WASTEWATER SECTOR AND WASTEWATER SYSTEMS IN SRI LANKA. Eng. D.P.M. Chandana NATIONAL WATER SUPPLY AND DRAINAGE BOARD

Similar documents
1. Development of New Water Sources

DATA COLLECTION SURVEY ON SEWERAGE SECTOR IN DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA FINAL REPORT

Best Practice in Sewage and Effluent Treatment Technologies

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)

Texas Commission on Environmental Quality Page 1 Chapter 30 - Occupational Licenses and Registrations

Challenges in Wastewater Treatment and Management in Asia:

Course: Wastewater Management

Performance Evaluation of Selected Sewerage Treatment Plants in Sri Lanka

WATER SUPPLY AND SANITARY ENGINEERING [ ENVIRONMENTAL ENGINEERING ]

Frequently Asked Questions for Septic Tank and other Wastewater Treatment Systems

NC-PC Industry Day Pretreatment 101. Industrial Waste Impacts on POTW Treatment Processes. Dawn Padgett Operations Manager Charlotte Water

TH PR OR TW TOTAL # # Internal * online examination

a water-secure world IWMI in sri lanka


Wastewater Management in Developing Countries. Dr. Mushtaq Ahmed Memon Programme Officer, UNEP IETC

SCHEME 2 PUBLIC HEALTH AYA NAGAR DEVELOPMENT PROJECT

Integrated Urban Water Resources Management in Sri Lanka Background, Issues and Training Needs

Environmental and Social Safeguards Framework (ESSF) for GPOBA-Financed

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

SECTION-I. b) Write a short note on pumping of savage. 4

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

Current Status of Myanmar on Sewage and Sanitation

Presentation on Status of Water and Sanitation in. By V. C. Kumar, Executive Engineer,

Obtainable from: Water Research Commission

Learning Wastewater Treatment

Sustainable Cities Programme In Asia

Database on rural water supply and sanitation technologies (local solution): Structure and Content. 20 April Alan R.

Abdul Gaffoor Irshadh 08/ Department of Civil Engineering. University of Moratuwa. Sri Lanka

Lynn Township Sewer Authority. Corrective Action Plan. March 2007

WASTEWATER & STORM WATER COLLECTION AND REMOVAL

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

Japan s Challenge HIDETO YOSHIDA DIRECTOR-GENERAL WASTE MANAGEMENT & RECYCLING MINISTRY OF THE ENVIRONMENT, JAPAN

Post-Tsunami Rapid Environmental Assessment in Sri Lanka. Ministry of Environment and Natural Resources

Current and Future Challenges of Water Environment and Wastewater Management in Myanmar

Mr.Kyaw Zin Assistant Director Department of Engineering (Water Supply & Sanitation) NayPyiTaw Development Committee, NAYPYITAW, MYANMAR

Small Scale Wastewater Treatment in Ghana (a Scenerio)

Domestic Waste Water (Sewage): Collection, Treatment & Disposal

Progress of Water Environmental Governance/Management and Future Challenges in Sri Lanka

Appendix B-1. Design Calculations for Sewage Treatment Plant

. ARUSHA URBAN WATER SUPPLY AND SANITATION AUTHORITY (AUWSA)

Table 4: Population connected to wastewater treatment plants

Technology Options for Wastewater Treatment. April 24, 2012

DESIGN OF SEWER SYSTEMS

SEWERAGE SYSTEM IN ULAANBAATAR

INDONESIA TOWARDS SDG S 2030

Information required for Preparation of Master Plan for Sewerage

PRE-BID QUERRIES REPLY, PAHARI SEWERAGE NETWORK ZONE V

STRUCTURAL AND OPERATIONAL STUDY OF 339 MLD SEWAGE TREATMENT PLANT AT AMBERPET

ENGINEERING STANDARD FOR DRAIN AND SEWER SYSTEMS OUTSIDE BUILDINGS FIRST EDITION NOVEMBER 2013

Expected Needs and Challenges due to Tsunami AM Mubarak-Director, ITI

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

3) Din Daeng WWTP. Outline of the Project. Appendix 2-9

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES

Appendix 3: Documentation of Expenditure Functions - Wastewater

enviroshore. specialised solutions for you and the planet

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

MUNICIPAL WASTEWATER MANAGEMENT IN THE WESTERN INDIAN OCEAN REGION

Sanitary and Environmental Engineering I (4 th Year Civil)

Water and Waste Department

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Application Pack 5. How to apply for a Connection to a Public Sewer/Lateral Drain

Illustrated Hard Landscape Seminars - Student Notes Copyright 1995 John Heather Rev Curriculum No. GD x 1.25hrs.

REPORT ON PERFORMANCE EVALUATION OF SEWAGE TREATMENT PLANT TIRUNELVELI, TAMILNADU

BIO MATERIAL FILTER APEC PUMP ENTERPRISE CORP.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Type of Area Density (persons/ha) Large lots 5-7 Small lots, single family 75 Small lots, two family 125 Multistory apartments min.

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population.

Analysis of Major Transport Corridors. 4.1 Introduction and Methodology of Evaluation

Palmerston North City Council Policy

A comparison of guidelines on septic tanks and soakage systems in Sri Lanka

Decentralized Wastewater Systems

Large On-Site Sewage Systems Wastewater Treatment Workshop

IDDE From the Regulatory Perspective. Chris Kallis IEPA

WATER SUPPLY AND SANITARY ENGINEERING [ ENVIRONMENTAL ENGINEERING ]

ONSITE AND DECENTRALISED SEWERAGE CONFERENCE AWA, October 2008

CEE 371 May 14, 2009 Final Exam

Examples of sanitary inspection forms

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

Energy, the water sector and rapid urbanization in the South. Lessons from Asia, Africa and Latin America

Septic Tank Guidelines

Urban Water Conservation v.s. Sanitation: Challenges and Opportunities

Healthy Villages. A guide for communities and community health workers

Water / Wastewater Facilities. Jersey City. Evaluation of Water Main Rehabilitation Methods. Force Main Evaluation

Tony Richards Senior Advisor (GTZ) Sanitation and Wastewater Department of Sanitation and Waste Management, Ministry of Local Government

Wastewater Collection System

Sewer Pipe Management and Maintenance. Tokyo Metropolitan Government Bureau of Sewerage, Pipeline Management Section

ON-SITE WASTEWATER MANAGEMENT POLICY

WEPA Action Programme for Sri Lanka 2016

San Joaquin County. Residential Onsite Systems Bulletin

SANITATION IN EGYPT: THE WAY FORWARD. Seville Spain November 2007

Decentralized WW Management: Issues for Small-Scale WWTPs. Mike Stephens MWEA Local Sections Committee Frankenmuth, MI

Below ground System of pipework required to carry waste fluids from building to disposal site.

Mob. No: No. of Pages: /

Wastewater Story MULTIPLE CHOICE QUESTIONS

Implementing Sewerage and Sewage Treatment Schemes in Developing Countries: Lessons from Lake Nakuru, Kenya and the Bhoj Wetland, India

CITY PROFILE Negambo Municipal Council

Buffalo Sewer Authority. David P. Comerford General Manager

Decentralized & Onsite Wastewater Solutions

Greater Dublin Drainage Project

Transcription:

WASTEWATER SECTOR AND WASTEWATER SYSTEMS IN SRI LANKA Eng. D.P.M. Chandana NATIONAL WATER SUPPLY AND DRAINAGE BOARD Sri Lanka 30 th January 23

PRESENT STATUS OF SEWERAGE SYSTEMS 1 SEWAGE TREATMENT PLANT Colombo City WASTEWATER TREATMENT PROCESS Course Screen, fine screen, grit removal and sea outfall NO. OF TREATMENT PLANTS 2 sea outfalls 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Biyagama Export Processing Zone (BEPZ) Katunayaka EPZ Seethawaka EPZ Kataragama Hikkaduwa Mattegoda, Kottawa Soyzapura, Moratuwa Digana Village Boossa Prison Camp Thellippalai Hospital Raddolugama Hantana, Kandy Koggala EPZ Mirigama EPZ Matara Hospital Hambantota Hospital Point Pedro Hospital Dental Faculty Hospital, Peradeniya Sirimavo Bandaranayake Hospital for Children Peradeniya Teaching Hospital Extended aeration (oxidation ditch), Aerated Lagoon with solid recycle type followed by polishing ponds Mechanically Aerated Lagoon Oxidation Ditch Facultative type waste stabilization ponds Facultative ponds and polishing ponds Waste Stabilization Ponds Trickling Filters Waste Stabilization Ponds Oxidation Ditch Conventional Activated Sludge with Digester Activated Sludge Trickling Filters Activated Sludge (Package Plant), Proposed Oxidation Ditch Activated Sludge (Package Plant) Oxidation Ditch Oxidation i Ditch Conventional Activated Sludge with Digester Activated Sludge (Package Plant) Rotating Biological Contactors Conventional Activated Sludge with Digester TOTAL NUMBER OF MAJOR SEWAGE TREATMENT PLANTS 03 22

MAJOR WASTEWATER TREATMENT PLANTS IN SRI LANK 1. Biyagama Export Processing Zone Wastewater Treatment Plant - Biyagama 2. Koggala Export Processing Zone Wastewater Treatment Plant - Koggala 3. Seethawaka Export Processing Zone Wastewater Treatment Plant - Awissawella 4. Hikkaduwa Sewerage Treatment Plant Hikkaduwa 5. Soyzapura Housing Scheme Sewerage Treatment Plant Moratuwa 6. Mattegoda Housing Scheme Sewerage Treatment Plant 7. Raddolugama Housing Scheme Sewerage Treatment Plant 8. Katunayake Export Processing Zone Wastewater Treatment Plant GAMPAHA DISTRICT COLOMB O DISTRICT Soyzapura STP Mattegoda STP Hikkaduwa STP Koggala EPZ Katunayake EPZ Biyagama EPZ Seethawaka EPZ GALLE

Major Projects Ongoing Major Projects (Mobilized) Ja Ela/Ekala Ratmalan/Moratuwa Wastewater Disposal Project Kandy City Wastewater Management Project GPOBA Greater Colombo Wastewater Management Project (Deh/ Mt La & Kol) Jaffna Municipality Sewerage Project Colombo Sewerage Rehabilitation Project Southern Catchment : (Completed) Greater Colombo Wastewater t Management Project (Managed by CMC) Projects in Bidding Stage Jayawardana Pura/ Kotte Wastewater Disposal Project Hambantota Wastewater Disposal Project Kataragama aga a Wastewater ate Disposal Project Kurunegala Water & Wastewater Project Improvement to WW Disposal System of Cancer Hospital

Global Partnership On Output based Aid Project (GPOBA PROJECT) The project will benefit 15,407 poor households (77, 000 people) who currently rely on unsatisfactory pit latrines, nun functioning septic tanks or have no sanitary facilities at all. Project Area Expected number of outputs Total Output 1 a: Direct connections Output 1 a 1: Full cost Build Output 1 a 2: Cost within premises Output 1: Sewer connections Output 2: On site Output 1 b: Output 1 c: Connections to Output 1 d: sanitation Connections simplified sewer extensions Connections to improve to conventiona l sewer extensions Output 1 c 1: Connections to simplified sewer extensions Output 1 c 1: Connections to simplified sewer extensions with pumping new decentralised networks ments number of outputs per project area Ratmalana 275 80 200 2100 560 500 3715 Dehiwala 350 70 500 300 100 100 1420 Moratuwa 275 86 500 1100 550 800 3311 Kolonnawa 375 70 300 3500 480 800 5525 Ja ela/ekala 200 86 650 300 100 100 1436 Number of outputs 725 750 392 2150 7300 1790 2300 15407 5

BADOWITA Simplified Extension with Pumping Detailed Designs, BOQ & Tender Document is in progress Tendering April 23 Project Details Total Connections 1400 Network Length 5 km Pumping Stations 3 nos Simplified Sewerage Designs This is off-site sanitation technology that removes all wastewater from household environment. Its same as conventional sewerage, but deferent in Construction (Layout and shallow depth) and Designs (Changed the hydraulic design basis from minimum self cleansing velocity to minimum tractive tension) Construction aspects when planning Badowita Decentralized WWS Layout : Consider as in-block system key feature is sewers routed in private land through either back or front yards. Shallow depths and small access chambers

Design Considerations With past experiences, we are not allow 100 mm dia sewers Comply minimum 60 l/p/d and reliable water supply Plot size is 2-4 perch, therefore on site is not a option Very high population density Existing pumping station which is constructed under the Moratuwa / Ratmalana project is available very closely Since separate system and expecting low grit and other suspended solids leads low silting and expecting good quality construction, average minimum tractive tension value is assumed. Minimum diameter taken as 150 mm

Difficulties faced when Planning and Designing Some households refused to lay others sewers in front yard Some back yard has no space to lay the sewer Length limitation due to sewer cleaning vehicles accessibility Remedial Measures taken; Sewer routing was re arranged.. Lane sewers no need much cover since access ways that are too narrow to allow heavy traffic Payment Sewers laid underneath payments to avoid heavy traffic Plot line Sewers the sewer is laid at shallow depth close to the front boundary of plots Conducted d awareness program about the importance of the system Will include a clause in the connection agreement, that the NWSDB has a authority to inspect / repair backyard or front yard sewer

Our Past Experiences on Simplified Sewers Soysapura Simplified Sewer System No. of sewerage connections - 2250 nos. No. of Manholes - 675 nos. Length of sewers - 6300m No. of Pump houses - 02 nos. No. of Pumps - 12 nos. Pipe material - Cast Iron and PVC Size of pipe - 100-200mm dia Present Situation Sewers not cleaning frequently and frequent overflowing Solid waste dump to the system Upstream/ upstairs people not concern No proper mechanism for collection money for rehabilitation/ cleaning Brick manholes blocked and collapsed Rainwater entered to the system through damaged pipe and manholes which will create more troubles

Conclusions.. Establishment and maintain of Condominium Management Authorities, specially if within the premises maintain by them Should Maintain Construction Quality and quality of materials Proper Agreement should sign to access back yards for cleaning and maintenance Awareness campaign should arrange about system operation and maintenance Sewer doesn t know whether they design Conventional or Simplified