PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER

Similar documents
Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

Dam Safety and Low Cost Spillway Designs

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

Flow Measuring Structures

Tangible benefits of technological prospection and prefeasibility studies in SHP projects Ing. Sergio Armando Trelles Jasso

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

Water Control Structures Selected Design Guidelines Alberta Environment Page 17-1

DESIGN OF CHANNEL FLOW DIVERSION FACILITIES

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

Outlet Flow Velocity in Circular Culvert

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

of the Crump weir Modelling of composite type variation

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

Index. Page numbers followed by f indicate figures.

Travers Reservoir Rehabilitation Project Irrigation Technical Conference Lethbridge, AB June 2, 2010

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA

MIEL I Hydroelectric Power Plant

Measuring flow in open channels (weirs)

SOUTHEAST TEXAS CONTINUING EDUCATION

Xayaburi Hydroelectric Power Project

CE Hydraulics. Andrew Kennedy 168 Fitzpatrick

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

PAPERWORK REDUCTION ACT A. GENERAL

Open Channel Flow. Ch 10 Young, Handouts

IMPACT AND PUNCTURING OF JARI TUNNEL AND ENLARGEMENT OF EXISTING TAPPINGS FOR ADDITIONAL WATER SUPPLY AND POWER GENERATION

A Study on Physical Model Test for Cheongpyeong Dam Discharge Recalculation

THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS

DIVERSION CHANNEL OF BELO MONTE HPP

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Final Drainage Report

Analysis of Side Sluice in Trapezoidal Channel

Reservoir on the Rio Boba

UNIVERSITY OF BOLTON WESTERN INTERNATIONAL COLLEGE FZE BENG (HONS) CIVIL ENGINEERING SEMESTER ONE EXAMINATION 2015/2016

Amina Reservoir Project Report

EXPERIMENTAL STUDY OF EFFECT OF END SILL ON STILLING BASIN PERFORMANCE

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

Coal Combustion Residuals Inflow Design Flood Control System Plan

CVEN 339 Summer 2009 Final Exam. 120 minutes allowed. 36 Students. No curve applied to grades. Median 70.6 Mean 68.7 Std. Dev High 88 Low 24.

Overview of the IWAYA Dam project. Specifications

RETENTION BASIN EXAMPLE

Tender Call No.: Likhu/GVN/Pkg-03/2012 OLUME III A 1 TABLE OF CONTENTS SALIENT FEATURES 1.0 SCOPE SALIENT FEATURES... 1

Effective Analysis by Arrangement of Multi-Baffle at Weir Downstream

Level 6 Graduate Diploma in Engineering Hydraulics and hydrology

Hydropower retrofitted onto existing water infrastructure assets


Application for a Dam Permit Ash Basin No. 1

ROLE OF THE FIRM IN THE PROJECT

Failure Consequence Classification

Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

Asst.Prof.Dr. Jaafar S. Maatooq. 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26

Lateral Outflow from Supercritical Channels

Irrigation System. BWCDD Zanjero Training 2/13/2008

Basic Design of Replogle Flumes

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS

Keeyask Generation Project. Physical Environment. Supporting Volume. Environmental Impact Statement

Outlet Structure Modeling

Via October Mr. William Neal, P.E. Technological Specialist DTE Electric Company One Energy Plaza Detroit, MI 48226

Interlake Tunnel Project

UNIT I: UNIFORM FLOW PART B

Appendix J Hydrology and Hydraulics

Water Control Structures Selected Design Guidelines Alberta Environment Page 13-1

Design of Stilling Basin Model with Impact Wall and end Sill

Irrigation Crossing Structures

Module 4 Hydraulic Structures for Flow Diversion and Storage

COMPUTER APPLICATIONS HYDRAULIC ENGINEERING

Pawana Dam Energy Dissipation A Case Study

2 Hydrology Studies. 2.1 Introduction

A&M WATERSHED MODEL USERS MANUAL WATER RESOURCES ENGINEERING

Figure 1: Overview of all AutoCAD generated cross-sections.

The Impacts of Pelosika and Ameroro Dams in the Flood Control Performance of Konaweha River

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

Sump Pumps Office procedures for the Drainage & Grading section

Module 3. Lecture 6: Synthetic unit hydrograph

Dam-Breach Modelling of the Staw Starzycki Embankment in Tomaszów Mazowiecki

Irrigation Structures 2. Dr. M. R. Kabir

DAM BREAK ANALYSIS & DISASTER MANAGEMENT PLAN

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

Drainage Analysis. Appendix E

Flood control and safety evaluation of Banqiao reservoir

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

Introduction to Hydrology, Part 2. Notes, Handouts

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

A simulation for the gated weir opening of Wonokromo River, Rungkut District, Surabaya

Informational Meeting- March 31, Boxelder B-2/B-3 Watershed Planning Study

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH

Numerical Simulation of Flood Routing in Complex Hydraulic Schemes. The Routing System Computer Program

THE CHANGES OF FLOW PROFILE DUE TO THE CONSTRUCTION OF CYLINDRICAL STRUCTURE AS A HYDRAULIC CONTROL STRUCTURE IN OPEN CHANNEL

Software Applications for Runoff Hydrological Assessment

Chapter 2. Water intake to a field

11/10/2009. Lake Uist - BAKER PT. Distributor from bore to penstocks Lowest level in draft tube FSL Top of surge tank.

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Transcription:

PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER Margarida Isabel Godinho Sobral Department of Civil Engineering and Architecture, Instituto Superior Técnico - Lisbon, Portugal SUMMARY The purpose of this document is to study, in a preliminary level, different solutions for the design of the hydraulic structures appurtenants to the dam in the Pisão river, in order to find a viable technical solution. A hydrological study was developed to obtain the flood hydrograph with a return period of 1000 years. For that purpose, precipitation-runoff models were used, such as the SCS HUD model and the rational formula. The hydrometric records of the area were also considered, scaled to the dam s watershed through the Meyer s formula. For the design of the spillway, several of the most common types of weirs for earthfill dams were considered, such as the labyrinth, the WES and the circular. The analysis concluded that the labyrinth weir has more advantages in the present case. Additionally, the open channel on the left riverbank and a hydraulic jump stilling basin were designed. The temporary diversion, designed for the return period of 20 years, was planned to be a gallery of concrete with circular cross section, also located on the left riverbank, below the dam embankment. This diversion includes the intake and restitution structures as well as two cofferdams. The restitution structure was planned as a SAF energy dissipation basin, suitable for the energy dissipation on the downstream end of a conduit. The intake tower was placed above the intake structure of the temporary diversion and the metallic conduits of the bottom outlet and the water intake were embodied inside the diversion gallery. The cross section of the bottom outlet and the Howell-Bunger valve were calculated to empty the reservoir within 20 days. The water intake conduit was intended to guarantee the discharge required for irrigation and maintain the ecological flow downstream. A simplified structural design of one of the concrete elements of the hydraulic structures was made. The open channel of the spillway was the chosen structure. Keywords: hydrological study, embankment dam, spillway, temporary diversion, bottom outlet, water intake.

1. INTRODUCTION The thesis focus on the preliminary design of an embankment dam in Pisão river, between the Breingel and Trigaches villages in the Beja district, defining a watershed with an area of 49 km 2. The implantation of the dam s axis was made based on the topographic characteristics of the construction area, with an established NWL at the elevation 159. The upstream and downstream slopes are 1:2.5 and 1:2.0, respectively. The dam has a maximum height of 16 m, 660 m of crest length and a total earthfill volume of 180 000 m 3. In Figure 1 the general dam plant is presented. Figure 1 General plant of the dam. 2

2. OBJECTIVES The purpose of this work is the hydraulic design of the appurtenant structures of the dam in the river Pisão. The designed works were: the spillway, the temporary diversion, the bottom outet, the water intake for irrigation and the ecological discharge. For each one, several solutions were studied, according to the conditions of the area, in order to present a possible and viable solution. 3. HYDROLOGICAL STUDY The main purpose of the hydrological study was to determine the peak discharge affluent to the dam for further hydraulic studies. The design was made, according to the actual legislation, for the return period of 1000 years. The peak discharge was determined through precipitation-runoff models and hydrometric records from hydrometric and meteorological stations near the watershed of the dam. The maximum annual precipitation records were organized and statistically studied in order to estimate the precipitation with 1000 years of return period, from which were calculated the precipitations with duration of three times the concentration period do the dam s watershed. Finally, the hyetographs were determined, according to the procedure presented by Portela (2006a and 2006b), taking into account the intensity-duration-frequency curve of the nearest meteorological station of those studied by Brandão et al. (2001). The peak discharge affluent to the reservoir was estimated based on the hyetographs and on the unitary synthetic hydrograph (USH) of the Soil Conservation Service, SCS (Portela, 2000). Additionaly, the rational formula was also used to determine the peak discarge, based on the precipitation with a duration equal to the concentration time. The hydometric records from a nearby station were also used, through a statistical analisys. The results of the discharge with the defined return period were transformed to the dam whatershed by the Meyer formula. In conclusion, the lowest peak discharge obtained was obtained by the Meyer formula (146 m 3 /s), followed by the rational formula (229 m 3 /s) and topped by the obtained though the USH model, considering hyetographs with alternate precipitation blocks (Q máx = 270 m 3 /s). A verification flood obtained, with the return period of 5000 years, was additionally considered. Applying the USH methodology, the peak discharge of this flood is 326 m 3 /s. 3

4. SPILLWAY The spillway was positioned in the left riverbank, due to the topographic conditions. The weir was designed to guarantee the passage in security of the design flow to downstream. The study of the spillway included an analysis of several types of weir, the design of the open channel in concrete and the energy dissipation structure. The studied weirs were the labyrinth, the WES and the circular, and it was concluded that the labyrinth weir presents more advantages in the present case. As presented in Figure 2, the characteristics of the adopted solutions are: α = 8º; depth, p = 2.00 m; two modules, with an effective length of 35.55 m and width of 7.10 m. Downstream of the weir, there is a constriction along 7.70 m with a slope of 15% in which the width of the channel goes from 7.10 to 4.00 m. At the downstream edge of the constriction, the runoff is critical. After the constriction, the channel has three straight reaches, connected by convex curves, completing a total of 187.90 m. The energy dissipation at the downstream edge of the channel is accomplished with a type III hydraulic jump basin form USBR (cf. Figure 2). 4

Figure 2 Spillway. Labyrinth weir, followed by a rectangular channel and a energy dissipation basin by hydraulic jump, type III of USBR. 5

5. TEMPORARY DIVERSION The temporary diversion, designed for the return period of 20 years, was planned to be a gallery of concrete with circular cross section, also located on the left riverbank, below the dam embankment. This diversion includes the intake and restitution structures as well as two cofferdams. The gallery has a cross section with 4.00 m diameter and a length of 130.00 m. The base of the intake structure was placed at elevation 142.70 and the highest level reached in the reservoir for the design flow is 146.00, which means that the crest of the upstream cofferdam must be at elevation 147.00, considering a freeboard of 1.00 m. In the present case, was considered necessary to design an energy dissipation device in the downstream edge of the gallery. The restitution structure was planned as a SAF energy dissipation basin, suitable for the energy dissipation downstream of a conduit. The stilling basin is 6.80 m long and 11.30 wide and it is presented in Figure 3. The walls of the stilling basin have the top at elevation 147.80 and make a 45º angle with the axis of the basin. Downstream from the basin, the channel has a trapezoidal section, covered with Reno mattresses and has a 15.00 m long constriction. The tailrace channel is 4.00 m wide and 70.00 m long. The transition between the reservoir and the gallery is made through a constriction, in which the width changes from 7.00 to 4.00 m. The walls ot the constriction must have an hydrodynamic geometry that guarantees a transition between the subcritical flow in the reservoir to the supercritical flow in the gallery without flow separation, as showed in Figure 3. The upstream cofferdam will be embodied in the dam s earthfill, which means that both upstream and downstream slopes are 1:2.5. The downstream cofferdam, with crest elevation 147, will be made in earthfill and with a 1:1.5 slope. 6

Figure 3 Temporary diversion. Hydraulic jump stilling basin from SAF type. 7

6. BOTTOM OUTLET AND INTAKE The bottom outlet and the water intake for irrigation are two parallel metallic conduits embodied in the gallery of the temporary diversion. Upstream, the intake tower has two entrances, one for the bottom outlet and another for irrigation intake, both at elevation 146.20. The geometry of these entrances was adapted from the intake structure of the temporary diversion. The tower is accessible through a bridge 2.00 m wide and 46.00 m long. The cross section of the bottom outlet and it is Howell-Bunger valve were calculated to empty the reservoir within 22 days. The maximum discharge of the outlet is 9 m 3 /s, with a velocity of 4 m/s. The conduit has 1.50 m in diameter and a Howell-Bunger control valve with 1 m in diameter at the bottom edge. The jet from the Howell-Bunger valve was directed to the SAF stilling basin built during the temporary diversion phase. The water intake has the double function of assuring 4 m 3 /s for irrigation and 20% of the modular flow (Q mod = 0.22 m 3 /s) for ecological discharge. The 1 m diameter conduit splits in two, one for irrigation and another for the ecological discharge. Air conducts to place downstream of the floodgates to avoid the formation of vortexes were also designed. Figure 4 contains the geometric definition of the intake tower and the bottom outlet. 8

Figure 4 Bottom outlet and water intake. Upstream intake tower. 9

7. DAM AND APPURTENANT CHARACTERISTICS Location: Watershed... Guadiana; River... Pisão; District... Beja; Villages... Beringel, Trigaches; Military maps... N. º 43. Dam and appurtenants structures: - Dam body and reservoir Type... earthfill; Dam height... 16.00 m; Volume of dam... 180 000 m 3 ; Crest length... 660.00 m; Crest width... 10.50 m; Crest elevation... 161.10; Maximum Flood Level, MFL... 160.10; Normal Water Level, NWL... 159.00; Minimum Operating Level... 151.00; Reservoir area... 49 km 2. - Spillway Location... left riverbank; Type... labyrinth weir, followed by a rectangular channel and a stilling basin downstream; Peak discharge (T=1000 years)... 270 m 3 /s; Weir elevation... 159.00 m; Weir width... 7.10 m; Weir high...... 2.00 m; Constriction length.. 7.70 m; Channel length... 187.90 m; Channel width... 4.00 m; Energy dissipation structure... USBR type III hydraulic jump stilling basin. 10

- Temporary deviation Location... left riverbank; Return period... 20 years; Peak discharge... 130 m 3 /s; Type... circular concrete gallery, with 4.00 m in diameter and 130.00 m long; Energy dissipation structure... SAF type hydraulic jump stilling basin; Upstream cofferdam at elevation 152.00, embodied in the dam s body; Downstream cofferdam at elevation 147.00, to be removed. - Bottom level: Location... left riverbank, embodied in the temporary deviation gallery; Bottom outlet entrance 3.50 x 2.50 m 2 at elevation 146.20 m, protected by a metallic grid and controlled by a sluice gate 1.50 x 1.50 m 2 ; Conduit and accessories in steel, DN 1500, 110.00 m long; Howell-Bunger valve DN 1000; Energy dissipation structure... SAF type hydraulic jump stilling basin. - Water intake and ecological discharge: Location... left riverbank, embodied in the temporary deviation gallery; Intake tower 20.00 m tall, with a rectangular section; Intake entrance 3.00 x 1.50 m 2 at elevation 146.20, protected by a metallic grid and controlled by a sluice gate 1.00 x 1.00 m 2 ; Conduit and accessories in steel, DN 1000, 110.00 m long; Deviation conduit for ecological discharge DN 100. 11