SAP Calculations. Project: Conversion of the Royal Oak Inn OSWESTRY, Kinnerley Dovaston, Shropshire, SY10 8DP

Similar documents
Building Regulation Compliance Page 1 of 11

SAP Calculations. Project: Adjacent to Number 7 Dince Hill Close Exeter, Whimple, Devon, EX5 2TE

SAP Calculations. M & T Homes Limited. Project: Plot 2, Wombourne Road Wombourne, Swindon, South Staffordshire, DY3 4NB

SAP Calculations. Draft SAP Project: Bungalow Undercliff. Contact: Sandra Hardwick

SAP Calculations. Acheson Construction. Project: Plot 8, Neils View Maiden Newton. Contact: James Frampton Trinity Architecture

As Built SAP Report. New Dwelling E SITE ADDRESS:- 39 The Old Common Chalford Stroud Gloucestershire GL6 8HH

SAP Report Submission for Building Regulations Compliance

SAP Calculations. Project: SITE 1 PHASE 2 MOYLAGH MEADOWS, MOYLAGH ROAD, BERAGH. Contact:

Full SAP Calculation Printout

SAP Calculations. Persimmon South Coast. Project: Larcombe Road, Petersfield. Contact: George Leadley The FES Group

Conversion SAP Checklist

Guidance on U Values from Domestic Heating Design Guide

Regulations Compliance Report

SAP. Standard Assessment Procedure for assessing the energy performance of dwellings. As Designed SAP. Redstone House

The calculation procedure will continue to be known as SAP 2005 but the SAP version number is incremented from 9.80 to 9.81.

ABBE LEVEL 3 DIPLOMA IN ON CONSTRUCTION ENERGY ASSESSMENT ABBE LEVEL 3 CERTIFICATE IN DOMESTIC ON CONSTRUCTION ENERGY ASSESSMENT (QCF)

Project name SOLAR HOUSE 80/50 Project summary

RdSAP Classification. New Transaction Types are now available. There are now the options of RHI Application and ECO Assessment

The effect of Building Regulations (Part L1 2002) on existing dwellings

Project Description. Projected build start date 15 Aug 2011 Projected date of occupation 19 Dec Existing external wall construction

Defining a Fabric Energy Efficiency Standard for zero carbon homes

Elmhurst Energy RdSAP Survey Form

Project name Fulford Passivhaus, York Project summary New-build singe-family detached house for individual clients. Certified as Passivhaus Plus.

Table P1: Effective air change rate. Trickle vents only. Windows fully open. Windows slightly open (50 mm) Windows open half the time

Dwellings Energy Assessment Procedure (DEAP) for Building Regulations Compliance. Kevin O Rourke Head, Built Environment Sustainable Energy Ireland

Appendix S: Reduced Data SAP for existing dwellings

EDEM detail description part 1: inputs and outputs

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles

Engineers Ireland Cork Region CPD lecture series

BRE RdSAP v9.91 software QSAP v9.0.0 April 2012

SAP Conventions. 12 September 2012 (v4.0)

NEARLY ZERO ENERGY BUILDING RETROFIT SAP Dr Luisa Brotas

SAP WorkSheet: New dwelling design stage

> Performance requirements: Part L UK vs Energiesprong vs Passivhaus.

Energy Performance Certificate

Building Typology Brochure England September 2014

Project Description. Projected build start date 03 May 2010 Projected date of occupation 06 Aug

Dwelling Energy Assessment Procedure (DEAP) Survey Guide

Project Description. Projected build start date Projected date of occupation. Existing external wall construction.

Energy Performance Certificate

BUILDING REGULATIONS PART L 2011 PROVISIONS & COSTS (STANDARD 3-BED SEMI-D, CIRCA 120 SQM)

One Size Fits All. Insulation A GUIDE TO BUILDING REGULATIONS / STANDARDS COMPLIANCE FOR NEW DWELLINGS USING STRUCTURAL INSULATED PANELS (SIPS)

RdSAP Conventions for RdSAP 9.92

CODE FOR SUSTAINABLE HOMES GUIDE TO MEET CODE LEVELS 3-6

Project Description. Projected build start date 01 Feb 2010 Projected date of occupation 31 May Queenborough and Rushenden, Kent, England

atspaceltd.co.uk SBEM Checklist Version 1.0 January 2017 Call us today on to speak with an adviser or visit atspaceltd.co.

# Limitations Topic Conventions Issue date

Insulation options. Calculating U-Values

Approved Document L1A and L2A

Construction Studies Theory - Higher Level

SAP 2012 Conventions. 17 May 2016 (v 6.1) Conventions apply to SAP 2012 throughout the UK except where otherwise indicated under 'Limitations'.

Project Description. Projected build start date 10 Sep 2012 Projected date of occupation 03 May

Project Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb

Radian Group. Performance Standards. Date November Author Rachel Mitchell. Version Final (V2)

RdSAP Conventions. Issued 22 October 2014 (v7.0) New and amended conventions for v7.0 indicated by light blue background.

External Walls Thermal Performance

Project Description. Projected build start date 24 Dec 2004 Projected date of occupation. Energy target. Existing external wall construction

Module Title: Building Services Mechanical 2

The effect of Building Regulations (Part L1 2002) on existing dwellings

CHAPTER 13: Sustainability

This draft design submission has been prepared from plans and specifications and may not reflect the property as constructed.

Refurbishing cavity-walled dwellings

Project name Old Dover Road Project summary Whole house retrofit and formation of new habitable roof structure

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Green Deal Presentation RdSAP and Green Deal

Project Description. Projected build start date 19 Apr 2010 Projected date of occupation 30 Sep

Upgrading To An A-Rated Home

A handbook of thermal bridging details incorporating Porotherm blocks

Results from the Application of the Maltese Energy Performance Rating of Dwellings in Malta EPRDM Software to a New Block of Apartments

Building Regulations - Part L (2002 Edition) User Guide

CODE FOR SUSTAINABLE HOMES GUIDE TO MEET CODE LEVELS 3-6

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target.

BRE Client Report. Ofgem Deemed Scores Methodology. Prepared for: Ofgem 9 Millbank, London, SW1P 3GE. BRE Watford, Herts WD25 9XX

Building Regulations for the Conservation of Fuel and Power

Conventions (v 10.0) for RdSAP 9.92 and RdSAP 9.93

SAP 2012 Conventions. 31 August 2017 (v 7.01) Conventions apply to SAP 2012 throughout the UK except where otherwise indicated under 'Limitations'.

Leaving Certificate Revision Notes. Airtightness. Potential air leakage paths (the numbered points in section 2.1 give a description for

Not useable for compliance

STRUCTURAL ASSESSMENT SURVEY REPORT

The Nottingham Ecohome. Part L1 (2002) in existing dwellings

Building Regulations Part L1A (2006)

Project name RetroPHit 04 - Steel Frame Bungalow Project summary A steel framed, brick clad bungalow built off a concrete raft foundation

Energy Efficiency in Buildings SANS XA & SANS 204. Project Details

6.4 Insulation of pipes, ducts and vessels. 6.6 Mechanical ventilation and air conditioning. 6.7 Commissioning building services

Construction Studies Theory - Higher Level

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20)

Building Regulations and the Future of Energy Efficient Buildings. Chris Hughes Programme Manager Energy Performance of Buildings Directive

6.4 Insulation of pipes, ducts and vessels. 6.6 Mechanical ventilation and air conditioning. 6.7 Commissioning building services

TIPS FOR ENERGY SAVING IN OLD AND NEW HOMES

Project Description. Projected build start date 18 Mar 2013 Projected date of occupation 11 Nov 2013

Energy Performance Certificate

Garage Conversions. Technical Issues

Construction Studies Theory - Higher Level

Consultation Paper: CONSP:13

Passivhaus Project Documentation Wrexham Passivhaus

CONSTRUCTION PROCESS. Rowner Research Project Phase One. March /5

Economic retrofitting of existing housing stock. existing housing Name stock

Project Description. Projected build start date 11 Feb 2013 Projected date of occupation 14 Nov

Transcription:

SAP Calculations Mr P Mellor Project: Conversion of the Royal Oak Inn OSWESTRY, Kinnerley Dovaston, Shropshire, SY10 8DP Contact: Julie Lock Energy Surveyor - Shropshire Council 01743 258748

Predicted Energy Assessment Page 2 of 12 Royal Oak, Kinnerley Dovaston, OSWESTRY, Shropshire, SY10 8DP Dwelling type: House, Detached Date of assessment: 18.Oct.2016 Produced by: Shropshire Council Total floor area: 229.9 m 2 This document is a Predicted Energy Assessment for properties marketed when they are incomplete. It includes a predicted energy rating which might not represent the final energy rating of the property on completion. Once the property is completed, this rating will be updated and an official Energy Performance Certificate will be created for the property. This will include more detailed information about the energy performance of the completed property. The energy performance has been assessed using the Government approved SAP2009 methodology and is rated in terms of the energy use per square meter of floor area; the energy efficiency is based on fuel costs and the environmental impact is based on carbon dioxide (CO2) emissions. Energy Efficiency Rating Environmental Impact (CO2) Rating Very energy efficient - lower running costs (92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20) A B C D E Not energy efficient - higher running costs EU Directive England & Wales 2002/91/EC The energy efficiency rating is a measure of the overall efficiency of a home. The higher the rating the more energy efficient the home is and the lower the fuel bills are likely to be. F G 67 Very environmentally friendly - lower CO2 emissions (92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20) A B C D E F G Not environmentally friendly - higher CO2 emissions 73 EU Directive England & Wales 2002/91/EC The environmental impact rating is a measure of a home's impact on the environment in terms of carbon dioxide (CO2) emissions. The higher the rating the less impact it has on the environment.

Summary Information Survey Reference: 16/03776/ENERAT Prop Type Ref: Conversion Property: Royal Oak, Kinnerley Dovaston, OSWESTRY, Shropshire, SY10 8DP SAP Rating: 67 D CO2 Emissions (t/year): 5.64 Environmental: 73 C General Requirements Compliance: Fail CfSH Results Version: ENE1 Credits: N/AENE2 Credits: N/A ENE7 Credits: N/A CfSH Level: N/A Software Version: Elmhurst Energy Systems SAP2009 Calculator (Design System) version 4.04r04 SAP version: SAP 2009, Regs Region: England and Wales (Part L1A 2010), Calculation Type: Conversion - new dwelling SUMMARY FOR INPUT DATA FOR Conversion - new dwelling Page 3 of 12 Orientation East 1.0 Property Type House, Detached 2.0 Number of Storeys 2 3.0 Date Built 2016 3.0 Property Age Band 4.0 Sheltered Sides 2 5.0 Sunlight/Shade Average or unknown 6.0 Measurements Internal Perimeter Internal Floor Area Average Storey Height Ground Floor: 51.82 124.35 2.35 1st Storey: 61.19 105.55 2.3 7.0 Living Area 71.26 8.0 Thermal Mass Parameter Simple calculation - Low 9.0 External Walls Description Construction U-Value Element Kappa Gross Area Nett Area Exisitng Wall Other 0.38 0.00 212.07 187.70 Cavity wall : plasterboard on dabs, AAC New 0.29 60.00 49.51 45.18 block, filled cavity, any outside structure 10.0 External Roofs Description Construction U-Value Element Kappa Gross Area Nett Area Sloping Plasterboard, insulated slope 0.19 9 69.54 68.18 Flat Roof Plasterboard, insulated flat roof 0.16 9 14.60 13.99 Flat Ceiling Plasterboard, insulated at ceiling level 0.15 9 56.43 56.43 11.0 HeatLoss Floors Description Construction U-Value Element Kappa Area Floor Slab on ground, screed over insulation 0.53 110 124.35 12.0 Opening Types Description Data Source Type Glazing Glazing Gap Argon Filled Solar Trans Frame Type Frame Factor U value Windows SAP table Window Double Low-E Soft 0.05 16 mm No 0.63 Wood 0.70 1.80 Solid Door SAP table Solid Door 3.00 Half Glazed Double Low-E Soft Glazed Door SAP table 16 mm No 0.63 Wood 0.70 2.40 Door 0.05 Rooflights Manufacturer Roof Window Double Low-E Soft 0.05 0.63 0.70 1.40 13.0 Openings Name Opening Type Location Orientation Curtain Type Overhang Ratio Wide Overhang Width Height Count Area Curtain Closed Solid Door Solid Door - Solid Door Exisitng Wall East None 0 No 0 0 0 4.00 0

SUMMARY FOR INPUT DATA FOR Conversion - new dwelling Page 4 of 12 Windows Window - Windows Exisitng Wall East None 0 No 0 0 0 3.93 0 Rooflights Roof Window - Rooflights Sloping East None 0 No 0 0 0 0.91 0 Solid Doors Solid Door - Solid Door Exisitng Wall South None 0 No 0 0 0 1.73 0 Windows Window - Windows Exisitng Wall South None 0 No 0 0 0 7.79 0 Windows Window - Windows Exisitng Wall West None 0 No 0 0 0 6.92 0 Windows Window - Windows New North None 0 No 0 0 0 1.68 0 Glazed Door Half Glazed Door - Glazed Door New North None 0 No 0 0 0 2.65 0 Rooflight Roof Light Roof Window - Rooflights Roof Window - Rooflights Sloping North None 0 No 0 0 0 0.45 0 Flat Roof North None 0 No 0 0 0 0.61 0 14.0 Conservatory None 15.0 Draught Proofing 100 16.0 Draught Lobby No 17.0 Thermal Bridging Default Y-value 0.15 Description 18.0 Pressure Testing No Designed q50 15.00 Property Tested? As Built q50 Same As Designed? 19.0 Mechanical Ventilation Mechanical Ventilation System No Present Approved Installation Windows open in hot weather Windows fully open Cross ventilation possible Yes Night Ventilation Yes Air change rate 8.00 Mechanical Ventilation data Type Type MV Reference Number Configuration MVHR Duct Insulated Manufacturer SFP Duct Type MVHR Efficiency Wet Rooms Brand, Model 20.0 Fans, Open Fireplaces, Flues MHS SHS Other Total Number of Chimneys 0 0 0 Number of open flues 0 0 0 Number of intermittent fans 4 Number of passive vents 0 Number of flueless gas fires 0 21.0 Cooling System No 22.0 Lighting Internal Total number of light fittings 25 Total number of L.E.L. fittings 25 Percentage of L.E.L. fittings 100.00 External External lights fitted No Light and motion sensors 23.0 Electricity Tariff Standard 24.0 Heating Systems Main Heating 1 Database Description LPG Boiler Percentage of Heat 100.00 Main Heating 2 Description Percentage of Heat Community Heating Secondary Heating None Water Heating Main Heating 1 Flue Gas Heat Recovery System No

SUMMARY FOR INPUT DATA FOR Conversion - new dwelling Page 5 of 12 Waste Water Heat Recovery System No 1 Waste Water Heat Recovery System No 2 Solar Panel No 25.0 Main Heating 1 Database Ref. No. 17056 Fuel Type Bulk LPG Main Heating Bulk LPG BLW Post 98 Combi condens. with auto ign. TestMethod SAP Code 104 Efficiency ( Split Efficiences ) % Efficiency ( Split Efficiences ) % In Winter 90.8 In Summer 80.7 Model Name Manufacturer Controls CBI Time and temperature zone control Delayed Start Stat Yes Sap Code 2110 Burner Control Boiler Compensator WeatherCompensator HETAS approved System Oil Pump Inside FI Case FI Water Flue Type Balanced Smoke Control Area Fan Assisted Flue Yes Is MHS Pumped Pump in heated space Heat Emitter Radiators Underfloor Heating Electric CPSU Temperature Combi boiler type Standard Combi Combi keep hot type None Combi store type 27.0 Community Heating Space Community Heating Distribution Loss Distribution Loss Value Controls SAP Code Water Community Heating Distribution Loss Distribution Loss Value Charging Linked To Heat Use 28.0 Secondary Heating Description SHS efficiency % SAP Code HETAS Approved System Smoke Control Area Test Method Manufacturer Model Name 29.0 Water Heating HWP From main heating 1 Water use <= 125 litres/person/day Yes SAP Code 901 Immersion Heater Summer Immersion Suplementary Immersion Immersion Only Heating Hot Water 29.1 Flue Gas Heat Recovery System Database ID Brand Model Details 29.2 Waste Water Heat Recovery System Total rooms with shower and/or bath 30.0 Hot Water Cylinder None Cylinder Stat Cylinder In Heated Space Independent Time Control Insulation Type Insulation Thickness Cylinder Volume

SUMMARY FOR INPUT DATA FOR Conversion - new dwelling Page 6 of 12 Loss (kwh/day) Pipes insulation In Airing Cupboard 31.0 Solar Panel Solar Panel Area Area Type Panel Type n0, a1, A/G ratio Orientation Elevation Overshading Solar Storage Volume Pump electrically powered Combined Cylinder 32.0 Thermal Store None Thermal Store Pipework within a single casing 33.0 Photovoltaic Unit Apportioned KWh/Year 34.0 Wind Turbines Terrain Type Urban Wind Turbines Count Apportioned Kwh/year Rotor Diameter Hub Height 35.0 Small-scale Hydro Electricity Generated Description Apportioned kwh/year Recommendations None Further measures to achieve even higher standards Solar water heating 69 D 68 C 74 Solar photovoltaic panels, 2.5 kwp 265 C 73 C 78

U-value calculator report Page 7 of 12 Survey Reference: 16/03776/ENERAT Type Ref: Conversion Project: Royal Oak, Kinnerley Dovaston, OSWESTRY, Shropshire, SY10 8DP SAP Rating: 67 D CO2 Emissions (t/year): 5.64 Environmental: 73 C General Requirements Compliance: Fail CfSH Results Version: ENE1 Credits: N/A ENE2 Credits: N/A ENE7 Credits: N/A CfSH Level: N/A Software Version: Elmhurst Energy Systems Design SAP 2009 version 4.04r04 Building Elements: Roof 000003 - pitched roof - insulated slope, sloping Roof Type: Pitched Roof, insulated sloping ceiling Layer Description Thickness Lambda R Fraction Ext surface 0.100 Layer 1 Layer 2 Layer 3 Layer 4 Layer 5 Layer 6 Tiles, clay Main construction 15 mm 1.000 0.000 100.00 % Air layer ventilated Main construction 25 mm 0.250 0.000 100.00 % Corrections - Cavity Ventilated, Emissivity: Normal Sarking Felt Main construction 1 mm 0.230 0.000 100.00 % Air layer ventilated Main construction 50 mm 0.500 0.000 100.00 % Quintherm Corrections - Cavity Ventilated, Emissivity: Normal Main construction 150 mm 0.022 6.818 92.00 % Bridging - Timber 150 mm 0.130 8.00 % Corrections - Air Gap: Level 0, Fasteners: None or plastic Plasterboard, standard Main construction 13 mm 0.210 0.060 100.00 % Int surface 0.100 Total resistance: Upper limit = 5.359 m 2 K/W Lower limit = 5.155 m 2 K/W Average = 5.257 m 2 K/W Unheated space: None U-value (unrounded) = 0.19 W/m 2 K Total thickness: 254 mm U-value: 0.19 W/m 2 K

U-value calculator report Page 8 of 12 Survey Reference: 16/03776/ENERAT Type Ref: Conversion Project: Royal Oak, Kinnerley Dovaston, OSWESTRY, Shropshire, SY10 8DP SAP Rating: 67 D CO2 Emissions (t/year): 5.64 Environmental: 73 C General Requirements Compliance: Fail CfSH Results Version: ENE1 Credits: N/A ENE2 Credits: N/A ENE7 Credits: N/A CfSH Level: N/A Software Version: Elmhurst Energy Systems Design SAP 2009 version 4.04r04 Building Elements: Roof 000004 - Flat roof insulation between timber joists Roof Type: Flat Roof standard (no precipitation) Layer Description Thickness Lambda R Fraction Ext surface 0.040 Layer 1 Layer 2 Layer 3 Layer 4 Layer 5 Felt Main construction 6 mm 0.030 0.200 100.00 % Timber decking Main construction 12 mm 0.130 0.092 100.00 % Quintherm Main construction 50 mm 0.022 2.273 100.00 % Quintherm Corrections - Air Gap: Level 1, Fasteners: None or plastic Main construction 100 mm 0.022 4.545 88.89 % Bridging - Timber 100 mm 0.130 11.11 % Corrections - Air Gap: Level 0, Fasteners: None or plastic Plasterboard, standard Main construction 13 mm 0.210 0.060 100.00 % Int surface 0.100 Total resistance: Upper limit = 6.534 m 2 K/W Lower limit = 5.706 m 2 K/W Average = 6.120 m 2 K/W Unheated space: None U-value (unrounded) = 0.16 W/m 2 K Total thickness: 181 mm U-value: 0.16 W/m 2 K

U-value calculator report Page 9 of 12 Survey Reference: 16/03776/ENERAT Type Ref: Conversion Project: Royal Oak, Kinnerley Dovaston, OSWESTRY, Shropshire, SY10 8DP SAP Rating: 67 D CO2 Emissions (t/year): 5.64 Environmental: 73 C General Requirements Compliance: Fail CfSH Results Version: ENE1 Credits: N/A ENE2 Credits: N/A ENE7 Credits: N/A CfSH Level: N/A Software Version: Elmhurst Energy Systems Design SAP 2009 version 4.04r04 Building Elements: Roof 000005 - Pitched roof - insulated at ceiling Roof Type: Pitched Roof, insulated flat ceiling Layer Description Thickness Lambda R Fraction Ext surface 0.040 Layer 1 Layer 2 Layer 3 Layer 4 Roof space Main construction 0 mm 0.000 0.000 100.00 % Mineral wool Main construction 150 mm 0.044 3.409 100.00 % Corrections - Air Gap: Level 0, Fasteners: None or plastic Mineral wool Main construction 150 mm 0.044 3.409 91.00 % Bridging - Timber 150 mm 0.130 9.00 % Corrections - Air Gap: Level 0, Fasteners: None or plastic Plasterboard, standard Main construction 13 mm 0.210 0.060 100.00 % Int surface 0.100 Total resistance: Upper limit = 6.731 m 2 K/W Lower limit = 6.508 m 2 K/W Average = 6.619 m 2 K/W Unheated space: None U-value (unrounded) = 0.15 W/m 2 K Total thickness: 313 mm U-value: 0.15 W/m 2 K

U-value calculator report Page 10 of 12 Survey Reference: 16/03776/ENERAT Type Ref: Conversion Project: Royal Oak, Kinnerley Dovaston, OSWESTRY, Shropshire, SY10 8DP SAP Rating: 67 D CO2 Emissions (t/year): 5.64 Environmental: 73 C General Requirements Compliance: Fail CfSH Results Version: ENE1 Credits: N/A ENE2 Credits: N/A ENE7 Credits: N/A CfSH Level: N/A Software Version: Elmhurst Energy Systems Design SAP 2009 version 4.04r04 Building Elements: Wall 000001 - Masonry solid wall Layer Description Thickness Lambda R Fraction Ext surface 0.040 Layer 1 Layer 2 Layer 3 Layer 4 Layer 5 Layer 6 Brick, outer leaf Main construction 400 mm 0.770 0.519 100.00 % Standard cavity Main construction 25 mm 0.139 0.180 100.00 % Quintherm Corrections - Cavity Unventilated, Emissivity: Normal Main construction 50 mm 0.022 2.273 84.03 % Bridging - Timber 50 mm 0.130 15.97 % Corrections - Air Gap: Level 1, Fasteners: None or plastic Standard cavity Main construction 25 mm 0.139 0.180 84.03 % Bridging - Timber 25 mm 0.130 15.97 % Corrections - Cavity Unventilated, Emissivity: Normal Plasterboard, standard Main construction 13 mm 0.210 0.060 100.00 % Plaster, standard Main construction 3 mm 0.400 0.008 100.00 % Int surface 0.130 Total resistance: Upper limit = 2.824 m 2 K/W Lower limit = 2.392 m 2 K/W Average = 2.608 m 2 K/W Unheated space: None U-value (unrounded) = 0.38 W/m 2 K Total thickness: 516 mm U-value: 0.38 W/m 2 K

U-value calculator report Page 11 of 12 Survey Reference: 16/03776/ENERAT Type Ref: Conversion Project: Royal Oak, Kinnerley Dovaston, OSWESTRY, Shropshire, SY10 8DP SAP Rating: 67 D CO2 Emissions (t/year): 5.64 Environmental: 73 C General Requirements Compliance: Fail CfSH Results Version: ENE1 Credits: N/A ENE2 Credits: N/A ENE7 Credits: N/A CfSH Level: N/A Software Version: Elmhurst Energy Systems Design SAP 2009 version 4.04r04 Building Elements: Wall 000002 - Masonry wall partial cavity fill Layer Description Thickness Lambda R Fraction Ext surface 0.040 Layer 1 Layer 2 Layer 3 Layer 4 Layer 5 Layer 6 Layer 7 Brick, outer leaf Main construction 105 mm 0.770 0.136 100.00 % Standard cavity Main construction 50 mm 0.278 0.180 100.00 % Quintherm Corrections - Cavity Unventilated, Emissivity: Normal Main construction 50 mm 0.022 2.273 100.00 % Corrections - Air Gap: Level 0, Fasteners: Wall ties, Cross sectional area: 80.00 mm 2, Lambda: 17.000 W/m.K, per m 2 : 2.500 Thermalite Turbo Main construction 100 mm 0.110 0.909 93.43 % Bridging - Mortar 100 mm 0.880 6.57 % Corrections - Air Gap: Level 1, Fasteners: None or plastic airspace/plaster dabs Main construction 15 mm 0.088 0.170 80.00 % Bridging - Mortar 15 mm 0.088 20.00 % Corrections - Cavity Unventilated, Emissivity: Normal Plasterboard, standard Main construction 13 mm 0.210 0.060 100.00 % Plaster, standard Main construction 3 mm 0.400 0.008 100.00 % Int surface 0.130 Total resistance: Upper limit = 3.841 m 2 K/W Lower limit = 3.619 m 2 K/W Average = 3.730 m 2 K/W Unheated space: None U-value (unrounded) = 0.29 W/m 2 K Total thickness: 336 mm U-value: 0.29 W/m 2 K

U-value calculator report Page 12 of 12 Survey Reference: 16/03776/ENERAT Type Ref: Conversion Project: Royal Oak, Kinnerley Dovaston, OSWESTRY, Shropshire, SY10 8DP SAP Rating: 67 D CO2 Emissions (t/year): 5.64 Environmental: 73 C General Requirements Compliance: Fail CfSH Results Version: ENE1 Credits: N/A ENE2 Credits: N/A ENE7 Credits: N/A CfSH Level: N/A Software Version: Elmhurst Energy Systems Design SAP 2009 version 4.04r04 Building Elements: Floor 000006 - floor - slab-on-ground floor Floor Type: Slab On Ground Floor Area = 124.35 m 2, Perimeter = 51.82 m, Wall thickness = 300.00 mm, Soil: Clay Horizontal edge insulation: none Vertical edge insulation: none Layer Description Thickness Lambda R Fraction Ext surface 0.040 Layer 1 Layer 2 Concrete, no fines Main construction 100 mm 1.200 0.083 100.00 % Chipboard Main construction 18 mm 0.130 0.138 100.00 % Int surface 0.170 Total resistance: Upper limit = 0.222 m 2 K/W Lower limit = 0.222 m 2 K/W Average = 0.222 m 2 K/W Unheated space: None U-value (unrounded) = 0.53 W/m 2 K Total thickness: 118 mm U-value: 0.53 W/m 2 K