3. INSPECTION FINDINGS

5. CONCLUSIONS, RECOMMENDATIONS, COST ESTIMATES

P20 Crack (generally 4mm width) to northeast corner of south leg corbel of pier SP-2 (ref. SC3)

East Lyme Middle School EAST LYME MIDDLE SCHOOL

Cast in place concrete parapet and Ministry standard sidewalk railing.

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number:

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 15 OVER THE ARCOLA CHANNEL HENNEPIN COUNTY

May 17, Mr. Fred Preuss Oak Park River Forest High School 201 North Scoville Avenue Oak Park, IL 60302

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 3 OVER THE RED LAKE RIVER DISTRICT 2 - PENNINGTON COUNTY

PONTIS ELEMENT DATA COLLECTION MANUAL OFFICE OF BRIDGE DEVELOPMENT

SOUTHEAST TEXAS CONTINUING EDUCATION BRIDGE INSPECTION, MAINTENANCE AND REPAIR

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CR 27 OVER THE RED LAKE RIVER DISTRICT 2 PENNINGTON COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - WILKIN COUNTY

PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS

Christchurch City Council

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6

Executive Summary RPT-SPE December 21. Old Spences Bridge No Inspection Report

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

LYNNVILLE ROAD BRIDGE. Site Number D00027 LYNNVILLE ROAD, CONCESSION 11, WINDHAM. 2.3km W of Highway 24

RENTON CONCESSION CULVERT. Site Number COUNTY ROAD 5, WOODHOUSE. 0.4 km S of Highway #3

STRUCTURAL EVALUATION REPORT

Lincoln Road Footbridge South Br. No. S December 2017 Special Inspection Report

DECOU ROAD BRIDGE. Municipal Structure Inspection Form NORFOLK COUNTY. Site Number DECOU ROAD, SIMCOE. 1.Okm E of Willow Drive

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO COUNTY STATE AID HIGHWAY 10 OVER THE POMME DE TERRE RIVER DISTRICT 4 STEVENS COUNTY

EXECUTIVE DEPARTMENT OFFICE OF GENERAL SERVICES DESIGN AND CONSTRUCTION GROUP - DIVISION OF DESIGN PROFESSIONAL CONSULTATION REPORT

PREPARED FOR: NEW BEDFORD HARBOR DEVELOPMENT COMMISSION FLOATING DOCK CONDITION ASSESSMENT REPORT PORT OF NEW BEDFORD POPE S ISLAND MARINA

1 layer of untreated timber running planks, 254 mm x 89 mm.

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 3 - MORRISON COUNTY

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

No structural deficiencies were observed to the west exterior elevation.

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS NO. 119 OVER THE RED LAKE RIVER DISTRICT 2 - POLK COUNTY, CITY OF EAST GRAND FORKS

UNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY, CITY OF MOORHEAD

SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit

Evaluation and Repair of Existing Post- Tensioned Buildings with Paper Wrapped Tendons Experiencing Corrosion Damage

Seismic Analysis and Design of Berth 14 Extension Balboa, Panama. Way, WA ; PH (206) ;

Appendix H. Proposed Shoreline Improvements

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CR 958 OVER A STREAM ST. LOUIS COUNTY

EXPERIMENTAL RESULTS

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO TRUNK HIGHWAY NO. 3 rd Avenue/Central Avenue OVER THE MISSISSIPPI RIVER

Ontario Structure Inspection Manual Inspection Form Structure Number: 12

Bijan Khaleghi, Ph, D. P.E., S.E.

SECTION 415 REINFORCING FOR CONCRETE

!"#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11

ST7008 PRESTRESSED CONCRETE


Superstructure Guidelines

MEMORANDUM. From: Moffatt & Nichol. Date: April 3, Subj: Wharf J-10 Evaluation of Structure for EIR Document. M&N File No:

Special Provision No. 999S28 June 2010 CONSTRUCTION SPECIFICATION FOR PRECAST PANELS FOR USE AS STAY-IN-PLACE DECK FORMS

EAST ¼ LINE BRIDGE, CONCESSION 2

Progressive Erection Applied to Box Girder with Strutted Wing Slab

NORWICH ROAD BRIDGE. Site Number D00016 NORWICH ROAD, DELHI. 1.0 km N of King Street Delhi

The bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge.

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company

A STRUCTURAL ASSESSMENT STUDY ON THE SUSTAINABILITY OF SULTAN ISKANDAR BRIDGE KUALA KANGSAR PERAK MALAYSIA

UNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY

Bridge Asset Management City of Battle Creek Planning and Projects

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

REPAIR AND CATHODIC PROTECTION OF SUBURBAN CONCRETE BRIDGES

PONTIS BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES

Presented by: Taya Retterer BRG Webinar July 30, 2012

STRUCTURAL ASSESSMENT OBSERVATION REPORT

SOUTH MEDFORD INTERCHANGE BRIDGES

TALBOT STREET BRIDGE

US 278 East Bound and West Bound. MacKay Creek and Skull Creek. Cursory Above Water and Underwater Investigation Of. Over

WCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS

RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES

Appendix A. Sample Inspection Report

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE

ADDENDUM NUMBER 3 AUGUST 18, Jackson County Utility Authority Project No Pascagoula/Moss Point WWTP Escatawpa WWTP Repairs

VENISON CREEK BRIDGE

National Roads Authority

SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket

AGENDA PRE-BID CONFERENCE

SIAMA. SIAMA Asset Management Technologies Level-2 Bridge Condition Inspection

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 7 WATONWAN COUNTY

BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant

Alberta Transportation Bridge Inspection & Maintenance System (Web 2005) W-2 Bridge. Bridge Inspection Form Type Lot No. 2

Concrete Parking Garage Degradation

3.4.2 DESIGN CONSIDERATIONS

Pile Driving Inspector Course

November 30, University of Virginia Facilities Management Engineering & Design Division P.O. Box Charlottesville, VA

Galvanic Cathodic Protection of Concrete Structures. David Whitmore, P.Eng., FCSCE Vector Corrosion Technologies

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

Louisiana Transportation Research Center Seminar Series Bridge Structures

Mr. Eric Ryffel, Manager October 5, 2015 Sanibel Beach Club 626 Nerita Street Sanibel Island, Florida 33957

Chapter 2 Notation and Terminology

Attachment G. Matrix of Parameters for Force Calculations Comparison

BRIDGE NO Inspection Type: Routine and Special STONINGTON STILLMAN AVENUE over PAWCATUCK RIVER

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS

LOT 4 CONCESSION 11-12, N. WALSINGHAM

SPECIFICATIONS FOR INSTALLATION OF PRECAST PRESTRESSED CONCRETE DECK PANELS

EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS)

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams

AS The External Waterproofing Membranes Standard

STRUCTURE AND BRIDGE DIVISION

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 5 (FRANKLIN AVENUE) OVER THE MISSISSIPPI RIVER HENNEPIN COUNTY

Transcription:

APPENDIXB PHOTOGRAPHS B - 1

Photo B-1: Overall view of Pier 40, looking southeast. Photo B-2: Overall view of the Finger Pier Extension with one-story shed, looking southeast. B-2

Photo B-3: View of typical Pier Shed substructure, looking north at Bent F-bar. Photo B-4: Typical Court Yard substructure. Note water seeping through deck planks at icicle location. B-3

Photo B-5: View of typical Finger Pier Extension substructure, looking south at the southern edge beam of the pier. Photo B-6: View of north side of Pier 40 looking southwest. Note Hornblower vessels berthed at the northwest corner of the pier. B-4

Photo B-7: View of north side of Pier 40 looking southeast. Note the timber fender system along the edge beam and additional floating fenders. Photo B-8: View of timber fender pile cluster located at the northwest corner of the Pier Shed. Note steel fender piles with full coverage coating loss. B-5

Photo B-9: Typical concrete encasement at the top of a steel H-pilc in Bent F-bar (foreground) and typical epoxy coating at top of steel H-pile in Bent F-bar (background). Photo B-10: Close-up of typical concrete encasement at the top of a steel H-pile at Bent S Pile Row4.7. 8-6

Photo B-11: Typical C-channel pile repair bolted to the flanges of H-pile I-bar 9-bar, view looking west. Note the depleted anodes attached to each side of the H-pile. Photo B-12: Typical C-channel pile repair bolted to the flanges of H-pile I-bar 9-bar, view looking south. B-7

Photo B-13: Typical condition of bolts at the C-channel repairs. Photo at H-pile location T 18.75 in the Pier Shed. Photo B-14: Typical rust staining and delamination of epoxy coating at Bent Q.25, Pile Row l 6S. Note,corrosion of the H-pile flange has caused a large crack in the concrete pile cap. B-8

Photo B-15: Typical rust staining and delamination of epoxy coating at Bent R.75, Pile Row 13- bar. Note, corrosion of the flange has caused a large spall in the concrete pile cap. Photo B-16: Typical condition of the flange of a H-pile graded Minor. H-pile location at Bent S bar and Pile Row 19. B-9

Photo B-17: Typical condition of the flange edge of a H-pile graded Minor. H-pile location at Bent S-bar and Pile Row 19. Photo B-18: Typical condition of the flange edge ofa H-pile graded Moderate. H-pile location at Bent T and Pile Row 21. B-10

Photo B-19: Typical condition of the flange edge and flange face of a H-pile graded Major. H pile location is the center-west H-pile of the pile cluster at Bent L and Pile Row 19. Photo B-20: Typical condition of the flange edge of a H-pile graded Major. H-pile location is the center-west H-pile of the pile cluster at Bent L and Pile Row 19. B- 11

Photo B-21: Typical condition of the flange edge of a H-pile graded Severe. H-pilc location at Bent K-bar and Pile Row 16-bar South. Photo B-22: Typical condition of the flange face of a H-pile graded Severe. H-pile location at Bent K-bar and Pile Row 16-bar South. B-12

Photo B-23: Interface between Pier Shed and Court Yard. Note the difference in exposed pile length. Photo B-24: Typical condition of concrete pile cap in the Court Yard. View looking west at Bent I-bar, Pile Row 9-bar. B-13

Photo B-25: Typical condition of concrete beam in the Court Yard with efflorescence and light cracking. View looking west at Bent I-bar, between Pile Row 9 and 9-bar. Photo B-26: Typical condition of concrete beam in the Pier Shed with light cracking and light rust staining. View looking north at Bent C, between Pile Row 17 and l 7.3. B-14

Photo B-27: Concrete beam in th~ Pi~r Sh~<l with a full length spall and exposed reinforcement. View looking west at Bent T.5 and Pile Row 8-bar. Photo B-28: Concrete beam in the Pier Shed with a full length spall and exposed reinforcement. View looking west at Bent D-bar between Pile Row 8.5 and 8-bar. B-15

Photo B-29: Concrete closure wall with large vertical crack and deflection View looking north at Pile Row 7-bar between Bent I and I-bar. Photo B-30: Concrete closeure wall with large vertical crack and deflection View looking east at Pile Row 7-bar between Bent I and I-bar. B-16

Photo B-31 : Erosion up to I in. deep and exposed reinforcing along the full height of the western edge beam between Pile Rows 7 and 8-bar. Photo B-32: Rust staining and delamination of the soffit of the first transverse beam north of Bent W at the Finger Pier Extension. B- 17

Photo B-33: Typical condition of Court Yard deck soffit with light shrinkage cracks. View looking west between Bent I and I-bar at Pile Row 9-bar. Photo B-34: Typical condition of Pier Shed deck soffit with light eftloresense and light shrinkage cracks. Also note the spall in the deck plank with exposed strands. B-18

Photo B-35: Large spall at Pier Shed deck soffit with exposed reinforcement. View looking north between Bents A and B at Pile Row 3. Photo B-36: Precast deck plank located east of Pile 9 in Bent F with multiple exposed and broken prestressed strands. B-19

Photo B-37: Spall along the north cap of the Finger Pier Extension between Bent Zand Bent Z.2. View looking north. Photo 8-38: Spall along the deck soffit of the Finger Pier Extension between Bent X. 7 and Bent Y adjacent to the north cap. View looking north. B-20

Photo B-39: Fender syslem along Lhe norlh side of Lht: Pit:r. Note the two steel fender piles located north of the timber fender system. Photo B-40: Pile cluster at the north corner of the Finger Pier Extension. Note the severe damage at the MLW elevation and the loose wire rope wraps at the top of the cluster. B-21

Photo B-41: Close-up of broken piles in the fender pile cluster at the north corner of the Finger Pier Extension. B-22