a wire brush, and a high-pressure washer. The minimum equipment for mixing is a measuring jug and a mortar-mixing paddle. Finally, the minimum equipment for application is a hand application trowel but depending on the type of application you may need appropriate spray equipment, pumping equipment, a wheelbarrow or conveyor equipment, a wooden float, and a steel or plastic finishing float. 2 Bluey Technologies

SURFACE PREPARATION This process starts with a thorough inspection of the defective substrate, including areas outside the visibly identified area. You should make the defective areas safe and investigate any areas affected by corrosion to determine the amount of concrete removal required. Once you have identified the area for concrete removal you should mark it out so all operators clearly understand where the removal area is. You should remove the concrete with methods that do not leave a feathered edge and that profile the substrate to the correct classification for any given application. CUTTING METHODS We at Bluey Technologies recommend the cutting methods described below. HIGH-PRESSURE WATER JETS These drive a small jet of water at high velocity, producing pressures of 69 to 310Mpa. DIAMOND WIRE CUTTING This involves wrapping a wire containing nodules impregnated with diamonds around the concrete mass to be cut and connecting it to a power pack that completes a continuous loop. The loop rotates through the plane to be cut. This method s obvious limitation is that you need to wrap the wire around the concrete. MECHANICAL SHEARING This involves using hydraulically powered jaws to cut the concrete and reinforced steel. This method requires a free edge or hole to start the process. STITCH DRILLING This involves drilling overlapping boreholes around the perimeter in order to cut out sections of concrete. It works well in situations in which only one face of the concrete is accessible and the concrete is deeper than you can cut economically with the diamond-blade method. SAW CUTTING This involves using diamond or carbide saws that are available in different sizes, the largest cutting up to depths of 1.3 m. Cementitious Repair 3

SELECTING A METHOD It is important to consider all technical, safety, feasibility, and economic factors before selecting the most appropriate technique for removal. The degree of deterioration should be the primary factor in determining the level of removal. It is essential to remove concrete to a minimum depth of 20 to 30 mm behind the steel reinforcement. In situations involving steel that has corroded, you must expose the full surface of the bar, remove the concrete until reaching non-corroded steel, and then continue approximately 50 mm beyond that point. Once you have removed the deteriorated concrete it is essential to prepare the surface of the substrate in the correct manner to optimise its surface for bonding with the mortar. For information on concrete surface-preparation techniques please refer to the Bluey Technologies concrete surfacepreparation document on the website. In situations in which the steel reinforcement has been damaged it is important to identify the cause of the damage and evaluate the condition of the steel. The steel should be capable of performing to the original design specification. Once the engineer is satisfied that the steel is still performing adequately, the surface should be cleaned, removing all rust deposits. If the steel is not performing to the required standard you will need to replace it. We at Bluey Technologies recommend the replacement of all exposed steel bars that have lost more than 20% of their diameter. When this is the case you must consult a structural engineer. You need to consider any carbonation or chloride effects on concrete and take appropriate action to ensure that all effects are removed prior to the repair. It is essential that no carbonated or chloridecontaminated concrete substrate be in contact with, or be within 5 mm of, the reinforcing bars. If carbonation tests show that carbonation has reached within 5 mm of the reinforcing bars you need to remove the concrete, exposing the full circumference of the steel, and then remove more to a further depth of 20 to 30 mm. You need to clean all exposed steel reinforcements to a surface purity of Sa 2.5 for chloride-contaminated concrete and Sa 2.0 for carbonated concrete. You generally do not need to prime reinforced steel. If the steel is to be exposed to the atmosphere for several days after cleaning an acceptable form of priming would be to mix the repair powder into a slurry using BluCem AP10 and to apply a cement-rich coating to the steel surface. APPLICATION OF THE REPAIR MORTAR Please note that we at Bluey Technologies encourage the use of experienced applicators, since the longterm performance of our products depends upon the correct application procedures. We can also offer technical assistance to clients who wish to apply our products themselves. The preparation of the substrate, and its reinforcement if necessary, should be the final step before the repair application to ensure that the area to be repaired is free of contaminants. You should mix the repair mortar strictly according to the procedure outlined on the product s technical data sheet (TDS) and only with the appropriate mixing equipment. Failure to adhere strictly to the mixing guidelines could result in a failure in the application procedure. All BluCem high-build products require only the addition of potable water to produce a uniform specialist repair mortar. You should not modify our products in any other way. You can repair the substrate in any one of several ways, and the correct method depends on the job s parameters. Please note that you should secure any exposed steel reinforcing bars firmly to avoid movement during the application process, as any such movement would affect mortar compaction, build, and bond. A brief explanation of each application method follows. 4 Bluey Technologies

SPALL REPAIR BY LOW-PRESSURE SPRAYING For the concrete surface profile (CSP) requirements please refer to the Bluey Technologies concrete surface-preparation document. Apply the repair mortar using small concrete pumps or heavy-duty grout pumps. Air is added at the nozzle to impel the mortar onto the prepared substrate. This style of application is useful for vertical or overhead operations to depths of up to 100 mm with each application. PROCEDURE Prepare the surface by applying BluCem AP 10 Acrylic Concrete Primer. Mix the repair grout with potable water in a highshear mechanical mixer for at least three minutes. Be sure to refer to the correct ratio of water to powder specified in the product s TDS. Load the mortar into the pump s hopper and work small amounts of repair material into the primed or dampened surface. Spray the mortar to the thickness required, being careful not to exceed the maximum thickness detailed in the product s TDS. If the job requires multiple layers wait until the initial set and roughen the surfaces before applying the next layer. Finish the repair to the desired standard, whether smooth or as sprayed. Coat the final surface finish with a curing compound. CHECKING THE REPAIR Take before and after photos. Ensure that the surface preparation is correct with a visual examination and either ph tests, CSP gauges, or both. Perform in-situ direct tensile-strength and bond tensile tests. SPALL REPAIR BY HAND APPLICATION To satisfy the CSP requirements it is important when removing the substrate to keep the shape of the repair cavity simple, being either square or rectangular. For the correct CSP please refer to the Bluey Technologies concrete surface-preparation document. Apply the repair mortar to the cavity by hand trowelling, building up the layer to the designated depth. Any sagging of the repair mortar is unacceptable. You should remove any material that sags and repeat the preparation process before reapplication. Please refer to the product-specific TDS for the maximum application thickness. This method is ideal for overhead and vertical applications. It uses minimal equipment and is a good method for shallow repairs and repairs in areas that are difficult to access. PROCEDURE Prepare the surface by applying BluCem AP 10 Acrylic Concrete Primer. Mix the repair grout with potable water in a high-shear mechanical mixer for at least three minutes. Be sure to refer to the correct ratio of water to powder specified in the product s TDS. Scrub a thin layer of the repair mortar onto the substrate to block all pores and ensure strong bonding of the material. Apply the remaining material with adequate pressure before the bond coat dries. You should apply the repair mortar in a compact way that ensures the full encapsulation of the reinforcement. If you require multiple layers wait until the initial set and then roughen the surfaces before applying the next layer. Finish the repair to the desired standard, whether smooth or as sprayed. Coat the final surface finish with a curing compound. Cementitious Repair 5

CHECK THE REPAIR Take before and after photos; Ensure that the surface preparation is correct with a visual examination and either ph tests, CSP gauges, or both. Check the cured repair for delaminations. Perform in-situ direct tensile strength tests. SPALL REPAIR OF HORIZONTAL CONCRETE SURFACES To satisfy the CSP requirements it is important to cut back enough to have a 20 mm clearance around any corroded steel reinforcement. For the correct CSP please refer to the Bluey Technologies concrete surface-preparation document. Apply the repair grout to the prepared cavity with a pump, hopper, or other conveying method, then level the surface by screeding off unnecessary mortar and floating and trowelling the finish. Use this method on horizontal surfaces, especially concrete slabs. PROCEDURE Prepare the surface by applying BluCem AP 10 Acrylic Concrete Primer. Mix the repair grout with potable water in a high-shear mechanical mixer for at least three minutes. Be sure to refer to the correct ratio of water to powder specified in the product s TDS. Apply the repair mortar to the cavity using your preferred method. Screed the repair mortar, float it, then trowel or brush it for the designated finish. Cure the repair according to the product guidelines outlined in the TDS. CURING TECHNIQUES You should perform the appropriate curing technique immediately after applying the repair mortar. Although most of our BluCem repair mortars have been modified to provide no-shrink characteristics, we at Bluey Technologies advise you to cover the repair with a polyethylene sheet in fast-drying environments to avoid high rates of water loss and increased chances of shrinkage. We at Bluey Technologies advise all our clients to check the repairs continually during the procedure and after its completion. It is particularly important to ensure that the concrete s surface preparation is correct before applying the repair mortar, as repairs are limited only by the standard of preparation. Testing equipment is available in various models and styles. Bluey Technologies recommends PCWI as a testing equipment supplier. Their website is at www.pcwi. com.au. IMPORTANT NOTE Bluey Technologies offers this application document as a guide for the application of our BluCem repair mortar products. It remains the responsibility of the engineer or client to determine the correct method for any given application. Bluey Technologies accepts no liability, either directly or indirectly, for any losses suffered in connection with the use or application of our products, whether in accordance with any advice, specification, recommendation, or information it has provided or otherwise. CHECK THE REPAIR Ensure that the surface preparation is correct with a visual examination and either ph tests, CSP gauges, or both. Run a compressive test on the repair material, then, check the bond using a pull-off test. 6 Bluey Technologies

STATEMENT OF RESPONSIBILITY The technical information and application advice given in this publication is based on the present state of our best knowledge. As the information herein is of a general nature, no assumption can be made as to a product s suitability for a particular use or application and no warranty as to its accuracy, reliability or completeness either expressed or implied is given other than those required by Commonwealth or State Legislation. The owner, their representative or the contractor is responsible for checking the suitability of products for their intended use. NOTE: Field service where provided, does not constitute supervisory responsibility. Suggestions made by Bluey Technologies Pty Ltd either verbally or in writing may be followed, modified or rejected by the owner, engineer or contractor since they, and not Bluey Technologies Pty Ltd are responsible for carrying out procedures appropriate to a specific application. Bluey Technologies Pty Ltd Bluey Technologies Pty Ltd Australia & Asia-Pacific bluey@bluey.com.au www.bluey.com.au