DEVELOPMENT OF A DESIGN AND PERFORMANCE PREDICTION TOOL FOR THE GROUND SOURCE HEAT PUMP SYSTEM

Similar documents
Comparative Heating Performances of Ground Source and Air Source Heat. Pump Systems for Residential Buildings in Shanghai

EXPERIMENT FOR VERIFICATION OF GROUND SOURCE HEAT PUMP USING THE DIRECT EXPANSION METHOD

STUDY ON THE DESIGN PROCEDURE OF GEOTHERMAL HEAT PUMPS: GEOTHERMAL HEAT PUMP SYSTEM WITH

First Thermal Response Test in Libya Abstract 1. Introduction 2. Background

Energy Efficient Heat Pump System Applied Short Term and Seasonal Thermal Energy Storage Part 1 Design concept of the system

Performance Evaluation under the Actual Operation Condition of a Ground Source Multiheat Pump System

Long-Term Heating Test Using the Semi-open Loop Ground Source Heat Pump System

Heat exchanger performance of ground source heat pump by water cooling method

STUDY ON GROUND SOURCE HEAT PUMP SYSTEM APPLYING PHC FOUNDATION PILES AND SHORT TERM THERMAL ENERGY STORAGE

Available online at ScienceDirect. Energy Procedia 78 (2015 )

REGRESSION ANALYSIS ON INFLUENCE OF VARIOUS FACTORS ON HEAT TRANSFER OF VERTICAL GROUND HEAT EXCHANGER

PREPROCESSOR FOR THE GENERATION OF G-FUNCTIONS USED IN THE SIMULATION OF GEOTHERMAL SYSTEMS

Enhancement of Heat Exchange Capacity of Ground Heat Exchangers by Injecting Water into Wells

Heat Recovery Ground Source Heat Pump System in Smart Community Takao KATSURA Faculty of Engineering, Graduate School of Hokkaido University

The performance benefits of Coaxial ground heat exchangers vs. Single U bend and Double U bends

A PILOT PROJECT OF THE CLOSED-LOOP GROUND SOURCE HEAT PUMP SYSTEM IN CHINA

Study on Heat Exchange Characteristics for PHC Energy Piles

MCS Based Design for GSHPs Horses for Courses. GSHPA Energy Expo Stone Sept 2017 Robin Curtis GeoScience Ltd

EXPERIMENT AND NUMBERICAL ANALYSIS OF THE DISCONTINUOUS OPERATION FOR GROUND HEAT EXCHANGERS

Ground Coupled Heat Pump Systems a Key for a Sustainable Development of Heating and Cooling Buildings

CO 2 Transcritical Cycle for Ground Source Heat Pump

An Assessment Methodology of Shallow Geothermal Energy Projects

NORTH AMERICAN MONITORING OF A HOTEL WITH ROOM SIZE GSHPS

CLOSED-LOOP HEAT EXCHANGER FOR GROUND COUPLED HEAT PUMPS

New developed solar thermal systems for heating and cooling Budapest, 16 th April 2009 Tsekouras Panagiotis Mech. Engineer NTUA Centre for Renewable

Research on single hole heat transfer power of ground source heat pump system

EVALUATION OF DISTRIBUTION SYSTEM PERFORMANCE IN DISTRICT HEATING AND COOLING SYSTEM

*Corresponding authors. Tel.: x415, address: (N. Zhu)

Magda Kaczmarczyk and Michał Kaczmarczyk

- 2 - SME Q1. (a) Briefly explain how the following methods used in a gas-turbine power plant increase the thermal efficiency:

Performance enhancement of a photovoltaic thermal (PVT) and ground-source heat pump system

Measurement of COPs for Ground Source Heat Pump (GSHP) System in Heating and Cooling Mode

Heat Pump Hot Water Supply Systems

Available online at ScienceDirect. Energy Procedia 78 (2015 )

Performance Comparison of Air-source Heat Pumps Using Economizer Vapor Injection and Internal Heat Exchanger in Cold Regions

A Sensitivity Analysis on Mixing Energy Loss in Air-Conditioned Rooms by Using CFD

Study on the change of soil temperature in Ground Source Heat Pump System Shili Han1, a*, Shunyu Su1,b, Lamei Liu1,c, Chuanhui Zhou1,d, Lei Shi2,e

AN ANALYSIS OF THE FRESH AIR LOAD REDUCTION SYSTEM BY USING UNDERGROUND DOUBLE FLOOR SPACE FOR AIR CONDITIONING

THERMAL CHARACTERISTICS AND ENERGY CONSERVATION MEASURES IN AN INDOOR SPEED-SKATING ARENA

Ground-Coupled Heat Pump And Energy Storage

MPhil Dissertation. School of Computing Engineering and Information Sciences

Heat Pump Field Trials and Implications for Design

Zero Energy House in Japan: Actual results and future target. Isamu Ohta Misawa Homes Institute of Research & Development CO., LTD.

In-Depth Exploration of Ground Source Heat Pump Technologies

Evaluation of reduced energy use resulting from a DHC network in the Shinjuku DHC area

Arthur Huber October 2008

Citation for the original published paper (version of record):

Thermal Performances Of Three Types Of Ground Heat Exchangers In Short-Time Period Of Operation

D DAVID PUBLISHING. Efficiency of Combined Solar Thermal Heat Pump Systems. 1. Introduction. 2. Solar Thermal and Heat Pump Systems

REAL-LIFE OPERATION OF SOLUS SYSTEM: A FOCUS ON THERMAL COMFORT 11 A P R I L D A N VA K D A G E N

An evaluation of ground thermal properties measure accuracy by thermal response test of horizontal ground heat exchangers

Influencing Factors on Ground Heat Balance of GSHP System Xiaohong Zhang1, a *, Zehua Liu2,b, Chao Zhang3,c and Long Ma4,d

Temperature Response functions (G-Functions) for Single Pile Heat Exchangers

Technical Feasibility Study of Hybrid Ventilation for a High-rise Office Building in Shanghai


Design and development of an Earth Air Tube Heat Exchanger

Energy from the Earth. Geothermal Two very different methods Tides, waves, currents. Unit 12 Energy from the earth - Slide 1

Simulations of a New Double U-tube Borehole Configuration with Solar Heat Injection and Ground Freezing

Exergy Analysis of a Ground-Source Heat Pump System. University of Cambridge, Department of Engineering, Cambridge, UK, 2

Experimental Validation of a Numerical Model for the Thermal Response of a Borehole Field

Tunnels, a new potential for sensible heat storage in rock: 3D numerical modelling of a reversible exchanger within tunnel

Coefficient of Performance Stabilisation in Ground Source Heat Pump Systems

Performance investigation of multiple-tube ground heat exchangers for ground-source heat pump

We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists. International authors and editors

Thermal Accumulation in Solar Systems for Hot Water Abstract 1. Introduction

ABSTRACT INTRODUCTION

Numerical and analytical analysis of groundwater influence on the pile ground heat exchanger with cast-in spiral coils

A SIMPLE TOOL FOR SIMULATION OF GROUND SOURCE HEAT PUMP SYSTEMS

RETRO-COMMISSIONING OF A HEAT SOURCE SYSTEM IN A DISTRICT HEATING AND COOLING SYSTEM Eikichi Ono 1*, Harunori Yoshida 2, Fulin Wang 3 KEYWORDS

GROUND-SOURCE HEAT PUMPS - RECHARGING OF BOREHOLES BY EXHAUST-AIR COILS

Research progress on heat pumps and mchp at Northumbria

Numerical Modelling of Geothermal Borehole Heat Exchanger Systems Miaomiao He

Research on Ground Source Heat Pump Design

Future changes in the carbon intensity of grid electricity and its effect on the carbon emissions from domestic electric heating solutions

Second Law Analysis of a Carbon Dioxide Transcritical Power System in Low-grade Heat Source Recovery

FLOW PATTERN IN CO 2 -LUBURICANT TWO-PHASE FLOW AT SUPERCRITICAL PRESSURE

HyTReC Encourages Hydrogen Industries

Welcome Everyone. Not Quite this kind! Geothermal Heat Pumps are a indirect solar heating system! Introduction to Geothermal

LEED Commissioning and Actual Energy Use. John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering

Innovative Solar thermal systems for heating and cooling

HEATING SYSTEM RETURN TEMPERATURE EFFECT ON HEAT PUMP PERFORMANCE

TO CONDUCT THE PERFORMANCE TEST ON CHILLER UNIT BY USING NANOFLUID COOLED CONDENSER

Arthur Huber September 2011

Design and Experiments of a Solar Low-temperature Hot Water Floor Radiant. Heating System 1

Heat Transfer Theory. Jennie Borgström

MULTI-YEAR OPERATION EFFECT OF GEOTHERMAL HEAT EXCHANGER ON SOIL TEMPERATURE FOR UNT ZERO ENERGY LAB. Vinayak P. Walikar

Enhancement on the Performance of Refrigeration System Using the Nano-Refrigerant

Ground Coupled Heat Pumps in Mixed Climate Areas: Design, Characterization and Optimization

enables to easily calculate the energy consumption of air conditioning in various conditions (MLIT). In this study, the university building is the obj

High Heat-transfer Titanium Sheet-HEET - for Heat Exchangers

METERING MEASUREMENT CHALLENGES & MONITORING OF A LARGE SCALE GROUND SOURCE HEAT PUMP (GSHP) SYSTEM

Special edition paper Research on Utilizing Air Thermal Energy for Railway Facilities

Reference System, Germany Solar domestic hot water system, single-family house

COMPARISONS BETWEEN TRNSYS SOFTWARE SIMULATION AND F-CHART PROGRAM ON POOL HEATING SYSTEM

CO 2 Heat Pump System for Combined Heating and Cooling of Non-Residential Buildings

Direct expansion ground source heat pump using carbon dioxide as refrigerant: Test facility and theoretical model presentation

WATER COOLING OF PHOTOVOLTAIC PANELS FROM PASSIVE HOUSE LOCATED INSIDE THE UNIVERSITY POLITEHNICA OF BUCHAREST

Scientific Journal Impact Factor: (ISRA), Impact Factor: [Son, 3(10): October, 2014] ISSN:

Computer modelling of a convective steam superheater

Transcription:

/33 DEVELOPMENT OF A DESIGN AND PERFORMANCE PREDICTION TOOL FOR THE GROUND SOURCE HEAT PUMP SYSTEM T. Katsura * K. Nagano * S. Takeda * T. Ibamoto * S. Narita * Y.Nakamura *2 N. Homma *3 * Hokkaido University *2 Nippon Steel Corporation *3 Hokkaido Electric Power Co., Inc

Background 2/33 The Kyoto protocol became effective at 6 th February 2005 CO 2 emissions reduction target of Japan 6% The GSHP system has been remarked as a system with large potential for reduction of CO 2 emission. The number of the GSHP systems installed in Japan is increasing rapidly Units 40 35 30 25 20 5 0 5 0 98 Markets of the GSHP in Japan 983 985 987 989 99 993 995 997 999 200 2003 2004

Background 3/33 When the GSHP system is installed, a design tool is required. The tool is used for Determination of length of the ground heat exchanger Demonstration of installing effect of the GSHP system? CO 2 emissions no design tool in Japan Oil boiler? GSHP system We developed a design tool for the GSHP system

Advantages of the developed tool 4/33. User friendly data input procedure and graphical output 2. Short time calculation according to hourly heating and cooling loads (Calculation time is approx. minute for calculation of two years operation) 3. Calculation of internal thermal resistance in a borehole for tube geometric arrangement by the boundary element method (BEM) 4. Calculation of the heat carrier fluid in the ground heat exchanger with large diameter 5. Including database of CO 2 emissions, costs, and lifetimes for LCA 6. High speed calculation algorithm for heat extraction or injection of the multiple ground heat exchangers buried in random layout

Examples of the input and output screens and windows 5/33 () Input windows Calculations are carried out. Then right window is displayed (2) Output windows Output window examples

Calculation of ground temperature 6/33 Ground temperature calculation applying the cylindrical heat source theory Vertical ground heat excahgner Infinite solid r p T s0 q bo T s hollow cylinder Theoretical solution of the ground temperature variation T s according to radius r and uncertain time t T s = T s 0 2 q bo πλ s ( e 0 as u 2 t J ) ( ur ) Y ( u r bo ) Y 0 ( ur ) J ( u r 2 2 2 u [ J ( u r bo ) + Y ( u r bo )] The developed tool uses an approximate expression of this response for making superposition Fast calculation 0 bo ) du X Nomenclature a: Thermal diffusivity [m 2 /s], J x : xth-order Bessel function of first kind, q : Heat flux [W/m 2 ], r: Radius [m], T: Temperature [ o C], t: Time [h], u: Characteristic value, Y x : xth-order Bessel function of second kind Subscripts b: Borehole surface, s: Soil Greek letters λ: Thermal conductivity [W/m/K]

Calculation of the GSHP system operation 7/33 Calculation diagram of a typical GSHP system Radiator 2 Heat pump unit Heat extraction from ground heat exchanger: Q T 2out T in Flow rate: m b 2 T 2in Heat load: Q 2 T out Compressor power: E Overall heat transfer coefficient : K bo-out Heat capacity T b T s change: ΔQ b Heat extraction from ground: Q bo 3 3 Ground heat exchanger T s r r = bo Nomenclature T: Temperature [ o C] Subscripts bo: Borehole surface, b: Heat carrier fluid (antifreeze solution or water), in: Inlet of heat pump unit, out: Outlet of heat pump unit, : Primary side, 2: Secondary side

Example of temperature distribution calculated by BEM 8/33 Single U-tube (λ bo =.8W/m/K) Case Case 2 20 20 0.0 0.2 32 52 32 72 0.4 0.6 R bo =2.23 0-2 m 2 /W/K R bo =.35 0-2 m 2 /W/K 0.8.0 Double U-tube (λ bo =.8W/m/K) Case Case 2 20 20 32 52 32 72 R bo =.52 0-2 m 2 /W/K R bo =7.58 0-3 m 2 /W/K Nomenclature R b : Borehole thermal resistance [m 2 /K/W]

Calculation of the heat carrier fluid in the ground heat exchanger with large diameter 9/33 Comparison calculated temperature with measured temperature Direct type steel pile with diameter of φ65mm Temperature [ºC] 5 4 3 2 Measured T f-out Calculated T f-out with.5 of λ s T f-in as the input condition of calculation Indirect type steel pile with diameter of φ400mm Temperature [ºC] 0 0 00 200 300 400 Time [h] 5 Measured T f-out 4 3 Calculated T f-out with.5 of λ s 2 T f-in as the input condition of calculation 0 0 50 00 50 200 Time [h]

Life cycle analysis of the GSHP system 0/33 Life cycle analysis Life cycle assessment Estimation of life cycle cost These are estimated by Total initial + Total running Lifetime Energy consumption CO 2 emission Electric power consumption (Calculated by the GSHP system operation ) This tool can also compare the GSHP system with conventional systems (ex.oil boiler system, ASHP) A database of CO 2 emissions, costs, and lifetimes for LCA is included in the tool

Calculation for multiple ground heat exchangers /33 Input window of pipe arrangement of multiple ground heat exchangers 2m 2m 2m 2m 2m 2m 2m Header HP Input 2m Piping route of CASE Piping route of CASE2 Steel foundation pile used as ground heat exchanger

Examples of the calculation results 2/33 Difference of temperature distributions according to pipe arrangement 5.0 0.0 CASE 5.0 CASE 5.0 CASE 3 2 4 0.0 5 5.0 5.0 20.0 5.0 5.0 5.0 CASE2 5.0 CASE2 CASE2 3 2 4 20.0 0.0 0.0 5 5.0 5.0 Elapsed time of 3000 h (Mar.7 th ) Elapsed time of 5000 h (May. 30 th ) Piping route Elapsed time of 7000 h (Aug. 2 st ) 5 0 5 20 Temperature [ o C]

Advantages of the developed tool 3/33. User friendly data input procedure and graphical output 2. Short time calculation according to hourly heating and cooling loads (Calculation time is approx. minute for calculation of two years operation) 3. Calculation of internal thermal resistance in a borehole for tube geometric arrangement by the boundary element method (BEM) 4. Calculation of the heat carrier fluid in the ground heat exchanger with large diameter 5. Including database of CO 2 emissions, costs, and lifetimes for LCA 6. High speed calculation algorithm for heat extraction or injection of the multiple ground heat exchangers buried in random layout From these advantages, this tool is Especially effective to evaluate the performance of the GSHP system, which is the large systems and the energy pile systems

Today s topics 4/33. Calculation of temperatures of the ground and the heat carrier fluid in the GSHP system for the multiple ground heat exchangers High speed calculation algorithm of the ground temperature for heat extraction or heat injection of multiple ground heat exchangers Calculation method of temperature of the heat carrier fluid in the GSHP system for pipe arrangement of the ground heat exchangers 2. Comparison of performance of the GSHP system The calculated conditions are changed for the comparison items Piping route Numbers of the parallel and serial circuits Number of the ground heat exchangers (But the total lengths are the same) Method of calculation (Detailed method and simplified method)

5/33 Calculation of the ground temperature for heat extraction or injection of multiple ground heat exchangers Applying the superposition principle 2 j r d,i r d,i2 r d,ij The thermal response of a certain ground heat exchanger i is calculated by summing up the all thermal responses r p Certain ground heat exchanger i Equation of the thermal response is, T n ( p, t) = s C ( p, t) + s, i r T r T s L ( rd, ij, t) j= T s C 2 πλ t ( r, t) q' ( t τ ) s τ = 0 I ( r, τ ) τ Thermal response for heat extraction of a certain ground heat exchanger i T s L 4πλ τ = 0 t ( r, t) q'' ( t τ ) s E 2 ( r a τ) 4 τ Thermal response for heat extraction of a surrounding ground heat exchanger j s

6/33 Calculation of the ground temperature for heat extraction or injection of multiple ground heat exchangers T s C * * * * t * * * * * T ( ) ( ) ( r τ ) s C t * * * * * * r, t = q t τ * T ( r, t ) = q ( t τ ) *, τ * = 0 τ Non-dimensional thermal response for heat extraction of a certain ground heat exchanger i T * * ( r τ ) * * s L, s L τ * = 0 * τ Non-dimensional thermal response for heat extraction of a surrounding ground heat exchanger j Applying superposition of the approximated thermal response for the cylindrical heat source Approximating the superposed thermal response for the line heat source T Approximate equation (t *.0 ) Ts n * * t * * * * * *, C s L ( r, t ) T + q ( t τ ) s Li i= τ * = * * *2 ( τ r ) * *2 ( τ r ) The ground temperature can be calculated with acceptable precision and speed to be used as a tool for designing of the GSHP system T s* : Non-dimensional temperature (= 2πλ s ΔT s / r p / q ) [-], t * : Fourier number (= at / r p2 ) [-], q * : Non-dimensional heat flux (= q / q 0 ) [-], q 0 : Unit heat flux (=) [W/m 2 ],

Calculation of temperatures for pipe arrangement 7/33 Detailed method - Parallel circuit- T out T in T pin, T pout, T pin,2 T pout,2 T pin,k- T pout,k T pin,m T pout,m T f, T f,2 T f,k T f,m T s (r p,,t) T s (r p,2,t) T s (r p,k,t) T s (r p,m,t) Heat balance equation of the heat carrier fluid in the primary side T T T = pin, k out in = m k = G f, k G f T pout, k 2 k m Heat balance equation of the heat carrier fluid in the ground heat exchanger dtf, k c ρ Vf, k = c ρ G ( Tpout, k Tpin, k) + K A ( Ts, f f f f f, k p out, k p out, k p out, k dt T n+ pout is obtained ( r, t) Tf k) c f ρ f : Heat capacity of heat carrier fluid [kj/m 3 ], V f : Volume of heat carrier fluid [m 3 ] G f : Flow rate of heat carrier fluid in primary side [m 3 /s], K : Overall heat transfer coefficient

Calculation of temperatures for pipe arrangement 8/33 Detailed method - Serial circuit- Heat pump unit T pin, = T out T pin,2 = T pout, T pin,3 = T pout,2 T pin,l = T pout,l- T pin,n = T pout,n- T in = T pin,n T 2out T in Q 2 Q T 2in E T out T f, T f,2 T f,l T f,n Equation to calculate T out n+ T = T Q c n+ n+ n+ 2 out in f E ρ m f n+ f T s (r p,,t) T s (r p,2,t) T s (r p,l,t) T s (r p,n,t) 2 l n Heat balance equation of the heat carrier fluid in the ground heat exchanger dt f, l c, (,, ) ( (, ) f ρ fvf l = c f ρ f G f Tpout l Tpin l + K p out, l Ap out, l Ts rp, l t Tf, l) dt T n+ pout is obtained

Calculation of temperatures for pipe arrangement 9/33 Simplified method Heat pump Supply and return header 2 3 n - n A. Serial circuit The ground heat exchangers are regarded as a ground heat exchanger whose length is equal to the total length of the ground heat exchangers 2 m - m B. Parallel circuit The flow rate is divided into according number of the parallel circuit From A and B, the following equation is obtained as respects all circuits c f ρ Vfn f dt dt f ρ G f = c ( T in T out) + K A f f p out p out m n( T s ( r, t) Tf ) p

Comparison of performance of the GSHP system 20/33 Calculated subject Location : Tokyo, Japan Cooling period: Apr.23rd - Nov.2nd Heating period: Nov.3rd - Apr.22nd Floor area: 30m 2 Heating load: 28.2 GJ (Maximum load: 6.6 kw) Cooling load: 0.0 GJ (Maximum load: 6.3 kw) Room condition Heating period Temperature: 20 o C Cooling period Temperature: 26 o C Humidity: 50% Heat loss coefficient: 2.33W/m 2 /K Initial ground temperature: 6.5 o C Soil heat capacity: 3000 kj/m 3 Soil thermal conductivity:.0 W/m/K

Comparison of performance of the GSHP system 2/33 Hourly variation of heat load 8 6 Heating period Cooling period Heat load [kw] 4 2 0-2 -4-6 -8 Cooling load Heating load: 28.2 GJ (Maximum load: 6.6 kw) Cooling load: 0.0 GJ (Maximum load: 6.3 kw) Heating load Nov. 3 rd Feb. 3 rd May. 3 rd Aug. 3 rd Nov. 2 nd

Calculated conditions 22/33 Pipe arrangement (Parallel Serial) Method for calculation CASE 4 5 Detailed method CASE2 4 5 Detailed method CASE3 20 Detailed method CASE4 (Borehole) Detailed method CASE5 4 5 Simplified method

Comparison items 23/33 Piping route: CASE vs. CASE2 CASE CASE 2 2m 2m 2m 2m 2m 2m 2m 2m 2m 2m 2m 2m 2 3 4 5 5 HP 2m 2m 4 3 2 HP Header Header 2m 2m Steel foundation pile used as ground heat exchanger

Comparison item 24/33 Numbers of the parallel and serial circuits : CASE vs. CASE3 CASE : Numbers of the parallel serial circuits are 4 5 CASE 3: All ground heat exchangers are connected in parallel Number of the ground heat exchangers : CASE vs. CASE4 CASE : Multiple ground heat exchangers of 8 m 20 (= 60 m) CASE 4: A single ground heat exchanger with length of 60 m Method of calculation : CASE vs. CASE5 CASE : Calculated by the detailed method CASE 5: Calculated by the simplified method

An example of calculation results 25/33 Operating condition (temperature variations*) of the third year 50 40 Heating Period Cooling Period T 2out *Temperatures of each part Temperature [ o C] 30 20 0 T p-outave T out T 2out T in T out 0 T 2out T p-outave T p-out -0 T out Minimum temperature:-0.4 o C Nov.3 rd Feb.3 rd May.3 rd Aug.3 rd Nov. 2 nd Temperatures are recovered The GSHP system can operate for a long term

Comparison between CASE and CASE2 26/33 Changes of temperature distribution in the ground surrounding piles 5.0 2 3 4 0.0 CASE 5.0 CASE 5.0 CASE 3 2 4 2 3 4 5 0.0 5 5.0 20.0 5.0 5 Temperature decrement: Almost even 5.0 4 3 2 5.0 5.0 Temperature increment: Pile is the largest CASE2 5.0 CASE2 CASE2 3 3 2 4 2 4 20.0 5 0.0 5 0.0 5 5.0 5.0 Temperature decrement: Pile is the largest Elapsed time of 3000 h (Mar.7 th ) Elapsed time of 5000 h (May. 30 th ) Piping route Ground temperature is decreased Effect of heat extraction is still left Temperature increment: Pile is the largest Elapsed time of 7000 h (Aug. 2 st ) 5 0 5 20 Temperature [ o C]

Comparison between CASE and CASE2 27/33 Integrating amounts of heat extraction and injection of each pile.5 Heating Period Cooling Period.5 Heating Period Cooling Period Amount of heat extraction [GJ].0 0.5 0.0-0.5 -.0 -.5 Pile2, Pile, Pile 3, Pile 4, Pile5 from top to bottom Total amount of heat extraction:5.65gj Total amount of heat injection :2.87GJ Difference: Large Difference: Small Pile2, Pile3, Pile 4, Pile, Pile5 from top to bottom -0.5 -.0 Nov.3 rd Feb.3 rd May.3 rd Aug.3 rd Nov.2 nd -.5 These results indicate Amount of heat extraction [GJ].0 0.5 0.0 Pile5, Pile, Pile 4, Pile 3, Pile2 from top to bottom Pile4, Pile5, Pile 3, Pile 2, Pile from top to bottom Total amount of heat extraction:5.65gj Total amount of heat injection :2.87GJ Difference: Small Difference: Large Nov.3 rd Feb.3 rd May.3 rd Aug.3 rd Nov.2 nd. Seasonal thermal storage effect appears 2. Total amounts of heat extraction are the same although the ones of individual piles differ depending on the piping route

Comparison between CASE and CASE2 28/33 Performance of the GSHP system Heating Period Average COP Average SCOP Cooling Period Average COP Average SCOP CASE 5.0 4.0 5.6 3.6 CASE2 5.0 4.0 5.6 3.6 CASE3 4.9 3.9 5.5 3.5 CASE4 5.4 4.2 5.3 3.4 CASE5 5.0 4.0 5.6 3.6 These results indicate In this calculated condition, difference of the performance of the GSHP system for the piping route is hardly occurred

Comparison between CASE and CASE3 29/33 Performance of the GSHP system Heating Period Average COP Average SCOP Cooling Period Average COP Average SCOP CASE 5.0 4.0 5.6 3.6 CASE2 5.0 4.0 5.6 3.6 CASE3 4.9 3.9 5.5 3.5 CASE4 5.4 4.2 5.3 3.4 CASE5 5.0 4.0 5.6 3.6 These results indicate Laminar flow of the heat carrier fluid yields reduction of heat extraction or injection and performance decrement of the GSHP system It s desirable to arrange the piping route to keep the turbulent flow

Comparison between CASE and CASE4 30/33 Performance of the GSHP system Heating Period Average COP Average SCOP Cooling Period Average COP Average SCOP CASE 5.0 4.0 5.6 3.6 CASE2 5.0 4.0 5.6 3.6 CASE3 4.9 3.9 5.5 3.5 CASE4 5.4 4.2 5.3 3.4 CASE5 5.0 4.0 5.6 3.6 These results indicate The GSHP with multiple ground heat exchangers can operate with high efficiency as well as the system with a single ground heat exchanger The GSHP system has potential to be popular in warm region in Japan

Comparison between CASE and CASE5 3/33 Performance of the GSHP system Heating Period Average COP Average SCOP Cooling Period Average COP Average SCOP CASE 5.0 4.0 5.6 3.6 CASE2 5.0 4.0 5.6 3.6 CASE3 4.9 3.9 5.5 3.5 CASE4 5.4 4.2 5.3 3.4 CASE5 5.0 4.0 5.6 3.6 These results indicate The simplified method provides high advantage from the viewpoint of precision and computational speed for evaluation of the GSHP system

Summary 32/33. Calculation algorithm of temperatures for pipe arrangement of the multiple ground heat exchangers is shown High speed calculation algorithm of the ground temperature for heat extraction or heat injection of multiple ground heat exchangers Calculation method of the heat carrier fluid in the GSHP system for pipe arrangement of the ground heat exchangers

Summary 33/33 2. Performances of the GSHP system were compared by changing calculated conditions These results indicate ) In this calculated condition, difference of the performance of the GSHP system for the piping route is hardly occurred although the ones of individual piles differ 2) It s desirable to arrange the piping route to keep the turbulent flow for reason of reduction of heat extraction or injection due to laminar flow of the heat carrier fluid 3) The simplified method provides high advantage from the viewpoint of precision and computational speed 4) The GSHP system has possibility to be popular in warm region in Japan

Thank you for your attention!!

Comparison between temperatures of the calculation and measurement in field experiments 35/25 Schematic diagram of the field experiments Experiment room In experiment room Heat pump Fan-coil Steel pile External diameter: 40 mm Internal diameter: 30 mm To outside To outside Water Brine (Acid organic type 40 %) 8m U-tube (PE00) External diameter: 32 mm Internal diameter: 25 mm F Flow sensor Electromagnetic flow meter T Pt-00 Work Shop of Annex29, 2005-05-30, Las Vegas, USA K. Nagano, T. Katsura, S. Takeda et al.

Comparison between temperatures of the calculation and measurement in field experiments 36/25 Field experiments Experiment room Steel pile Work Shop of Annex29, 2005-05-30, Las Vegas, USA K. Nagano, T. Katsura, S. Takeda et al.

Comparison between temperatures of the calculation and measurement in field experiments 37/25 Temperature measurement points Measurement room.8 m 7.2 m Line.8 m Line2 Line3 Pile A Pile B Pile C Pile D Pile E 9 7 6 5 4 3 0 m 8 Line4 2 Line5 : Steel pile Measuring points of water temperature in a pile : At GL-, 2, 4, 6 and 8 m Measuring points of ground temperature ( to 9) : At GL-0.5, 2, 4, 6, 8 and 0 m : At GL-, 4 and 8 m : At GL-6 m Work Shop of Annex29, 2005-05-30, Las Vegas, USA K. Nagano, T. Katsura, S. Takeda et al.

Comparison between temperatures of the calculation and measurement in field experiments 38/25 Result 5 Point Temperature [ o C] 0 5 0 Point2 Point4 Point9 Calculated -5 Mar.9 th Mar.29 th Apr.8 th Apr.8 th Apr.28 th May.8 th Date Work Shop of Annex29, 2005-05-30, Las Vegas, USA K. Nagano, T. Katsura, S. Takeda et al. Measured T in