SGHA 2018 WENT LIVE. Iva Pluhackova, Manager, Ground Operations, IATA

Similar documents
Sneak Peek to SGHA WELCOME to 16:15 17:30

Swissport Tanzania Training Centre

e-awb SOP e-awb Standard Operating Procedures at Riyadh - Saudi Arabia

TASK DESCRIPTION. Location : GCAS Gulf Centre for Aviation Studies Abu Dhabi, UAE Completed by : Course Development Unit

Agent versus Forwarder - Implication on Liabilities

e-awb standard operating procedure for ACC Airport

Pre-conditions. Is ready to operate paperless or to accept a locally produce print-out of the AWB from Electronic Shipment Data. Day-to-day Operations

RESOLUTION 600i CARRIAGE CONCLUDED AND EVIDENCED BY ELECTRONIC MEANS - CONDITIONS OF CONTRACT

The relationship existing between two parties by which one is authorized to transact certain business for the other.

e-freight Standard Operating Procedure BRU

AIR WAYBILL CONDITIONS OF CONTRACT

IMPORT SHIPMENTS. Pre-conditions. Responsibility Task

Southwest Cargo Suite. Enhancing your Southwest Cargo experience.

Annex 6 Dangerous Goods Amendments

A copy of the IATA Resolution 600b Air Waybill Conditions of Contract is attached for your files.

31 ST IGHC DOHA DAILY TAKEAWAYS

CUSTOMS AND EXCISE ACT, 1964 AMENDMENT OF RULES

IATA Direct Shipment

Swissport Tanzania Training Centre

Saudia Cargo e-booking Handbook

ICAO Training on Lithium Batteries

e-awb Geneva Standard Operating Procedure

e-awb Geneva Standard Operating Procedure

StB Cargo. e-awb Standard Operating Procedure (SOP) - Morocco

DHL PARCEL EUROPE GENERAL TERMS & CONDITIONS OF CARRIAGE ( Terms and Conditions )

New Resolution Consignment Security Declaration (CSD) and electronic Consignment Security Declaration (e-csd)

Speed Dating for e-freighting. How e-freight works? Brussels, 19 April, Frederic Leger Head, Cargo Process & Standards IATA

EXPORT PROCESS SOP e-awb CANADA

Operator Dangerous Goods Inspections

EXPORT PROCESS GUIDELINES FOR e-awb IN USA

Electronic Consignment Security Declaration (e-csd)

AirBridgeCargo Airlines LLC. General Terms for the Use of Unit Load Devices and Other Loading Equipment Loaned or Received by the Carrier s Customers

Manual Iata Air Waybill Terms And Conditions Pdf

GoldStreak Rules and Regulations for Carriage

LOCAL CONDITIONS ex SLOVENIA FROM 01/01/2018

E-AWB NORDIC STANDARD OPERATING PROCEDURE NORDIC & BALTIC SINGLE PROCESS IN HELSINKI

IATA Ground Safety Integrated Solution

THE FUTURE OF IGOM DETERMINATION OF SAFETY CRITICAL PROCEDURES

Appendix III: INSTRUMENTS OF THE WCO AND ICAO ON API

e-awb BANGKOK SINGLE PROCESS Standard Operating Procedure (SOP)

e-awb Nordic Standard Operating Procedure Nordic & Baltic Single process in Stockholm

Sub Title. ISAGO and IGOM Alignment Workshop

CARGO AGENCY AND AUTHORIZED INTERMEDIARY AGREEMENT (INDEPENDENT BRANCH)

LOCAL CONDITIONS ex MALI FROM [01/11/2017]

CARGO SERVICE GENERAL TERMS

SAS Cargo Group General Conditions of Carriage for Cargo 1.0

I. Scope: The scope of this document is to guide all stakeholders how to proceed their daily export activities by using e-awb.

Generic Standard Operating procedures for transiting and importing goods/supplies

NEW IATA PRODUCTS WORKSHOP FOR GROUND HANDLERS

DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE

2) The mode of payment to contractor would be on a per unit output basis. 3) Please refer to the followings for further details:

Official rates for warehouse handling Amsterdam and Rotterdam as of January 1 st 2018 for forwarders

e-freight fundamentals

Údarás Eitlíochta na héireann Foirgneamh na hamanna Sráid D Olier Baile Átha Cliath 2, Éire. Rannán na Rialachán Sábháilteachta

ICAO WCO JOINT WORKSHOP AIR CARGO SECURITY AND FACILITATION

e-awb Basel Standard Operating Procedure

Official rates for warehouse handling Amsterdam and Rotterdam as of January 1 st 2019 for forwarders

Media KIT THE RIGHT PATH FOR ADVERTISING TO THE AVIATION INDUSTRY

Official rates for warehouse handling Amsterdam and Rotterdam as of July 1 st 2018 for forwarders

SMS and Dangerous Goods. Oversight System

100% e-awb. The Way Beginning of e-commerce for Air Cargo. International Air Cargo Association of Chicago April 9, 2013

SKYSHOP USA AGREEMENT FOR SERVICES AND GENERAL OBLIGATIONS 1 SERVICES IN GENERAL: This agreement is entered into by and between Expedited Global

TERMINAL CHARGES WFS HOLLAND 2018

EURASIAN ECONOMIC COMMISSION COLLEGIUM RESOLUTION

ISAGO Program Manual. Effective January st Edition

ISAGO Program Manual. Preview Release. Effective September st Edition

SARJAK CONTAINER LINES PVT. LTD.

e-awb Nordic Standard Operating Procedure Nordic & Baltic Single process in Copenhagen

QAS CARGO OAL EXPORT / IMPORT Handling Process

Handling Charges 2012

Grant of Approval to Carry Dangerous Goods by Air.

T&T Sensitive Label FAQ

L 360/64 Official Journal of the European Union

GHANA CIVIL AVIATION (AERODROMES) DIRECTIVES

IATA E-FREIGHT STRATEGY

CAR DG DANGEROUS GOODS REGULATIONS

Section: 0 Edition : 1 Page : 1 / 9 Date :

AMS Amsterdam Schiphol Airport

SAP Transportation Management 9.0 Release Notes

REPORT 2014/044. Lebanon. in the United Nations Interim Force in FINAL OVERALL RATING: PARTIALLY SATISFACTORY

The following table shows the common errors of FWB submission during parallel trail period since 15 July 2010.

Waybill TERMS AND CONDITIONS T&C 1. Data Privacy Policy 2. SF s Liability

Handling Charges 2013

TURKISH CARGO. Special Cargo Management. Reorganization Job Description. Turkish Cargo Special Cargo Department

CASE STUDY The Benefits of e-freight for a Network Freight Forwarder The case of Kuehne+Nagel in Hong Kong. e-freight

IPC Paper Free Mail Operational Processes & Messaging Procedures

TAYLOR DISTRIBUTING COMPANY RULES AND SPECIAL CHARGES TARIFF. Effective January 1, 2008

OT:RR:RD:BS H CMS DEPARTMENT OF HOMELAND SECURITY. U.S. Customs and Border Protection

GENERAL CONDITIONS OF CARRIAGE FOR CARGO

Edition 1 July General Terms and Conditions of Eurasian carriage by rail (GTC EurAsia)

AirBridgeCargo Airlines LLC. General Conditions of Cargo Carriage

Seminário Transporte e Negócios Groundforce Portugal

REPORT 2014/030 INTERNAL AUDIT DIVISION. Audit of movement control operations in the United Nations Stabilization Mission in Haiti

Airline / GHA Import Procedure:

TERMS AND CONDITIONS OF THE PURCHASE ORDER

AVSEC Doc 8512 / SAGAS S8116

Dangerous Goods Training Program Approval

Transcription:

SGHA 2018 Went Live

SGHA 2018 WENT LIVE Moderator: Iva Pluhackova, Manager, Ground Operations, IATA Panelists: Christian Bergfelder, Director Network Airside & Airport Affairs Europe, DHL Carlos Cardiga, Senior Vice President Sales & Customer Service, Fraport AG

IATA Ground Operations Governance Operations Committee (OPC) Direction, Strategy and Standards Approval Ground Operations Group (GOG) Other WGs under OPC, PSC and CSC Ground Ops Standards Development A G S A A S G G S E E I G O M L C A M Ground Ops. Technical Groups (TGs)

SGHA 2018 Highlights

Definitions & Terminology TRANSIT FLIGHT is an aircraft making a landing for commercial reasons where a partial change of Loads, Passenger and/or crew occurs. It should be noted that a change in the flight number of the same aircraft does not change the status of the flight. UNIT LOAD DEVICE (ULD) is either an aircraft pallet and pallet net combination, or an aircraft container. The purpose of the unit is to enable individual pieces of cargo, baggage or mail to be assembled into a standard-sized unit to facilitate rapid loading onto and offloading from aircraft having compatible handling and restraint systems which interface directly with the unit.

Main Agreement - Article 3 3.2 The Carrier shall not appoint any other person, company or organisation to provide the services which the Handling Company has agreed to provide by virtue of this Agreement, except in such special cases as shall be agreed between the Parties. 3.3 The Carrier shall not perform self-handling on the services which the Handling Company has agreed to provide by virtue of this Agreement, except in such special cases as shall be agreed between the Parties.

Main Agreement - Article 5 5.3 In the case of absence of instructions by the Carrier, the Handling Company shall apply its own standard practices and procedures provided they follow the applicable IATA industry developed standards, which may include but not limited to: (a) IATA Resolutions Dangerous Goods Resolutions (DGR), CSC Resolution 618 Live Animal Regulations (LAR), CSC Resolution 620 Perishable Cargo Regulations (PCR), CSC Resolution 622 Temperature Control Regulations (TCR), CSC Resolution 624 Passenger Services Conference Resolution Manual (PSCRM) (b) IATA Recommended Practices or other IATA Standards Framework for a postal agreement, CSC Recommended Practice 1677 ULD Regulations (ULDR), CSC RP 1681 IATA Airport Handling Manual (AHM), PSC RP 1690a IATA Ground Operational Manual (IGOM) PSC RP 1690b ISAGO Standard Manual (GOSM) IATA Fuel Quality Pool Control of Fuel Quality & Fueling Safety Standards IATA Guidance Material on Standard Into-Plane Fueling Procedures IATA Cargo Handling Manual (ICHM) and/or ICAO and/or other governing rules, regulations and procedures.

Main Agreement - Article 5 5.6 The Handling Company shall ensure that a training program is established for all personnel to perform ground operations functions safely. As a minimum the Training Program shall include applicable governing rules and regulations. Industry Standards and Practices as listed in Sub- Article 5.3 should be taken in account for reference. The Handling Company agrees to ensure that the authorization of specialized personnel performing services for the Carrier is valid and current. If at any time the Handling Company is unable to provide authorized personnel as requested by the Carrier, the Handling Company shall inform the Carrier immediately.

Main Agreement - Article 5 5.13 The Handling Company should ensure that all ground service equipment complies with the AIRCRAFT DAMAGE PREVENTION REQUIREMENTS Aircraft Damage recommendations as detailed in Chapter 9 of the AHM. 5.14 The Handling Company shall ensure that all ground service equipment is maintained in accordance with the manufacturers' requirements or to a higher standard.

Main Agreement - Article 7 7.3 The Parties shall reach agreement on the payment terms at each location which shall form part of the applicable Annex(es) B. Should the Carrier fail to make payment or dispute the invoice(s), within the agreed terms, the Handling Company shall notify the Carrier in writing of the failure to pay. In the event that the Carrier fails to pay the amount due within the agreed rectification period, as specified in Annex(es) B, the Handling Company shall be entitled to issue 7 calendar days notice of suspension of services to the Carrier. The Handling Company shall restore services to the Carrier within 24 hours of receipt of payment. 7.4 If the Carrier becomes insolvent, makes a general assignment for the benefit of creditors, or commits an act of bankruptcy, or if a petition in bankruptcy, or for its reorganization, or the readjustment of its indebtedness be filed by or against it, provided the petition is found justified by the appropriate authority, or if a receiver, trustee or liquidator of all, or substantially all, of its property be appointed or applied for, the Carrier has to provide prepayment or cash payment with immediate effect to the Handling Company.

Main Agreement - Article 11 11.11 The Handling Company shall have the right at any time to vary the charges set out in the Annex(es) B provided, however, that the Handling Company has given notice in writing to the Carrier not less than sixty days prior to the revised charges becoming effective; the first thirty days being a consultation period. The notice shall specify the revised charges which the Handling Company proposes to introduce, together with the date on which they are to be brought into effect. 11.13 Notwithstanding Sub-Article 11.11, when changes occur in the mandatory minimum wage enforced by the state or local government, which affect the handling costs, either Party shall have the right to request an adjustment to the handling charges as from the date of the change provided that the Party informs the other Party without delay.

Annex A Section 2 2.2.3 (a) Check travel documents for the flight(s) concerned within the booking. Handling Company shall be liable for Immigration fines in the following cases: (i) Expired Passports/Visas or Passports/Visas without the minimum required validity at the day of entry (ii) Non-Existence of Visa/Necessary Travel Document required by destination or transit station(s). (Excluding passports damaged or missing at point of transit or entry). In the event that the Handling Company does not have access to information that verifies visa validities and entry conditions for the passenger's final destination and transit point(s) the Handling Company will not have liability. The Handling Company shall not be liable for immigration fines in the event of non-bona fide travel documents or other events which are outside of their control. In the event an immigration fine is announced or raised against the Carrier, the Carrier will make available to the Handling Company all supporting documents to investigate the matter.

Annex A Section 3 3.1.2 Segregate baggage as specified in Annex B 3.1.3 Priority Baggage (a) Provide (b) Arrange for 1. Sortation of priority baggage 2. Load priority baggage in accordance with Carrier s instructions 3. Prioritise delivery of priority baggage to claim area

Annex A Section 3 3.1.10 Baggage Tracking (a) Provide (b) Arrange for (c) Operate system to provide 1. Evidence of acquisition; 2. Evidence of delivery; 3. Inventory of bags, upon departure of flight; 4. Data exchange (e.g. with other airlines)

Annex A Section 3 3.8.3 (a) Provide (b) install (c) remove Aircraft steering bypass pin.

Annex A Section 5 5.3.1 (a) Prepare airwaybill or shipment record. (b) Check all documentation to ensure shipment may be carried. The check shall not include the rates charged. (c) Check security status for the shipment(s) concerned and take action as per Carrier's instructions. (d) Obtain capacity/booking information for the Carrier's flights. (e) Split airwaybill. Forward copies of manifests and airwaybills or shipment record to the Carrier. (f) Prepare cargo manifest(s). (g) Provide the load control unit with special load notification. (h) Return copy of airwaybill or shipment record to shipper, endorsed with flight details. (i) Check and/or enter data into Carrier's and/or government/customs system, as specified in Annex B (j) Receive and process EDI messages (FWB/FHL and e-csd) received from Carrier or other parties. (k) Upon request from the Carrier print air waybill copies in plain paper copy or IATA Resolution 600a format. (l) Provide and transmit EDI messages in accordance with the standards of the Master Operating Plan. (m) Inform airline or shipper about shipment status via FSU message in accordance with the Master Operating Plan.

Annex A Section 5 5.7 Irregularities Handling 5.7.1 Take immediate action in respect of irregularities, damage or mishandling of dangerous goods and other special shipments. 5.7.2 Report to the Carrier any irregularities discovered in (a) cargo (b) mail 5.7.3 Handle lost, found and damaged (a) cargo (b) mail 5.7.4 (a) Notify the Carrier of complaints and claims. (b) Process claims. 5.7.5 Take action when consignee refuses acceptance and payment.

Annex B Paragraph 8 In the event that both Parties wish to incorporate AHM 811 Yellow Pages 8.1 The following amendments to the Definitions and Terminology, Main Agreement and Annex A reflected in Yellow Pages of AHM811 edition..., (year... ) shall apply: For example: Definitions and Terminology: e.g. nil or all Main Agreement: e.g. nil or all except Article x Annex A: e.g. nil or 3.6.x, 3.8.x, 6.6.x

Annex B Paragraph 9 9.3.1 Notwithstanding Sub-Paragraph 8.1.1 of this Annex B, this Annex B may be terminated on the following terms.... 9.3.2 The Carrier may terminate this Annex B, if the Handling Company fails to provide a consistently satisfactory level of service, the Carrier reserves the right to provide the Handling Company with written notice to the effect that correction is required within (...) days. If the Handling Company fails to correct the situation within (...) days, the Carrier may terminate the Agreement upon an additional (...) days prior written notice. In accordance with Sub- Article 5.8 of the Main Agreement a consistent satisfactory level of service is defined in a separate Service Level Agreement as Attachment to this Annex B.

Annex B Paragraph 9 9.3.3 In the event of the Handling Company's material and sustained failure to perform the services as outlined in Sub-Article 5.8 of the Main Agreement, Carrier reserves the right to provide the Handling Company with written notice to the effect that correction is required within (...) days. If the Handling Company fails to reasonably correct the situation within (...) days, the Carrier may terminate the Agreement upon an additional (...) days prior written notice. The number of these clauses can be extended as far as necessary.

Upcoming Changes

AHM 811, Yellow Pages 2019 (AHM Ed. 39) Article 5 5.6 The Handling Company shall ensure that a training program is established for all personnel to perform ground operations functions safely. As a minimum the training program shall include applicable requirements defined in AHM Chapter 11, ULDR Chapter 1.6 and the relevant industry standards and practices as listed in Sub-Article 5.3 and all governing rules and regulations. The Handling Company agrees to ensure that the authorization of specialized personnel performing services for the Carrier is valid and current. If at any time the Handling Company is unable to provide authorized personnel as requested by the Carrier, the Handling Company shall inform the Carrier immediately 5.15 Electronic Data Interchange EDI messages shall be recorded and stored by the Handling Company, unaltered and secured, for a period of three (3) months unless defined by the regulatory body of the state of the registration or Carrier.

AHM 811, Yellow Pages 2019 (AHM Ed. 39) Article 11 11.14 In the event of a material change to the Carriers manual, procedures or instructions, which affect the handling costs, either Party shall have the right to request an adjustment to the handling charges as from the date of the change provided that the Party informs the other Party without delay.

AHM 803, Cargo SLA (AHM Ed. 39) Target number Service definition Target Measurement points, method Measured by Training (Should be indicated in more specific terms in accordance with ISAGO training requirements) Target for training compliance: 100% staff to be trained in DG or x% of staff trained in ULD Build-up Measured quarterly / spot check during selfassessments and regular carrier audits Carrier/Handler ULDs Correct build-up, serviceability and nonconform ULDs Target for cargo handler: number of rejected / corrected cargo ULDs at aircraft not to exceed x % based on all built ULDs / Measured monthly / incident reporting Carrier/Handler Shipper or Forwarder Built ULDs Number of rejected / corrected cargo ULDs at ready for carriage acceptance not to exceed x % based on all BUP ULDs Measured monthly / incident reporting Carrier/Handler Unmanifested Cargo All unmanifested Cargo to be reported / Found Cargo [insert] Carrier Dangerous Goods All non-compliances to be reported to Carrier and Authorities as required [insert] Carrier

IN THE PIPELINE

AHM 8xx, Standard Subcontracting Agreement Contract between GSPs for subcontracted services Idea is to create the template similar to the SGHA

On the work plan based on the GOG priorities Develop a mechanism for including IGOM Variations in SGHA Safety Performance Indicators in SLA

Your feedback matters