Annex C TIME-OUT CHECKLIST INTRODUCTION

Similar documents
Workplace Safety and Health Guidelines Contractor Management

E & B Oilfield Services Inc.

Health & Safety Policy & Management Systems. Guidance Note 13

Construction Safety Audit Scoring System (ConSASS) Audit Checklist

START. Your Safety and Work. A guide to help small- and medium-sized enterprises get started on workplace safety and health

bizsafe Level 3 Risk Management Audit Checklist (26-Sep-2017)

Construction, Demolition & Excavation Works Doc Reference: DoMN-WHSMS 3.14 Version Number: 2.2

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

A Short Guide to. The Safety, Health and Welfare at Work Act, 2005

SAFETY CULTURE IN ITALY: THE LEGISLATION, INSPECTIONS, THE PERSPECTIVE OF AN INSPECTOR

Health, Safety and Wellbeing Manual. Section 10. Managing Incidents

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

Occupational Health and Safety Management Manual v2.2

CORPORATE HEALTH AND SAFETY POLICY

INTRODUCTION... 2 CHIEF EXECUTIVE FORESTRYSA EXECUTIVE... 3 Executive level engagement... 3 MANAGER / COORDINATOR / SUPERVISOR...

SAMPLE PAGES. Construction Safety and Health Program. [Company name]

Work Health and Safety Management Systems and Auditing Guidelines

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993

WHSE POL 1 WORK HEALTH, SAFETY & ENVIRONMENT MANAGEMENT POLICY

Verify Category A Audit Content

Health and Safety Policy Standard

A Guide to the Health and

Solihull Metropolitan Borough Council. Corporate Health and Safety Policy For Core Council Staff. September 2015

Safe Practices Safety Management System III (Steps 6-10)

NATIONAL COMPETENCY STANDARD

Annex I: Summary of duty holders

POLICY. Occupational Health and Safety Policy. (from Complispace) Approved: 18 April 2018

Corporate Health and Safety Policy July 2012

Towards Sustainable Mining Safety and Health Protocol

Risk Management Bulletin

Contractor Management and Purchasing

Training Standard Draft Only

Improving Your Organization's Health & Safety Performance with an OHS Management System.

Sample Form: Review Checklist

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE

WORK HEALTH, SAFETY AND WELLBEING (WHS&W)

ENVIRONMENT, HEALTH & SAFETY POLICY Up date

Health and Safety Policy and Procedures

Health, Safety and Environmental Management Systems Audit Report

National Supervision Guideline for Electrotechnology Apprentices

FCX Department of Occupational Health and Safety. Contents. Open-Hole Policy

Workplace Safety & Health. Awards 2016-Public Briefing 13 January 2016, pm

OSH LEGISLATION LAW AND REGULATION TO CONSTRUCTION SAFETY LAW AND REGULATION TO CONSTRUCTION SAFETY 20/2/2013

CONTRACTOR WHS HAZARD STANDARD FORMWORK & FALSEWORK EXTERNAL USE ONLY

DRAKS INTERIOR DOOR SYSTEMS LTD STATEMENT OF INTENT

Mini Tender PART B External Wall Insulation, Mechanical and Electrical Installation

Loss Control and Employee Safety Program

Health and Safety Policy

CHAS Assessment Standards

Work Health and Safety Management System. Table of Contents

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

CODE HEALTH AND SAFETY COMMITTEE. Student Safety: A Guide for Supervisory Officers, Principals and Vice-Principals

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

HEALTH & SAFETY POLICY

Health and Safety Policy

CONDUCTING SAFETY INTERACTIONS CS-OHS-19

HAZARD IDENTIFICATION AND RISK ASSESSMENT Revision Date: 04/2017

HEALTH AND SAFETY POLICY

Annex H: Effective worker engagement for health and safety

TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT

Construction Regulations 2014 vs Construction Regulations 2003

Health & Safety Policy

This procedure applies to all personnel and departments that operate lift trucks at the University of Windsor.

Contractor Guidance. Five or more employees. Health and Safety

Process Safety Management (PSM) Program. General Company Policy

TRAFFIC MANAGEMENT SUBCONTRACTOR INFORMATION PACK

Phoenix Energy Holdings Gas Ltd Health & Safety Policy

Occupational Health and Safety Program Manual Chapter 14 Monitoring and Measurement. Table of Contents

Transport Sector Portfolio

Manufacturing Domain Health and Safety Manual

Learner Guide to Principles of Risk Assessment

CONDUCTING CRITICAL CONTROL AUDITS CS-OHS-60

SAFETY MANAGEMENT SYSTEMS IMPLEMENTATION EVALUATION GUIDE

at work Health and safety p o l i c y d o c u m e n t

Health and Safety Policy Statement. LONDONGUILD Ltd ELECTRICAL CONTRACTORS. The Palmerston Centre Oxford Road Wealdstone Harrow Middlesex HA3 7RG

ESSENTIAL STANDARD no.1. Excavations

Policy Work Health and Safety (WHS) RCPA Introduction WHS legislation

1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY

CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11

PREMIUM DISCOUNT SCHEME AUDIT TOOL

UNIVERSITY OF ROEHAMPTON LONE WORKING POLICY

Safety for Supervisors

Catch22 policy Health and Safety

HEALTH & SAFETY POLICY OF:

University of Roehampton. Lone and Remote Working Policy

SAFETY AUDITS. Leader s Guide. Marcom Group Ltd.

FARNCOMBE CONSTRUCTION. Health & Safety Policy, Organisation and Arrangements

Design and Build Guidance

Moresecure Health & Safety

SAFE WORK METHOD STATEMENT

Health, Safety and Wellbeing Policy

Health and Safety Policy STATEMENT OF INTENT

Health & Safety Policy

Essentially, the policy to achieve this will consist of three parts: The first part of the policy will be concerned with its general objectives.

ADGAS GROUP HEALTH, SAFETY AND ENVIRONMENT (HSE) COMMITTEE PRE QUALIFICATION

THE CITY OF EDMONTON PROJECT AGREEMENT VALLEY LINE LRT STAGE 1. Schedule 11. Project Safety Requirements

Release: 1. CPCCBC4002A Manage occupational health and safety in the building and construction workplace

CDM-C Guidance. Five or more employees. Health and Safety 1. CMD-C Guidance Notes V

Transcription:

Annex C TIME-OUT CHECKLIST INTRODUCTION A. A Time-out is a Workplace Safety and Health (WSH) response measure that involves the temporary suspension of all or part of a company s operations so as to address pressing WSH concerns in the workplace. Your company should consider taking a Time-out if any of the following situations (but not limited to these) occurs: An incident involving injuries and /or fatalities; A dangerous occurrence (Reference may be taken from the 2 nd Schedule of the WSH Act, see Appendix I); Near miss with potentially severe consequences; External events that have similar loss exposures to your company; or Key WSH targets of your company have not been met. B. This Time-out checklist will guide your company to take stock and review your current WSH systems and work processes. The review will help your company to: Assess whether your current WSH systems and procedures are in place or require improvements; Identify possible systemic lapses in WSH system and processes; Identify possible factors that might have contributed to the incident in your workplace (if applicable); and Take the necessary measures to address the lapses identified. Be proactive in loss prevention. C. This checklist is made generic so that it can be applied to any industry sector during a Timeout. The list is by no means exhaustive and is meant to provide a broad framework to initiate more thought processes on your part during the Time-out. D. It is important for the top management to be actively involved in the Time-out to demonstrate that this safety review is to be taken seriously. Their commitment is integral to the success of the Time-out. Specifically, the top management should see through the Time-out from setting the objectives to the endorsement of the follow-up actions before allowing the re-commencement of work. 7

PART ONE- SELECTING THE TEAM TO BE INVOLVED 1 To-Do Items Status Remarks 1.1 Top management to define the objectives and work scope of the Time-out. 1.2 To appoint the appropriate lead person from the management to conduct the safety review. 1.3 To appoint appropriate persons from relevant sections and levels in the company to participate in the safety review. 1.4 To check that relevant WSH personnel are involved in the safety review. 1.5 To check and ensure the team has the relevant competency and expertise on the subject matters, including sourcing for external help. 1.6 If an incident occurred at your workplace, a. Assign the right personnel, preferably from a different unit to form an incident investigation team to identify the causes leading to the incident and ensure that inputs from witnesses to the incident have been taken into account; and b. Provide the initial findings and recommendations of the incident to all units so as to prevent a similar recurrence. 8

PART TWO - CONDUCTING THE REVIEW AND IMPLEMENTING RESPONSE MEASURES A. Work environment 2 To-Do Items Status Remarks 2.1 To inspect and ensure that the work environment conditions are safe for the work to be carried out. 2.2 To assess that the machinery / equipment / materials are suitable and properly designed for the work. 2.3 To check through the records that there is a maintenance regime in place for the machinery / equipment used and facilities in the workplace. 2.4 To monitor that the machinery/ equipment / substances / materials / facilities have been used properly. 2.5 To investigate if there is any component failure(s) in the machinery / equipment used. 2.6 If an incident has happened at your workplace, a. To take steps to mitigate or eliminate the immediate risks arising from the incident area pertaining to the work environment before work is resumed; and b. To work through all other work areas which potentially have similar risks. 9

B. Work processes 3 To-Do Items Status Remarks 3.1 To go through the records and confirm that a risk assessment (RA) has been a. conducted for the work process(es); communicated to the relevant personnel via briefings and / or checklists; and b. Implemented accordingly. 3.2 To check and verify that mechanisms are in place to ensure the RA for the work processes(es) are a. regularly updated; b. effectively communicated; and c. properly implemented. 3.3 To conduct a review to ensure that the work process(es) have been properly designed so as not to impose an onerous workload resulting in fatigue or occupational stress. 3.4 To review relevant documentation and verify that standard operating procedures (SOPs), rules and all other safeguards are in place. 3.5 To put in place a mechanism to ensure compliance with work processes. 3.6 If an incident has happened at your workplace, a. To review and update the RA of the process(es) involved; b. To review and update the SOP, rules and other safeguards of the process(es) involved; and c. To have an emergency response plan so as to enable prompt and safe recovery from the incident. 10

C. Personnel factors 4 To-Do Items Status Remarks 4.1 To make sure an individual or team responsible for the training needs in WSH for the workforce have been appointed. 4.2 To check and verify that training requirements have been planned for various levels of the workforce, including the following: a. Senior management b. Supervisors and managers c. Employees d. Part-timers e. Trainees f. New staff g. Disabled and pregnant employees h. Contractors and contractor workers 4.3 To establish a regular review and update of the training programmes so that training is effective and employees are competent after the training. 4.4 To verify that personnel have been adequately trained / qualified before being assigned to commence work. 4.5 If an incident has happened at your workplace, a. To conduct briefings (mass or targeted as appropriate) for sharing with all concerned employees; and b. To share the post-incident precautionary measures and propose follow-up action items to the employees and management. 11

D. Organisational factors 5 To-Do Items Status Remarks 5.1 To provide a safety & health policy with regards to the responsibilities of various levels of the management personnel. 5.2 To put in place a mechanism for organizational changes (e.g. changes in work flow and processes, training, machinery). 5.3 To monitor and ensure adequate supervision provided for the various work processes. 5.4 To put in place arrangements for collating feedback with regard to WSH issues. 5.5 If an incident has happened at your workplace, a. To notify authorities as soon as reasonably practicable on the occurrence of the incident; and b. Develop the appropriate remedial actions. 12

E. Contractors and sub-contractors 6 To-Do Items Status Remarks 6.1 To monitor and assess that the contractors and sub-contractors comprising their management, supervisors and workers are appropriately involved in the safety review. 6.2 To check that the safety review has also covered the work environment, work processes, personnel and organisation factors (as highlighted in the preceding sub-sections A to D) of the contractors and sub-contractors. PART THREE - CLOSING OUT ACTIONS 7 To-Do Items Status Remarks 7.1 To compile and communicate the action plans and recommendations arising from the Time-out on all concerned areas, not limiting to the following: a. Work environment b. Work processes c. Personnel d. Organisational factors 7.2 To appoint persons responsible for all actions complete with target dates of completion. 7.3 To put in place a system to monitor the progress status, resource allocation, timely completion and effective follow-up of the action plans and recommendations. 7.4 To document and communicate the findings from the Time-out session to all stakeholders. 13

Appendix 1 Dangerous Occurrences Listed Under the 2nd Schedule of Workplace Safety and Health Act 1. Bursting of a revolving vessel, wheel, grindstone or grinding wheel moved by mechanical power. 2. Collapse or failure of lifting equipment. 3. Explosion or fire in a room or place in which persons are at work, and which results in damage to the structure of the room or place, or to any machine or plant in there and the complete suspension of work for at least 5 hours. 4. Electrical short circuit or failure of electrical machinery, plant or apparatus, which results in explosion, fire or structural damage, and involves its stoppage or disuse for at least 5 hours. 5. Explosion or fire affecting any room in which persons are at work and causing complete suspension of ordinary work in the room for at least 24 hours. 6. Explosion or failure of the structure of a steam boiler, receiver or container used for the storage at a pressure greater than atmospheric pressure of any gas or gases (including air) or any liquid or solid resulting from the compression of gas. 7. Failure or collapse of formwork or its supports. 8. Collapse, in part or in whole, of a scaffold exceeding 15 metres in height, or a suspended or hanging scaffold from which any person may fall more than 2 metres; or 9. Accidental seepage or entry of seawater into a dry dock or floating dock causing flooding of the dry dock or floating dock. 14