APPENDIX - I (See paragraph 6) FORM 1

Similar documents
APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1

Annex F Scoping Checklist

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram

APPENDIX I (See paragraph 6) FORM 1

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

FORM 1 BASIC INFORMATION S.NO.

APPENDIX I. (See paragraph 6) FORM 1

FORM-I for seeking clearance for project attracting CRZ notification

APPENDIX I (See paragraph 6) FORM 1

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)

APPENDIX I (See paragraph - 6) FORM 1

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.

APPENDIX- I FORM- 1. (I) Basic Information:

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR

Sri.T.N.Balasubramanya

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.

Haridarshan Residency ( Row Type House & School Building )

FORM 1 (Application for Environment Clearance)

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1 Riverbed Sand Mining Project

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)

APPENDIX I (See paragraph 6) FORM 1

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

M/S Overseas Min Tech Consultants, Jaipur 1

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State

FORM 1 Riverbed Sand/Morrum / Mining Project

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2

Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

FORM 1 Riverbed Sand Mining Project

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project

FORM min Village. Chowgund, Tehsil. Doru District. Anantnag State

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

(I) Basic Information:

APPENDIX I (See paragraph 6) FORM 1

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See Paragraph 6) FORM 1

JSW DHARAMTAR PORT LIMITED

RATNAAKAR SHELTER LLP

APPENDIX I. (See paragraph 6) FORM 1

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1

Ms.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu

APPENDIX I. (See paragraph 6) FORM 1

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1

Sl. No. 1. Name of the Project/s : Chudeshwar Gravel Deposit (Narmada River) 2. Sl. No. of the Schedule : Category B-2 of Activity 1(A)

ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu

30 TPH Fertilizer Blending unit for Customized NPK Production at Zuarinagar, Sancoale, Marmugao, SouthGoa, Goa

Application for Prior Environmental Clearance (EC)

Revised FORM - I & PRE-FEASIBILITY REPORT

Proposed Multiplex & Commercial Complex FORM I

UPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT

FORM-I, PRE-FEASIBILITY REPORT FOR ENVIRONMENTAL CLEARANCE (EC) (Under Clause 6 of S.O.1533 of Environment Impact Assessment Notification, 2006)

FORM 1. Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification

FORM 1. Basic Information. Sl. No.

FORM-I. Environmental Clearance (EC)

Form 1, Form 1(A) and Proposed ToR for Residential Project at Chala, Taluka: Vapi & District: Valsad, Gujarat.

Salai Godhani Stone Quarry of Mr. Arvind Janraoji Gajbhiye in Village Salai Godhani, Th Nagpur (Gra) & Dist Nagpur Form I APPENDIX-I FORM-1

556/2C2,3B2,4A,5B,6B,7,8,9,10,11A,12A, 12B2,

APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR QUARRYING BRICK EARTH. Natham Group Village. Kamuthi Taluk, Ramanathapuram District

Salient Features of Proposed Project Namely Surya Emerald proposed to be developed by M/s. Surya Buildcon

Rajarhat-Bishnupur 1 No.Gram Panchayat Tehsil - District

APPENDIX I. (See paragraph -6) FORM- 1. S.No. Item Details 1 Name of the projects/s: Flag Stone Quarry

Transcription:

APPENDIX - I (See paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the project/s M/S Jashnani Constructions Pvt. Ltd. Proposed residential building project at Shahapur, Thane 2 S.. in the Schedule 8 (b) 3 Proposed capacity / area/ length/tonnage to Details Area Unit be handled/ command area/lease area/ Total plot area 26,710 m 2 number of wells to be drilled. Deduction for a) Existing road area 138 m 2 b) Road widening area 184 m 2 RG area 3,970 m 2 Net plot area 23,749.20 m 2 Permissible FSI area 18,218.23 m 2 Proposed FSI area 17,199.99 m 2 Total Construction area 17,199.99 m 2 Area statement is attached as Annexure I 4 New / Expansion / Modernization New project 5 Existing Capacity/ Area etc. 6 Category of project i.e. A or B B2 Category 7 Does it attract the general condition? if yes, please specify 8 Does it attract the specific condition? If yes, please specify 9 Location Village Shahapur, Taluka Shahapur, District Thane Plot/Survey/ Khasra. 35/3, 107/1, 31/A, 109/3A, 109/2A, 116/1A at Village Shahapur, Taluka Shahapur, District Thane Village Shahapur Tehsil Shahapur District Thane State Maharashtra 10 Nearest railway station/port along with Asangaon railway station: 3.1 km distance in kms. 11 Nearest Town, city, District Headquarters Asangaon Distance: 3.1 km along with distance in kms. 12 Village Panchayat, Zilla Parishad, Municipal Shahapur Grampanchayat Corporation, Local body(complete postal addresses with telephone nos. to be given) 13 Name of the applicant Mr. Shivkumar Jashnani Director 14 Registered address M/S Jashnani Constructions Pvt. Ltd. 15 Address for correspondence: Name Mr. Shivkumar Jashnani Designation(Owner/ Partner / Promoter Director (Director) CEO) Address 454, Center Facility Building, APMC Market Vashi, New Mumbai. Pin code 400703 E-mail Telephone. Fax. 16 Details of alternative sites examined, if any. Location of these sites should be shown on a toposheet. 17 Interlinked projects t Applicable 18 Whether separate application of interlinked project has been submitted? 19 If yes, date of submission t Applicable 20 If, Reason Stand alone construction project 21 Whether the proposal involves approval/clearance under: if,yes details of the same and their status to be given a) The Forest (Conservation) Act, 1980? b) The wildlife (protection) Act, 1972? c) The CRZ tification, 1991? 22 Whether there is any Government Order/policy relevant/relating to the site? 23 Forest land involved ( hectares) forest land involved in proposed project site Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance tification 14.09.2006 1

24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? a) Name of the court b) Case. c) Orders/ Directions of the court if any and its relevance with the proposed project. such litigation pending against the project Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) / Details thereof (with approximate quantities /rates, 1.1 Permanent or temporary change in As per Regional plan the said project is in residential zone land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? 1.3 Creation of new land uses? As per regional plan the said project is in residential zone. 1.4 Pre-construction investigations e.g. bore houses, soil testing? Soil samples taken within the plot premises for geotechnical investigation 1.5 Construction works? 1.6 Demolition works? Excess debris material will be sent to the authorized debris disposal site as per debris management rules 1.7 Temporary sites used for Temporary sheds will be provided for workers. construction works or Housing of construction workers? 1.8 Above ground buildings, structures Total excavation quantity will be reused for backfilling. or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or tunnelling? Only water storage tank for fire fighting, rainwater harvesting, sewer pipeline etc. 1.10 Reclamation works? 1.11 Dredging? 1.12 Offshore structures? 1.13 Production and manufacturing processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? Only construction material will be stored in temporary storage site Organic waste converter machine for treatment of solid waste System and Sewage Treatment Plant. Movements of trucks for material transport while construction. 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? 1.23 Abstraction or transfers of water form ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? There will not be any changes in water bodies or the land surface Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance tification 14.09.2006 2

1.25 Transport of personnel or materials Construction workers and construction material for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? There will not be any impact on the Environment. 1.28 Influx of people to an area in either Only Construction workers will stay till construction temporarily or permanently? completes 1.29 Introduction of alien species? introduction of alien species will occur as this is purely residential project 1.30 Loss of native species or genetic threat of species loss will occur diversity? 1.31 Any other actions? 2. Use of Natural resources for construction or operation of the Project (such as land, water, Materials or energy, especially any resources which are non-renewable or in short supply): Information/checklist 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: KLD / Details thereof (with approximate quantities /rates, Undeveloped land will be used for construction purpose. Source of water Shahapur Grampanchayat Description Water Requirement Unit Total 264 m 3 /day 2.3 Minerals (MT) 2.4 construction material stone, aggregates, sand / soil (expected Stone aggregates demand will be met from the stone suppliers from nearest quarry. source MT) 2.5 Forests and timber (source MT) Only door frames (if so planned) 2.6 Energy including electricity and fuels (source, competing users) Energy consumption Unit: fuel (MT), energy (MW) Description Power requirement Unit Total 1.4 MW 2.7 Any other natural resources (use appropriate standard units) Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance tification 14.09.2006 3

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. / 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other causes hazardous material will be used for construction. Proposed project will not affect welfare of people Proposed project will not affect hospital patients, children etc. 4. Production of solid wastes during construction or operation or decommissioning (Mt/month) / 4.1 Spoil, overburden or mine wastes 4.2 ` Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Description Solid waste generation Unit Total 977 kg/day Hazardous waste will be generated at this is residential project. 4.4 Other industrial process wastes, this is residential project 4.5 Surplus product t Applicable 4.6 Sewage sludge or other sludge from Used as manure after drying. effluent treatment 4.7 Construction or demolition wastes Construction waste- Steel, concrete etc. (Quantification difficult) 4.8 Redundant machinery or equipment t Applicable 4.9 Contaminated soils or other materials t Applicable 4.10 Agricultural wastes t Applicable 4.11 Other solid wastes t Applicable 5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr) / 5.1 Emissions from combustion of fossil t Applicable fuels from stationary or mobile sources 5.2 Emissions from production processes t Applicable 5.3 Emissions from materials handling Fugitive emission from handling such as sand including storage or transport 5.4 Emissions from construction activities Transportation of construction material, DG sets etc. including plant and equipment 5.5 Dust or odours from handling of materials including construction Transportation, loading and unloading of material will generate dust. materials, sewage and waste 5.6 Emissions from incineration of waste t Applicable 5.7 Emissions from burning of waste in t Applicable open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources t Applicable 6. Generation of ise and Vibration, and Emissions of Light and Heat: / with source of information data Construction equipment, mixers, vehicles, etc. 6.1 From operation of equipment e.g. engines, ventilation plant, crushers 6.2 From industrial or similar processes t Applicable 6.3 From construction or demolition Minor construction machinery as Ready Mix Concrete will be used 6.4 From blasting or piling Open Foundation Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance tification 14.09.2006 4

6.5 From construction or operational By movement of trucks for material & Ready Mix traffic Concrete 6.6 From lighting or cooling systems t Applicable 6.7 From any other sources t Applicable 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: / 7.1 From handling, storage, use or spillage t Applicable of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land STP will be used. Surplus treated water will be discharged into the nalla. (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to t Applicable air into the land or into water 7.4 From any other sources t Applicable 7.5 Is there a risk of long term build up of pollutants in the environment from the resources? t Applicable 8. Risk of accidents during construction or operation of the project, which could affect human health or the environment / 8.1 From explosions, spillages, fires etc t Applicable from storage, handling, use or production of hazardous substances 8.2 From any other causes t Applicable 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? The proposed structure is designed as per Seismic Zone III standards. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality 9.1 Lead to development of supporting. facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other 9.2 Lead to after-use of the site, which could have an impact on the environment 9.3 Set a precedent for later developments 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects / Details thereof (with approximate quantities/rates, wherever possible) with source of information data Total occupancy for the project would approximately be around 1,962 persons. t Applicable As this a residential project, there will be generation of employment during Construction and Operation phase. t Applicable Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance tification 14.09.2006 5

(III) Environmental Sensitivity Areas Name/ Identity 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or YES sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters 5 State, National boundaries 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas 7 Defence installations Aerial distance (within 15 km.) Proposed project location boundary Bhatsa chanel river : 30 Meter near to project 8 Densely populated or built-up area Project is in Grampanchayat area. 9 Areas occupied by sensitive manmade land uses (hospitals, schools, places of worship, community Residential and Commercial Complexes, School, Collage, Dispensaries, Nursing Homes, Parks & Play Grounds are Proposed near this Project. facilities) 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance tification 14.09.2006 6

(IV). Proposed Terms of Reference for EIA studies t Applicable I hereby given undertaking that the data & information given in the application & enclosures are true to the best of my knowledge & belief & I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date:10.04.2017 Place: Thane NOTE: Mr. Shivkumar Jashnani M/s. Jashnani Constructions PVT. LTD. 454, Center Facility Building, APMC Market Vashi, New Mumbai. Signature of the applicant With name & full address (Project proponent/authorised signatory) The projects involving clearance under Coastal Regulation Zone tification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t C.R.Z(at the stage of TOR) and the recommendations of the State Coastal Zone management Authority(at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z tification, 1991 for the activities to be located in the CRZ. The projects to be located within 10 km of the national Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-a -vis the project location and the recommendations or comments of the chief Wildlife thereon.(at the stage of EC) All correspondence with the ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarifications as may be required from time to time, participation in the EAC meeting on behalf of the project proponent shall be made by the authorised signatory only. The authorised signatory should also submit a document in support of his claim of being an authorised signatory for the specific project. Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance tification 14.09.2006 7