DEVELOPMENTS IN WESTERN MARKETS: RENEWABLES AND EXPANSION OF ORGANIZED MARKETS IN THE WEST

Similar documents
Energy Imbalance Market Design Straw Proposal and Issue Paper. Stakeholder Meeting April 11, 2013

EIM Greenhouse Gas Enhancement. Draft Final Proposal

Energy Imbalance Market Year 1 Enhancements. Issue Paper and Straw Proposal

APS Stakeholder Meeting. September 9 th 2016

Energy Imbalance Market Overview

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal

Energy Imbalance Market Year 1 Enhancements

Stepped Constraint Parameters. Issue Paper

Energy Imbalance Market

Status of the western energy imbalance market and regional initiatives

155 FERC 61,111 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Making Sense of U.S. Energy Markets

August 18, Energy Imbalance Market (EIM) Entity Readiness Criteria

Introduction to the Energy Imbalance Market (EIM Module 1)

Energy Imbalance Market Update

Energy Imbalance Market

EIM Settlements Load Customer Training September 13, 2016

165 FERC 61,050 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING PROPOSED TARIFF REVISIONS. (Issued October 29, 2018)

CAISO Energy Imbalance Market Dr. Khaled Abdul-Rahman Executive Director, California ISO

2018 CAISO Policy Initiatives Roadmap

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development

Organized Markets in WECC. Status Update and Implications for Planning 2/1/18

Western Energy Imbalance Market and Regional Initiatives

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Senate Bill 350 Study

2018 Draft Policy Initiatives Roadmap. Market and Infrastructure Policy December 7, 2017

Southern California Edison Stakeholder Comments. PacifiCorp s Energy Imbalance Market (EIM) Entity Proposal Dated October 18, 2013

PacifiCorp Contract Review. Discussion Paper

California ISO Energy Imbalance Market Operations Overview. June 10, 2014 Webinar

April 28, Filing of CAISO Rate Schedule No. 90 Docket No. ER

Energy Imbalance Market (EIM) Benefits and Challenges

Policy Initiatives Catalog

Straw Proposal. Post-Release 1 MRTU Functionality for Demand Response

BILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. [Docket No. RM ]

System Flexibility and Renewable Energy Integration

Organized Markets in WECC 4/18/18

SUBMITTED VIA E-TARIFF FILING. August 4, 2017

Policy Initiatives Catalog

EIM - Second Revised Straw Proposal

Clean Energy and Pollution Reduction Act Senate Bill 350 Early Release Material. April 14, 2016

CHAPTER 6 - Load Forecast & Resource Plan

Regional Resource Adequacy Stakeholder Meeting on Straw Proposal

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION

Comments of Powerex Corp. on Day-Ahead Market Enhancements Phase 2

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Business Practice Manual for The Transmission Planning Process

Utility Scale Integration of Wind and Solar Power

Day Ahead Market Enhancements: Issue Paper/Straw Proposal

The Western Energy Imbalance Market DOUG HOWE, CHAIR, WESTERN ENERGY IMBALANCE MARKET JANUARY 10, 2018

On the Horizon: Energy Imbalance Market

Price Formation. Eric Ciccoretti Attorney-Advisor Office of Energy Policy and Innovation Federal Energy Regulatory Commission June 13, 2017

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Xcel Energy s Comments on CAISO Draft Final Straw Proposal

PACIFICORP S ENERGY IMBALANCE MARKET ENTITY PROPOSAL. September 13, 2013 Revised October 18, 2013

Review Transmission Access Charge Structure. Revised Straw Proposal

Briefing on 2018 Policy Initiatives Roadmap and Annual Plan

California ISO. Structural competiveness of the energy imbalance market: Analysis of market power of the Berkshire Hathaway entities.

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Policy Initiatives Catalog

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

EIM Transitional Committee Governance Straw Proposal

Issue Paper. Direct Participation of Demand Response Resources in CAISO Electricity Markets. December 22, CAISO JEP / BDC/ JDG 12/22/08, page 1

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Stakeholder Comments Template

CAISO EIM Straw Proposal Process

Day Ahead Market Enhancements

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. California Independent System ) Docket No. RM Operator Corporation )

EIM Winter Reliability notes and processes for EIM entities. Craig Williams Training and Readiness

The DAM consists of the following functions performed in sequence: the MPM-RRD, IFM, and RUC.

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Benefits for Participating in EIM February 1, 2016

First Revised Sheet No. 449 Canceling Original WN U-60 Sheet No. 449 PUGET SOUND ENERGY Electric Tariff G SCHEDULE 449 RETAIL WHEELING SERVICE

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Impact of EIM Imports on Carbon and REC accounting. Clare Breidenich Western Power Trading Forum Regional Issues Forum September 7, 2017

Resource Adequacy Enhancements Straw Proposal - Part 1. Stakeholder Call January 23, 2019

ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3.

Open Access Transmission Tariff ATTACHMENT K

NEW YORK INDEPENDENT SYSTEM OPERATOR

December 6, Docket No. ER Energy Imbalance Market Structural Market Power Informational Report

Extended Short-Term Unit Commitment. Issue Paper/Straw Proposal

Extended Short-Term Unit Commitment. Draft Final Proposal

Demand Response and Scarcity Pricing

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Chapter 2. Direct Testimony of Joseph P. Hoerner and Shayleah J.

Full Network Model Expansion Second Revised Straw Proposal

Business Practice Energy Imbalance Market (EIM BP) Revision Number: Revision Date: November 30July 29, 2015

Midwest ISO EIM Start-up and Exiting Issues Todd Ramey, Executive Director Market Administration. March 7-8, 2011

Relevant changes will be made to corresponding sections of OA and RAA.

Draft Policy Initiatives Catalog

Seattle City Light: GHG Impacts of EIM Participation

California ISO. Q Report on Market Issues and Performance. November 1, Department of Market Monitoring

Briefing on EIM Implementation

Flexible Ramping Products

Advancing Renewable Alternatives

Western Energy Imbalance Market

Stakeholder Comments Template

Transcription:

DEVELOPMENTS IN WESTERN MARKETS: RENEWABLES AND EXPANSION OF ORGANIZED MARKETS IN THE WEST Power Regulatory Webinar Series Deanna E. King Stephen J. Hug September 28, 2016

CURRENT DEVELOPMENTS IN WESTERN MARKETS Growth of Renewable Resources is a Primary Driver Impact Flexibility and Reliability Challenges Grid and Planning Challenges Multiple Market and Grid Developments West-wide transmission and planning CAISO EIM Regional RTO Integration Initiative 2

THE GROWTH OF RENEWABLE RESOURCES

THE GROWTH OF RENEWABLE RESOURCES Source: Lawrence Berkeley National Lab, available at: https://emp.lbl.gov/projects/renewables-portfolio 4

RENEWABLE RESOURCE GROWTH IN THE WEST Historical & projected growth of renewables in the Western Interconnection under RPS policies in place through 2014 Source: Western Interconnection Flexibility Assessment, Final Report (January 11, 2016), available at: https://www.wecc.biz/reliability/wecc_flexibility_assessment_report_2016-01-11.pdf 5

GROWTH OF RENEWABLE RESOURCES IN CALIFORNIA 6 Source: California Energy Commission, Tracking Progress (Dec. 22, 2015), available at: http://www.energy.ca.gov/renewables/tracking_progress/documents/renewable.pdf

IMPACT OF RENEWABLE RESOURCE GROWTH New Transmission Challenges Growth of renewables has fundamentally altered the task of those responsible for operating and balancing the wholesale electric grid Balancing authorities must ensure that they have sufficient resources to respond to real-time changes in renewable production while meeting demand and preserving reliability Renewables can create new transmission constraints and usage patterns that affect grid management and regional transmission planning New Energy Products and Practices Renewable resources in turn increase the importance of flexible resources that can be dispatched up or down to respond to fluctuations in variable production New Markets 7

IMPACT OF CALIFORNIA S RENEWABLE RESOURCE GROWTH Source: California ISO, Flexible Resources: Fast Facts, available at: https://www.caiso.com/documents/flexibleresourceshelprenewables_fastfacts.pdf 8

RENEWABLE RESOURCES AND ORGANIZED MARKETS 9 Source: Federal Energy Regulatory Commission, RTO Map, available at: http://www.ferc.gov/industries/electric/indus-act/rto/elec-ovr-rto-map.pdf

RENEWABLE RESOURCES: WESTERN MARKET RESPONSE Renewed interest in regional coordination and diversity benefits has led to several ongoing multi-state initiatives: o CAISO Energy Imbalance Market o Western RTO o Mountain West Transmission Group 10

CAISO ENERGY IMBALANCE MARKET

CAISO EIM - OVERVIEW First significant expansion of organized markets in the Western Interconnection outside of California CAISO real-time market for participating BAAs ( EIM Entities ) to meet obligation to provide energy and generation imbalance service o Diversity: CAISO dispatches resources from combined area to meet variations in load and generation on 5-minute and 15-minute basis o Imbalances settled based on CAISO-calculated LMP EIM Entities maintain OATT and retain reliability obligations and control over their respective transmission systems 12

CAISO EIM OPENS WITH PACIFICORP PARTICIPATION PacifiCorp operates two BAAs spanning five states in the Western Interconnection June 19, 2014 FERC issues orders approving revisions to CAISO and PacifiCorp tariffs to implement EIM 13

CAISO EIM PACIFICORP Initial Difficulties o Deployment delayed from October 1, 2014 until November 1, 2014 to allow for extended period of non-binding market simulation o Price spikes immediately occur following market deployment CAISO triggers application of $1,000/MWh penalty price o Initial Response to Price Spikes CAISO requests waiver of penalty pricing provisions FERC investigation under Section 206 of the FPA to identify underlying issues and solutions 14

CAISO EIM PACIFICORP FERC proceedings focus on nature of EIM shortages o Resource insufficiency v. false scarcity Significant modifications made to the EIM in result: o Available Balancing Capacity mechanism o Enhanced readiness measures o 6-month transition period for BAAs integrating into the EIM 15

CAISO EIM GROWTH AND DEVELOPMENT On May 14, 2015, FERC issues orders approving proposed extension of EIM to BAA operated by NV Energy After period of parallel operations and testing, NV Energy integrates into the EIM on December 1, 2015 16

CAISO EIM GROWTH AND DEVELOPMENT APS and Puget Sound Energy expected to integrate into EIM on October 1, 2016 Additional BAAs have expressed interest in participating: o Portland General -2017 o Idaho Power - 2018 o Seattle City Light TBD o LADWP - TBD 17

CAISO EIM GROWTH AND EVOLUTION EIM Governance o Distinct governance model for EIM: EIM Governing Body Body of State Regulators Regional Issues Forum 18

CAISO EIM GROWTH AND EVOLUTION EIM Intertie Bidding / External Resource Participation o CAISO initially gave EIM Entities discretion over whether to implement economic intertie bidding Commits to revisit the issue after initial year of operations In 2016, CAISO submits tariff revisions to prohibit EIM Entities from unilaterally enabling intertie bidding o FERC rejects CAISO s proposal and directs staff to hold technical conference to further explore feasibility of intertie bidding CAISO outlines a potential external resource participation framework at August 4, 2016 Regional Issues Forum FERC technical conference set for October 28, 2016 19

CAISO EIM GROWTH AND EVOLUTION EIM Carbon Leakage o Imports of energy into California are subject to GHG emission regulation by the California Air Resources Board o EIM Participating Resources may submit a bid adder expressing willingness to be delivered to serve load in California o Current concern that CAISO dispatch system results in GHG leakage CAISO EIM model currently selects lower-emitting power plants and deems them delivered to California However, in reality, higher-emitting power plants may be plants dispatched to serve California load 20

CAISO EIM PRACTICAL IMPLICATIONS Extension of organized market framework to external BAAs represents a paradigm shift for integrating utilities and customers o EIM framework fundamentally changes manner in which transactions are scheduled o EIM creates new compliance challenges and financial risks for customers taking service over an EIM Entity s transmission system o EIM-participating resources are required to submit new EIM-specific market power analysis 21

CAISO EIM PRACTICAL IMPLICATIONS New Transmission Model o No incremental transmission charges or reservation necessary for participating resources dispatched in the EIM o EIM dispatch relies upon transmission rights reserved by third parties: Donation framework ATC framework o At same time, implementation of EIM has potential to impose new charges on existing transmission customers for use of transmission Schedule adjustments made after T-57 treated as imbalance and settled based on LMP, even where customer has transmission reservation to support transaction 22

CAISO EIM PRACTICAL IMPLICATIONS New Compliance Risks o Customers taking service under terms of EIM Entity s OATT are subject to rules of conduct that obligate them to: Comply with CAISO dispatch instructions and EIM Entity operating orders Submit bids for resources that are reasonably expected to be available and capable of performing at levels specified in bid Utilize commercially-reasonable efforts to ensure that forecasts are accurate and based on all information that is known or should have been known at the time of submission to EIM Entity o EIM Entity may refer violations of rules of conduct to FERC 23

CAISO EIM PRACTICAL IMPLICATIONS New MBR Authority Required o Any public utility that seeks to make market-based rate sales in the EIM must seek prior authorization from FERC o Requirement has proven particularly problematic for EIM Entities Lack of third party participation in the EIM and constraints between EIM Entity BAAs creates structural market power issues FERC has found that extension of CAISO market mitigation and monitoring to EIM Entity BAAs insufficient to mitigate market power concerns o As a result, no existing or prospective EIM Entity has been granted authority to make sales at market-based rates without restriction 24

REGIONAL INTEGRATION

REGIONAL INTEGRATION INTRODUCTION On April 14, 2015, PacifiCorp and CAISO announced that they had entered into agreement to explore feasibility and benefits of PacifiCorp joining CAISO as a Participating Transmission Owner PTO vs EIM Participation Key Differences: o Extends CAISO s full day-ahead and real-time markets for energy and ancillary services into the five states in which PacifiCorp operates o CAISO assumes operational control over PacifiCorp transmission system and dispatch of all associated resources o Elimination of PacifiCorp s OATT-based transmission framework 26

REGIONAL INTEGRATION INTRODUCTION October 7, 2015, California Governor signs SB 350, Clean Energy and Pollution Reduction Act of 2015 o The bill expresses intent of legislature to provide for the evolution of the [CAISO] into a regional organization to promote the development of regional electricity transmission markets in the western states and to improve the access of consumers served by the [CAISO] to those markets. o SB 350 directs CAISO to: Conduct public study of potential impacts of a regional market, including impact on emissions of greenhouse gases and other air pollutants Develop governance modifications to facilitate transition of CAISO to regional market 27

REGIONAL INTEGRATION BENEFITS STUDY Between February and July 2016, CAISO s consulting firms study potential benefits of a west-wide RTO, including: o Overall benefits to California ratepayers o Emissions of greenhouse gases and other air pollutants o Creation or retention of jobs and other benefits to the California economy o Environmental impacts in California and in adjacent areas o Reliability and integration of renewable energy resources Study methodology and conclusions criticized by a variety of groups in the region 28

REGIONAL INTEGRATION BENEFITS STUDY SB 350 Study Process o Final study transmitted to California governor on September 15, 2016 o Study s key findings in support of a west-wide RTO: Cost savings associated with reduction in curtailment of renewable resources, thereby reducing need for development of in-state resources Reduction in GHG emissions and other air pollutants Additional 9,900 to 19,300 jobs in California by 2030 Estimates at least $700 million/year in benefits to California ratepayers by 2030 o Key assumption: Full participation by virtually all utilities and transmission providers in the Western Interconnect by 2030 29

REGIONAL INTEGRATION - GOVERNANCE In April 2016, California Energy Commission commenced proceeding to consider potential governance changes to facilitate development of west-wide RTO o Envisions a single ISO under a multi-state governance structure o Convenes series of workshops to permit public discussion of potential governance structures with CAISO, CPUC, California Governor, and stakeholders o Goal to submit governance structure to legislature by end of 2016 30

REGIONAL INTEGRATION GOVERNANCE CAISO Governance Proposal: o Governance Principles o Governance Transitional Committee o Independent Board o Western States Committee o Market Advisory Committee 31

REGIONAL INTEGRATION - GOVERNANCE CAISO Governance Proposal o July 26, 2016 Joint state agency workshop and CAISO presentation Many stakeholders express concern regarding pace of initiative Other key issues Role and authority of Western States Committee Prohibition on capacity markets GHG accounting and policies Market Advisory Committee o August 8, 2016: California Governor sends letter notifying California legislature that significant unresolved issues have emerged Aim to submit governance proposal by end of January 2017 32

REGIONAL INTEGRATION CRITICAL INITIATIVES In addition to benefits study and governance, CAISO and PacifiCorp have identified several other key initiatives that must be addressed before regional integration: o Integration of PacifiCorp OATT rights o GHG Accounting o Regional Resource Adequacy o Transmission Access Charge Options 33

REGIONAL INTEGRATION OUTSTANDING ISSUES Integration of existing PacifiCorp OATT Rights o Following PacifiCorp integration into CAISO footprint, PacifiCorp would no longer provide transmission service under an OATT Raises issue of how to address existing transmission rights over the PacifiCorp system o January 27, 2016 PacifiCorp holds meeting to discuss issues associated with proposed integration into CAISO footprint Existing Contracts will continue to be honored for the duration of those contracts. Indicates that PacifiCorp will attempt to negotiate changes to the extent necessary to align the contract s scheduling and operating provisions with CAISO s scheduling and operational procedures 34

REGIONAL INTEGRATION OUTSTANDING ISSUES Integration of existing PacifiCorp OATT Rights o June 24, 2016 CAISO and PacifiCorp hold second integration meeting Discussion focuses on integration proposal outlined in joint CAISO and PacifiCorp discussion paper Proposes to terminate rights of customers taking service under any transmission service agreements entered into after effective date of PacifiCorp OATT Stakeholders express significant concerns regarding PacifiCorp proposal s impact on long-term firm rights under PacifiCorp OATT 35

REGIONAL INTEGRATION OUTSTANDING ISSUES GHG Accounting o Imports of energy into California and California generators subject to California Cap-and-Trade program o CAISO market optimization currently treats supply serving any load within CAISO BAA as subject to California Cap-and-Trade program o Key question is how to take into account flows within western RTO between states with different GHG policies Some stakeholders have expressed concern that regional integration may undermine ability of California to achieve climate and environmental goals 36

REGIONAL INTEGRATION OUTSTANDING ISSUES GHG Accounting o CAISO currently seeking stakeholder comments on potential design changes that can accommodate GHG policies within western RTO footprint o Potential solutions: Separate zones based on state boundaries or GHG policies Ability for generation to opt-out of serving California load similar to EIM structure 37

REGIONAL INTEGRATION OUTSTANDING ISSUES Transmission Access Charge Options o Focuses on how to allocate costs of transmission grid following integration of external PTO Embedded costs of CAISO grid recovered through access charge assessed to load and exports Costs of PacifiCorp facilities recovered from OATT customers reserving transmission 38

REGIONAL INTEGRATION OUTSTANDING ISSUES Transmission Access Charge Options o Distinguishes between existing and new high-voltage facilities: Sub-regional allocation for existing transmission facilities and new reliability-driven projects to meet distinct need within sub-region Regional allocation of high-voltage policy and economic projects Construction and cost allocation decisions left to Western States Committee 39

REGIONAL INTEGRATION OUTSTANDING ISSUES Regional Resource Adequacy o Initiative focused on modifying existing resource adequacy provisions to accommodate expansion to western RTO o Key issues: Load forecasting Treatment of intertie resources for RA purposes Internal transfer constraints Counting methodologies 40

DEVELOPMENT OF WESTERN MARKETS WHAT S NEXT? Further market design changes and proposed market solutions should be expected as the Western Interconnect grapples with dramatically increasing renewable resource penetration Numerous significant and contentious issues that will need to be addressed before creation of a western RTO o The manner in which these issues are handled will have an impact on all entities that participate in western markets o Efforts to integrate PacifiCorp likely to continue to occur over the next two to three years EIM appears to be here to stay and can be expected to expand and to further develop over the coming years 41

BRACEWELL CONTACTS Deanna E. King Partner T: E: +1.512.494.3612 deanna.king@bracewell.com bracewell.com/king Deanna King represents domestic and foreign energy-industry clients in a broad range of matters related to market access, competition, market behavior and market design, enforcement and compliance, and restructuring and cross-border issues related to participation in United States energy markets. Deanna counsels energy sector clients on regulatory and compliance matters and represents them in enforcement, administrative and litigation proceedings, with a particular focus on organized and bilateral energy markets in the west, contract negotiation and dispute resolution, and compliance with market rules. She has represented clients participating in agency rulemaking and policy proceedings involving competition, pricing and access to wholesale electricity and transmission markets. Stephen J. Hug Associate T: E: +1.202.828.5866 stephen.hug@bracewell.com bracewell.com/hug Stephen Hug represents clients in matters related to federal and state regulatory policies, regulations and rules applicable to the electric industry. He has experience with the Federal Energy Regulatory Commission (FERC) and the Federal Power Act (FPA), including: FERC enforcement and compliance; wholesale power trading; centralized energy and capacity markets; transmission and interconnection matters; and representation of utilities in contested proceedings before FERC. Stephen also has experience with state regulatory matters, including: ERCOT and PUCT regulations; state net metering programs, interconnection issues, and retail choice programs. Prior to joining Bracewell, Stephen was an Attorney Advisor in the Office of the General Counsel, Energy Markets at FERC, where he reviewed and analyzed filings submitted under Section 205 and 206 of the FPA. 42

WE KNOW ENERGY 43 T E X A S N E W Y O R K W A S H I N G T O N, D C C O N N E C T I C U T S E A T T L E D U B A I L O N D O N b r a c e w e l l. c o m

This presentation is provided for informational purposes only and should not be considered specific legal advice on any subject matter. You should contact your attorney to obtain advice with respect to any particular issue or problem. The content of this presentation contains general information and may not reflect current legal developments, verdicts or settlements. Use of and access to this presentation does not create an attorney-client relationship between you and Bracewell.