WELCOME HDR, all rights reserved.

Similar documents
Public Meeting. US Highway 81 From 306 th St. to 303 rd St. & 300 th St. Yankton County NH 0081(103)6 PCN 04G5. Brandon Riss, PE Road Design Engineer

Public Meeting. SD 37 James River Bridge Beadle County P 0037(140)140 PCN 04FH. Steve Johnson, PE Chief Bridge Design Engineer.

Public Meeting. US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County

South Dakota Department of Transportation EA Reevaluation Project: SD Rice to I-90

Willmar Wye Public Open House #4 and Public Hearing

TCWR Route Alternatives Study St. Louis Park Presentation November 29, Mark Amfahr Amfahr Consulting

House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions. March 28, 2016

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

AGENDA COMMITTEE OF THE WHOLE COUNTY OF KANE

Chapter 9: Vision Plan. Chapter 9. Vision Plan. Lake Loveland. Image 179 Credit: City of Loveland

APPENDIX G DIVERSION AND PELICAN LAKE CUTOFF CHANNELS HYRAULICS AND BRIDGE TECHNICAL MEMORANDUM

Rules for providing public testimony

1.4 Analysis of Alignment Alternatives

Section 7 Environmental Constraints

ENGINEERING DEPARTMENT

Appendix C Presentation Slides with Script

BILLINGS BYPASS UPDATE

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

Executive Summary. ES.1 Project Overview

MOBILITY AND ALTERNATIVES ANALYSIS

DAKOTA COUNTY PHYSICAL DEVELOPMENT COMMITTEE OF THE WHOLE

APPENDIX C NOISE STUDY TECHNICAL REPORT

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

Longmeadow Parkway Fox River Bridge Corridor. Kane County Board Committee of the Whole July 25, 2007

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD

APPENDIX C NOISE STUDY TECHNICAL REPORT

I-20 East Transit Initiative

Exposition Light Rail Transit Project

Environme ntal Assessment Addendum

Appendix F 2008 Travel Demand Modeling

I-229/26 th St/Southeastern Ave Reconstruction Project

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

U S H I G H W A Y 1 4 F I N A L E N V I R O N M E N T A L I M P A C T S T A T E M E N T ( F E I S

Interchange Workshop Report (August 2004)

Operational Analysis of Dulles Toll Road Ramps to Tysons. Board Transportation Committee Meeting September 17, 2013

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

Public Meeting for SH-85A Horse Creek Bernice, OK. SH-85A bridge located 3.5 miles east of SH-85, including west and east approaches

Project Alignment Appendix A

Table 2: Recommended Improvement Projects - Northeast Area Transit Evaluation. Plan

I-70 East PACT DRAFT EVALUATION DATA

CESAM-RD-N May 29, 2014 PUBLIC NOTICE NO. SAM JSC

LA 23 NOGC Railway Relocation PE/NEPA Project. Public Meeting

State Route 8 Bridge Replacement Project

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction

FINDINGS OF FACT and CONCLUSIONS

TABLE SUMMARY OF POTENTIAL CONFLICTS WITH MAJOR UTILITIES DUS ACCESS TO 162 ND AVENUE AREA

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Information for File # RJH

Free Bridge Congestion Relief Project: Using FHWA s Eco-Logical Process

ENGINEERING DEPARTMENT

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION S.2 PURPOSE AND NEED

NEPA and Design Public Hearings

Exposition Light Rail Transit Project

NATIONAL WESTERN CENTER

Recommendations. Bismarck-Mandan MPO Regional Freight Study

Conceptual Design Report

SUPPLEMENTAL DRAFT ENVIRONMENTAL IMPACT STATEMENT NORTH BELT FREEWAY SUMMARY INTRODUCTION

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION. Project Commitment. Public Yes Design/ Permitting (Prior to Construction Beginning)

Oversight Team Meeting

Transportation Update

Oklahoma Department of Transportation Environmental Programs Division Office Fax

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont)

PROGRAMMATIC AGREEMENT

October. South Diversion Master Transportation Plan Final Report

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003)

Fargo-Moorhead Flood Risk Management Project Supplement to Environmental Impact Statement (SEIS) Final Preparation Notice May 21, 2018

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

7. Value Management Workshop

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

Informational Brochure. Proposed Interchange. Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island

TH 13 Port of Savage Truck Access Study

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R October 26, 2018

I-95/US 322 Interchange Improvement Project. Website Update

APPENDIX H NEPA TRANSITION REPORT

REEVALUATION FORM. Page 1. Code:

Sacramento Area Flood Control Agency. May State Clearinghouse No Prepared for: Prepared by: Consulting Engineers and Scientists

BL ENGLAND & RELIABILITY PIPELINE PROJECT. September 27, 2013

Conclusions & Lessons Learned

J O I N T P U B L I C N O T I C E

I-20 East Transit Initiative

Public Open House and Stakeholder Meeting Summary

Table 1 Sterling Highway MP 45 to 60 Facts Summary

LA 23 NOGC Railway Relocation PE/NEPA Project

Hazardous Materials Technical Memorandum

Placerville, a Unique Historical Past Forging into a Golden Future

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

Northern Branch Corridor CLC Meeting. June 30, 2008

Engineering Assessment Process: Keys to a Solid Engineer s Report

Date: Time: Location: Thursday, March 15, :00 p.m. to 8:00 p.m. Nobleton Arena Programs Room 15 Old King Road Nobleton, ON

South Dakota Interstate Corridor Study. Phase I Summary Report

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

TABLE OF CONTENTS 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

I-95/Route 630 Reconstruction and Widening Initial Financial Plan

SECTION 5 Environmental Commitments

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

Central Santa Rosa Library: 211 E Street, Santa Rosa Forestville Regional Library: 7050 Covey Road, Forestville Water Agency s administrative office

Transcription:

WELCOME Public Meeting on Environmental Assessment East Side Corridor (SD100) I-90 to South of Madison Street Northern Segment of Hwy 100 Date: October 21, 2014 2014 HDR, all rights reserved.

Introductions- Project Team Lead Agencies City of Sioux Falls South Dakota Department of Transportation Federal Highway Administration Environmental & Design Consultant HDR

EA Public Meeting Goals Review Environmental Assessment Share Preferred Alternative Receive Public Comments

EA Public Meeting Outline Background Project Purpose and Need Alternatives (Revisited and New) Environmental Assessment Recommended Preferred Alternative Next Steps

Background 2003-2005- 2012-2014- EA and FONSI Issued o o Eastside Corridor from I-29 to I-90 EA Selected 2003 Preferred Alternative Construction of Madison to 26 th Street Supplemental EA and FONSI Issued o SD100 Southern Segment from I-29 to South of 26 th Street o Selected Revised Build Alternative EA Issued o Hwy 100 Northern Segment from South of Madison Street to I-90 o Recommends Alternative 4a as the Preferred Alternative Construction Completed to Date- Madison Street to 57 th Street

Selection of Alternative Evaluation of Environmental Impacts Purpose and Need Study Approach and Scope Development of Alternatives Steps of the Environmental Process

Project Purpose and Need Prepare Sioux Falls for public and private infrastructure investments Address transportation deficiencies associated with: o Highway Capacity o Safety o Access Provide for regional traffic growth

Alternatives No Build Alternative 2003 EA Preferred Alternative SDDOT Supplemental Segment Revised Build Alternative Alternatives 1 thru 8 Preferred Alternative 4a

Alternatives No Build Alternative Provides for no action to be taken Does not meet the project purpose and need Powderhouse Road Six Mile Road

Alternatives 2003 EA Preferred Alternative Alternative was selected in the FONSI From I-29 to I-90 2006 open house public comments expressed Corridor Speed Intersection Safety Traffic Capacity 2003 EA Preferred Alternative Reassessment determined this alternative no longer meets purpose and need (highway capacity)

Alternatives Revised Build Alternative To address public concerns: o Minimize train and vehicle conflicts o Increase design speed o Increase to 6 lane facility (3 each direction) o Realigned 60 th St North and Redwood Blvd o Allows dual turn lanes at full intersections 2003 EA Preferred Alternative Revised Build Alternative Other Considerations Minimize utility impacts Reduce bridge length and cost

Alternatives Revised Build Alternative (Northern Segment) Utility regulations and requirements changed o National utility regulations changed o Increased electrical loads o Not feasible to reroute electrical loads o Construction schedule unpredictable Reassessment determined this alternative was no longer practical or feasible.

Alternatives New Build Alternatives Alternatives 1 thru 8 were developed to address utility and constructability issues Alternatives 4, 4a, and 7 o Determined to meet the project purpose and need o Carried forward for further environmental analysis

New Build Alternatives Alternatives 4 and 4a Main elements: o Alignment modifications at Rice Street, 60th Street, and Redwood Boulevard o Reconstruction of I-90 and N Timberline Avenue Interchange o Bridge crossing for Slip-Up Creek and Big Sioux River o Diagonal alignment through Cactus Hills o Construction of 2 railroad overpasses and one at-grade crossing

New Build Alternatives Alternative 7 Main elements: o Alignment modifications at Rice Street, 60th Street, and Redwood Boulevard o Reconstruction of I-90 and N Timberline Avenue Interchange o Bridge crossings for Slip-Up Creek and Big Sioux River o Alignment is west of Cactus Hills

Environmental Assessment of: ROW Acquisitions o 5400 N Timberline Avenue- Residence and pole barn o 4901 N Timberline Avenue- Residence Historic Resources o Residence at 5100 North Timberline Avenue o E&E and BNSF Railroads o Determination of No Adverse Effect

Environmental Assessment /4a Aquatic Resources Intermittent streams, perennial streams, ponds, and groundwater o Big Sioux River o Slip-Up Creek o Unnamed intermittent stream Alternative 4 and 4a had less impacts than Alternative 7 Alternative 7 eliminated from further consideration due to regulations associated with limiting impacts to Aquatic Resources.

Environmental Assessment Threatened and Endangered Species Topeka Shiner o Slip-Up Creek and Big Sioux River crossings o Minimization of construction footprint to protect species Western Prairie Fringed Orchid o Surveys within identified marginal habitat areas before construction: coordinate with FWS and FHWA Lined Snake o Survey within potential habitat areas o Mitigation Measures

Preferred Alternative Multi-use Path Alternative 4a Segment- Madison Street to Maple Street Avoid gas pipeline adjacent to Powderhouse Road Reconstructs intersections of Madison Street and Maple Street Constructs multi-use path on west side of Hwy 100 to approximately ¼ mile north of Madison Street then switches to east side Gas Line Shown in Red

Preferred Alternative Alternative 4a Segment- Maple Street to Rice Street Includes: Constructs multi-use path on east side of Hwy 100 Rice Street realigned to meet design standards Mitigation measures provided for lined snake Potential need for 750,000 cubic yards of fill material Multi-use Path

Preferred Alternative Alternative 4a Segment- Rice Street to I-90 Includes: Requires two acquisitions Avoids acquisition of businesses Realigns 60th Street to avoid floodway impacts and meet design standards Constructs two railroad overpasses Potential need for 1.5 million cubic yards of fill material Multi-use Path

Next Steps EA/ Section 4(f) Available for Public Comment October 6, 2014 Public Information Meeting October 21, 2014 Final Decision Document November 2014 Construction of Madison Street to Maple Street 2015 (Tentative) Construction of Maple Street to Rice Street 2017 (Tentative) Construction of Rice Street to I-90 2018-2019 (Tentative)

Projects in STIP 2018 2019 (Tentative): $42.0 Million 2017 (Tentative): $12.3 Million 2015 (Tentative): $11.5 Million

Comments? Specific questions will be taken at individual exhibits. Comment forms are available. Please submit all comments by November 6, 2014 Contact Steve Hoff HDR Engineering, Inc. 6300 S. Old Village Place, Suite 100 Sioux Falls, SD 57108 (605) 977-7740 Email: Steve.Hoff@hdrinc.com Website: http://www.sddot.com/transportation/highway s/planning/specialstudies/sd100/default.aspx